CN203740865U - Lifting fork for loading and unloading of building materials - Google Patents

Lifting fork for loading and unloading of building materials Download PDF

Info

Publication number
CN203740865U
CN203740865U CN201420076777.1U CN201420076777U CN203740865U CN 203740865 U CN203740865 U CN 203740865U CN 201420076777 U CN201420076777 U CN 201420076777U CN 203740865 U CN203740865 U CN 203740865U
Authority
CN
China
Prior art keywords
fork
jibs
longitudinal
transverse
building materials
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201420076777.1U
Other languages
Chinese (zh)
Inventor
陆玉权
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201420076777.1U priority Critical patent/CN203740865U/en
Application granted granted Critical
Publication of CN203740865U publication Critical patent/CN203740865U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Abstract

The utility model discloses a lifting fork for the loading and unloading of building materials. The lifting fork is characterized by comprising two longitudinal jibs, wherein the upper ends of the two longitudinal jibs are respectively connected with two transverse jibs, the two transverse jibs are connected by a transverse boom, the middle part of the transverse boom is provided with a hook, and the lower parts of the two longitudinal jibs are respectively detachably connected with two inserting forks; the transverse jibs are provided with multiple dip angle adjustment holes which are connected, and the two ends of the transverse boom are respectively inserted into the dip angle adjustment holes of the two transverse jibs so as to connect with the transverse jibs; the longitudinal jibs are connected with the inserting forks through a lock catch, the lock catch comprises bent lock tongues and reversed buckles, the bent lock tongues are arranged at the lower parts of the longitudinal jibs, and the reversed buckles are arranged at the side parts of the inserting forks; the lifting fork is provided with a reinforcing rib connected with the two longitudinal jibs; the two inserting forks are connected through a transverse connecting rod. By using the lifting fork, an effect of time and labor saving is achieved in the processes of loading and unloading; the lifting fork is small in labor intensity and high in handling efficiency.

Description

Fork is hung in a kind of building materials handling
Technical field
The utility model relates to a kind of hanging device, and specifically fork is hung in a kind of handling of the building materials for solid kind.
Background technology
At present, solid building material is if the handling labor of the good brick of code is normally with manually completing, first by manually fragment of brick being placed in hanging basket, by crane handling to destination, then by manually that fragment of brick is good from code fetch in hanging basket.This mode fragment of brick is at random in the time putting into and take out hanging basket, the good fragment of brick of code cannot be shifted by the gross, and workman is wasted time and energy in the time of handling, and labour intensity is large, handling efficiency is low.
Utility model content
The purpose of this utility model is for the deficiencies in the prior art, and provide a kind of and use manpower and material resources sparingly, building materials handling that handling efficiency is higher hang fork.
The purpose of this utility model is to realize by following technical scheme:
Fork is hung in a kind of building materials handling, comprise two longitudinal booms, the upper end of two longitudinal booms is connected with two horizontal arms respectively, and two horizontal arms connect by horizontal hanger rod, the middle part of horizontal hanger rod is provided with suspension hook, and the bottom of two longitudinal booms is removably connected with two plug in forks respectively.
Described horizontal arm is provided with multiple connected tilt adjustment holes, and the two ends of horizontal hanger rod are inserted respectively in the tilt adjustment hole of two horizontal arms with horizontal arm and are connected.
Described longitudinal boom is connected by snap close with plug in fork, and snap close comprises elbow dead bolt and back-off, and elbow dead bolt is arranged on the bottom of longitudinal boom, and back-off is arranged on the sidepiece of plugging in fork.
Being provided with reinforced rib is connected with two longitudinal booms.
Plugging in fork for two connects by transverse link.
When use, plug in fork separated before this with longitudinal boom, first inserted a yard good fragment of brick bottom by plugging in fork, will plug in fork and fix with longitudinal boom, then adjust the position of horizontal hanger rod in tilt adjustment hole according to the weight of fragment of brick and position, adjust the equilibrium point that hangs fork,, behind destination, take out and plug in fork by crane handling, the good fragment of brick of code completes by the gross and shifts, without again piling up, time saving and energy saving when workman loads and unloads, labour intensity is little, handling efficiency is higher again.
The utility model is except the handling applicable to the good fragment of brick of code, and originally hanging fork can support the use with multiple lifting overhead hoist, is also applicable to the handling handling of the building materials of the solid kinds such as timber, stone material, metallic material, adapts to face width.
Brief description of the drawings
Fig. 1 is the structural representation of the utility model embodiment;
Fig. 2 is the construction profile schematic diagram of Fig. 1;
Fig. 3 is the another kind of structural representation of embodiment.
In figure, 1. horizontal arm 3. horizontal hanger rod 4. suspension hooks 5. of longitudinal boom 2. are plugged in fork 6. tilt adjustment hole 7. snap close 8. elbow dead bolt 9. back-off 10. reinforced rib 11. transverse links.
Detailed description of the invention
Below in conjunction with drawings and Examples, the utility model content is further elaborated, but is not to restriction of the present utility model.
Embodiment:
With reference to Fig. 1 Fig. 2, fork is hung in a kind of building materials handling, comprise two longitudinal booms 1, article two, the upper end of longitudinal boom 1 is connected with two horizontal arms 2 respectively, article two, horizontal arm 2 connects by horizontal hanger rod 3, the bottom that the middle part of horizontal hanger rod 3 is provided with 4, two longitudinal booms 1 of suspension hook is removably connected with two plug in forks 5 respectively.Two longitudinal booms 1 are set, and to make to hang the stationarity of fork better.
Described horizontal arm 2 is provided with multiple connected tilt adjustment holes 6, and the two ends of horizontal hanger rod 3 are inserted respectively in the tilt adjustment hole 6 of two horizontal arms 2 with horizontal arm 2 and are connected.
Described longitudinal boom 1 is connected by snap close 7 with plug in fork 5.
Figure 3 shows that the snap close of another kind of structure, comprise elbow dead bolt 8 and back-off 9, elbow dead bolt 8 is arranged on the bottom of longitudinal boom 1, and back-off 9 is arranged on the sidepiece of plugging in fork 5.
Be provided with reinforced rib 10 and be connected with two longitudinal booms 1, indeformable to keep hanging the global shape of fork.
Two plug in forks 5 connect by transverse link 11, make the bottom of plugging in fork 5 have supporting mass, and handling goods is more steady, and the while also facilitates with rope and will be bound with plugging in fork by handling thing, avoid handling process to be fallen by handling thing.
When use, plug in fork 5 separated before this with longitudinal boom 1, first insert by plugging in fork 5 the fragment of brick bottom that code is good, to plug in fork 5 and fix with longitudinal boom 1, then adjust the position of horizontal hanger rod 3 in tilt adjustment hole 6 according to the weight of fragment of brick and position, adjust the equilibrium point that hangs fork, by crane handling behind destination, take out and plug in fork 5, the good fragment of brick of code completes by the gross and shifts, without again piling up again.

Claims (5)

1. fork is hung in building materials handling, it is characterized in that: comprise two longitudinal booms, article two, the upper end of longitudinal boom is connected with two horizontal arms respectively, article two, horizontal arm connects by horizontal hanger rod, the middle part of horizontal hanger rod is provided with suspension hook, and the bottom of two longitudinal booms is removably connected with two plug in forks respectively.
2. fork is hung in building materials according to claim 1 handling, it is characterized in that: described horizontal arm is provided with multiple connected tilt adjustment holes, and the two ends of horizontal hanger rod are inserted respectively in the tilt adjustment hole of two horizontal arms and are connected with horizontal arm.
3. fork is hung in building materials handling according to claim 1, it is characterized in that: described longitudinal boom is connected by snap close with plug in fork, and snap close comprises elbow dead bolt and back-off, and elbow dead bolt is arranged on the bottom of longitudinal boom, and back-off is arranged on the sidepiece of plugging in fork.
4. fork is hung in building materials handling according to claim 1, it is characterized in that: be provided with reinforced rib and be connected with two longitudinal booms.
5. fork is hung in building materials handling according to claim 1, it is characterized in that: plug in fork for two and connect by transverse link.
CN201420076777.1U 2014-02-24 2014-02-24 Lifting fork for loading and unloading of building materials Expired - Fee Related CN203740865U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201420076777.1U CN203740865U (en) 2014-02-24 2014-02-24 Lifting fork for loading and unloading of building materials

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201420076777.1U CN203740865U (en) 2014-02-24 2014-02-24 Lifting fork for loading and unloading of building materials

Publications (1)

Publication Number Publication Date
CN203740865U true CN203740865U (en) 2014-07-30

Family

ID=51340693

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201420076777.1U Expired - Fee Related CN203740865U (en) 2014-02-24 2014-02-24 Lifting fork for loading and unloading of building materials

Country Status (1)

Country Link
CN (1) CN203740865U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103879880A (en) * 2014-02-24 2014-06-25 陆玉权 Building material loading and unloading hanging fork

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103879880A (en) * 2014-02-24 2014-06-25 陆玉权 Building material loading and unloading hanging fork
CN103879880B (en) * 2014-02-24 2017-05-24 广西建工集团联合建设有限公司 Building material loading and unloading hanging fork

Similar Documents

Publication Publication Date Title
CN204624992U (en) A kind of portable suspension bracket peculiar to vessel
CN109095343A (en) Assembled hanger
CN203740865U (en) Lifting fork for loading and unloading of building materials
CN103395689A (en) Horizontal hoisting clamp for wallboard
CN103879880A (en) Building material loading and unloading hanging fork
CN206680061U (en) A kind of gravity type board suspending frame
CN205132903U (en) Steel wire slings
CN204434070U (en) Hanging apparatus
CN203528519U (en) Steel bar conveying pushing frame
CN102847635B (en) Steel rim coating hanger
CN205170159U (en) Can hang hoist that hangs in overhead traveling crane
CN202897816U (en) Steel bar lifting hook
CN209306818U (en) Cargo hoisting frame
CN203754232U (en) Simple steel rail lifting tool
CN203511699U (en) Customized trolley for delivering rectangular weight
CN208948679U (en) Assembled hanger
CN205662225U (en) Become a bundle semitrailer pterygoid lamina special lifting device
CN203833462U (en) Crane lifting tool of steel plate
CN205472231U (en) Gallows is transported to aluminium bar
CN208378198U (en) A kind of filler support special hanger
CN202657831U (en) Wire rod lifting device
KR100797415B1 (en) Hook for carrying and installing utility pole under-bracing
CN203345920U (en) Multifunctional lifting hook
CN211310542U (en) Transport fertilizer with supplementary hoist of driving a vehicle
CN205531273U (en) A hanging flower basket for building engineering

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20140730

Termination date: 20160224

CF01 Termination of patent right due to non-payment of annual fee