CN104732033A - 一种电力系统机电暂态过程的仿真分析方法 - Google Patents
一种电力系统机电暂态过程的仿真分析方法 Download PDFInfo
- Publication number
- CN104732033A CN104732033A CN201510146768.4A CN201510146768A CN104732033A CN 104732033 A CN104732033 A CN 104732033A CN 201510146768 A CN201510146768 A CN 201510146768A CN 104732033 A CN104732033 A CN 104732033A
- Authority
- CN
- China
- Prior art keywords
- equation
- network
- generator
- electric
- transient
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02T—CLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO TRANSPORTATION
- Y02T10/00—Road transport of goods or passengers
- Y02T10/80—Technologies aiming to reduce greenhouse gasses emissions common to all road transportation technologies
- Y02T10/82—Elements for improving aerodynamics
Landscapes
- Supply And Distribution Of Alternating Current (AREA)
Abstract
一种电力系统机电暂态过程的仿真分析方法,通过对于电力系统的机电暂态的系统模型建立,网络分割以及微分代数方程组的求解来对电力系统的机电暂态进行仿真,并按照仿真流程进行仿真计算,通过仿真建模对电力系统的几点暂态进行分析,从而保障电力系统稳定性与安全性。
Description
技术领域
本发明涉及电力系统的暂态稳定性分析技术领域,具体的是,一种电力系统机电暂态过程的仿真分析方法。
背景技术
由于各区域电网间的地域跨度大,电网结构复杂,负荷特征差异大,系统运行方式变化大,区域电网的互联扩大也导致了电力系统复杂程度的迅速增加,大大增加了发生系统性事故甚至大面积停电事故的几率,大面积停电事故的发生将给社会生产和人民生活带来巨大伤害,造成巨大经济损失。电力系统的系统设计、规划、运行和调度都应该充分考虑系统在突然受到大扰动后的运行稳定性。电力系统的机电暂态仿真是分析系统的动态性能及其运行稳定性的有效工具,在电力系统的系统设计、规划、运行和调度等方面有广泛的应用。在当前电力系统的设计和规划中,广泛采用了FACTS元件、继电保护装置等自动化控制设备。这些设备和装置均属于动态元件,其作用及对电网的影响需要首先通过机电暂态和电磁暂态仿真试验加以验证后,才能投入实际系统使用。机电暂态仿真还可以模拟实际电力系统运行,因而可用于培训调度及运行技术人员,帮助熟悉系统特性和运行规律;可进行输电线短路、断路及发电机断开等大扰动故障及处理的模拟和仿真,从而进行联合反事故演习,一方面有利于发现系统弊端、防范于未然,另一方面实现事故处理预演,有利于发掘更好的事故处理方案,并提高系统操作人员的事故应变能力。
发明内容
本发明提出了一种电力系统机电暂态过程的仿真分析方法,机电暂态过程的仿真,主要研究电力系统受到扰动后的动态行为和保持同步运行的能力,分析系统的暂态稳定性能和静态稳定性能。其中,暂态稳定是指电力系统在某个运行情况下,突然受到大的干扰后,诸如短路故障,切除线路、发电机、负荷,发电机失去励磁或者冲击性负荷等大扰动作用下,研究电力系统能否经过暂态过程达到新的稳态运行状态或者恢复到原来的状态。静态稳定则是指电力系统受到小干扰后,不发生自发振荡或非周期性失步,自动恢复到初始运行状态的能力。
电力系统机电暂态过程的仿真分析方法包括:
1.机电暂态仿真建模
(1)全系统模型构成
电力系统基本上由发电机及励磁原动机及调速器、网络、负荷及其它控制装置等动态元件所组成。系统中的所有动态元件是相互独立的,是电力网络将它们联系在一起。
全系统模型在数学上可以统一描述成如下一般形式的微分代数方程组:
其中,x表示微分方程中描述系统动态特性的状态变量;V表示代数方程组中系统的运行参量。整个系统模型包括了大量常微分方程组和大量稀疏代数方程组。因此暂态稳定分析是一个微分代数初值问题。
(2)微分方程组式(1)主要包括:
1)描述各同步发电机暂态和次暂态电势变化规律的微分方程;
2)描述各同步发电机转子运动的摇摆方程;
3)描述同步发电机组中励磁调节系统动态特性的微分方程;
4)描述同步发电机组中原动机及调速系统动态特性的微分方程;
5)描述各感应电动机和同步电动机负荷动态特性的微分方程;
6)描述直流系统整流器和逆变器控制行为的微分方程;
7)描述其它动态装置(如SVC、TCSC等FACTS元件)动态特性的微分方程。
(3)代数方程组式(2)主要包括:
1)电力网络方程,描述在公共参考系X—Y下节点电压与节点注入电流之间的关系;
2)各同步发电机定子电压方程(建立在各自的d—g坐标系下)及d—q坐标系与x—Y坐标系间联系的坐标变换方程;
3)各直流线路的电压方程;
4)负荷的电压静态特性方程等。
(4)网络分割
一个电力系统可以被视为由多个子网组成子网间由联络线互相连接联络线与子网的联接母线被称之为边界点按处理器数目把网络分割为多个子网是最常用的并行化方法为提高并行计算的效率网络分割要满足以下要求:
1边界点的数目要尽量少它和处理器之间的数据交换量直接相关;
2每个处理器的计算量要大体相等;
3由于网络新增的注入元要尽量少。
(5)求解微分代数方程
微分代数方程组中的差分方程和网络方程可以使用以下紧凑形式表示
式中,;式f=0和g=0分别与式(1)和式(2)对应.假设已知,第k次迭代中待解的代数方程具有以下形式
式中 是残差矢量,是位移矢量,是雅可比矩阵。
为了在时间上并行求解在一个具有ns个连续步长的积分窗中展开式(4),如下式所示
2.机电暂态计算仿真流程
机电暂态计算仿真过程如下:
1.输入原始数据,主要包括系统的元件模型、参数、网络拓扑信息和稳定分析的要求(发电机模型的阶数)、潮流计算和暂态稳定计算需要的数据(线路参数、发电机参数等,线路两端节点号或名称等)、仿真步长以及仿真总时间等。调速励磁控制系统都不放在机电暂态程序里面,而放在外部利用RTDS下的数据通信进行数据交换;
2.根据输入的参数信息进行潮流计算,得到各节点的电压、相角以及全网的潮流分布信息。根据网络元件参数及网络拓扑关系形成节点导纳矩阵。将发电机内部暂态导纳和负荷中恒定导纳部分等值并入系统的导纳矩阵中。这一步主要是形成网络暂态稳定计算所需的所有变量初始值,为暂态计算做准备;
3.暂态计算开始时,通过标志位Flag判断出先进行发电机状态量的求解。Flag有0、l、2三个取值,当标志位为O时,表示新的一次暂态计算开始,各标志位和中断位初始化,为新的计算开始做准备;当标志位为l时,求解发电机暂态方程;标志位为2时,表示发电机方程解已完成,可以开始网络方程求解。
具体流程如下:
(1)标志位Flag为1,求解发电机的暂态方程——微分方程组,当发电机数目较多时,可以设置每一步求解n台发电机,分若干步求解完毕;
(2)Flag变为2,求解网络方程组。网络方程组的求解采用因子表分解的方法,具体求解中必然有循环或多重循环部分,可以在一个步长内完成m个循环的计算,分若干步完成;
(3)当系统网络求解完毕,标志位Flag回到0,表示全网络求解(包括微分方程组合代数方程组)完成了一次,将所有控制变量和计算量初始化,Flag为l,为下一时步的计算做好准备;
(4)重复以上步骤。采用时域仿真方法进行岛到到时步的计算,求取时刻系统的状态量和代数量。代数方程组和微分方程求解完成后等待数据交换信号;
通过对于电力系统的机电暂态的系统模型建立,网络分割以及微分代数方程组的求解来对电力系统的机电暂态进行仿真,并按照仿真流程进行仿真计算,通过仿真建模对电力系统的几点暂态进行分析,从而保障电力系统稳定性与安全性。
附图说明
图1为电力系统等值结构图
图2为仿真分析计算流程图。
具体实施方式
电力系统机电暂态过程的仿真分析方法包括:
1.机电暂态仿真建模
(1)全系统模型构成
电力系统基本上由发电机及励磁原动机及调速器、网络、负荷及其它控制装置等动态元件所组成。系统中的所有动态元件是相互独立的,是电力网络将它们联系在一起。
全系统模型在数学上可以统一描述成如下一般形式的微分代数方程组:
其中,x表示微分方程中描述系统动态特性的状态变量;V表示代数方程组中系统的运行参量。整个系统模型包括了大量常微分方程组和大量稀疏代数方程组。因此暂态稳定分析是一个微分代数初值问题。
(2)微分方程组式(1)主要包括:
1)描述各同步发电机暂态和次暂态电势变化规律的微分方程;
2)描述各同步发电机转子运动的摇摆方程;
3)描述同步发电机组中励磁调节系统动态特性的微分方程;
4)描述同步发电机组中原动机及调速系统动态特性的微分方程;
5)描述各感应电动机和同步电动机负荷动态特性的微分方程;
6)描述直流系统整流器和逆变器控制行为的微分方程;
7)描述其它动态装置(如SVC、TCSC等FACTS元件)动态特性的微分方
程。
(3)代数方程组式(2)主要包括:
1)电力网络方程,描述在公共参考系X—Y下节点电压与节点注入电流之间的关系;
2)各同步发电机定子电压方程(建立在各自的d—g坐标系下)及d—q坐标系与x—Y坐标系间联系的坐标变换方程;
3)各直流线路的电压方程;
4)负荷的电压静态特性方程等。
(4)网络分割
一个电力系统可以被视为由多个子网组成子网间由联络线互相连接联络线与子网的联接母线被称之为边界点按处理器数目把网络分割为多个子网是最常用的并行化方法为提高并行计算的效率网络分割要满足以下要求
1边界点的数目要尽量少它和处理器之间的数据交换量直接相关;
2每个处理器的计算量要大体相等
3由于网络新增的注入元要尽量少
(5)求解微分代数方程
微分代数方程组中的差分方程和网络方程可以使用以下紧凑形式表示
式中,;式f=0和g=0分别与式(1)和式(2)对应.假设已知,第k次迭代中待解的代数方程具有以下形式
式中 是残差矢量,是位移矢量,是雅可比矩阵。
为了在时间上并行求解在一个具有ns个连续步长的积分窗中展开式(4),如下式所示
2.机电暂态计算仿真流程
机电暂态计算仿真过程如下
1.输入原始数据,主要包括系统的元件模型、参数、网络拓扑信息和稳定分析的要求(发电机模型的阶数)、潮流计算和暂态稳定计算需要的数据(线路参数、发电机参数等,线路两端节点号或名称等)、仿真步长以及仿真总时间等。调速励磁控制系统都不放在机电暂态程序里面,而放在外部利用RTDS下的数据通信进行数据交换;
2.根据输入的参数信息进行潮流计算,得到各节点的电压、相角以及全网的潮流分布信息。根据网络元件参数及网络拓扑关系形成节点导纳矩阵。将发电机内部暂态导纳和负荷中恒定导纳部分等值并入系统的导纳矩阵中。这一步主要是形成网络暂态稳定计算所需的所有变量初始值,为暂态计算做准备;
3.暂态计算开始时,通过标志位Flag判断出先进行发电机状态量的求解。Flag有0、l、2三个取值,当标志位为O时,表示新的一次暂态计算开始,各标志位和中断位初始化,为新的计算开始做准备;当标志位为l时,求解发电机暂态方程;标志位为2时,表示发电机方程解已完成,可以开始网络方程求解。
具体流程如下:
(1)标志位Flag为1,求解发电机的暂态方程——微分方程组,当发电机数目较多时,可以设置每一步求解n台发电机,分若干步求解完毕;
(2)Flag变为2,求解网络方程组。网络方程组的求解采用因子表分解的方法,具体求解中必然有循环或多重循环部分,可以在一个步长内完成m个循环的计算,分若干步完成;
(3)当系统网络求解完毕,标志位Flag回到0,表示全网络求解(包括微分方程组合代数方程组)完成了一次,将所有控制变量和计算量初始化,Flag为l,为下一时步的计算做好准备;
(4)重复以上步骤。采用时域仿真方法进行岛到到时步的计算,求取时刻系统的状态量和代数量。代数方程组和微分方程求解完成后等待数据交换信号;
通过对于电力系统的机电暂态的系统模型建立,网络分割以及微分代数方程组的求解来对电力系统的机电暂态进行仿真,并按照仿真流程进行仿真计算,通过仿真建模对电力系统的几点暂态进行分析,从而保障电力系统稳定性与安全性。
Claims (6)
1.一种电力系统机电暂态过程的仿真分析方法,其特征在于,所述电力系统由发电机及励磁原动机及调速器、网络、负荷及其它控制装置所组成。
2.如权利要求1所述的一种电力系统机电暂态过程的仿真分析方法,其特征在于,全系统模型在数学上表示为微分代数方程组:
其中,x表示微分方程中描述系统动态特性的状态变量;V表示代数方程组中系统的运行参量。
3.如权利要求2所述的一种电力系统机电暂态过程的仿真分析方法,其特征在于,微分方程组式(1)主要包括:
1)描述各同步发电机暂态和次暂态电势变化规律的微分方程;
2)描述各同步发电机转子运动的摇摆方程;
3)描述同步发电机组中励磁调节系统动态特性的微分方程;
4)描述同步发电机组中原动机及调速系统动态特性的微分方程;
5)描述各感应电动机和同步电动机负荷动态特性的微分方程;
6)描述直流系统整流器和逆变器控制行为的微分方程;
7)描述其它动态装置动态特性的微分方程,
(3)代数方程组式(2)主要包括:
1)电力网络方程,描述在公共参考系X—Y下节点电压与节点注入电流之间的关系;
2)各同步发电机定子电压方程及d—q坐标系与x—Y坐标系间联系的坐标变换方程;
3)各直流线路的电压方程;
4)负荷的电压静态特性方程。
4.如权利要求3所述的一种电力系统机电暂态过程的仿真分析方法,其特征在于,网络分割要满足以下要求:
1边界点的数目要尽量少它和处理器之间的数据交换量直接相关;
2每个处理器的计算量要大体相等;
3由于网络新增的注入元要尽量少。
5.如权利要求4所述的一种电力系统机电暂态过程的仿真分析方法,其特征在于,微分代数方程组中的差分方程和网络方程表示为
式中,;式f=0和g=0分别与式(1)和式(2)对应.假设已知,第k次迭代中待解的代数方程具有以下形式
式中 是残差矢量,是位移矢量,是雅可比矩阵,
为了在时间上并行求解在一个具有ns个连续步长的积分窗中展开式(4),如下式所示
。
6.如权利要求5所述的一种电力系统机电暂态过程的仿真分析方法,其特征在于,机电暂态计算仿真过程如下:
1.输入原始数据,包括系统的元件模型、参数、网络拓扑信息和稳定分析的要求、潮流计算和暂态稳定计算需要的数据、仿真步长以及仿真总时间,调速励磁控制系统都不放在机电暂态程序里面,而放在外部利用RTDS下的数据通信进行数据交换;
2.根据输入的参数信息进行潮流计算,得到各节点的电压、相角以及全网的潮流分布信息,根据网络元件参数及网络拓扑关系形成节点导纳矩阵,将发电机内部暂态导纳和负荷中恒定导纳部分等值并入系统的导纳矩阵中,形成网络暂态稳定计算所需的所有变量初始值;
3.暂态计算开始时,通过标志位Flag判断出先进行发电机状态量的求解,Flag有0、l、2三个取值,当标志位为O时,表示新的一次暂态计算开始,各标志位和中断位初始化,为新的计算开始做准备;当标志位为l时,求解发电机暂态方程;标志位为2时,表示发电机方程解已完成,开始网络方程求解,
具体流程如下:
(1)标志位Flag为1,求解发电机的暂态方程—微分方程组,当发电机数目较多时,可以设置每一步求解n台发电机,分若干步求解完毕;
(2)Flag变为2,求解网络方程组,网络方程组的求解采用因子表分解的方法,具体求解中必然有循环或多重循环部分,可以在一个步长内完成m个循环的计算,分若干步完成;
(3)当系统网络求解完毕,标志位Flag回到0,表示全网络求解完成了一次,将所有控制变量和计算量初始化,Flag为l,为下一时步的计算做好准备;
(4)重复以上步骤,采用时域仿真方法进行到到时步的计算,求取时刻系统的状态量和代数量,代数方程组和微分方程求解完成后等待数据交换信号。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510146768.4A CN104732033A (zh) | 2015-03-31 | 2015-03-31 | 一种电力系统机电暂态过程的仿真分析方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510146768.4A CN104732033A (zh) | 2015-03-31 | 2015-03-31 | 一种电力系统机电暂态过程的仿真分析方法 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN104732033A true CN104732033A (zh) | 2015-06-24 |
Family
ID=53455915
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201510146768.4A Pending CN104732033A (zh) | 2015-03-31 | 2015-03-31 | 一种电力系统机电暂态过程的仿真分析方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN104732033A (zh) |
Cited By (13)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105954629A (zh) * | 2016-06-24 | 2016-09-21 | 青岛大学 | 一种六相整流发电机整流桥工作过程的分析方法 |
CN106026083A (zh) * | 2016-06-27 | 2016-10-12 | 吉林大学 | 一种基于matlab的电网暂态稳定分析方法 |
CN107132772A (zh) * | 2017-04-21 | 2017-09-05 | 南方电网科学研究院有限责任公司 | 交直流电网的实时仿真系统及方法 |
CN107291981A (zh) * | 2017-05-17 | 2017-10-24 | 国网北京市电力公司 | 输电线路的仿真方法和装置 |
CN107592044A (zh) * | 2017-09-20 | 2018-01-16 | 四川理工学院 | 一种pscad自定义发电机控制器的初始化方法 |
CN108241782A (zh) * | 2018-01-04 | 2018-07-03 | 清华大学 | 一种混合暂态分析方法及混合暂态分析系统 |
CN109815607A (zh) * | 2019-01-31 | 2019-05-28 | 上海交通大学 | 面向大规模交流电网基于时频坐标变换的全电磁暂态仿真方法 |
CN110619162A (zh) * | 2019-09-03 | 2019-12-27 | 中国航空工业集团公司沈阳飞机设计研究所 | 一种联合仿真平台稳定性分析方法及设备 |
CN111709107A (zh) * | 2020-06-16 | 2020-09-25 | 全球能源互联网研究院有限公司 | 一种含大规模电力电子设备的电力网络仿真方法及系统 |
CN111709155A (zh) * | 2020-07-21 | 2020-09-25 | 国网宁夏电力有限公司 | 一种基于混合单调特性的电力系统机电暂态特性分析方法 |
CN113221298A (zh) * | 2021-04-21 | 2021-08-06 | 南方电网科学研究院有限责任公司 | 一种机电暂态过程的仿真方法及系统 |
CN113515827A (zh) * | 2021-04-21 | 2021-10-19 | 南方电网科学研究院有限责任公司 | 一种电力系统全过程动态仿真方法及系统 |
CN116722563A (zh) * | 2023-05-30 | 2023-09-08 | 杭州盛星能源技术有限公司 | 一种基于动态相量的电磁暂态仿真频域扩展方法及装置 |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101719182A (zh) * | 2009-12-11 | 2010-06-02 | 中国电力科学研究院 | 一种交直流电力系统分割并行电磁暂态数字仿真方法 |
CN102436534A (zh) * | 2012-01-13 | 2012-05-02 | 浙江省电力试验研究院 | 一种电力系统仿真方法 |
CN102592003A (zh) * | 2011-12-15 | 2012-07-18 | 天津大学 | 一种用于机电与电磁暂态混合仿真的数据交换方法 |
US20150006141A1 (en) * | 2013-06-26 | 2015-01-01 | International Business Machines Corporation | Method, computer program and system providing real-time power grid hypothesis testing and contigency planning |
-
2015
- 2015-03-31 CN CN201510146768.4A patent/CN104732033A/zh active Pending
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101719182A (zh) * | 2009-12-11 | 2010-06-02 | 中国电力科学研究院 | 一种交直流电力系统分割并行电磁暂态数字仿真方法 |
CN102592003A (zh) * | 2011-12-15 | 2012-07-18 | 天津大学 | 一种用于机电与电磁暂态混合仿真的数据交换方法 |
CN102436534A (zh) * | 2012-01-13 | 2012-05-02 | 浙江省电力试验研究院 | 一种电力系统仿真方法 |
US20150006141A1 (en) * | 2013-06-26 | 2015-01-01 | International Business Machines Corporation | Method, computer program and system providing real-time power grid hypothesis testing and contigency planning |
Non-Patent Citations (4)
Title |
---|
何超军: "《电力系统二次设备的机电暂态仿真建模》", 《中国优秀硕士学位论文全文数据库 工程科技II辑》 * |
安娜: "《基于RTDS的机电暂态仿真及其接口模型优化的研究》", 《中国优秀硕士学位论文全文数据库 工程科技II辑》 * |
李亚楼: "《大规模电力系统机电暂态实时仿真算法及软件的研究》", 《中国优秀硕士学位论文全文数据库 工程科技II辑》 * |
李亚楼: "基于PC机群的电力系统机电暂态仿真并行算法", 《电网技术》 * |
Cited By (21)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105954629B (zh) * | 2016-06-24 | 2018-08-03 | 青岛大学 | 一种六相整流发电机整流桥工作过程的分析方法 |
CN105954629A (zh) * | 2016-06-24 | 2016-09-21 | 青岛大学 | 一种六相整流发电机整流桥工作过程的分析方法 |
CN106026083A (zh) * | 2016-06-27 | 2016-10-12 | 吉林大学 | 一种基于matlab的电网暂态稳定分析方法 |
CN106026083B (zh) * | 2016-06-27 | 2019-02-19 | 吉林大学 | 一种基于matlab的电网暂态稳定分析方法 |
CN107132772A (zh) * | 2017-04-21 | 2017-09-05 | 南方电网科学研究院有限责任公司 | 交直流电网的实时仿真系统及方法 |
CN107291981A (zh) * | 2017-05-17 | 2017-10-24 | 国网北京市电力公司 | 输电线路的仿真方法和装置 |
CN107291981B (zh) * | 2017-05-17 | 2020-12-11 | 国网北京市电力公司 | 输电线路的仿真方法和装置 |
CN107592044A (zh) * | 2017-09-20 | 2018-01-16 | 四川理工学院 | 一种pscad自定义发电机控制器的初始化方法 |
CN107592044B (zh) * | 2017-09-20 | 2019-12-13 | 四川理工学院 | 一种pscad自定义发电机控制器的初始化方法 |
CN108241782A (zh) * | 2018-01-04 | 2018-07-03 | 清华大学 | 一种混合暂态分析方法及混合暂态分析系统 |
CN108241782B (zh) * | 2018-01-04 | 2020-10-20 | 清华大学 | 一种混合暂态分析方法及混合暂态分析系统 |
CN109815607A (zh) * | 2019-01-31 | 2019-05-28 | 上海交通大学 | 面向大规模交流电网基于时频坐标变换的全电磁暂态仿真方法 |
CN109815607B (zh) * | 2019-01-31 | 2022-10-11 | 上海交通大学 | 面向大规模交流电网基于时频坐标变换的全电磁暂态仿真方法 |
CN110619162A (zh) * | 2019-09-03 | 2019-12-27 | 中国航空工业集团公司沈阳飞机设计研究所 | 一种联合仿真平台稳定性分析方法及设备 |
CN111709107A (zh) * | 2020-06-16 | 2020-09-25 | 全球能源互联网研究院有限公司 | 一种含大规模电力电子设备的电力网络仿真方法及系统 |
CN111709107B (zh) * | 2020-06-16 | 2023-03-24 | 全球能源互联网研究院有限公司 | 一种含大规模电力电子设备的电力网络仿真方法及系统 |
CN111709155A (zh) * | 2020-07-21 | 2020-09-25 | 国网宁夏电力有限公司 | 一种基于混合单调特性的电力系统机电暂态特性分析方法 |
CN111709155B (zh) * | 2020-07-21 | 2023-05-23 | 国网宁夏电力有限公司 | 一种基于混合单调特性的电力系统机电暂态特性分析方法 |
CN113221298A (zh) * | 2021-04-21 | 2021-08-06 | 南方电网科学研究院有限责任公司 | 一种机电暂态过程的仿真方法及系统 |
CN113515827A (zh) * | 2021-04-21 | 2021-10-19 | 南方电网科学研究院有限责任公司 | 一种电力系统全过程动态仿真方法及系统 |
CN116722563A (zh) * | 2023-05-30 | 2023-09-08 | 杭州盛星能源技术有限公司 | 一种基于动态相量的电磁暂态仿真频域扩展方法及装置 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104732033A (zh) | 一种电力系统机电暂态过程的仿真分析方法 | |
CN102609575B (zh) | 一种基于隐式数值积分的电力系统暂态稳定仿真方法 | |
Mahseredjian et al. | Simulation tools for electromagnetic transients in power systems: Overview and challenges | |
CN103646152B (zh) | 一种基于矩阵指数的电力系统电磁暂态仿真方法 | |
CN103700036B (zh) | 一种适于电力系统多时间尺度的暂态稳定性投影积分方法 | |
Yang et al. | Dynamic phasor modeling of multi-generator variable frequency electrical power systems | |
CN102819641B (zh) | 适于电磁暂态仿真的大规模配电网络整体模型化简方法 | |
CN103810646B (zh) | 一种基于改进投影积分算法的有源配电系统动态仿真方法 | |
CN103049617B (zh) | 保留无源性的大规模配电网络电磁暂态仿真模型化简方法 | |
CN102436534B (zh) | 一种电力系统仿真方法 | |
CN102799950B (zh) | 基于粒子群算法的船舶电网重构优化方法 | |
Patel et al. | MATLAB/Simulink-based transient stability analysis of a multimachine power system | |
WO2018102720A1 (en) | System and method for a fast power network simulator | |
CN104765282B (zh) | 一种电站全数字综合仿真平台 | |
Sattouf | Simulation model of hydro power plant using Matlab/Simulink | |
CN103778230A (zh) | 一种黑启动方案在线自动生成方法 | |
CN102545263B (zh) | 一种基于显式数值积分的电力系统暂态稳定仿真方法 | |
CN110135039A (zh) | 风电汇集地区三相电压不平衡度确定方法及装置 | |
CN115173467A (zh) | 风电场经柔性直流并网仿真系统、方法及存储介质 | |
CN106026083B (zh) | 一种基于matlab的电网暂态稳定分析方法 | |
Abdelmalak et al. | PSS/E to RSCAD model conversion for large power grids: Challenges and solutions | |
CN108988320A (zh) | 电力系统动态元件响应特性对暂态电压稳定性影响分析方法 | |
CN107017666B (zh) | 小型单相同步发电机并列运行系统有限元模型建立方法 | |
Benato et al. | An original educational algorithm assessing the behaviours of angular frequency deviations of a multimachine system in small signal analysis | |
Saunders et al. | Transient stability analysis using potential energy indices for determining critical generator sets |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20150624 |
|
RJ01 | Rejection of invention patent application after publication |