CN104724265B - 一种双线并排对拉移船方法 - Google Patents

一种双线并排对拉移船方法 Download PDF

Info

Publication number
CN104724265B
CN104724265B CN201310713486.9A CN201310713486A CN104724265B CN 104724265 B CN104724265 B CN 104724265B CN 201310713486 A CN201310713486 A CN 201310713486A CN 104724265 B CN104724265 B CN 104724265B
Authority
CN
China
Prior art keywords
ship
halves
hawser
depressed place
cucurbit
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201310713486.9A
Other languages
English (en)
Other versions
CN104724265A (zh
Inventor
何琎
陈景庚
程建
贾庄龙
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CSSC Huangpu Wenchong Shipbuilding Co Ltd
Original Assignee
CSSC Guangzhou Huangpu Shipbuilding Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CSSC Guangzhou Huangpu Shipbuilding Co Ltd filed Critical CSSC Guangzhou Huangpu Shipbuilding Co Ltd
Priority to CN201310713486.9A priority Critical patent/CN104724265B/zh
Publication of CN104724265A publication Critical patent/CN104724265A/zh
Application granted granted Critical
Publication of CN104724265B publication Critical patent/CN104724265B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Bridges Or Land Bridges (AREA)
  • Cleaning Or Clearing Of The Surface Of Open Water (AREA)

Abstract

本发明公开一种双线并排对拉移船的方法:船坞注水前将两半船艏艉端近船坞中心线一侧的对拉眼板用卸扣连接缆绳,同时在两半船葫芦眼板穿挂卸扣后连接葫芦;第一坞位双线整船出坞后,通过坞墙上两侧引船小车将两半船移至预坐墩坞位;提升两半船艏艉连接缆绳;逐步收紧缆绳,吊钩同步缓慢下降;将葫芦收紧缆绳捆绑至带缆桩;解除吊钩与缆绳间连接;在两半船另一端重复以上步骤;两半船艏艉两端已相互靠拢,且离开各自坞墙,需保证两半船距各自坞墙10米以上距离;在预坐墩坞位两侧坞墙上装定位靠架。该法可避免双线移船定位时发生钢丝绳干涉;减小横移缆绳长度,具有横移惯性小、操作简便等优点;降低浮态双线移船操作难度,提高移船效率及安全性。

Description

一种双线并排对拉移船方法
技术领域
本发明涉及船舶制造领域,特别涉及一种双线并排对拉移船的方法。
背景技术
使用干船坞造船是一种高效的船舶制造方法,由于场地的限制,本厂干船坞能够双排串联制造一条半的船舶。为了保证船舶建造的连贯性,整船建造完毕出坞后,半船要重新移位坐墩。在并联一条半的建造情况下,两条整船出坞后,两条半船都需要重新移位坐墩。当然可以分次对两条半船进行移位坐墩,这样会导致吊机、缆绳等设施需要分两次进行布置,是一种资源浪费。
发明内容
本发明要解决的技术问题,是针对上述两条半船需要移船坐墩的现实状况,提出一种两半船双线并排对拉的移船坐墩方法。
为解决上述技术问题,采用如下技术方案:
一种双线并排对拉移船方法,包括如下步骤:
(1)在船坞注水前,将两半船艏艉端近船坞中心线一侧的对拉眼板通过卸扣连接缆绳,缆绳保留有足够长度,同时在两半船葫芦眼板穿挂卸扣后连接葫芦;
(2)待第一坞位双线整船出坞后,保持两半船间的连接缆绳处于放松状态,并通过坞墙上两侧引船小车将两半船移至预(二次)坐墩坞位(两船移船过程中无需同步);
(3)利用吊机(龙门吊、坞边两旁门座吊)对两半船一端的连接缆绳进行提升;
(4)两半船艏或艉端开始靠拢,利用葫芦与吊机之间产生恒张力,对缆绳逐步收紧;此时,吊钩也是同步缓慢下降;
(5)再将葫芦收紧缆绳捆绑至带缆桩;
(6)解除吊钩与缆绳之间连接;
(7)在两半船另一端再次按以上步骤(3)至步骤(6)实施;
(8)此时,两半船艏艉两端均已相互靠拢,且离开各自坞墙,仅需保证两半船距各自坞墙10米以上距离;
(9)在两半船预坐墩坞位的两侧坞墙,安装定位靠架;
(10)解除两半船带缆桩上的缆绳,利用坞边牵引装置,将两半船重新拉向坞墙,并靠在定位靠架上,由坞边牵引装置及定位靠架进行移船坐墩。
与现有技术相比,本发明的方法具有以下优点:
(1)可避免双线移船定位时发生钢丝绳干涉;
(2)减小横移缆绳长度,具有横移惯性小、操作简便等优点;
(3)降低浮态双线移船操作难度,并提高移船效率及安全性。
附图说明
图1双线并排对拉移船工装布置图(起浮前);
图2是图1的局部放大示意图;
图3双线并排对拉移船工装布置图(移船时);
图4双线并排对拉移船操作示意图之一;
图5双线并排对拉移船操作示意图之二;
图6双线并排对拉移船操作示意图之三。
具体实施方式
下面结合附图对本双线并排对拉移船方法作进一步详细描述:
如图1~6所示,本发明的一种双线并排对拉移船方法,包括如下步骤:
1)船坞注水前,将两半船艏艉端近船坞中心线一侧对拉眼板1通过卸扣4连接缆绳7(缆绳保留有足够长度),同时在两半船葫芦眼板2穿挂卸扣4后连接葫芦5;
2)待第一坞位双线整船出坞后,保持两半船间连接缆绳7处于放松状态,通过坞墙上两侧引船小车将两(半)船移至预(二次)坐墩坞位;(无需保证两船移船过程中同步)
3)利用吊车(龙门吊、坞边两旁门座吊),对两半船一端的连接缆绳7进行提升。
4)两半船艏(或艉)端开始靠拢,利用葫芦5与吊机之间产生恒张力,对缆绳逐步收紧。此时,吊钩也是同步缓慢下降;
5)再将葫芦5收紧缆绳7捆绑至带缆桩3;
6)解除吊钩与缆绳7之间连接;
7)在两半船另一端再次按以上步骤3)至步骤6)实施;
8)此时,两半船艏艉两端均已相互靠拢,且离开各自坞墙(仅需保证两半船距各自坞墙10米以上距离)
9)在两半船预坐墩坞位的两侧坞墙,安装定位靠架;
10)解除两半船带缆桩缆绳,利用坞边牵引装置,将两半船重新拉向坞墙,并靠在定位靠架上,由坞边牵引装置及定位靠架进行移船坐墩。

Claims (1)

1.一种双线并排对拉移船方法,包括如下步骤:
(1)在船坞注水前,将两半船艏艉端近船坞中心线一侧的对拉眼板通过卸扣连接缆绳,缆绳保留有足够长度,同时在两半船葫芦眼板穿挂卸扣后连接葫芦;
(2)待第一坞位双线整船出坞后,保持两半船间的连接缆绳处于放松状态,并通过坞墙上两侧引船小车将两半船移至预坐墩坞位;
(3)利用吊机对两半船一端的连接缆绳进行提升;
(4)两半船艏或艉端开始靠拢,利用葫芦与吊机之间产生恒张力,对缆绳逐步收紧;此时,吊钩也是同步缓慢下降;
(5)再将葫芦收紧缆绳捆绑至带缆桩;
(6)解除吊钩与缆绳之间连接;
(7)在两半船另一端再次按以上步骤(3)至步骤(6)实施;
(8)此时,两半船艏艉两端均已相互靠拢,且离开各自坞墙,仅需保证两半船距各自坞墙10米以上距离;
(9)在两半船预坐墩坞位的两侧坞墙,安装定位靠架;
(10)解除两半船带缆桩上的缆绳,利用坞边牵引装置,将两半船重新拉向坞墙,并靠在定位靠架上,由坞边牵引装置及定位靠架进行移船坐墩。
CN201310713486.9A 2013-12-20 2013-12-20 一种双线并排对拉移船方法 Active CN104724265B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310713486.9A CN104724265B (zh) 2013-12-20 2013-12-20 一种双线并排对拉移船方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310713486.9A CN104724265B (zh) 2013-12-20 2013-12-20 一种双线并排对拉移船方法

Publications (2)

Publication Number Publication Date
CN104724265A CN104724265A (zh) 2015-06-24
CN104724265B true CN104724265B (zh) 2017-06-27

Family

ID=53448806

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310713486.9A Active CN104724265B (zh) 2013-12-20 2013-12-20 一种双线并排对拉移船方法

Country Status (1)

Country Link
CN (1) CN104724265B (zh)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108202846B (zh) * 2016-12-16 2020-03-24 沪东中华造船(集团)有限公司 一种船舶二次进坞的定位方法
CN110758672A (zh) * 2018-07-26 2020-02-07 江苏扬子鑫福造船有限公司 两条大型半漂船快速整体移位落墩方法

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101357673A (zh) * 2008-04-30 2009-02-04 大连船舶重工集团有限公司 坞内非干式多船建造法
CN201665303U (zh) * 2009-08-18 2010-12-08 武汉金鼎船舶工程设计有限公司 一种新型船舶定位及移船系统
CN101920766A (zh) * 2010-05-14 2010-12-22 蓬莱中柏京鲁船业有限公司 一种船舶建造方法
CN102358406A (zh) * 2011-09-01 2012-02-22 广州中船黄埔造船有限公司 船坞内船舶二次落墩定位装置
CN102897298A (zh) * 2012-10-22 2013-01-30 蓬莱中柏京鲁船业有限公司 三艘艉半船在船坞内起浮、前移、定位、落敦的方法
CN102963509A (zh) * 2012-11-30 2013-03-13 大连船舶重工集团有限公司 30万干船坞并联建造船只出坞的牵引方法

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2001199388A (ja) * 2000-01-19 2001-07-24 Sumitomo Metal Ind Ltd 大型重量物の水上運搬方法と水底設置方法

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101357673A (zh) * 2008-04-30 2009-02-04 大连船舶重工集团有限公司 坞内非干式多船建造法
CN201665303U (zh) * 2009-08-18 2010-12-08 武汉金鼎船舶工程设计有限公司 一种新型船舶定位及移船系统
CN101920766A (zh) * 2010-05-14 2010-12-22 蓬莱中柏京鲁船业有限公司 一种船舶建造方法
CN102358406A (zh) * 2011-09-01 2012-02-22 广州中船黄埔造船有限公司 船坞内船舶二次落墩定位装置
CN102897298A (zh) * 2012-10-22 2013-01-30 蓬莱中柏京鲁船业有限公司 三艘艉半船在船坞内起浮、前移、定位、落敦的方法
CN102963509A (zh) * 2012-11-30 2013-03-13 大连船舶重工集团有限公司 30万干船坞并联建造船只出坞的牵引方法

Also Published As

Publication number Publication date
CN104724265A (zh) 2015-06-24

Similar Documents

Publication Publication Date Title
CN101492140B (zh) 铝合金双体船整船下水的工艺方法
EP2758301B1 (en) Device for and method of tensioning chains, in particular mooring legs
KR102536839B1 (ko) 웨지 심블을 사용하여 인장 로프를 고정하기 위한 시스템 및 방법
US9127747B2 (en) Mooring chain connecting link
CN104480865B (zh) 一种大型钢沉井精确定位方法
CN205602074U (zh) 一种大线型船舶船台下水装置
CN104724265B (zh) 一种双线并排对拉移船方法
CN203129178U (zh) 一种超大型沉管绞缆出坞系统
CN103422483A (zh) 浅水导管架浮托安装的方法
CN104816806A (zh) 一种大型水下组合拖曳装置及其使用方法
CN103883273A (zh) 利用饱和潜水支持船上的双吊机安装立管的方法
CN202966592U (zh) 一种海洋工程船
CN104627830A (zh) 浮式生产储存卸货装置船大型火炬塔吊装方法
CN204737016U (zh) 一种大型水下组合拖曳装置
CN204606137U (zh) 一种吸泥船的锚泊装置
CN103552655B (zh) 一种400吨起重铺管船托管架水上安装方法
CN203158854U (zh) 一种拖拉滑移装置
CN204265369U (zh) 恒拉力绞缆机
CN204703172U (zh) 一种海洋管道铺设施工用高压注浆气囊
CN103640674A (zh) 多用途救生艇吊
CN206766281U (zh) 一种拖船的起抛锚装置
CN204210696U (zh) 船舶艏部锚泊系泊装置及船舶
CN204548418U (zh) 一种锁紧装置
CN200995770Y (zh) 基于大型浮标的传感器链布放装置
CN103640972A (zh) 起重机用吊钩固定装置

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CP01 Change in the name or title of a patent holder
CP01 Change in the name or title of a patent holder

Address after: Cheung Chau Street in Whampoa District of Guangzhou City, Guangdong Province, No. 188 510000

Patentee after: Middle ship Huangpu Wen Chong boats and ships Co., Ltd

Address before: Cheung Chau Street in Whampoa District of Guangzhou City, Guangdong Province, No. 188 510000

Patentee before: CSSC Guangzhou Shipbuilding Co., Ltd.