CN203129178U - 一种超大型沉管绞缆出坞系统 - Google Patents
一种超大型沉管绞缆出坞系统 Download PDFInfo
- Publication number
- CN203129178U CN203129178U CN 201320013583 CN201320013583U CN203129178U CN 203129178 U CN203129178 U CN 203129178U CN 201320013583 CN201320013583 CN 201320013583 CN 201320013583 U CN201320013583 U CN 201320013583U CN 203129178 U CN203129178 U CN 203129178U
- Authority
- CN
- China
- Prior art keywords
- immersed tube
- ultra
- stranded cable
- large type
- undocking
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
Images
Landscapes
- Laying Of Electric Cables Or Lines Outside (AREA)
Abstract
本实用新型涉及海底隧道沉管制造领域,具体是一种超大型沉管绞缆出坞系统,该出坞系统包括:预制厂内设备,其包括卷扬机,所述卷扬机用于将沉管牵引至预制厂的坞口内,控制沉管的位置和方向;安装船,其安装在沉管上部,用于对沉管进行浮力支撑;该安装船上设有牵引绞车;预制厂坞口外海域绞缆机构,其包括预埋在海域中的定位锚;所述牵引绞车与该定位锚通过缆绳连接;还包括多个拖轮,用于在预制厂的坞口外,用于平衡水流力,并调整沉管姿态。本实用新型能够方便、快捷地将沉管运送出预制厂坞口,并且运行安全可靠,运行成本低,具有很高的工程实用性。
Description
技术领域
本实用新型涉及海底隧道沉管制造领域,具体是一种超大型沉管绞缆出坞系统。
背景技术
海底隧道一般设有沉管工程预制厂,管节在此预制、舾装、存放,待作业条件满足要求后经管节出坞、浮运、系泊等多道工序将管节运送至施工现场进行管节的对接、安装。
目前,沉管绞缆出坞系统有多种:拖轮直接拖拽裸管出坞系统,锚艇定点系泊拖拽管节出坞。但是超大型隧道沉管出坞,使用现有出坞系统较为困难。
为了解决以上问题,本实用新型做了有益改进。
实用新型内容
(一)要解决的技术问题
本实用新型的目的是一种方便、快捷且运行可靠的超大型沉管绞缆出坞系统。
(二)技术方案
本实用新型是通过以下技术方案实现的:一种超大型沉管绞缆出坞系统,包括:
预制厂内设备,包括卷扬机,所述卷扬机用于将沉管牵引至预制厂的坞口内,控制沉管的位置和方向;
安装船,其安装在沉管上部,用于对沉管进行浮力支撑;该安装船上设有牵引绞车;
预制厂坞口外海域绞缆机构,其包括预埋在海域中的定位锚;所述牵引绞车与该定位锚通过缆绳连接;
多个拖轮,放置在预制厂的坞口外。
其中,至少两个卷扬机分别设置在预制厂内坞口航道的两侧。
并且,所述定位锚为抓力锚,其数量为两口;所述牵引绞车为两台,该两台牵引绞车与两口抓力锚通过缆绳交叉连接。
此外,所述预制厂内设备还包括导缆机构,所述卷扬机通过导缆机构与沉管连接。
进一步,所述导缆机构包括多个导缆器和多个导缆柱。
再进一步,所述安装船上还设有调位绞车,该调位绞车与所述导缆机构通过缆绳连接。
此外,所述导缆机构还设置有快速脱钩器。
(三)有益效果
与现有技术和产品相比,本实用新型有如下优点:
1、本实用新型能够方便、快捷地将沉管运送出预制厂坞口,并且运行安全可靠;
2、本实用新型运行成本低,具有很高的工程实用性。
附图说明
图1是本实用新型在出坞过程中沉管绞缆出坞系统示意图;
图2是本实用新型提供的安装船连接示意图。
附图中,各标号所代表的组件列表如下:
1.预制厂;2.预制工位;3.卷扬机;31.导缆机构;4.安装船;41.绞车;42.调位绞车;5.沉管;6.定位锚;7.拖轮
具体实施方式
下面结合附图对本实用新型的具体实施方式做一个详细的说明。
如图1和图2所示,本实用新型提供一种大型隧道工程中,超大型沉管绞缆出坞系统,该系统应用在预制厂1中,包括预制厂内设备、安装船、预制厂坞口外海域绞缆机构和拖轮;将这些设备根据出坞所需组合为一种超大型管节绞缆出坞系统。
其中,预制厂内设备包括卷扬机3,所述卷扬机用于将沉管5牵引至预制厂内的坞口内部,控制沉管的方向;安装船4安装在沉管上部,用于对沉管进行浮力支撑;该安装船上设有牵引绞车41;预制厂坞口外海域绞缆机构,其包括预埋在海域中的定位锚6;所述牵引绞车与该定位锚通过缆绳连接;多个拖轮7用于在预制厂的坞口外对平衡水流力,并调整沉管姿态。
所述预制厂内设备还包括导缆机构31,所述卷扬机通过导缆机构与沉管连接。导缆机构包括多个导缆器和多个导缆柱,而且导缆机构还设置有快速脱钩器,当缆绳与系缆柱、导缆器之间的连接时,采用快速脱钩器,方便解缆,降低了操作难度,缩短了解缆时间,进而缩短了出坞时间。
上述的定位锚为抓力锚,其数量为两口;牵引绞车数量为两台,该两台牵引绞车与两口抓力锚通过缆绳交叉连接,这样便于调整安装船的方向和位置。坞口外海域埋设两口5t的HY-17大抓力锚,锚抓力为100t,埋设点位距离安装船艏端900m。安装船在牵引绞车的牵引下,驶出预制厂坞口。并且,安装船上还设有调位绞车42,该调位绞车与所述导缆机构通过缆绳连接,用于在沉管驶出航道过程中,对沉管的位置和方向进行调节。
将沉管绞出坞口航道之后,使用多个拖轮用于平衡水流力和调整沉管姿态
本实施例中,该超大型沉管绞缆出坞设备的操作方法,包括以下步骤:
S1.通过卷扬机将沉管从预制工位2牵引至预制厂坞口内;固定在坞口内侧的卷扬机用缆绳连接沉管的后端将沉管从预制工位拉入坞口内,同时固定在坞口航道两侧的卷扬机,连接在沉管的前端。通过上述的卷扬机调节沉管的方向和位置。
S2.将安装船安装在沉管的上部,完成对沉管的浮力支撑;
S3.将安装船上设有的牵引绞车通过缆绳连接在预埋在海域中的定位锚,并在该牵引绞车的牵引下,将沉管拖拽出坞口航道;牵引绞车优选设有两台,定位锚也设置两台;牵引绞车和定位锚绞车连接,方便行驶过程中,保持安装船的位置和方向。安装船上还可设有导缆器、滑轮、系缆柱若干及调位绞车,这些部件可与预制厂内的导缆机构相连,用于控制调节沉管的方向。
沉管在出坞过程中,牵引绞车起制动作用,当需要制动时,立即将牵引绞车的拉力提高;当需要调整管节姿态时,可立即将卷扬机、调位绞车拉力进行调整,从而对沉管进行控制。
S4.驶出坞口航道后,解除卷扬机对沉管的连接,并用多个拖轮连接沉管,从而平衡水流力且调整沉管姿态。
以上所述仅为本实用新型的较佳实施例,并不用以限制本实用新型,凡在本实用新型的精神和原则之内,所作的任何修改、等同替换、改进等,均应包含在本实用新型的保护范围之内。
Claims (7)
1.一种超大型沉管绞缆出坞系统,其特征在于,包括:
预制厂内设备,包括卷扬机,所述卷扬机用于将沉管牵引至预制厂的坞口内,控制沉管的位置和方向;
安装船,其安装在沉管上部,用于对沉管进行浮力支撑;该安装船上设有牵引绞车;
预制厂坞口外海域绞缆机构,其包括预埋在海域中的定位锚;所述牵引绞车与该定位锚通过缆绳连接;
多个拖轮,放置在预制厂的坞口外。
2.根据权利要求1所述的超大型沉管绞缆出坞系统,其特征在于,至少两个卷扬机分别设置在预制厂内坞口航道的两侧。
3.根据权利要求1所述的超大型沉管绞缆出坞系统,其特征在于,所述定位锚为抓力锚,其数量为两口;所述牵引绞车为两台,该两台牵引绞车与两口抓力锚通过缆绳交叉连接。
4.根据权利要求2所述的超大型沉管绞缆出坞系统,其特征在于,所述预制厂内设备还包括导缆机构,所述卷扬机通过导缆机构与沉管连接。
5.根据权利要求4所述的超大型沉管绞缆出坞系统,其特征在于,所述导缆机构包括多个导缆器和多个导缆柱。
6.根据权利要求4所述的超大型沉管绞缆出坞系统,其特征在于,所述安装船上还设有调位绞车,该调位绞车与所述导缆机构通过缆绳连接。
7.根据权利要求4所述的超大型沉管绞缆出坞系统,其特征在于,所述导缆机构还设置有快速脱钩器。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 201320013583 CN203129178U (zh) | 2013-01-10 | 2013-01-10 | 一种超大型沉管绞缆出坞系统 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 201320013583 CN203129178U (zh) | 2013-01-10 | 2013-01-10 | 一种超大型沉管绞缆出坞系统 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN203129178U true CN203129178U (zh) | 2013-08-14 |
Family
ID=48937173
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN 201320013583 Expired - Lifetime CN203129178U (zh) | 2013-01-10 | 2013-01-10 | 一种超大型沉管绞缆出坞系统 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN203129178U (zh) |
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104612423A (zh) * | 2015-02-16 | 2015-05-13 | 中交四航局第二工程有限公司 | 一种沉管横移系泊绞缆控制系统 |
CN105604079A (zh) * | 2016-03-22 | 2016-05-25 | 中铁隧道集团二处有限公司 | 一种适用于大流速条件下的隧道沉管管节出坞施工方法 |
CN105604093A (zh) * | 2016-03-18 | 2016-05-25 | 中铁隧道集团二处有限公司 | 一种大流速条件下的沉管法隧道管节顺基槽浮运施工方法 |
CN109930618A (zh) * | 2019-01-28 | 2019-06-25 | 中建地下空间有限公司 | 一种固定锚固定沉管装置 |
CN113186956A (zh) * | 2021-04-01 | 2021-07-30 | 中交第四航务工程局有限公司 | 一种坞门浮运安装的施工方法及坞门浮运寄放的施工方法 |
CN113879464A (zh) * | 2021-10-12 | 2022-01-04 | 中交第四航务工程局有限公司 | 一种狭窄内河沉管寄放方法 |
-
2013
- 2013-01-10 CN CN 201320013583 patent/CN203129178U/zh not_active Expired - Lifetime
Cited By (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104612423A (zh) * | 2015-02-16 | 2015-05-13 | 中交四航局第二工程有限公司 | 一种沉管横移系泊绞缆控制系统 |
CN104612423B (zh) * | 2015-02-16 | 2017-02-01 | 中交四航局第二工程有限公司 | 一种沉管横移系泊绞缆控制系统 |
CN105604093A (zh) * | 2016-03-18 | 2016-05-25 | 中铁隧道集团二处有限公司 | 一种大流速条件下的沉管法隧道管节顺基槽浮运施工方法 |
CN105604079A (zh) * | 2016-03-22 | 2016-05-25 | 中铁隧道集团二处有限公司 | 一种适用于大流速条件下的隧道沉管管节出坞施工方法 |
CN109930618A (zh) * | 2019-01-28 | 2019-06-25 | 中建地下空间有限公司 | 一种固定锚固定沉管装置 |
CN109930618B (zh) * | 2019-01-28 | 2024-03-12 | 中建地下空间有限公司 | 一种固定锚固定沉管装置 |
CN113186956A (zh) * | 2021-04-01 | 2021-07-30 | 中交第四航务工程局有限公司 | 一种坞门浮运安装的施工方法及坞门浮运寄放的施工方法 |
CN113879464A (zh) * | 2021-10-12 | 2022-01-04 | 中交第四航务工程局有限公司 | 一种狭窄内河沉管寄放方法 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN203129178U (zh) | 一种超大型沉管绞缆出坞系统 | |
CN102332695B (zh) | 登陆平台的海底电缆终端的提升方法 | |
CN113148030B (zh) | 深水海底电缆舷侧下水的铺设安装方法 | |
CN101578219B (zh) | 用于浮式采油装置的操作缆绳的牵引系统 | |
US8747025B2 (en) | Offshore cable laying method | |
CN104480865B (zh) | 一种大型钢沉井精确定位方法 | |
CN101881353B (zh) | 浅海小口径钢带塑料复合软管海上敷设方法 | |
US2770950A (en) | Submarine cable installation | |
EP0653349B1 (en) | Line fisher for use in anchor laying | |
US20170253302A1 (en) | Systems, Methods and Units for Offloading or Loading Cargo at Sea | |
Wang et al. | Latest progress in deepwater installation technologies | |
CN208815567U (zh) | 一种沉管系泊安装锚系预张拉系统 | |
CN204775850U (zh) | 一种滚轮导缆器 | |
CN110848459A (zh) | 海底管道浮筒安装回收方法 | |
CN101218459B (zh) | 近海浮式采油装置上的提升管安装 | |
CN105346677B (zh) | 一种折叠式板锚及其使用方法 | |
US7559721B2 (en) | Towing and installation method for deepwater pipelines and risers | |
CN200995770Y (zh) | 基于大型浮标的传感器链布放装置 | |
CN210529503U (zh) | 一种悬索桥运梁船定位装置 | |
RU2676927C1 (ru) | Способ постановки бурового судна с турелью на якорно-швартовную систему в ледовых условиях | |
CN112722161A (zh) | 导管架低成本下水施工工艺 | |
CN207814644U (zh) | 海底管道卷管铺设装置 | |
CN107642106A (zh) | 一种用于沉管安装的船舶布置方法 | |
CN104787254A (zh) | 一种船舶海上补给万向导绳装置及应用方法 | |
CN112319700B (zh) | 一种母船无锚机的抛锚方法 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CX01 | Expiry of patent term |
Granted publication date: 20130814 |
|
CX01 | Expiry of patent term |