CN101881353B - 浅海小口径钢带塑料复合软管海上敷设方法 - Google Patents
浅海小口径钢带塑料复合软管海上敷设方法 Download PDFInfo
- Publication number
- CN101881353B CN101881353B CN2010101753804A CN201010175380A CN101881353B CN 101881353 B CN101881353 B CN 101881353B CN 2010101753804 A CN2010101753804 A CN 2010101753804A CN 201010175380 A CN201010175380 A CN 201010175380A CN 101881353 B CN101881353 B CN 101881353B
- Authority
- CN
- China
- Prior art keywords
- flexible pipe
- sea
- towing
- underground
- supply vessel
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 238000000034 method Methods 0.000 title claims abstract description 11
- 229910000831 Steel Inorganic materials 0.000 title claims abstract description 7
- 239000010959 steel Substances 0.000 title claims abstract description 7
- 239000002131 composite material Substances 0.000 title claims abstract description 4
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 claims description 5
- 210000003954 umbilical cord Anatomy 0.000 claims description 4
- 210000001503 joint Anatomy 0.000 claims description 2
- 238000010276 construction Methods 0.000 abstract description 10
- 238000005516 engineering process Methods 0.000 abstract description 2
- 230000009286 beneficial effect Effects 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 238000010587 phase diagram Methods 0.000 description 1
- 230000002035 prolonged effect Effects 0.000 description 1
- 238000011084 recovery Methods 0.000 description 1
- 230000001105 regulatory effect Effects 0.000 description 1
Images
Landscapes
- Laying Of Electric Cables Or Lines Outside (AREA)
Abstract
Description
Claims (1)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2010101753804A CN101881353B (zh) | 2009-09-22 | 2010-04-29 | 浅海小口径钢带塑料复合软管海上敷设方法 |
Applications Claiming Priority (3)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN200920220817 | 2009-09-22 | ||
CN200920220817.4 | 2009-09-22 | ||
CN2010101753804A CN101881353B (zh) | 2009-09-22 | 2010-04-29 | 浅海小口径钢带塑料复合软管海上敷设方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN101881353A CN101881353A (zh) | 2010-11-10 |
CN101881353B true CN101881353B (zh) | 2011-12-07 |
Family
ID=43053439
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2010101753804A Expired - Fee Related CN101881353B (zh) | 2009-09-22 | 2010-04-29 | 浅海小口径钢带塑料复合软管海上敷设方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN101881353B (zh) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109140048A (zh) * | 2018-10-24 | 2019-01-04 | 海洋石油工程股份有限公司 | 利用导管架桩腿进行海底管道起始铺设的方法 |
Families Citing this family (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102588675B (zh) * | 2012-03-14 | 2014-02-05 | 中国海洋石油总公司 | 深水柔性软管保护性回收的方法 |
CN102661443B (zh) * | 2012-06-05 | 2013-11-06 | 青岛北海船舶重工有限责任公司 | 浮式生产储卸油装置输油软管安装方法 |
CN102913683B (zh) * | 2012-10-26 | 2014-08-06 | 中国海洋石油总公司 | 利用软管修复水底输送管路的方法 |
CN103215980A (zh) * | 2013-04-15 | 2013-07-24 | 山东海盛海洋工程集团有限公司 | 气举排浆海管在线挖沟设备 |
CN103256428B (zh) * | 2013-05-23 | 2015-09-16 | 国家电网公司 | 一种海底管线定位敷设系统及其敷设方法 |
CN103527851B (zh) * | 2013-10-18 | 2015-06-03 | 中国海洋石油总公司 | 海底管道起始铺设系统的预布设工艺 |
CN104653863A (zh) * | 2013-11-22 | 2015-05-27 | 天津市海王星海上工程技术股份有限公司 | 单船舶海洋软管挖沟铺设同步作业法 |
CN107473121B (zh) * | 2017-09-18 | 2018-11-13 | 中国船舶科学研究中心(中国船舶重工集团公司第七0二研究所) | 海底铺缆绞车 |
Family Cites Families (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
IT1277185B1 (it) * | 1995-03-23 | 1997-11-05 | Snam Progetti | Metodo per la connessione di condotte sottomarine particolarmente adatto per alte profondita' e grossi diametri |
US6767165B1 (en) * | 1998-04-03 | 2004-07-27 | Sonsub International Ltd. | Method and apparatus for connecting underwater conduits |
CN2381861Y (zh) * | 1999-08-17 | 2000-06-07 | 上海交通大学 | 浅海海底管道铺设装置 |
CN100365341C (zh) * | 2004-11-05 | 2008-01-30 | 海洋石油工程股份有限公司 | 一种铺设海底石油管道的方法及其专用设备 |
US7770655B2 (en) * | 2005-07-20 | 2010-08-10 | Intermoor Inc. | Conductor casing installation by anchor handling/tug/supply vessel |
CN101280862B (zh) * | 2007-04-03 | 2012-07-18 | 上海市基础工程有限公司 | 海底pe管道边敷边埋施工方法 |
-
2010
- 2010-04-29 CN CN2010101753804A patent/CN101881353B/zh not_active Expired - Fee Related
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109140048A (zh) * | 2018-10-24 | 2019-01-04 | 海洋石油工程股份有限公司 | 利用导管架桩腿进行海底管道起始铺设的方法 |
Also Published As
Publication number | Publication date |
---|---|
CN101881353A (zh) | 2010-11-10 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN101881353B (zh) | 浅海小口径钢带塑料复合软管海上敷设方法 | |
CN101280862B (zh) | 海底pe管道边敷边埋施工方法 | |
CN103247977B (zh) | 多相海底电缆横向布置循环敷设施工方法 | |
CN103527851B (zh) | 海底管道起始铺设系统的预布设工艺 | |
CN102269296B (zh) | 海底管道穿越浮式生产储油装置系统铺设工艺 | |
CN112627267B (zh) | 一种埋设犁及其工作方法 | |
US8747025B2 (en) | Offshore cable laying method | |
CN109790697A (zh) | 用于安装海底线缆的组件和方法 | |
CN203129178U (zh) | 一种超大型沉管绞缆出坞系统 | |
Wang et al. | Latest progress in deepwater installation technologies | |
EP3499662A1 (en) | Assembly and method for installing a submarine line | |
CN106979382A (zh) | 深水s型海底管道的起始铺设工艺 | |
CN108033283A (zh) | 一种大直径超长hdpe管道陆上出运方法 | |
CN102221128B (zh) | 一种基于锚墩固定的海底输油输气软管管线 | |
CN112600130A (zh) | 一种埋设犁及其工作方法 | |
CN101218459B (zh) | 近海浮式采油装置上的提升管安装 | |
CN110848459A (zh) | 海底管道浮筒安装回收方法 | |
CN2381861Y (zh) | 浅海海底管道铺设装置 | |
CN202746765U (zh) | 海底设置反拖拉点机构 | |
AU2007244951B2 (en) | Towing and recovery method for deepwater pipelines and risers | |
CN106764062A (zh) | 一种海底管路铺设辅助装置 | |
CN106678444B (zh) | 用于在位浮式平台的钢制悬链线立管的安装方法 | |
CN104653863A (zh) | 单船舶海洋软管挖沟铺设同步作业法 | |
CN101265995B (zh) | 水下泵管及其施工方法及砼输送方法 | |
CN109538826B (zh) | 一种用于海底管线埋设的自行振动沉管机械及其使用方法 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
ASS | Succession or assignment of patent right |
Owner name: WUDI HAIZHONG HOSE MANUFACTURING CO., LTD. Effective date: 20120228 |
|
C41 | Transfer of patent application or patent right or utility model | ||
TR01 | Transfer of patent right |
Effective date of registration: 20120228 Address after: 300384 Tianjin City, Nankai District Huayuan Industrial Park Road No. 1 Industrial Park E block six layer Co-patentee after: Wudi Haizhong Hose Manufacturing Co., Ltd. Patentee after: Haiwangxing Ocean Engineering Technology Co., Ltd, Tianjin City Address before: 300384 Tianjin City, Nankai District Huayuan Industrial Park Road No. 1 Industrial Park E block six layer Patentee before: Haiwangxing Ocean Engineering Technology Co., Ltd, Tianjin City |
|
PE01 | Entry into force of the registration of the contract for pledge of patent right |
Denomination of invention: Sea laying method for shallow-sea small-diameter steel strip-plastic composite hose Effective date of registration: 20130724 Granted publication date: 20111207 Pledgee: Bank of Shanghai Limited by Share Ltd Tianjin branch Pledgor: Tianjin Neptune Marine Engineering Technology Co., Ltd.|Wudi sea hose manufacturing Co., Ltd. Registration number: 2013990000500 |
|
PLDC | Enforcement, change and cancellation of contracts on pledge of patent right or utility model | ||
C56 | Change in the name or address of the patentee |
Owner name: NEPTUNE OFFSHORE ENGINEERING DEVELOPMENT CO., LTD. Free format text: FORMER NAME: HAIWANGXING OCEAN ENGINEERING TECHNOLOGY CO., LTD, TIANJIN CITY |
|
CP01 | Change in the name or title of a patent holder | ||
CP01 | Change in the name or title of a patent holder |
Address after: 300384 Tianjin City, Nankai District Huayuan Industrial Park Road No. 1 Industrial Park E block six layer Patentee after: NEPTUNE OFFSHORE ENGINEERING DEVELOPMENT CO., LTD. Patentee after: Wudi Haizhong Hose Manufacturing Co., Ltd. Address before: 300384 Tianjin City, Nankai District Huayuan Industrial Park Road No. 1 Industrial Park E block six layer Patentee before: Haiwangxing Ocean Engineering Technology Co., Ltd, Tianjin City Patentee before: Wudi Haizhong Hose Manufacturing Co., Ltd. |
|
PC01 | Cancellation of the registration of the contract for pledge of patent right |
Date of cancellation: 20141119 Granted publication date: 20111207 Pledgee: Bank of Shanghai Limited by Share Ltd Tianjin branch Pledgor: Tianjin City Neptune marine engineering technology Limited by Share Ltd|Wudi loyal hose manufacturing Co., Ltd. Registration number: 2013990000500 |
|
PLDC | Enforcement, change and cancellation of contracts on pledge of patent right or utility model | ||
PM01 | Change of the registration of the contract for pledge of patent right |
Change date: 20141119 Registration number: 2013990000500 Pledgor after: Tianjin City Neptune marine engineering technology Limited by Share Ltd Pledgor after: Wudi loyal hose manufacturing Co., Ltd. Pledgor before: Tianjin Neptune Marine Engineering Technology Co., Ltd. Pledgor before: Wudi sea hose manufacturing Co., Ltd. |
|
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20111207 Termination date: 20170429 |