CN104674962A - Method for constructing external heat-insulation systems of external walls from expanded perlite heat-insulation plates - Google Patents

Method for constructing external heat-insulation systems of external walls from expanded perlite heat-insulation plates Download PDF

Info

Publication number
CN104674962A
CN104674962A CN201510042165.XA CN201510042165A CN104674962A CN 104674962 A CN104674962 A CN 104674962A CN 201510042165 A CN201510042165 A CN 201510042165A CN 104674962 A CN104674962 A CN 104674962A
Authority
CN
China
Prior art keywords
expanded perlite
perlite thermal
heat
alkali
insulation
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201510042165.XA
Other languages
Chinese (zh)
Other versions
CN104674962B (en
Inventor
丁二虎
吴晓东
刘庆昌
赵业荣
曹生财
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
ANHUI TONGJI CONSTRUCTION GROUP Co Ltd
Original Assignee
ANHUI TONGJI CONSTRUCTION GROUP Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by ANHUI TONGJI CONSTRUCTION GROUP Co Ltd filed Critical ANHUI TONGJI CONSTRUCTION GROUP Co Ltd
Priority to CN201510042165.XA priority Critical patent/CN104674962B/en
Publication of CN104674962A publication Critical patent/CN104674962A/en
Application granted granted Critical
Publication of CN104674962B publication Critical patent/CN104674962B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02WCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO WASTEWATER TREATMENT OR WASTE MANAGEMENT
    • Y02W30/00Technologies for solid waste management
    • Y02W30/50Reuse, recycling or recovery technologies
    • Y02W30/91Use of waste materials as fillers for mortars or concrete

Landscapes

  • Curing Cements, Concrete, And Artificial Stone (AREA)
  • Finishing Walls (AREA)
  • Building Environments (AREA)

Abstract

The invention discloses a method for constructing external heat-insulation systems of external walls from expanded perlite heat-insulation plates. The method includes steps of (1), processing wall surfaces; (2), snapping lines according to references; (3), manufacturing materials and adhering alkali-resistant glass fiber mesh cloth; (4), adhering the expanded perlite heat-insulation plates; (5), plastering first plastered mortar; (6), constructing the alkali-resistant glass fiber mesh cloth; (7), mounting anchoring parts; (8), plastering second plastered mortar; (9), constructing the expanded perlite heat-insulation plates when the expanded perlite heat-insulation plates are about to be used as fireproof isolation areas; (10), constructing decorative finish layers of the external walls. The method has the advantages that merits of various methods for external heat-insulation systems of external walls are integrated with one another, domestic advanced external heat-insulation technologies for the external walls are implemented, energy-saving standard requirements of different climatic regions can be met, the method is wide in application range, the external heat-insulation systems are excellent in heat-insulation performance, weather resistance and durability, indoor heat environments and the environmental quality of buildings can be guaranteed, and power consumption of the buildings can be reduced.

Description

The construction method of expanded perlite thermal-nsulation plate exterior wall external heat preservation system
Technical field
The present invention relates to a kind of construction method, especially the construction method of expanded perlite thermal-nsulation plate exterior wall external heat preservation system.
Background technology
Along with China's economy and social fast development, " energy-saving and emission-reduction " have become the important industry policy realizing China's target of sustainable development, and external wall outer insulation is a ring important in building energy conservation.In recent years, the progressively raising of energy saving igniter, promote the development of building thermal insulation material, the external wall outer insulation materials and systems of looking for novelty should meet insulation, the fireproof performance requirement of energy-saving design, easy construction again, guarantee construction quality and use safety, reduce site operation wet trade as far as possible, become the common recognition that each side pays close attention to and the common objective of carrying out application technical research.Architecture exterior wall insulating materials is changed the inexorable trend of the development being insulation industry to Inorganic system, paste system to plate system by organic system, have wide market prospects.
Expanded perlite thermal-nsulation plate is with being main raw material(s) by mine tailing, tailings, lightweight expansion perlite, special gelatin gel material, be auxiliary material by exciting agent, water-repelling agent, phase change heat storage material, the compositions such as the dry mash made are puddled by suitable proportion, add appropriate clean water, viscous paste is made through premixing technique, utilize the compression molding of automation machine of making board, there is fire-resistant (A level), light weight, high-strength, impervious, coefficient of thermal conductivity is little, there are the features such as good adhesive property, good effect of heat insulation, easy construction in warming plate and body of wall basic unit.
Summary of the invention
The technical problem to be solved in the present invention is to provide a kind of construction method of expanded perlite thermal-nsulation plate exterior wall external heat preservation system.
The present invention is achieved through the following technical solutions.
A construction method for expanded perlite thermal-nsulation plate exterior wall external heat preservation system, step comprises:
(1) metope process:
Guarantee wall surface levelling, clean, if metope protrudes, play chipping whole, if metope out-of-flatness part, fill with waterproof cement mortar;
(2) benchmark snap the line:
At metope bullet horizontal and vertical control line, to determine the position such as expanded perlite thermal-nsulation plate seam, lattice deformation joint, bracket.
(3) material formulation paste alkali-resisting glass fiber screen cloth:
Configuration adhesive mortar and finishing mucilage, adhesive mortar is according to percentage by weight, comprise portland cement 38%-44%, quartz sand 11%-17%, fine sand 11%-17%, washed-out sand 11%-17%, flyash 11%-17%, redispersable latex powder 1%-6%, polyvinyl alcohol 0.2%-0.3%, hydroxypropyl methyl cellulose ether 0.1%-0.2%, finishing mucilage is that the portland cement of P.042.5 level forms according to material-water ratio 1:0.21-0.23 configuration, wherein the grain fineness number modulus of portland cement is 2.0-2.8, particle diameter is not more than 2.5mm, mud content is not more than 5%, the every square meter consumption of finishing mucilage is at 1-1.5KG, on the end limit of metope expanded perlite thermal-nsulation plate, malformation is stitched, outer door and window hole first pastes alkali-resisting glass fiber screen cloth with adhesive mortar,
(4) expanded perlite thermal-nsulation plate is pasted:
Expanded perlite thermal-nsulation board size is 300-400mm × 300-400mm, thickness is 20mm ~ 60mm, expanded perlite thermal-nsulation back full coat adhesive mortar, plate is pasted on surface of wall, bond area is not less than 80%, whole metope or the region delimited according to snap the line start from top or bottom to paste, according to from top to bottom or from bottom to up, from left to right or dextrosinistral order, make real with rubber hammer and flatten, be close to mutually between adjacent expanded perlite thermal-nsulation plate about during stickup, align, fissure of displacement arrangement between neighbouring expanded perlite thermal-nsulation plate;
(5) criticize and smear first pass finishing mucilage:
Smear anticracking grout at twice at expanded perlite thermal-nsulation plate external surface, during coating ornamental surface, thickness thickness when 6-8mm, curtain wall facing is 4-6mm, and therebetween alkali resistant glass fibre open weave cloth is strengthened, and adopts expansion anchor to reinforce;
Coating ornamental surface be inner wall of building, ceiling or exterior wall surface basic unit after treatment, the building finishing of spray, slurry or coating, be mainly used for protection body of wall, beautify building, and meet instructions for use, improve indoor lighting and clean conditions.Curtain wall facing is the exterior wall enclosure of building, and not load-bearing, hangs up as curtain, is enclosed in the periphery of main structure and makes whole building reach attractive in appearance, the exterior wall finish of multi-functional safety again;
First time, anticracking grout was smeared in expanded perlite thermal-nsulation plate surface, and thickness 3 ~ 4mm is 2 ~ 3mm during curtain wall facing, smears second time levelling anticracking grout after paving alkali resistant glass fibre open weave cloth again;
(6) alkali-resistant glass fiber mesh cloth construction:
The double-deck alkali-resisting glass fiber screen cloth of metope paving, first floor docking paving, then carries out second layer paving, pastes anticracking grout between two-layer alkali-resisting glass fiber screen cloth;
(7) anchoring piece is installed:
The anchoring piece quantity of expanded perlite thermal-nsulation plate exterior wall external heat preservation system is 5-12/m 2; Be 4-8/m during building curtain wall facing 2, the installation of anchoring piece is secondary in two batches to be carried out, and first time installs after expanded perlite thermal-nsulation plate adhesive mortar pre-fixes, and bolt quantity is about the 20-40% of crab-bolt sum; Second time to be carried out when being pressed into the initial set of alkali-resisting glass fiber screen cloth at first pass anticracking grout, bolt quantity is about the 60-80% of design crab-bolt sum, the metope punching that the crab-bolt hole using electric drill to reserve at expanded perlite thermal-nsulation plate is corresponding, inserts in the hole anchoring piece through expanded perlite thermal-nsulation plate;
(8) criticize and smear second time finishing mucilage:
Second time anticracking grout is thick is 3 ~ 4mm, and be 2 ~ 3mm during curtain wall facing, cover alkali-proof glass fiber mesh, should suitably sprinkle water after construction maintenance 2-5 days;
(9) exterior wall finish layer construction:
Namely flexible waterproof putty construction is carried out after float coat surface drying, criticize with steamed bun cutter or scraper plate and scrape, after first pass flexible waterproof putty surface drying, scrape second time flexible waterproof putty again, compacting polishing survives, after flexible waterproof putty is completely solid, namely investment precoat construction is carried out, investment precoat is according to percentage by weight, comprise water aluminium polychloride 41%-47%, PAC 5%-10%, dispersing agent 5%-10%, defoamer 0.05-0.01%, kaolin 5%-12%, titanium dioxide 5%-12%, AMP950.15%-0.20%, coalescents 1.5%-2.0%, propane diols 0.5%-1% anticorrisive agent 0.14%-0.19%, defoamer 0.22%-0.27%, emulsion 18%-25%, water 7%-15%, from wall top, carry out from top to down.
Beneficial effect of the present invention:
Combine the advantage of various external thermal insulation system way, it is domestically leading External Thermal Insulation Technology for External, the energy conservation standard requirement in Different climate district can be met, applied widely, thermal and insulating performance is excellent, weather-proof ability is good, excellent durability, ensure that indoor thermal environment and the environmental quality of building, decrease building energy consumption.Its safety can avoid common external wall outer insulation crack and fire prevention accident.
Accompanying drawing explanation
Fig. 1 is the schematic flow sheet of the construction method of expanded perlite thermal-nsulation plate exterior wall external heat preservation system of the present invention.
Detailed description of the invention
According to drawings and embodiments the present invention is described in further detail below.
Fig. 1 is the schematic flow sheet of the construction method of expanded perlite thermal-nsulation plate exterior wall external heat preservation system of the present invention, with reference to Fig. 1, the present invention, and the construction method of bright expanded perlite thermal-nsulation plate exterior wall external heat preservation system, step comprises:
A construction method for expanded perlite thermal-nsulation plate exterior wall external heat preservation system, step comprises:
(1) metope process:
Guarantee wall surface levelling, clean, if metope protrudes, play chipping whole, if metope out-of-flatness part, fill with waterproof cement mortar;
(2) benchmark snap the line:
At metope bullet horizontal and vertical control line, to determine the position such as expanded perlite thermal-nsulation plate seam, lattice deformation joint, bracket.
(3) material formulation paste alkali-resisting glass fiber screen cloth:
Configuration adhesive mortar and finishing mucilage, adhesive mortar is according to percentage by weight, comprise portland cement 38%-44%, quartz sand 11%-17%, fine sand 11%-17%, washed-out sand 11%-17%, flyash 11%-17%, redispersable latex powder 1%-6%, polyvinyl alcohol 0.2%-0.3%, hydroxypropyl methyl cellulose ether 0.1%-0.2%, finishing mucilage is that the portland cement of P.042.5 level forms according to material-water ratio 1:0.21-0.23 configuration, wherein the grain fineness number modulus of portland cement is 2.0-2.8, particle diameter is not more than 2.5mm, mud content is not more than 5%, the every square meter consumption of finishing mucilage is at 1-1.5KG, on the end limit of metope expanded perlite thermal-nsulation plate, malformation is stitched, outer door and window hole first pastes alkali-resisting glass fiber screen cloth with adhesive mortar,
(4) expanded perlite thermal-nsulation plate is pasted:
Expanded perlite thermal-nsulation board size is 300-400mm × 300-400mm, thickness is 20mm ~ 60mm, expanded perlite thermal-nsulation back full coat adhesive mortar, plate is pasted on surface of wall, bond area is not less than 80%, whole metope or the region delimited according to snap the line start from top or bottom to paste, according to from top to bottom or from bottom to up, from left to right or dextrosinistral order, make real with rubber hammer and flatten, be close to mutually between adjacent expanded perlite thermal-nsulation plate about during stickup, align, fissure of displacement arrangement between neighbouring expanded perlite thermal-nsulation plate;
(5) criticize and smear first pass finishing mucilage:
Smear anticracking grout at twice at expanded perlite thermal-nsulation plate external surface, during coating ornamental surface, thickness thickness when 6-8mm, curtain wall facing is 4-6mm, and therebetween alkali resistant glass fibre open weave cloth is strengthened, and adopts expansion anchor to reinforce;
First time, anticracking grout was smeared in expanded perlite thermal-nsulation plate surface, and thickness 3 ~ 4mm is 2 ~ 3mm during curtain wall facing, smears second time levelling anticracking grout after paving alkali resistant glass fibre open weave cloth again.
(6) alkali-resistant glass fiber mesh cloth construction:
The double-deck alkali-resisting glass fiber screen cloth of metope paving, first floor docking paving, then carries out second layer paving, pastes anticracking grout between two-layer alkali-resisting glass fiber screen cloth;
(7) anchoring piece is installed:
The anchoring piece quantity of expanded perlite thermal-nsulation plate exterior wall external heat preservation system is 5-12/m 2; Be 4-8/m during building curtain wall facing 2, the installation of anchoring piece is secondary in two batches to be carried out, and first time installs after expanded perlite thermal-nsulation plate adhesive mortar pre-fixes, and bolt quantity is about the 20-40% of crab-bolt sum; Second time to be carried out when being pressed into the initial set of alkali-resisting glass fiber screen cloth at first pass anticracking grout, bolt quantity is about the 60-80% of design crab-bolt sum, the metope punching that the crab-bolt hole using electric drill to reserve at expanded perlite thermal-nsulation plate is corresponding, inserts in the hole anchoring piece through expanded perlite thermal-nsulation plate;
(8) criticize and smear second time finishing mucilage:
Second time anticracking grout is thick is 3 ~ 4mm, and be 2 ~ 3mm during curtain wall facing, cover alkali-proof glass fiber mesh, should suitably sprinkle water after construction maintenance 2-5 days;
(9) exterior wall finish layer construction:
Namely flexible waterproof putty construction is carried out after float coat surface drying, criticize with steamed bun cutter or scraper plate and scrape, after first pass flexible waterproof putty surface drying, scrape second time flexible waterproof putty again, compacting polishing survives, after flexible waterproof putty is completely solid, namely investment precoat construction is carried out, investment precoat is according to percentage by weight, comprise water aluminium polychloride 41%-47%, PAC 5%-10%, dispersing agent 5%-10%, defoamer 0.05-0.01%, kaolin 5%-12%, titanium dioxide 5%-12%, AMP950.15%-0.20%, coalescents 1.5%-2.0%, propane diols 0.5%-1% anticorrisive agent 0.14%-0.19%, defoamer 0.22%-0.27%, emulsion 18%-25%, water 7%-15%, from wall top, carry out from top to down.
Expanded perlite thermal-nsulation plate exterior wall external heat preservation system is made up of adhesive mortar, expanded perlite thermal-nsulation plate, anticracking grout and coating or curtain wall finish coat, expanded perlite thermal-nsulation plate is reliably connected with basic unit by the mode of " to glue, sticky nail combination ", is aided with that alkali resistant glass fibre open weave cloth carries out strengthening, cracking resistance process in anticracking grout.
The present invention, combine the advantage of various external thermal insulation system way, it is domestically leading External Thermal Insulation Technology for External, the energy conservation standard requirement in Different climate district can be met, applied widely, thermal and insulating performance is excellent, weather-proof ability is good, excellent durability, ensure that indoor thermal environment and the environmental quality of building, decrease building energy consumption.Its safety can avoid common external wall outer insulation crack and fire prevention accident.Meet the relevant requirements of national green construction, be confirmed in multiple engineer applied, there is good social benefit and environmental benefit.
High, nontoxic, tasteless, the non-volatile material of expanded perlite thermal-nsulation plate intensity, associativity and good waterproof performance, in factory process producing shaped, on-the-spot stickup, greatly reduce site operation wet trade, programming is fast; Favourable energy-conservation, sharp useless and environmental protection; Can coating or curtain wall facing outside heat-insulation system, meet different facade designing requirement, cost performance is excellent; The development of related industry can be promoted simultaneously, economic benefit and social benefit remarkable.
Above-described embodiment, only for technical conceive of the present invention and feature are described, its object is to allow the personage being familiar with this art can understand content of the present invention and be implemented, can not limit the scope of the invention with this.All equivalences done according to Spirit Essence of the present invention change or modify, and all should be encompassed in protection scope of the present invention.

Claims (1)

1. a construction method for expanded perlite thermal-nsulation plate exterior wall external heat preservation system, is characterized in that, step comprises:
(1) metope process:
Guarantee wall surface levelling, clean, if metope protrudes, play chipping whole, if metope out-of-flatness part, fill with waterproof cement mortar;
(2) benchmark snap the line:
At metope bullet horizontal and vertical control line, to determine the position such as expanded perlite thermal-nsulation plate seam, lattice deformation joint, bracket.
(3) material formulation paste alkali-resisting glass fiber screen cloth:
Configuration adhesive mortar and finishing mucilage, adhesive mortar is according to percentage by weight, comprise portland cement 38%-44%, quartz sand 11%-17%, fine sand 11%-17%, washed-out sand 11%-17%, flyash 11%-17%, redispersable latex powder 1%-6%, polyvinyl alcohol 0.2%-0.3%, hydroxypropyl methyl cellulose ether 0.1%-0.2%, finishing mucilage is that the portland cement of P.042.5 level forms according to material-water ratio 1:0.21-0.23 configuration, wherein the grain fineness number modulus of portland cement is 2.0-2.8, particle diameter is not more than 2.5mm, mud content is not more than 5%, the every square meter consumption of finishing mucilage is at 1-1.5KG, on the end limit of metope expanded perlite thermal-nsulation plate, malformation is stitched, outer door and window hole first pastes alkali-resisting glass fiber screen cloth with adhesive mortar,
(4) expanded perlite thermal-nsulation plate is pasted:
Expanded perlite thermal-nsulation board size is 300-400mm × 300-400mm, thickness is 20mm ~ 60mm, expanded perlite thermal-nsulation back full coat adhesive mortar, plate is pasted on surface of wall, bond area is not less than 80%, whole metope or the region delimited according to snap the line start from top or bottom to paste, according to from top to bottom or from bottom to up, from left to right or dextrosinistral order, make real with rubber hammer and flatten, be close to mutually between adjacent expanded perlite thermal-nsulation plate about during stickup, align, fissure of displacement arrangement between neighbouring expanded perlite thermal-nsulation plate;
(5) criticize and smear first pass finishing mucilage:
Smear anticracking grout at twice at expanded perlite thermal-nsulation plate external surface, during coating ornamental surface, thickness thickness when 6-8mm, curtain wall facing is 4-6mm, and therebetween alkali resistant glass fibre open weave cloth is strengthened, and adopts expansion anchor to reinforce;
First time, anticracking grout was smeared in expanded perlite thermal-nsulation plate surface, and thickness 3 ~ 4mm is 2 ~ 3mm during curtain wall facing, smears second time levelling anticracking grout after paving alkali resistant glass fibre open weave cloth again;
(6) alkali-resistant glass fiber mesh cloth construction:
The double-deck alkali-resisting glass fiber screen cloth of metope paving, first floor docking paving, then carries out second layer paving, pastes anticracking grout between two-layer alkali-resisting glass fiber screen cloth;
(7) anchoring piece is installed:
The anchoring piece quantity of expanded perlite thermal-nsulation plate exterior wall external heat preservation system is 5-12/㎡; Be 4-8/㎡ during building curtain wall facing, the installation of anchoring piece is secondary in two batches to be carried out, and first time installs after expanded perlite thermal-nsulation plate adhesive mortar pre-fixes, and bolt quantity is about the 20-40% of crab-bolt sum; Second time to be carried out when being pressed into the initial set of alkali-resisting glass fiber screen cloth at first pass anticracking grout, bolt quantity is about the 60-80% of design crab-bolt sum, the metope punching that the crab-bolt hole using electric drill to reserve at expanded perlite thermal-nsulation plate is corresponding, inserts in the hole anchoring piece through expanded perlite thermal-nsulation plate;
(8) criticize and smear second time finishing mucilage:
Second time anticracking grout is thick is 3 ~ 4mm, and be 2 ~ 3mm during curtain wall facing, cover alkali-proof glass fiber mesh, should suitably sprinkle water after construction maintenance 2-5 days;
(9) construction of exterior wall finish layer should meet following requirement:
Namely flexible waterproof putty construction is carried out after float coat surface drying, criticize with steamed bun cutter or scraper plate and scrape, after first pass flexible waterproof putty surface drying, scrape second time flexible waterproof putty again, compacting polishing survives, after flexible waterproof putty is completely solid, namely investment precoat construction is carried out, investment precoat is according to percentage by weight, comprise water aluminium polychloride 41%-47%, PAC 5%-10%, dispersing agent 5%-10%, defoamer 0.05-0.01%, kaolin 5%-12%, titanium dioxide 5%-12%, AMP950.15%-0.20%, coalescents 1.5%-2.0%, propane diols 0.5%-1% anticorrisive agent 0.14%-0.19%, defoamer 0.22%-0.27%, emulsion 18%-25%, water 7%-15%, from wall top, carry out from top to down.
CN201510042165.XA 2015-01-27 2015-01-27 The construction method of expanded perlite thermal-nsulation plate exterior wall external heat preservation system Active CN104674962B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510042165.XA CN104674962B (en) 2015-01-27 2015-01-27 The construction method of expanded perlite thermal-nsulation plate exterior wall external heat preservation system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510042165.XA CN104674962B (en) 2015-01-27 2015-01-27 The construction method of expanded perlite thermal-nsulation plate exterior wall external heat preservation system

Publications (2)

Publication Number Publication Date
CN104674962A true CN104674962A (en) 2015-06-03
CN104674962B CN104674962B (en) 2016-08-24

Family

ID=53310507

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510042165.XA Active CN104674962B (en) 2015-01-27 2015-01-27 The construction method of expanded perlite thermal-nsulation plate exterior wall external heat preservation system

Country Status (1)

Country Link
CN (1) CN104674962B (en)

Cited By (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106759975A (en) * 2016-12-05 2017-05-31 青岛天源伟业保温防水工程有限公司 A kind of construction method of EPS wall thermal insulation structures
CN108277894A (en) * 2017-01-05 2018-07-13 烟台政通节能建材设备制造有限公司 A kind of plate heat preserving formwork mounting process of concrete shear force wall
CN108457389A (en) * 2018-02-11 2018-08-28 河北晨阳工贸集团有限公司 A kind of construction technology that exterior wall is pasted with soft and graceful soft rock finished product
CN109057059A (en) * 2018-08-15 2018-12-21 徽都建设有限公司 A kind of thermal insulation construction technique of exterior walls of buildings
CN109736520A (en) * 2019-01-14 2019-05-10 龚柱 The laying method of wall cladding sheets
CN110206174A (en) * 2019-05-27 2019-09-06 中国十七冶集团有限公司 One kind prevents expanded perlite thermal-nsulation composite plate from falling off node and its construction method
CN110424558A (en) * 2019-07-30 2019-11-08 北京崇建工程有限公司 A kind of anti-hollowing of board bottom insulating layer, fall off construction method
CN111003993A (en) * 2019-11-27 2020-04-14 山东大学 Modifier for high liquid limit clay and application thereof
CN111005443A (en) * 2019-11-27 2020-04-14 广西建工集团第五建筑工程有限责任公司 Construction method for punching and sticking insulation board of waterproof protection layer of basement outer wall
CN111305397A (en) * 2020-02-28 2020-06-19 盐城笃诚建设有限公司 Building outer wall waterproof structure and construction method
CN111535462A (en) * 2020-03-27 2020-08-14 上海二十冶建设有限公司 Construction method of outer wall homogeneous modified fireproof insulation board
CN114250870A (en) * 2021-12-25 2022-03-29 汝州市东江建筑工业科技有限公司 Preparation process of prefabricated simple outdoor heat insulation system
CN115075576A (en) * 2022-07-21 2022-09-20 中国十七冶集团有限公司 Construction method of homogeneous modified fireproof insulation board

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0814186B2 (en) * 1990-05-09 1996-02-14 北海道農材工業株式会社 Outer wall of building and its construction method
CN101168994A (en) * 2007-11-30 2008-04-30 康玉范 Outside thermal insulation construction method for anchoring and sticking composite thermal insulation plate outside wall
CN103834222A (en) * 2013-12-25 2014-06-04 杨昌富 Outer wall paint
CN103924696A (en) * 2013-01-10 2014-07-16 昆山蓝胜建材有限公司 Aerogel insulation board thin plastering thermal insulation system and manufacture method thereof
CN104179263A (en) * 2014-09-01 2014-12-03 中启胶建集团有限公司 Building exterior wall external thermal insulation system waterproof and drainage construction method
CN104178014A (en) * 2014-09-17 2014-12-03 遵义市斌灏信息咨询有限公司 External wall coating and preparation method thereof

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0814186B2 (en) * 1990-05-09 1996-02-14 北海道農材工業株式会社 Outer wall of building and its construction method
CN101168994A (en) * 2007-11-30 2008-04-30 康玉范 Outside thermal insulation construction method for anchoring and sticking composite thermal insulation plate outside wall
CN103924696A (en) * 2013-01-10 2014-07-16 昆山蓝胜建材有限公司 Aerogel insulation board thin plastering thermal insulation system and manufacture method thereof
CN103834222A (en) * 2013-12-25 2014-06-04 杨昌富 Outer wall paint
CN104179263A (en) * 2014-09-01 2014-12-03 中启胶建集团有限公司 Building exterior wall external thermal insulation system waterproof and drainage construction method
CN104178014A (en) * 2014-09-17 2014-12-03 遵义市斌灏信息咨询有限公司 External wall coating and preparation method thereof

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
陆凯安: "憎水珍珠岩保温板开发与应用研究", 《房材与应用》 *

Cited By (16)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106759975B (en) * 2016-12-05 2019-02-15 青岛天源伟业保温防水工程有限公司 A kind of construction method of EPS wall thermal insulation structure
CN106759975A (en) * 2016-12-05 2017-05-31 青岛天源伟业保温防水工程有限公司 A kind of construction method of EPS wall thermal insulation structures
CN108277894A (en) * 2017-01-05 2018-07-13 烟台政通节能建材设备制造有限公司 A kind of plate heat preserving formwork mounting process of concrete shear force wall
CN108457389A (en) * 2018-02-11 2018-08-28 河北晨阳工贸集团有限公司 A kind of construction technology that exterior wall is pasted with soft and graceful soft rock finished product
CN109057059A (en) * 2018-08-15 2018-12-21 徽都建设有限公司 A kind of thermal insulation construction technique of exterior walls of buildings
CN109736520B (en) * 2019-01-14 2022-08-16 泉州睿郎机电技术有限公司 Method for laying wall covering plate
CN109736520A (en) * 2019-01-14 2019-05-10 龚柱 The laying method of wall cladding sheets
CN110206174A (en) * 2019-05-27 2019-09-06 中国十七冶集团有限公司 One kind prevents expanded perlite thermal-nsulation composite plate from falling off node and its construction method
CN110424558A (en) * 2019-07-30 2019-11-08 北京崇建工程有限公司 A kind of anti-hollowing of board bottom insulating layer, fall off construction method
CN111003993A (en) * 2019-11-27 2020-04-14 山东大学 Modifier for high liquid limit clay and application thereof
CN111005443A (en) * 2019-11-27 2020-04-14 广西建工集团第五建筑工程有限责任公司 Construction method for punching and sticking insulation board of waterproof protection layer of basement outer wall
CN111305397A (en) * 2020-02-28 2020-06-19 盐城笃诚建设有限公司 Building outer wall waterproof structure and construction method
CN111305397B (en) * 2020-02-28 2021-05-18 盐城笃诚建设有限公司 Building outer wall waterproof structure and construction method
CN111535462A (en) * 2020-03-27 2020-08-14 上海二十冶建设有限公司 Construction method of outer wall homogeneous modified fireproof insulation board
CN114250870A (en) * 2021-12-25 2022-03-29 汝州市东江建筑工业科技有限公司 Preparation process of prefabricated simple outdoor heat insulation system
CN115075576A (en) * 2022-07-21 2022-09-20 中国十七冶集团有限公司 Construction method of homogeneous modified fireproof insulation board

Also Published As

Publication number Publication date
CN104674962B (en) 2016-08-24

Similar Documents

Publication Publication Date Title
CN104674962B (en) The construction method of expanded perlite thermal-nsulation plate exterior wall external heat preservation system
CN100585105C (en) Insulating decoration integral board for building exterior wall
CN101158213B (en) Exterior outer-insulating system construction method for using direct-compress EPS inorganic clad plate
CN201826405U (en) Environment-friendly wall insulating structure for prefabricated buildings
CN202644775U (en) Prefabricated sandwich external wall panel with thermal insulation concrete
CN201284516Y (en) Wall heat-preserving system
CN201891179U (en) Wall composite heat insulation system
CN106013475B (en) A kind of steel house gypsum base water-proof fire-retardant goes along with sb. to guard him heat-insulation system and preparation method
CN102011470A (en) Fire prevention, thermal insulation and decoration integrated board
CN207714657U (en) A kind of new A grade fire-retardant heat insulation decorative integrated plate
CN108086614A (en) A kind of A grades of fire-retardant heat insulation decorative integrated plate and preparation method thereof
CN103276818A (en) Construction technology of inorganic glass bead heat preservation outer wall
CN103850362A (en) GHB (Glazed Hollow Bead) heat preservation and heat insulation building wall body and construction technology
CN102011437B (en) Fireproof outer wall heat-insulating system and manufacturing method thereof
CN201236390Y (en) Cement composite polystyrene foam thermal insulation thermal shield
CN202672534U (en) Aerated concrete wall surface coating
CN105239745B (en) Integrated wallboard and its plate stitch processing method
CN203452212U (en) Building wall surface heat insulation system and building wall body
CN100396862C (en) Thermal insulation system structure for mineral wool coated building
CN205476220U (en) Composite sheet is decorated to building outer wall
CN103397713B (en) A kind of self-insulation wall structure
CN103410316A (en) Method for conducting construction on plaster base inorganic thermal insulating mortar system
CN211499917U (en) Assembled steel construction house
CN108166704A (en) A kind of thin-coat plaster heat insulating decorative board and preparation method thereof
CN106567464A (en) Thinly-plastered external wall thermal insulation system provided with composite sandwich vacuum insulation board

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant