CN109736520A - The laying method of wall cladding sheets - Google Patents

The laying method of wall cladding sheets Download PDF

Info

Publication number
CN109736520A
CN109736520A CN201910033327.1A CN201910033327A CN109736520A CN 109736520 A CN109736520 A CN 109736520A CN 201910033327 A CN201910033327 A CN 201910033327A CN 109736520 A CN109736520 A CN 109736520A
Authority
CN
China
Prior art keywords
panel
press strip
wall cladding
metope
cladding sheets
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201910033327.1A
Other languages
Chinese (zh)
Other versions
CN109736520B (en
Inventor
龚柱
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Quanzhou Ruilang Mechanical and Electrial Technology Co Ltd
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201910033327.1A priority Critical patent/CN109736520B/en
Publication of CN109736520A publication Critical patent/CN109736520A/en
Priority to GB2012072.1A priority patent/GB2584230B/en
Priority to CN201980011544.9A priority patent/CN111801473B/en
Priority to PCT/CN2019/118642 priority patent/WO2020147412A1/en
Priority to GB2000554.2A priority patent/GB2581435B/en
Priority to US16/742,810 priority patent/US11199009B2/en
Priority to IE20200010A priority patent/IE20200010A2/en
Application granted granted Critical
Publication of CN109736520B publication Critical patent/CN109736520B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Finishing Walls (AREA)
  • Building Environments (AREA)

Abstract

The present invention discloses a kind of laying method of wall cladding sheets, belong to decoration field, it is the following steps are included: 1. place auxiliary line, 2. placing and fastening the first press strip, 3. place the first pearl cotton, and 4. place the first wall cladding sheets, 5. placing and fastening the second press strip, 6. placing the second pearl cotton, 7. place the second wall cladding sheets, and 8. place and fasten third press strip.Following beneficial effect can be brought using method disclosed by the invention, 1., which have prevented ceramic tile, falls the hidden danger hurted sb.'s feelings because of hollowing;2. no moisture distributes in Room, no moisture;3. formaldehydeless pollution;4. ceramic tile no-load centrostigma, is not easily broken when ceramic tile is impacted;5. facilitating ceramic tile secondary use, resources effective utilization prevents the wasting of resources;6. improving the thermal insulation property and sound insulation value of wall;7. wall is thinner lighter, the burden of floor beam body is alleviated;8. reducing the loss of usable floor area in covering.

Description

The laying method of wall cladding sheets
Technical field
The present invention relates to decoration field, in particular to a kind of laying method of wall cladding sheets.
Background technique
In decoration field, the decoration of metope is usually first levelling to blank metope with cement mortar, then is beaten with powder of lacquer putty for use on Bottom is finally coated with emulsion paint, and such decoration process inevitably has formaldehyde pollution, causes healthy hidden danger to indoor personnel.Cause This, in order to avoid formaldehyde pollution, the decoration of metope uses wall cladding sheets, wall cladding sheets such as natural marble, Huo Zheren Making marble, perhaps perhaps glass or metal plate need before wall cladding sheets are layed in metope to blank wall ceramic tile Face carries out smearing cement mortar screeding, and cement mortar thickness is about 5 millimeters or so, is again covered metope with cement mortar after levelling Plate is layed on above-mentioned levelling good metope, and the thickness of cement mortar used is about 10 millimeters or so, therefore, total cement bonded sand Starching thickness is about 15 millimeters or so, and pasting wall cladding sheets decoration using cement mortar can be to avoid formaldehyde pollution, but significantly Metope thickness is increased, usable floor area in set is reduced, due to using cement mortar in process of deployment, wall cladding sheets In one period after laying, the moisture in metope is slowly distributed, and indoor moisture is made to have peculiar smell greatly.How one kind is designed i.e. It can avoid the decoration that formaldehyde pollution does not greatly increase metope thickness again, become problem to be solved by this invention.
Summary of the invention
The purpose of the present invention is to solve the above problem, and provides a kind of laying method of wall cladding sheets, it can keeps away Exempt from formaldehyde pollution and does not greatly increase metope thickness again.
For this purpose, the present invention provides a kind of laying method of wall cladding sheets comprising following steps:
C1. auxiliary line is placed, auxiliary line is placed on ground (1), is laid with wall cladding sheets along auxiliary line;
C2. it places the first press strip (10), adjusts the first press strip (10), make first panel (16) close proximity to ground of the first press strip (10) (1), make the first press strip (10) second panel (17) and metope (2) cooperate, the third panel (18) of the first press strip (10) with it is auxiliary Index contour is close to;
C3. the first expandable nail (13) are placed, are drilled on metope (2) with the first mounting hole corresponding position on the first press strip (10), The first press strip (10) is anchored on metope (2) by the first expandable nail (13);
C4. the first pearl cotton (11) are placed, the first pearl cotton (11) is made to be close to metope (2), the first pearl cotton (11) and the first pressure The distance between third panel (18) of item (10) is slightly less than the thickness of the first wall cladding sheets (12);
C5. it places the first wall cladding sheets (12), the first wall cladding sheets (12) are assemblied in the first press strip in a manner of interference (10) between third panel (18) and the first pearl cotton (11);
C6. it places the second press strip (20), adjusts the second press strip (20), the fourth face plate (26) of the second press strip (20) is made to be close to first First face of wall cladding sheets (12) cooperates the 5th panel (27) of the second press strip (20) and metope (2), the second press strip (20) The 6th panel (28) be close to the first wall cladding sheets (12) the second face;
C7. the second expandable nail (23) are placed, are drilled on metope (2) with the second mounting hole corresponding position on the second press strip (20), The second press strip (20) is anchored on metope (2) by the second expandable nail (23);
C8. the second pearl cotton (21) are placed, the second pearl cotton (21) is made to be close to metope (2), the second pearl cotton (21) and the second pressure The distance between 6th panel (28) of article (20) is slightly less than the thickness of the second wall cladding sheets (22);
C9. it places the second wall cladding sheets (22), the second wall cladding sheets (22) are assemblied in the second press strip in a manner of interference (20) between the 6th panel (28) and the second pearl cotton (21);
C10. third press strip (30) are placed, adjusted third press strip (30), the 7th panel (36) of third press strip (30) is made to be close to the The third face of two wall cladding sheets (22) cooperates the octahedral plate (37) of third press strip (30) and metope (2), third press strip (30) the 9th panel (38) is close to the fourth face of the second wall cladding sheets (22);
C11. third expandable nail (33) are placed, drilled on metope (2) with the third mounting hole corresponding position on third press strip (30), Third press strip (30) is anchored on metope (2) by third expandable nail (33).
Advantageously, step c2 also passes through the second panel (17) and metope of the first backing plate (15) filling the first press strip (10) The distance between (2), step c6 also passes through the 5th panel (27) and metope (2) of the second backing plate (25) filling the second press strip (20) The distance between, step c10 also pass through third backing plate (35) filling third press strip (30) octahedral plate (37) and metope (2) it Between distance.
Advantageously, further include being vertically aligned step: c12. makes the first wall cladding sheets by adjusting third backing plate (35) (12) fourth face in the second face and the second wall cladding sheets (22) is located on same vertical plane.
Optionally, wall cladding sheets are lithotome or artificial stone or ceramic tile.
Specifically, the first press strip (10) includes first panel (16), second panel (17) and third panel (18), the second face Plate (17) is parallel to third panel (18), and first panel (16) is vertically connected at second panel (17) and third panel (18), the Two panels (17) and third panel (18) are located at the ipsilateral of first panel (16), and second panel (17) setting is used for the first of installation Mounting hole;
Second press strip (20) includes fourth face plate (26), the 5th panel (27) and the 6th panel (28), and the 5th panel (27) is parallel In the 6th panel (28), fourth face plate (26) is vertically connected at the middle part of the 5th panel (27), and the 5th panel (27) is located at the 4th The side of panel (26), second mounting hole of the 5th panel (27) setting for installation;
Third press strip (30) includes the 7th panel (36), octahedral plate (37) and the 9th panel (38), octahedral plate (37) and the Nine panels (38), octahedral plate (37) are parallel to the 9th panel (38), and the 7th panel (36) is vertically connected at octahedral plate (37) With the 9th panel (38), octahedral plate (37) and the 9th panel (38) are located at the opposite side of the 7th panel (36), octahedral plate (37) third mounting hole of the setting for installation.
The present invention also provides a kind of laying methods of wall cladding sheets, and the first press strip is anchored on ground, the first press strip Mounting hole be set to first panel.
Beneficial effect
It can be brought the following benefits using the laying method of wall cladding sheets disclosed by the invention:
1. due to using mechanical system fastening ceramic tile, the generation of hollowing phenomenon is avoided, to prevent ceramic tile due to hollowing Fall the hidden danger hurted sb.'s feelings.
2. not using water and mortar, therefore, indoor anhydrous dispersion due to using mechanical fasteners in ceramic tile process of deployment completely Hair, no moisture.
3. it is not bonded using glue due to using mechanical fasteners in ceramic tile process of deployment completely, it is therefore, indoor formaldehydeless It distributes, formaldehydeless pollution.
4. the intact nothing of ceramic tile cuts slot due to the edge for clasping ceramic tile from ceramic tile front using press strip, the ceramic tile back side is laid with precious Pearl cotton, ceramic tile between the walls by pearl cotton buffering, therefore, ceramic tile no-load centrostigma, when ceramic tile front is hit, Impact force is discharged into pearl cotton by the entire ceramic tile back side, and symmetrical load, no-load centrostigma, thus, ceramic tile is not easily broken.
5. due to using expansion nail fastening, this is a kind of dismountable assembly method, when needing to fit up metope again, It is convenient to intactly disassemble wall cladding sheets from metope, and then carries out secondary use, resources effective utilization, The wasting of resources is prevented.
6. improving the thermal insulation property and sound insulation value of wall due to the independent air bubble structure of pearl cotton.
7. the cement mortar adhesive layer of cement mortar screeding layer and the wall cladding sheets back side is replaced using pearl cotton, so that wall Body is thinner lighter, alleviates the burden of floor beam body, while decreasing the loss for covering interior usable floor area.
8. due to the pearl cotton at the ceramic tile back side bear be the entire ceramic tile back side load, the area of monolithic ceramic tile gets over Greatly, the load born on the unit area of pearl cotton with regard to smaller, and then on pearl cotton unit area deflection with regard to smaller, i.e., Ceramic tile is less susceptible to be displaced towards the method phase direction in ceramic tile face.The hardness of the bulk ceramic tile just laid using pearl cotton as Using hardness of the bulk ceramic tile of cement mortar bonding after solidifying, but weight ratio water's cement mortar of pearl cotton is light.
Detailed description of the invention
It is of the invention and its excellent below in reference to attached drawing in the explanation of the embodiment provided as non-limiting embodiment More property will be better understood that attached drawing is as follows:
Fig. 1 is the partial perspective view of the wall cladding sheets laying method of embodiment one disclosed by the invention;
Fig. 2 is the exploded perspective view of Fig. 1;
Fig. 3 is the partial enlarged view in Fig. 2 at D;
Fig. 4 is the partial enlarged view in Fig. 1 at A;
Fig. 5 is the perspective view of the first press strip;
Fig. 6 is the partial enlarged view in Fig. 1 at B;
Fig. 7 is the perspective view of the second press strip;
Fig. 8 is the partial enlarged view in Fig. 1 at C;
Fig. 9 is the perspective view of third press strip;
Figure 10 is the exploded partial perspective view of Fig. 1;
Figure 11 is the perspective view of backing plate;
Figure 12 is the perspective view of the backing plate of another embodiment;
Figure 13 is the punching line arrangement schematic diagram of the backing plate of Figure 12;
Figure 14 is ceramic tile relative flatness adjustment schematic diagram;
Figure 15 is the perspective view of the first press strip in embodiment two;
Figure 16 is a kind of auxiliary tool being fixed temporarily for ceramic tile disclosed by the invention;
Description of symbols
1. ground;2. metope;
10. the first press strip;11. the first pearl cotton;12. the first wall cladding sheets;13. the first expandable nail;
14. the first expansion sleeve;15. the first backing plate;16. first panel;17. second panel;18. third panel;
20. the second press strip;21. the second pearl cotton;22. the second wall cladding sheets;23. the second expandable nail;
24. the second expansion sleeve;25. the second backing plate;26. fourth face plate;27. the 5th panel;28. the 6th panel;
30. third press strip;33. third expandable nail;34. third expansion sleeve;35. third backing plate;
36. the 7th panel;37. octahedral plate;38. the 9th panel.
Specific embodiment
Embodiment one
As shown in Figure 1, being a kind of completion schematic diagram of the laying method of wall cladding sheets disclosed by the invention, the wall of the present embodiment Face cover plate is using ceramic tile as objective for implementation, and the size of ceramic tile is 600 millimeters of width, 1200 millimeters, 11 millimeters of thickness of height.Pass through The lower edge of first ceramic tile is fixed on metope 2 by the first press strip 10, is consolidated the top edge of the first ceramic tile by the second press strip 20 It is scheduled on metope 2, the first pearl cotton 11 is clamped between the first ceramic tile and metope 2.It will be under the second ceramic tile by the second press strip 20 Edge is fixed on metope 2, the top edge of second ceramic tile is fixed on metope 2 by third press strip 30, the second ceramic tile and wall Clamp the second pearl cotton 21 between face 2, pearl cotton with a thickness of 5 millimeters.The present embodiment is for being laid with 2 row ceramic tiles, if being laid with Line number is 2) N(N is greater than, then the 1st row (close to ground 1) fixes the first ceramic tile, N using the first press strip 10 and the second press strip 20 Row (close to ceiling) fixes the second ceramic tile using the second press strip 20 and third press strip 30, and the 2nd row to N-1 row is using up and down each 1 A second press strip 20 fixes the first ceramic tile, and press strip is anchored on metope 2 by expansion surely, and metope 2 of the present invention includes but not It is limited to not levelling blank metope or levelling blank metope.
Laying method disclosed in embodiment one is drilled while assembly, suitable for the laying of small area wall, Laying method packet following steps:
C1. auxiliary line is placed, auxiliary line is placed on ground 1, is laid with ceramic tile along auxiliary line, auxiliary line can pass through ink fountain Auxiliary line is placed in ground 1 by the mode of snap the line.
C2. the first press strip 10 is placed, the first press strip 10 is adjusted, makes 16 close proximity to ground 1 of first panel of the first press strip 10, make The second panel 17 and metope 2 of first press strip 10 cooperate, and the third panel 18 of the first press strip 10 is close to auxiliary line.It is of the invention public The laying method opened can be implemented on black skin, since black skin is not yet levelling, the second panel 17 of the first press strip 10 Might have gap presence between metope 2, gap can be filled with the first backing plate 15 herein, especially at the mounting hole between Gap needs to be filled with the first backing plate 15, can be combined by multiple first backing plates 15 and carry out integral thickness adjusting to adapt to difference The filling in gap, as shown in Figure 3.
C3. the first expandable nail 13 is placed, is drilled on metope 2 with the first mounting hole corresponding position on the first press strip 10, is led to It crosses the first expandable nail 13 and the cooperation of the first expansion sleeve 14 and first press strip 10 is anchored on metope 2.
C4. the first pearl cotton 11 is placed, the first pearl cotton 11 is made to be close to metope 2, the first pearl cotton 11 and the first press strip 10 The distance between third panel 18 be slightly less than the thickness of the first ceramic tile, so that the elastic conjunction for the first ceramic tile provides basis.
C5. the first ceramic tile is placed, the first ceramic tile is assemblied in the third panel 18 and of the first press strip 10 in a manner of interference Between one pearl cotton 11.First ceramic tile oblique cutting is entered into the sky between the first pearl cotton 11 and the third panel 18 of the first press strip 10 Between, then with auxiliary tool the first ceramic tile is temporarily fixed at current location.
C6. the second press strip 20 is placed, the second press strip 20 is adjusted, the fourth face plate 26 of the second press strip 20 is made to be close to the first ceramic tile The first face, cooperate the 5th panel 27 of the second press strip 20 with metope 2, the 6th panel 28 of the second press strip 20 is close to the first porcelain Second face of brick.First face of the first ceramic tile is towards the side of ceiling after ceramic tile assembles, and the second face of the first ceramic tile is porcelain The front of brick.Laying method disclosed by the invention can be implemented on black skin, since black skin is not yet levelling, second It might have gap presence between the 5th panel 27 and metope 2 of press strip 20, gap can be filled with the second backing plate 25 herein, special Be not that gap at mounting hole needs to be filled with the second backing plate 25, can pass through the combination of multiple second backing plates 25 carry out it is whole thick Degree adjusts to adapt to the filling of different gap, while being also adjusted to the vertical degree of the first ceramic tile, as shown in Figure 2.
C7. the second expandable nail 23 is placed, is drilled on metope 2 with the second mounting hole corresponding position on the second press strip 20, is led to Second press strip 20 is anchored on metope 2 by the cooperation for crossing the second expandable nail 23 and the second expansion sleeve 24, is removed described in step c5 Auxiliary tool, arrive this, the first ceramic tile laying finish, as shown in Figure 4 and Figure 6.Followed by the laying of the second ceramic tile.
C8. the second pearl cotton 21 is placed, the second pearl cotton 21 is made to be close to metope 2, the second pearl cotton 21 and the second press strip 20 The distance between the 6th panel 28 be slightly less than the thickness of the second ceramic tile;To provide basis for the elastic conjunction of the second ceramic tile.
C9. place the second ceramic tile, the second wall ceramic tile be assemblied in a manner of interference the 6th panel 28 of the second press strip 20 with Between second pearl cotton 21;Second ceramic tile oblique cutting is entered into the sky between the second pearl cotton 21 and the 6th panel 28 of the second press strip 20 Between, then with auxiliary tool the second ceramic tile is temporarily fixed at current location.
C10. third press strip 30 is placed, third press strip 30 is adjusted, the 7th panel 36 of third press strip 30 is made to be close to the second porcelain The third face of brick cooperates the octahedral plate 37 of third press strip 30 and metope 2, and the 9th panel 39 of third press strip 30 is close to second The fourth face of ceramic tile;The third face of second ceramic tile is after ceramic tile assembles towards the side of ceiling, and the fourth face of the second ceramic tile is The front of ceramic tile.Laying method disclosed by the invention can be implemented on black skin, since black skin is not yet levelling, the It might have gap presence between the octahedral plate 37 and metope 2 of three press strips 30, gap can be filled with third backing plate 35 herein, Gap especially at mounting hole needs to be filled with third backing plate 35, can be combined by multiple third backing plates 35 and carry out entirety Thickness adjusts to adapt to the filling of different gap, while being also adjusted to the vertical degree of the second ceramic tile, as shown in Figure 10.
C11. third expandable nail 33 is placed, is drilled on metope 2 with the third mounting hole corresponding position on third press strip 30, is led to It crosses third expandable nail 33 and third expansion sleeve 34 and third press strip 30 is anchored on metope 2, remove auxiliary described in step c9 Tool arrives this, and the laying of the second ceramic tile finishes, as shown in Figure 6 and Figure 8.Followed by the opposite of the first ceramic tile and the second ceramic tile Flatness adjustment.
C12. by adjusting the number of combinations of third backing plate 35 to make the first ceramic tile the second face and the second ceramic tile the Four sides is located on same vertical plane, and the datum level at air-bubble leveling ruler both ends is bonded the first ceramic tile and the second ceramic tile respectively, then makes gas Soaked leveling ruler is vertical, and the bubble by observing air-bubble leveling ruler detects the vertical state of the first ceramic tile and the second ceramic tile, such as Figure 14 It is shown.
As shown in figure 5, being a kind of perspective view of first press strip 10 disclosed by the invention, the first press strip 10 includes first panel 16, second panel 17 and third panel 18, second panel 17 are parallel to third panel 18, and first panel 16 is vertically connected at second Panel 17 and third panel 18, second panel 17 and third panel 18 are located at the ipsilateral of first panel 16, and second panel 17 is arranged Multiple the first mounting holes for installation, the spacing between the first mounting hole are consistent.
As shown in fig. 7, being a kind of perspective view of second press strip 20 disclosed by the invention, the second press strip 20 includes fourth face plate 26, the 5th panel 27 and the 6th panel 28, the 5th panel 27 are parallel to the 6th panel 28, and fourth face plate 26 is vertically connected at the 5th The middle part of panel 27, the 5th panel 27 are located at the side of fourth face plate 26, and multiple second for installation are arranged in the 5th panel 27 Mounting hole, the spacing between the second mounting hole are consistent.
As shown in figure 9, being a kind of perspective view of third press strip 30 disclosed by the invention, third press strip 30 includes the 7th panel 36, octahedral plate 37 and the 9th panel 39, octahedral plate 37 and the 9th panel 39, octahedral plate 37 are parallel to the 9th panel 39, 7th panel 36 is vertically connected at octahedral plate 37 and the 9th panel 39, and octahedral plate 37 and the 9th panel 39 are located at the 7th panel Multiple third mounting holes for installation are arranged in 36 opposite side, octahedral plate 37, and the spacing between third through-hole is consistent.
It as shown in figure 11, is a kind of perspective view of backing plate disclosed by the invention, backing plate is thin plate-shaped structure, and one side has For being inserted into the U-shaped opening of expandable nail, with a thickness of 1 millimeter or 3 millimeters, can according to the out-of-flatness degree of blank metope 2 into The backing plate of row different-thickness combines, and then fills the gap between press strip and blank metope 2, while also to the vertical state of ceramic tile It is adjusted.
It as shown in figure 12, is the perspective view of another backing plate disclosed by the invention, backing plate is thin plate-shaped structure, one side tool There is the U-shaped opening for being inserted into expandable nail, the opposite side of U-shaped opening has and the consistent lug of U-shaped opening shape, ledge arrangement Be conducive to backing plate grasping manipulation at the gap being inserted between press strip and metope 2, meanwhile, such structure is also convenient for Dies ' Blanking When punching line arrangement, improve the utilization rate of material, whole strip can be made to make full use of, as shown in figure 13.
It as shown in figure 16, is a kind of auxiliary tool being fixed temporarily for ceramic tile disclosed by the invention, two sides are respectively arranged One tripod is connected with cross bar between two tripods, and the spacing between cross bar can be adjusted according to the height of ceramic tile, Cross bar is used for temporary support ceramic tile, prevents ceramic tile from overturning.
When laying method disclosed by the invention applies to not levelling blank metope, cement mortar is replaced using pearl cotton Screed-coat, pearl cotton with a thickness of 5 millimeters, ceramic tile abuts directly on the cement mortar eliminated in pearl cotton with a thickness of 10 millimeters Adhesive layer, therefore, thickness of wall body are thinned, and reduce the loss of usable floor area in covering.
When laying method disclosed by the invention applies to levelling blank metope, cement mortar is replaced using pearl cotton Adhesive layer, ceramic tile are abutted directly in pearl cotton, few 5 milli of cement mortar adhesive layer with a thickness of 5 millimeters, than 10 millimeters of pearl cotton Rice, therefore, thickness of wall body is thinned, and reduces the loss of usable floor area in covering.
Traditional dry hanging, the ceramic tile back side only have 4 a small amount of hitch points, and total contact surface is about the entire ceramic tile back side 0.5% -1% or so, when ceramic tile front is hit, impact force is just born by hitch point, and hitch point is cut Out for installing the groove of metal hanger, and metal hanger and ceramic tile are all rigid, and are not buffered, therefore hitch point is whole The load concentration point and weak spot of piece ceramic tile, therefore, when ceramic tile is by certain shock, ceramic tile is easy at hitch point Rupture.And the ceramic tile laying method of the present patent application, since the intact nothing of ceramic tile cuts slot, the ceramic tile back side is laid with pearl cotton, ceramic tile with It is buffered between the walls by pearl cotton, therefore, ceramic tile no-load centrostigma, when ceramic tile front is hit, impact force passes through The entire ceramic tile back side is discharged into pearl cotton, no-load centrostigma, thus, ceramic tile is not easily broken.
Due to the pearl cotton at the ceramic tile back side bear be the entire ceramic tile back side load, the area of monolithic ceramic tile gets over Greatly, the load born on the unit area of pearl cotton with regard to smaller, and then on pearl cotton unit area deflection with regard to smaller, i.e., Ceramic tile is less susceptible to be displaced towards the method phase direction in ceramic tile face.The hardness of the bulk ceramic tile just laid using pearl cotton as Using hardness of the bulk ceramic tile of cement mortar bonding after solidifying, but weight ratio water's cement mortar of pearl cotton is light.
Embodiment two
Laying method disclosed in embodiment two is drilled while assembly, suitable for the laying of small area wall, is implemented Example is second is that be anchored on ground 1 for the first press strip 10 in embodiment one, and setting is for fastening the swollen of the first press strip 10 on ground 1 Expansion set pipe, laying method packet following steps:
D1. auxiliary line is placed, auxiliary line is placed on ground 1, is laid with wall cladding sheets along auxiliary line, auxiliary line can lead to Auxiliary line is placed in ground 1 by the mode for crossing ink fountain snap the line.
D2. the first press strip 10 is placed, the first press strip 10 is adjusted, makes 16 close proximity to ground 1 of first panel of the first press strip 10, make The second panel 17 and metope 2 of first press strip 10 cooperate, and the third panel 18 of the first press strip 10 is close to auxiliary line.It is of the invention public The laying method opened can be implemented on black skin, since black skin is not yet levelling, the second panel 17 of the first press strip 10 Might have gap presence between metope 2, gap can be filled with the first backing plate 15 herein, especially at the mounting hole between Gap needs to be filled with the first backing plate 15, can be combined by multiple first backing plates 15 and carry out integral thickness adjusting to adapt to difference The filling in gap, as shown in Figure 3.
D3. the first expandable nail 13 is placed, is drilled on ground 1 with the first mounting hole corresponding position on the first press strip 10, is led to It crosses the first expandable nail 13 and first press strip 10 is anchored on ground 1.
D4. the first pearl cotton 11 is placed, the first pearl cotton 11 is made to be close to metope 2, the first pearl cotton 11 and the first press strip 10 The distance between third panel 18 be slightly less than the thickness of the first wall cladding sheets 12, so that the elastic conjunction for the first ceramic tile mentions For basis.
D5. the first ceramic tile is placed, the first ceramic tile is assemblied in the third panel 18 and of the first press strip 10 in a manner of interference Between one pearl cotton 11, the first ceramic tile oblique cutting is entered into the sky between the first pearl cotton 11 and the third panel 18 of the first press strip 10 Between, then with auxiliary tool the first ceramic tile is temporarily fixed at current location.
D6. the second press strip 20 is placed, the second press strip 20 is adjusted, the fourth face plate 26 of the second press strip 20 is made to be close to the first ceramic tile The first face, cooperate the 5th panel 27 of the second press strip 20 with metope 2, the 6th panel 28 of the second press strip 20 is close to the first porcelain Second face of brick.First face of the first ceramic tile is towards the side of ceiling after ceramic tile assembles, and the second face of the first ceramic tile is porcelain The front of brick.Laying method disclosed by the invention can be implemented on black skin, since black skin is not yet levelling, second It might have gap presence between the 5th panel 27 and metope 2 of press strip 20, gap can be filled with the second backing plate 25 herein, special Be not that gap at mounting hole needs to be filled with the second backing plate 25, can pass through the combination of multiple second backing plates 25 carry out it is whole thick Degree adjusts to adapt to the filling of different gap, while being also adjusted to the vertical degree of the first ceramic tile, as shown in Figure 2.
D7. the second expandable nail 23 is placed, is drilled on metope 2 with the second mounting hole corresponding position on the second press strip 20, is led to It crosses the second expandable nail 23 and second press strip 20 is anchored on metope 2, remove auxiliary tool described in step d5, arrive this, the first porcelain Brick laying finishes, as shown in Figure 4 and Figure 6.Followed by the laying of the second ceramic tile.
D8. the second pearl cotton 21 is placed, the second pearl cotton 21 is made to be close to metope 2, the second pearl cotton 21 and the second press strip 20 The distance between the 6th panel 28 be slightly less than the thickness of the second wall cladding sheets 22;To be mentioned for the elastic conjunction of the second ceramic tile For basis.
D9. the second ceramic tile is placed, the second ceramic tile is assemblied in the 6th panel 28 and of the second press strip 20 in a manner of interference Between two pearl cottons 21;Second ceramic tile oblique cutting is entered into the sky between the second pearl cotton 21 and the 6th panel 28 of the second press strip 20 Between, then with auxiliary tool the second ceramic tile is temporarily fixed at current location.
D10. third press strip 30 is placed, third press strip 30 is adjusted, the 7th panel 36 of third press strip 30 is made to be close to the second porcelain The third face of brick cooperates the octahedral plate 37 of third press strip 30 and metope 2, and the 9th panel 39 of third press strip 30 is close to second The fourth face of ceramic tile;The third face of second ceramic tile is after ceramic tile assembles towards the side of ceiling, and the fourth face of the second ceramic tile is The front of ceramic tile.Laying method disclosed by the invention can be implemented on black skin, since black skin is not yet levelling, the It might have gap presence between the octahedral plate 37 and metope 2 of three press strips 30, gap can be filled with third backing plate 35 herein, Gap especially at mounting hole needs to be filled with third backing plate 35, can be combined by multiple third backing plates 35 and carry out entirety Thickness adjusts to adapt to the filling of different gap, while being also adjusted to the vertical degree of the second ceramic tile, as shown in Figure 10.
D11. third expandable nail 33 is placed, is drilled on metope 2 with the third mounting hole corresponding position on third press strip 30, is led to It crosses third expandable nail 33 and third press strip 30 is anchored on metope 2, remove auxiliary tool described in step d9, arrive this, the second porcelain Brick laying finishes, as shown in Figure 6 and Figure 8.It is adjusted followed by the relative flatness of the first ceramic tile and the second ceramic tile.
D11. by adjusting the number of combinations of third backing plate 35 to make the first ceramic tile the second face and the second ceramic tile the Four sides is located on same vertical plane, and the datum level at air-bubble leveling ruler both ends is bonded the first ceramic tile and the second ceramic tile respectively, then makes gas Soaked leveling ruler is vertical, and the bubble by observing air-bubble leveling ruler detects the vertical state of the first ceramic tile and the second ceramic tile, such as Figure 14 It is shown.
It as shown in figure 15, is the perspective view of the first press strip of one kind 10 disclosed in example IV, the first press strip 10 includes first Panel 16, second panel 17 and third panel 18, second panel 17 are parallel to third panel 18, and first panel 16 is vertically connected at Second panel 17 and third panel 18, second panel 17 and third panel 18 are located at the ipsilateral of first panel 16, first panel 16 The first mounting hole for installation is set, and the spacing between the first mounting hole is consistent.

Claims (10)

1. a kind of laying method of wall cladding sheets, special for not levelling blank metope or levelling blank metope Sign be the following steps are included:
C1. auxiliary line is placed, auxiliary line is placed on ground (1), is laid with wall cladding sheets along auxiliary line;
C2. it places the first press strip (10), adjusts the first press strip (10), make first panel (16) close proximity to ground of the first press strip (10) (1), make the first press strip (10) second panel (17) and metope (2) cooperate, the third panel (18) of the first press strip (10) with it is auxiliary Index contour is close to;
C3. the first expandable nail (13) are placed, are drilled on metope (2) with the first mounting hole corresponding position on the first press strip (10), The first press strip (10) is anchored on metope (2) by the first expandable nail (13);
C4. the first pearl cotton (11) are placed, the first pearl cotton (11) is made to be close to metope (2), the first pearl cotton (11) and the first pressure The distance between third panel (18) of item (10) is slightly less than the thickness of the first wall cladding sheets (12);
C5. it places the first wall cladding sheets (12), the first wall cladding sheets (12) are assemblied in the first press strip in a manner of interference (10) between third panel (18) and the first pearl cotton (11);
C6. it places the second press strip (20), adjusts the second press strip (20), the fourth face plate (26) of the second press strip (20) is made to be close to first First face of wall cladding sheets (12) cooperates the 5th panel (27) of the second press strip (20) and metope (2), the second press strip (20) The 6th panel (28) be close to the first wall cladding sheets (12) the second face;
C7. the second expandable nail (23) are placed, are drilled on metope (2) with the second mounting hole corresponding position on the second press strip (20), The second press strip (20) is anchored on metope (2) by the second expandable nail (23);
C8. the second pearl cotton (21) are placed, the second pearl cotton (21) is made to be close to metope (2), the second pearl cotton (21) and the second pressure The distance between 6th panel (28) of article (20) is slightly less than the thickness of the second wall cladding sheets (22);
C9. it places the second wall cladding sheets (22), the second wall cladding sheets (22) are assemblied in the second press strip in a manner of interference (20) between the 6th panel (28) and the second pearl cotton (21);
C10. third press strip (30) are placed, adjusted third press strip (30), the 7th panel (36) of third press strip (30) is made to be close to the The third face of two wall cladding sheets (22) cooperates the octahedral plate (37) of third press strip (30) and metope (2), third press strip (30) the 9th panel (38) is close to the fourth face of the second wall cladding sheets (22);
C11. third expandable nail (33) are placed, drilled on metope (2) with the third mounting hole corresponding position on third press strip (30), Third press strip (30) is anchored on metope (2) by third expandable nail (33).
2. a kind of laying method of wall cladding sheets according to claim 1, which is characterized in that step c2 also passes through first Backing plate (15) fills the distance between second panel (17) and metope (2) of the first press strip (10), and step c6 also passes through the second pad Plate (25) fills the distance between the 5th panel (27) and metope (2) of the second press strip (20), and step c10 also passes through third backing plate (35) the distance between octahedral plate (37) and metope (2) of third press strip (30) are filled.
3. a kind of laying method of wall cladding sheets according to claim 2, which is characterized in that further include being vertically aligned step It is rapid:
C12. make the second face and the second wall cladding sheets (22) of the first wall cladding sheets (12) by adjusting third backing plate (35) Fourth face be located on same vertical plane.
4. a kind of laying method of wall cladding sheets according to claim 3, which is characterized in that wall cladding sheets are natural Stone material or artificial stone or ceramic tile.
5. a kind of laying method of wall cladding sheets according to claim 1, which is characterized in that the first press strip (10) includes First panel (16), second panel (17) and third panel (18), second panel (17) are parallel to third panel (18), the first face Plate (16) is vertically connected at second panel (17) and third panel (18), and second panel (17) and third panel (18) are located at first Ipsilateral, first mounting hole of second panel (17) setting for installation of panel (16);
Second press strip (20) includes fourth face plate (26), the 5th panel (27) and the 6th panel (28), and the 5th panel (27) is parallel In the 6th panel (28), fourth face plate (26) is vertically connected at the middle part of the 5th panel (27), and the 5th panel (27) is located at the 4th The side of panel (26), second mounting hole of the 5th panel (27) setting for installation;
Third press strip (30) includes the 7th panel (36), octahedral plate (37) and the 9th panel (38), octahedral plate (37) and the Nine panels (38), octahedral plate (37) are parallel to the 9th panel (38), and the 7th panel (36) is vertically connected at octahedral plate (37) With the 9th panel (38), octahedral plate (37) and the 9th panel (38) are located at the opposite side of the 7th panel (36), octahedral plate (37) third mounting hole of the setting for installation.
6. a kind of laying method of wall cladding sheets, special for not levelling blank metope or levelling blank metope Sign be the following steps are included:
D1. auxiliary line is placed, auxiliary line is placed on ground (1), is laid with wall cladding sheets along auxiliary line;
D2. it places the first press strip (10), adjusts the first press strip (10), make first panel (16) close proximity to ground of the first press strip (10) (1), make the first press strip (10) second panel (17) and metope (2) cooperate, the third panel (18) of the first press strip (10) with it is auxiliary Index contour is close to;
D3. the first expandable nail (13) are placed, are drilled on ground (1) with the first mounting hole corresponding position on the first press strip (10), The first press strip (10) is anchored on ground (1) by the first expandable nail (13);
D4. the first pearl cotton (11) are placed, the first pearl cotton (11) is made to be close to metope (2), the first pearl cotton (11) and the first pressure The distance between third panel (18) of item (10) is slightly less than the thickness of the first wall cladding sheets (12);
D5. it places the first wall cladding sheets (12), the first wall cladding sheets (12) are assemblied in the first press strip in a manner of interference (10) between third panel (18) and the first pearl cotton (11);
D6. it places the second press strip (20), adjusts the second press strip (20), the fourth face plate (26) of the second press strip (20) is made to be close to first First face of wall cladding sheets (12) cooperates the 5th panel (27) of the second press strip (20) and metope (2), the second press strip (20) The 6th panel (28) be close to the first wall cladding sheets (12) the second face;
D7. the second expandable nail (23) are placed, are drilled on metope (2) with the second mounting hole corresponding position on the second press strip (20), The second press strip (20) is anchored on metope (2) by the second expandable nail (23);
D8. the second pearl cotton (21) are placed, the second pearl cotton (21) is made to be close to metope (2), the second pearl cotton (21) and the second pressure The distance between 6th panel (28) of article (20) is slightly less than the thickness of the second wall cladding sheets (22);
D9. it places the second wall cladding sheets (22), the second wall cladding sheets (22) are assemblied in the second press strip in a manner of interference (20) between the 6th panel (28) and the second pearl cotton (21);
D10. third press strip (30) are placed, adjusted third press strip (30), the 7th panel (36) of third press strip (30) is made to be close to the The third face of two wall cladding sheets (22) cooperates the octahedral plate (37) of third press strip (30) and metope (2), third press strip (30) the 9th panel (38) is close to the fourth face of the second wall cladding sheets (22);
D11. third expandable nail (33) are placed, drilled on metope (2) with the third mounting hole corresponding position on third press strip (30), Third press strip (30) is anchored on metope (2) by third expandable nail (33).
7. a kind of laying method of wall cladding sheets according to claim 6, which is characterized in that step d2 also passes through first Backing plate (15) fills the distance between second panel (17) and metope (2) of the first press strip (10), and step d6 also passes through the second pad Plate (25) fills the distance between the 5th panel (27) and metope (2) of the second press strip (20), and step d10 also passes through third backing plate (35) the distance between octahedral plate (37) and metope (2) of third press strip (30) are filled.
8. a kind of laying method of wall cladding sheets according to claim 7, which is characterized in that further include being vertically aligned step It is rapid:
D12. make the second face and the second wall cladding sheets (22) of the first wall cladding sheets (12) by adjusting third backing plate (35) Fourth face be located on same vertical plane.
9. a kind of laying method of wall cladding sheets according to claim 8, which is characterized in that wall cladding sheets are natural Stone material or artificial stone or ceramic tile.
10. a kind of laying method of wall cladding sheets according to claim 6, which is characterized in that the first press strip (10) packet First panel (16), second panel (17) and third panel (18) are included, second panel (17) is parallel to third panel (18), and first Panel (16) is vertically connected at second panel (17) and third panel (18), and second panel (17) and third panel (18) are located at the Ipsilateral, first mounting hole of second panel (17) setting for installation of one panel (16);
Second press strip (20) includes fourth face plate (26), the 5th panel (27) and the 6th panel (28), and the 5th panel (27) is parallel In the 6th panel (28), fourth face plate (26) is vertically connected at the middle part of the 5th panel (27), and the 5th panel (27) is located at the 4th The side of panel (26), second mounting hole of the 5th panel (27) setting for installation;
Third press strip (30) includes the 7th panel (36), octahedral plate (37) and the 9th panel (38), octahedral plate (37) and the Nine panels (38), octahedral plate (37) are parallel to the 9th panel (38), and the 7th panel (36) is vertically connected at octahedral plate (37) With the 9th panel (38), octahedral plate (37) and the 9th panel (38) are located at the opposite side of the 7th panel (36), octahedral plate (37) third mounting hole of the setting for installation.
CN201910033327.1A 2019-01-14 2019-01-14 Method for laying wall covering plate Active CN109736520B (en)

Priority Applications (7)

Application Number Priority Date Filing Date Title
CN201910033327.1A CN109736520B (en) 2019-01-14 2019-01-14 Method for laying wall covering plate
GB2012072.1A GB2584230B (en) 2019-01-14 2019-11-15 Method for laying wall cladding sheet
CN201980011544.9A CN111801473B (en) 2019-01-14 2019-11-15 Method for laying wall covering plate
PCT/CN2019/118642 WO2020147412A1 (en) 2019-01-14 2019-11-15 Method for laying wall cladding panel
GB2000554.2A GB2581435B (en) 2019-01-14 2020-01-14 Method for laying wall cladding sheet
US16/742,810 US11199009B2 (en) 2019-01-14 2020-01-14 Method for laying wall cladding sheet
IE20200010A IE20200010A2 (en) 2019-01-14 2020-01-14 Method for laying wall cladding sheet

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910033327.1A CN109736520B (en) 2019-01-14 2019-01-14 Method for laying wall covering plate

Publications (2)

Publication Number Publication Date
CN109736520A true CN109736520A (en) 2019-05-10
CN109736520B CN109736520B (en) 2022-08-16

Family

ID=66364737

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910033327.1A Active CN109736520B (en) 2019-01-14 2019-01-14 Method for laying wall covering plate

Country Status (1)

Country Link
CN (1) CN109736520B (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2020147412A1 (en) * 2019-01-14 2020-07-23 龚柱 Method for laying wall cladding panel
US20230383543A1 (en) * 2021-10-07 2023-11-30 Alexander Lorenz Flood Resistant Wall

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2005105568A (en) * 2003-09-29 2005-04-21 Herikkusu:Kk Siding assembly, siding board, decoration board, stationary plate and siding execution method
US20080098683A1 (en) * 2006-10-27 2008-05-01 Nailite International Decorative wall covering with improved interlock system
CN101215917A (en) * 2007-12-28 2008-07-09 瞿浩荣 Heat insulation decoration board and its connecting component on site construction method
CN101302782A (en) * 2008-06-30 2008-11-12 深圳市明远氟涂料有限公司 Dried hanging thermal insulation decorative curtain wall and mounting process thereof
US8453388B2 (en) * 2009-01-09 2013-06-04 Franz Neuhofer, Jr. Wall lining
CN104674962A (en) * 2015-01-27 2015-06-03 安徽同济建设集团有限责任公司 Method for constructing external heat-insulation systems of external walls from expanded perlite heat-insulation plates
CN107724619A (en) * 2017-11-08 2018-02-23 孟昭凤 A kind of sheet material outer wall heat insulating and decorating plate
CN108643496A (en) * 2018-05-24 2018-10-12 大连光洋科技集团有限公司 A kind of wall construction method and structure

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2005105568A (en) * 2003-09-29 2005-04-21 Herikkusu:Kk Siding assembly, siding board, decoration board, stationary plate and siding execution method
US20080098683A1 (en) * 2006-10-27 2008-05-01 Nailite International Decorative wall covering with improved interlock system
CN101215917A (en) * 2007-12-28 2008-07-09 瞿浩荣 Heat insulation decoration board and its connecting component on site construction method
CN101302782A (en) * 2008-06-30 2008-11-12 深圳市明远氟涂料有限公司 Dried hanging thermal insulation decorative curtain wall and mounting process thereof
US8453388B2 (en) * 2009-01-09 2013-06-04 Franz Neuhofer, Jr. Wall lining
CN104674962A (en) * 2015-01-27 2015-06-03 安徽同济建设集团有限责任公司 Method for constructing external heat-insulation systems of external walls from expanded perlite heat-insulation plates
CN107724619A (en) * 2017-11-08 2018-02-23 孟昭凤 A kind of sheet material outer wall heat insulating and decorating plate
CN108643496A (en) * 2018-05-24 2018-10-12 大连光洋科技集团有限公司 A kind of wall construction method and structure

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2020147412A1 (en) * 2019-01-14 2020-07-23 龚柱 Method for laying wall cladding panel
GB2584230A (en) * 2019-01-14 2020-11-25 Zhu Gong Method for laying wall cladding panel
GB2584230B (en) * 2019-01-14 2023-09-13 Jinjiang Sanjinggude Ind Design Co Ltd Method for laying wall cladding sheet
US20230383543A1 (en) * 2021-10-07 2023-11-30 Alexander Lorenz Flood Resistant Wall

Also Published As

Publication number Publication date
CN109736520B (en) 2022-08-16

Similar Documents

Publication Publication Date Title
CN109736520A (en) The laying method of wall cladding sheets
CN104929297B (en) A kind of decoration panel installation of ceiling technique
CN111801473B (en) Method for laying wall covering plate
US20100064618A1 (en) Ceiling tile and edge suspension system
CN109736521A (en) The laying method of wall cladding sheets
CN110512821A (en) A kind of no substrate ceramic tile mounting structure and its installation method
CN111851898B (en) Wall calcium silicate veneer dry-hanging assembly system
CN204081199U (en) A kind of plaster tablet suspended ceiling of novel crack resistence
CN207003900U (en) A kind of novel wall surface cladding panel structure
CN113089908A (en) Wooden keel glass curtain wall system and construction method thereof
CN205063254U (en) Wallboard upper portion installation device
CN212427880U (en) Wall surface hanging system
CN211313162U (en) Improved light dry-hanging wallboard structure
CN211286367U (en) Light dry-hanging wallboard structure
CN215978212U (en) Decorative panel
CN208668689U (en) A kind of curtain wall structure of compound steel lightweight
CN214995423U (en) Wet-pasted ceramic tile wall
CN206143963U (en) Integral type wallboard of modularization installation
CN111734061A (en) Wall decoration structure of buckle groove type light decoration brick and construction method thereof
CN215631260U (en) Wall decorative board bracket
US20050028453A1 (en) Stone laminated structure and method for its construction
CN108316481A (en) Can quick assembling wall body decoration system
CN208777645U (en) A kind of wallboard hanging strip component
CN204163311U (en) A kind of trim components, decoration board mounting structure
CN209482628U (en) A kind of mounting structure of glass wall facing

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
TA01 Transfer of patent application right

Effective date of registration: 20220629

Address after: Room 416, 136 Dongqian Road, Dongyuan Town, Taiwan investment zone, Quanzhou City, Fujian Province 362122

Applicant after: Quanzhou ruilang Electromechanical Technology Co.,Ltd.

Address before: 361021 room 402, 93 Binshui Wuli, Jimei District, Xiamen City, Fujian Province

Applicant before: Gong Zhu

TA01 Transfer of patent application right
GR01 Patent grant
GR01 Patent grant