CN110512821A - A non-substrate tile installation structure and installation method thereof - Google Patents

A non-substrate tile installation structure and installation method thereof Download PDF

Info

Publication number
CN110512821A
CN110512821A CN201910745584.8A CN201910745584A CN110512821A CN 110512821 A CN110512821 A CN 110512821A CN 201910745584 A CN201910745584 A CN 201910745584A CN 110512821 A CN110512821 A CN 110512821A
Authority
CN
China
Prior art keywords
ceramic tile
plug
unit
tile
transom
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201910745584.8A
Other languages
Chinese (zh)
Other versions
CN110512821B (en
Inventor
丁欣欣
丁泽成
王文广
周东珊
王可
余广
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhejiang Yasha Decoration Co Ltd
Original Assignee
Zhejiang Yasha Decoration Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhejiang Yasha Decoration Co Ltd filed Critical Zhejiang Yasha Decoration Co Ltd
Priority to CN201910745584.8A priority Critical patent/CN110512821B/en
Publication of CN110512821A publication Critical patent/CN110512821A/en
Application granted granted Critical
Publication of CN110512821B publication Critical patent/CN110512821B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04FFINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
    • E04F13/00Coverings or linings, e.g. for walls or ceilings
    • E04F13/07Coverings or linings, e.g. for walls or ceilings composed of covering or lining elements; Sub-structures therefor; Fastening means therefor
    • E04F13/08Coverings or linings, e.g. for walls or ceilings composed of covering or lining elements; Sub-structures therefor; Fastening means therefor composed of a plurality of similar covering or lining elements
    • E04F13/0801Separate fastening elements
    • E04F13/0803Separate fastening elements with load-supporting elongated furring elements between wall and covering elements
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04FFINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
    • E04F13/00Coverings or linings, e.g. for walls or ceilings
    • E04F13/07Coverings or linings, e.g. for walls or ceilings composed of covering or lining elements; Sub-structures therefor; Fastening means therefor
    • E04F13/08Coverings or linings, e.g. for walls or ceilings composed of covering or lining elements; Sub-structures therefor; Fastening means therefor composed of a plurality of similar covering or lining elements
    • E04F13/0801Separate fastening elements
    • E04F13/0803Separate fastening elements with load-supporting elongated furring elements between wall and covering elements
    • E04F13/081Separate fastening elements with load-supporting elongated furring elements between wall and covering elements with additional fastening elements between furring elements and covering elements

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Finishing Walls (AREA)
  • Load-Bearing And Curtain Walls (AREA)

Abstract

本发明公开了一种无基板瓷砖安装结构及其安装方法,包括固定在原始墙面顶部位置的横龙骨、固定在原始墙面中部位置的横龙骨及设置在原始地面上的底部型材,所述原始墙面顶部位置的横龙骨上设有顶部插件,所述原始墙面中部位置的横龙骨上设有瓷砖插件,所述顶部插件、瓷砖插件及底部型材上下位置相对应,所述顶部插件与瓷砖插件之间、瓷砖插件与瓷砖插件之间及瓷砖插件与底部型材之间均插接设置瓷砖,从而构成瓷砖面层。本发明的有益效果是:本发明将传统干挂方式与工业化内装相结合,解决传统干挂占用空间较大的问题,同时取消了基板,采用直接干挂瓷砖,降低墙板重量。

The invention discloses a tile installation structure without a base plate and an installation method thereof, comprising a horizontal keel fixed at the top of the original wall, a horizontal keel fixed at the middle of the original wall, and a bottom profile arranged on the original ground. A top insert is provided on the horizontal keel at the top of the original wall, and a ceramic tile insert is provided on the horizontal keel at the middle of the original wall. Ceramic tiles are inserted between the tile inserts, between the tile inserts and between the tile inserts and the bottom profiles, thereby forming the tile surface. The beneficial effects of the present invention are: the present invention combines the traditional dry-hanging method with industrial interior decoration, solves the problem that the traditional dry-hanging occupies a large space, cancels the base plate at the same time, adopts direct dry-hanging tiles, and reduces the weight of the wallboard.

Description

一种无基板瓷砖安装结构及其安装方法A non-substrate tile installation structure and installation method thereof

技术领域technical field

本发明涉及建筑装饰技术领域,具体涉及一种无基板瓷砖安装结构及其安装方法。The invention relates to the technical field of architectural decoration, in particular to a substrate-less tile installation structure and an installation method thereof.

背景技术Background technique

在工业化内装领域,在工业化内装装配式厨卫空间中,采用独立框架体系,基板由卡接或插接结构安装于框架上。基板上可覆仿纹理膜或瓷砖,基板在工厂预处理后可于现场直接拼装,缩短安装时间,避免现场湿作业,降低安装成本。In the field of industrialized interior decoration, in the industrialized interior decoration kitchen and bathroom space, an independent frame system is adopted, and the substrate is installed on the frame by a snap-in or plug-in structure. The substrate can be covered with imitation texture film or tiles, and the substrate can be assembled directly on site after pretreatment in the factory, which shortens installation time, avoids wet work on site, and reduces installation costs.

由于整块基板覆瓷砖后重量较重;基板厚度占用室内空间;且瓷砖有一定的脱落风险。Because the weight of the entire substrate covered with tiles is heavy; the thickness of the substrate occupies indoor space; and the tiles have a certain risk of falling off.

为解决上述问题,现开发一种无基板干挂瓷砖方式。将传统干挂方式与工业化内装相结合,降低墙面厚度、降低墙板重量。In order to solve the above problems, a method of dry-hanging ceramic tiles without a substrate is now developed. Combining the traditional dry-hanging method with industrial interior decoration, the thickness of the wall surface and the weight of the wallboard are reduced.

发明内容Contents of the invention

针对现有技术中存在的问题,本发明提供了设计合理的一种无基板瓷砖安装结构及其安装方法。Aiming at the problems existing in the prior art, the present invention provides a rationally designed tile installation structure without a substrate and an installation method thereof.

本发明的技术方案如下:Technical scheme of the present invention is as follows:

一种无基板瓷砖安装结构及其安装方法,其特征在于,包括固定在原始墙面顶部位置的横龙骨、固定在原始墙面中部位置的横龙骨及设置在原始地面上的底部型材,所述原始墙面顶部位置的横龙骨上设有顶部插件,所述原始墙面中部位置的横龙骨上设有瓷砖插件,所述顶部插件、瓷砖插件及底部型材上下位置相对应,所述顶部插件与瓷砖插件之间、瓷砖插件与瓷砖插件之间及瓷砖插件与底部型材之间均插接设置瓷砖,从而构成瓷砖面层。A ceramic tile installation structure without a base plate and its installation method, characterized in that it includes a horizontal keel fixed at the top of the original wall, a horizontal keel fixed at the middle of the original wall, and a bottom profile set on the original ground. A top insert is provided on the horizontal keel at the top of the original wall, and a ceramic tile insert is provided on the horizontal keel at the middle of the original wall. Ceramic tiles are inserted between the tile inserts, between the tile inserts and between the tile inserts and the bottom profiles, thereby forming the tile surface.

所述的一种无基板瓷砖安装结构及其安装方法,其特征在于,所述原始墙面的阳角处设有阳角件,所述横龙骨在阳角处切断,瓷砖在阳角处的切45°角对拼,并用阳角件固定。The installation structure and installation method of the ceramic tile without substrate is characterized in that, the outer corner of the original wall is provided with an outer corner piece, the horizontal keel is cut off at the outer corner, and the tiles at the outer corner are Cut a 45° angle and fix it with male corner pieces.

所述的一种无基板瓷砖安装结构及其安装方法,其特征在于,所述原始墙面的阴角处的横龙骨采用对撞安装结构,且瓷砖在阴角处留1-2mm的缝隙。The installation structure and installation method of the ceramic tile without substrate is characterized in that the horizontal keel at the inner corner of the original wall adopts a collision installation structure, and the tiles leave a gap of 1-2mm at the inner corner.

所述的一种无基板瓷砖安装结构及其安装方法,其特征在于,所述顶部插件包括第一瓷砖卡扣、第一横龙骨扣接部及顶部平台,所述第一瓷砖卡扣与瓷砖的顶部槽口插接配合,并与瓷砖背面粘接;所述横龙骨扣接部与横龙骨扣接。The above-mentioned installation structure and installation method of a ceramic tile without a substrate is characterized in that the top insert includes a first tile buckle, a first horizontal keel buckle joint and a top platform, and the first tile buckle is connected with the tile The top notch of the tile is plugged and fitted, and bonded to the back of the tile; the buckling part of the horizontal keel is buckled with the horizontal keel.

所述的一种无基板瓷砖安装结构及其安装方法,其特征在于,所述瓷砖插件包括T型瓷砖卡扣及第二横龙骨扣接部,所述T型瓷砖卡扣包括上扣件及下扣件,且上扣件及下扣件分别与瓷砖的上下槽口插接,并与瓷砖背部粘接;所述第二横龙骨扣接部与横龙骨扣接;所述横龙骨扣接部上设有用于调节螺栓穿设的螺栓孔。The above-mentioned installation structure and installation method for a ceramic tile without a substrate is characterized in that the tile insert includes a T-shaped tile buckle and a second horizontal keel buckle joint, and the T-shaped tile buckle includes an upper fastener and a second horizontal keel buckle. The lower fastener, and the upper fastener and the lower fastener are inserted into the upper and lower notches of the tiles respectively, and bonded to the back of the tile; the second horizontal keel fastening part is fastened to the horizontal keel; the horizontal keel fastening Bolt holes for adjusting bolts are provided on the upper part.

所述的一种无基板瓷砖安装结构及其安装方法,其特征在于,所述底部型材包括型材本体及设置在型材本体上表面的第二瓷砖卡扣,所述第二瓷砖卡扣与瓷砖的上槽口插接。The above-mentioned installation structure and installation method for a ceramic tile without a substrate is characterized in that the bottom profile includes a profile body and a second tile buckle arranged on the upper surface of the profile body, and the second tile buckle is connected to the tile body. Plug into the upper slot.

所述的一种无基板瓷砖安装结构及其安装方法,其特征在于,所述阳角件采用Y型结构包括限位件及支撑件,所述限位件设置在阳角处瓷砖的缝隙位置,所述支撑件与横龙骨固定连接。The above-mentioned installation structure and installation method of a ceramic tile without a substrate is characterized in that the male corner piece adopts a Y-shaped structure and includes a limiting member and a supporting member, and the limiting member is arranged at the gap position of the ceramic tile at the male corner , the support member is fixedly connected with the transverse keel.

所述的一种无基板瓷砖安装结构的安装方法,其特征在于,包括如下步骤:The installation method of a non-substrate tile installation structure is characterized in that it includes the following steps:

1)固定底部型材:根据深化图纸测量完成面线,用钢排钉将底部型材固定在相应位置,遇到原始墙面阳角处将底部型材切45°角对拼;1) Fix the bottom profile: measure and complete the surface line according to the deepening drawing, fix the bottom profile at the corresponding position with steel nails, and cut the bottom profile at a 45° angle when encountering the original wall surface;

2)固定横龙骨:根据深化图纸确定横龙骨所在位置,调平后用膨胀螺钉将横龙骨固定在原始墙面上;2) Fix the transverse keel: Determine the position of the transverse keel according to the deepening drawing, and fix the transverse keel on the original wall with expansion screws after leveling;

3)将瓷砖插件与瓷砖固定:用VHB胶带将瓷砖插件与瓷砖固定牢固,将T型瓷砖卡扣插入瓷砖预先开好的槽口中;3) Fix the tile insert and the tile: Use VHB tape to fix the tile insert and the tile firmly, and insert the T-shaped tile buckle into the pre-opened notch of the tile;

4)插入瓷砖插件:将瓷砖插件从侧面插入横龙骨中,再向下落入横龙骨上;4) Insert the tile insert: insert the tile insert into the horizontal keel from the side, and then drop down onto the horizontal keel;

5)安装底部第一排瓷砖:将底部型材插入底部第一排瓷砖的槽口中,固定瓷砖位置;5) Install the first row of tiles at the bottom: Insert the bottom profile into the notch of the first row of tiles at the bottom to fix the position of the tiles;

6)固定、调整瓷砖插件:调整安装上墙的瓷砖,通过旋转瓷砖插件孔洞内的螺栓调整瓷砖的上下位置;通过移动瓷砖调整瓷砖的左右位置,调整完后将螺栓拧紧,固定;6) Fix and adjust the tile insert: adjust the tile installed on the wall, adjust the up and down position of the tile by rotating the bolt in the hole of the tile insert; adjust the left and right position of the tile by moving the tile, tighten the bolt after adjustment, and fix it;

7)插入下一块瓷砖:将瓷砖插件插入下一块瓷砖的下部槽口,重复步骤6),直到安装完成一面墙左右瓷砖;7) Insert the next tile: insert the tile insert into the lower notch of the next tile, repeat step 6), until the installation is complete with one wall left and right tiles;

8)安装顶部插件:将顶部插件插入最上层瓷砖的槽口中,并将顶部插件从侧面插入横龙骨中,墙面安装完成,最后再进行顶部板块的安装。8) Install the top insert: insert the top insert into the notch of the uppermost tile, and insert the top insert into the horizontal keel from the side, the wall installation is completed, and finally the top plate is installed.

本发明的有益效果是:本发明将传统干挂方式与工业化内装相结合,解决传统干挂占用空间较大的问题,同时取消了基板,采用直接干挂瓷砖,降低墙板重量。The beneficial effects of the present invention are: the present invention combines the traditional dry-hanging method with industrial interior decoration, solves the problem that the traditional dry-hanging takes up a large space, cancels the base plate at the same time, adopts direct dry-hanging tiles, and reduces the weight of the wallboard.

附图说明Description of drawings

图1为本发明的整体安装结构图;Fig. 1 is the overall installation structure drawing of the present invention;

图2为本发明的顶部插件结构图;Fig. 2 is a top plug-in structural diagram of the present invention;

图3为本发明的瓷砖插件结构图;Fig. 3 is a structural diagram of a ceramic tile insert of the present invention;

图4为本发明的底部型材结构图;Fig. 4 is a bottom profile structural diagram of the present invention;

图5为本发明的阳角件结构图;Fig. 5 is a structural diagram of the male corner fitting of the present invention;

图6为本发明的阳角件处安装结构图;Fig. 6 is a diagram of the installation structure of the male corner fitting of the present invention;

图7为本发明的阴角处安装结构图;Fig. 7 is a diagram of the installation structure at the inner corner of the present invention;

图8为本发明的步骤1)安装图;Fig. 8 is step 1) installation drawing of the present invention;

图9为本发明的步骤2)安装图;Fig. 9 is step 2) installation drawing of the present invention;

图10为本发明的步骤3)安装图;Fig. 10 is step 3) installation drawing of the present invention;

图11为本发明的步骤4)安装图;Fig. 11 is step 4) installation drawing of the present invention;

图12为本发明的步骤5)安装图;Fig. 12 is step 5) installation drawing of the present invention;

图13为本发明的步骤6)安装图;Fig. 13 is step 6) installation drawing of the present invention;

图14为本发明的步骤7)安装图;Fig. 14 is step 7) installation drawing of the present invention;

图15为本发明的步骤8)安装图;Fig. 15 is step 8) installation drawing of the present invention;

图中:1-横龙骨,2-顶部插件,3-膨胀螺栓,4-紧固螺栓,5-瓷砖插件,6-底部型材,7-阳角件,8-瓷砖。In the figure: 1-horizontal keel, 2-top insert, 3-expansion bolt, 4-fastening bolt, 5-tile insert, 6-bottom profile, 7-male corner piece, 8-tile.

具体实施方式Detailed ways

以下结合说明书附图,对本发明作进一步描述。The present invention will be further described below in conjunction with the accompanying drawings of the description.

如图1-15所示,一种无基板瓷砖安装结构及其安装方法,包括横龙骨1、顶部插件2、膨胀螺栓3、紧固螺栓4、瓷砖插件5、底部型材6、阳角件7及瓷砖8。其中横龙骨1固定于原始墙面,起找平作用;顶部插件2、瓷砖插件5插入瓷砖的槽口中,扣在横龙骨1上,起连接作用;底部型材6固定于地面,起定位、支撑作用,墙面瓷砖压住地面瓷砖,形成“墙压地”的效果,避免朝天缝的出现;阳角件7在出现阳角的时候使用,连接阳角处的瓷砖。As shown in Figure 1-15, a non-substrate tile installation structure and its installation method, including a horizontal keel 1, a top insert 2, expansion bolts 3, fastening bolts 4, tile inserts 5, bottom profiles 6, male corner pieces 7 and tile 8. Among them, the horizontal keel 1 is fixed on the original wall for leveling; the top insert 2 and the tile insert 5 are inserted into the notches of the tiles and buckled on the horizontal keel 1 for connection; the bottom profile 6 is fixed on the ground for positioning and support , The wall tiles press the floor tiles to form the effect of "wall pressing the ground" to avoid the appearance of seams facing the sky; the external corner piece 7 is used when there is an external corner, and connects the tiles at the external corner.

固定在原始墙面顶部位置的横龙骨1、固定在原始墙面中部位置的横龙骨1及设置在原始地面上的底部型材6,所述原始墙面顶部位置的横龙骨1上设有顶部插件2,所述原始墙面中部位置的横龙骨1上设有瓷砖插件5,所述顶部插件2、瓷砖插件5及底部型材6上下位置相对应,所述顶部插件2与瓷砖插件5之间、瓷砖插件5与瓷砖插件5之间及瓷砖插件5与底部型材6之间均插接设置瓷砖8,从而构成瓷砖面层。The horizontal keel 1 fixed at the top position of the original wall, the horizontal keel 1 fixed at the middle of the original wall and the bottom profile 6 arranged on the original ground, the horizontal keel 1 at the top of the original wall is provided with a top plug-in 2. The horizontal keel 1 in the middle of the original wall is provided with a ceramic tile insert 5, and the upper and lower positions of the top insert 2, the tile insert 5 and the bottom profile 6 correspond to each other. Between the top insert 2 and the tile insert 5, Ceramic tiles 8 are inserted between the tile inserts 5 and the tile inserts 5 and between the tile inserts 5 and the bottom profile 6 to form a tile surface.

当遇到原始墙面的阳角处,在阳角处设置阳角件7,所述横龙骨1在阳角处切断,瓷砖8在阳角处的切45°角对拼,并用阳角件7固定,两块瓷砖8为一组,组合好后成为一体,用瓷砖插件5固定在横龙骨1上。When encountering the male corner of the original wall, the male corner piece 7 is set at the male corner, the horizontal keel 1 is cut off at the male corner, the tiles 8 are assembled at a 45° angle at the male corner, and the male corner piece is used 7 is fixed, two ceramic tiles 8 are a group, become one after combining, be fixed on the transverse keel 1 with ceramic tile insert 5.

当遇到原始墙面的阴角处横龙骨1采用对撞安装结构,且瓷砖8在阴角处留1-2mm的缝隙,优选为1.5mm。When encountering the internal corner of the original wall, the horizontal keel 1 adopts a collision installation structure, and the ceramic tile 8 leaves a gap of 1-2mm at the internal corner, preferably 1.5mm.

顶部插件2包括第一瓷砖卡扣201、第一横龙骨扣接部202及顶部平台203,所述第一瓷砖卡扣201与瓷砖8的顶部槽口插接配合,并与瓷砖8背面粘接;所述横龙骨扣接部202与横龙骨1扣接。The top insert 2 includes a first tile buckle 201, a first horizontal keel buckle 202 and a top platform 203. The first tile buckle 201 is plugged into the top notch of the tile 8 and bonded to the back of the tile 8. ; The fastening part 202 of the transverse keel is buckled with the transverse keel 1 .

瓷砖插件5包括T型瓷砖卡扣501及第二横龙骨扣接部502,所述T型瓷砖卡扣501包括上扣件及下扣件,且上扣件及下扣件分别与瓷砖8的上下槽口插接,并与瓷砖8背部粘接;所述第二横龙骨扣接部502与横龙骨1扣接;所述横龙骨扣接部502上设有用于调节螺栓4穿设的螺栓孔;调节螺栓4穿过瓷砖插件5的螺栓孔,可上下调整并锁紧,将瓷砖插件5所连接的下部瓷砖顶起或下降,起到调整作用。The tile insert 5 includes a T-shaped tile buckle 501 and a second horizontal keel buckle 502. The T-shaped tile buckle 501 includes an upper fastener and a lower fastener, and the upper fastener and the lower fastener are respectively connected to the tile 8. The upper and lower notches are plugged in and bonded to the back of the tile 8; the second transverse keel fastening part 502 is fastened to the transverse keel 1; the transverse keel fastening part 502 is provided with a bolt for the adjustment bolt 4 to pass through hole; the adjusting bolt 4 passes through the bolt hole of the ceramic tile insert 5, which can be adjusted up and down and locked, and the lower ceramic tile connected by the ceramic tile insert 5 is lifted or lowered to play an adjustment role.

底部型材6包括型材本体601及设置在型材本体601上表面的第二瓷砖卡扣602,所述第二瓷砖卡扣602与瓷砖8的上槽口插接,并与瓷砖8背部粘接。The bottom profile 6 includes a profile body 601 and a second tile buckle 602 arranged on the upper surface of the profile body 601 , the second tile buckle 602 is plugged into the upper notch of the tile 8 and bonded to the back of the tile 8 .

阳角件7采用Y型结构包括限位件701及支撑件702,所述限位件701设置在阳角处瓷砖8的缝隙位置,所述支撑件702与横龙骨1固定连接。其中限位件701用于确定瓷砖的缝隙,支撑件702用于将阳角处的瓷砖固定(一般采用粘结固定)。The male corner piece 7 adopts a Y-shaped structure and includes a limiting piece 701 and a supporting piece 702. The limiting piece 701 is set at the gap between the tiles 8 at the male corner, and the supporting piece 702 is fixedly connected to the transverse keel 1. Among them, the limit piece 701 is used to determine the gap between the tiles, and the support piece 702 is used to fix the tiles at the external corners (generally by bonding).

一种无基板瓷砖安装结构的安装方法,具体步骤如下:A method for installing a ceramic tile installation structure without a substrate, the specific steps are as follows:

1)固定底部型材:根据深化图纸测量完成面线,用钢排钉将底部型材固定在相应位置,遇到原始墙面阳角处将底部型材切45°角对拼;1) Fix the bottom profile: measure and complete the surface line according to the deepening drawing, fix the bottom profile at the corresponding position with steel nails, and cut the bottom profile at a 45° angle when encountering the original wall surface;

2)固定横龙骨:根据深化图纸确定横龙骨所在位置,调平后用膨胀螺钉将横龙骨固定在原始墙面上;2) Fix the transverse keel: Determine the position of the transverse keel according to the deepening drawing, and fix the transverse keel on the original wall with expansion screws after leveling;

3)将瓷砖插件与瓷砖固定:用VHB胶带将瓷砖插件与瓷砖固定牢固,将T型瓷砖卡扣插入瓷砖预先开好的槽口中;3) Fix the tile insert and the tile: Use VHB tape to fix the tile insert and the tile firmly, and insert the T-shaped tile buckle into the pre-opened notch of the tile;

4)插入瓷砖插件:将瓷砖插件从侧面插入横龙骨中,再向下落入横龙骨上;4) Insert the tile insert: insert the tile insert into the horizontal keel from the side, and then drop down onto the horizontal keel;

5)安装底部第一排瓷砖:将底部型材插入底部第一排瓷砖的槽口中,固定瓷砖位置;5) Install the first row of tiles at the bottom: Insert the bottom profile into the notch of the first row of tiles at the bottom to fix the position of the tiles;

6)固定、调整瓷砖插件:调整安装上墙的瓷砖,通过旋转瓷砖插件孔洞内的螺栓调整瓷砖的上下位置;通过移动瓷砖调整瓷砖的左右位置,调整完后将螺栓拧紧,固定;6) Fix and adjust the tile insert: adjust the tile installed on the wall, adjust the up and down position of the tile by rotating the bolt in the hole of the tile insert; adjust the left and right position of the tile by moving the tile, tighten the bolt after adjustment, and fix it;

7)插入下一块瓷砖:将瓷砖插件插入下一块瓷砖的下部槽口,重复步骤6),直到安装完成一面墙左右瓷砖;7) Insert the next tile: insert the tile insert into the lower notch of the next tile, repeat step 6), until the installation is complete with one wall left and right tiles;

8)安装顶部插件:将顶部插件插入最上层瓷砖的槽口中,并将顶部插件从侧面插入横龙骨中,墙面安装完成,最后再进行顶部板块的安装。8) Install the top insert: insert the top insert into the notch of the uppermost tile, and insert the top insert into the horizontal keel from the side, the wall installation is completed, and finally the top plate is installed.

Claims (8)

1. a kind of no substrate ceramic tile mounting structure, which is characterized in that the transom including being fixed on original metope top position (1), the bottom section bar (6) for being fixed on the transom (1) of original metope medium position and being arranged on original ground is described original The transom (1) of metope top position is equipped with top plug-in unit (2), sets in the transom (1) of the original metope medium position Have ceramic tile plug-in unit (5), the top plug-in unit (2), ceramic tile plug-in unit (5) and bottom section bar (6) upper and lower position are corresponding, the top Between plug-in unit (2) and ceramic tile plug-in unit (5), between ceramic tile plug-in unit (5) and ceramic tile plug-in unit (5) and ceramic tile plug-in unit (5) and bottom section bar (6) equal grafting setting ceramic tile (8) between, to constitute ceramic tile surface layer.
2. a kind of no substrate ceramic tile mounting structure according to claim 1, which is characterized in that the external corner of the original metope Place is equipped with external corner part (7), and the transom (1) cut off at external corner, and ceramic tile (8) cuts 45° angle to spelling at external corner, and with positive Corner fittings (7) is fixed.
3. a kind of no substrate ceramic tile mounting structure according to claim 1, which is characterized in that the inner corner trim of the original metope The transom (1) at place is using head-on collision mounting structure, and ceramic tile (8) stays the gap of 1-2mm at inner corner trim.
4. a kind of no substrate ceramic tile mounting structure according to claim 1, which is characterized in that top plug-in unit (2) packet Include the first ceramic tile buckle (201), the first transom engaging portion (202) and top platform (203), the first ceramic tile buckle (201) mating with the top notch of ceramic tile (8) and Nian Jie with ceramic tile (8) back side;The transom engaging portion (202) with Transom (1) snapping.
5. a kind of no substrate ceramic tile mounting structure according to claim 1, which is characterized in that ceramic tile plug-in unit (5) packet Include T-type ceramic tile buckle (501) and the second transom engaging portion (502), the T-type ceramic tile buckle (501) include upper fastener and under Fastener, and the notch grafting up and down with ceramic tile (8) respectively of upper fastener and lower fastener, and it is Nian Jie with ceramic tile (8) back;Described second Transom engaging portion (502) and transom (1) snapping;The transom engaging portion (502) is equipped with and wears for adjusting bolt (4) If bolt hole.
6. a kind of no substrate ceramic tile mounting structure according to claim 1, which is characterized in that bottom section bar (6) packet It includes the second ceramic tile of profile ontology (601) and setting in profile ontology (601) upper surface and buckles (602), the second ceramic tile card The upper notch grafting of (602) and ceramic tile (8) is detained, and Nian Jie with ceramic tile (8) back.
7. a kind of no substrate ceramic tile mounting structure according to claim 2, which is characterized in that the external corner part (7) uses Y Type structure includes locating part (701) and supporting element (702), and the gap position of ceramic tile (8) is arranged at external corner in the locating part (701) It sets, the supporting element (702) is fixedly connected with transom (1).
8. a kind of installation method of no substrate ceramic tile mounting structure according to claim 1, which is characterized in that including as follows Step:
1) fixed bottom section bar: being measured upper thread according to in-depth drawing, bottom section bar be fixed on corresponding position with steel nail, It encounters and bottom section bar is cut into 45° angle to spelling at original metope external corner;
2) fixed transom: transom position is determined according to in-depth drawing, is fixed transom with swell fixture after leveling On original metope;
3) ceramic tile plug-in unit is fixed with ceramic tile: with VHB adhesive tape by ceramic tile plug-in unit and ceramic tile fixation, T-type ceramic tile is buckled and is inserted Enter in the notch that ceramic tile is held successfully in advance;
4) it is inserted into ceramic tile plug-in unit: ceramic tile plug-in unit being laterally inserted into transom, is fallen into transom still further below;
5) first row ceramic tile in bottom is installed: by the notch of bottom section bar insertion bottom first row ceramic tile, fixing ceramic tile position;
6) fixed, adjustment ceramic tile plug-in unit: the ceramic tile of wall is installed in adjustment, and the bolt passed through in rotation ceramic tile plug-in unit hole adjusts porcelain The upper and lower position of brick;The left-right position that ceramic tile is adjusted by mobile ceramic tile, tightens bolt after having adjusted, fixed;
7) it is inserted into next block of ceramic tile: ceramic tile plug-in unit is inserted into the lower part notch of next block of ceramic tile, step 6) is repeated, until installing At a face wall or so ceramic tile;
8) installation top plug-in unit: top plug-in unit is inserted into the notch of top layer's ceramic tile, and top plug-in unit is laterally inserted into cross In keel, metope is installed, and finally carries out the installation of top plate again.
CN201910745584.8A 2019-08-13 2019-08-13 Substrate-free ceramic tile mounting structure and mounting method thereof Active CN110512821B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910745584.8A CN110512821B (en) 2019-08-13 2019-08-13 Substrate-free ceramic tile mounting structure and mounting method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910745584.8A CN110512821B (en) 2019-08-13 2019-08-13 Substrate-free ceramic tile mounting structure and mounting method thereof

Publications (2)

Publication Number Publication Date
CN110512821A true CN110512821A (en) 2019-11-29
CN110512821B CN110512821B (en) 2025-04-08

Family

ID=68624861

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910745584.8A Active CN110512821B (en) 2019-08-13 2019-08-13 Substrate-free ceramic tile mounting structure and mounting method thereof

Country Status (1)

Country Link
CN (1) CN110512821B (en)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111764574A (en) * 2020-07-31 2020-10-13 广东博智林机器人有限公司 A modular wall panel and combined wall panel
CN111779182A (en) * 2020-07-31 2020-10-16 广东博智林机器人有限公司 A modular wall panel forming structure and a method for forming a modular wall panel
CN111962791A (en) * 2020-09-09 2020-11-20 浙江亚厦装饰股份有限公司 Wall surface hanging type external corner system
CN113175172A (en) * 2021-03-30 2021-07-27 北新集团建材股份有限公司 Decoration integrated board installation system of corner department
CN113502994A (en) * 2021-07-19 2021-10-15 成都百威凯诚科技有限公司 Dry paving process for wall tiles
CN115262906A (en) * 2022-09-26 2022-11-01 和能人居科技(天津)集团股份有限公司 Wall tile mounting structure
CN115506550A (en) * 2022-09-26 2022-12-23 和能人居科技(天津)集团股份有限公司 Wall surface ceramic tile installation method

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2009097209A (en) * 2007-10-16 2009-05-07 Takenaka Komuten Co Ltd Tile mounting structure for mounting tile on concrete panel
CN102691397A (en) * 2012-06-14 2012-09-26 苏州苏明装饰有限公司 Decorative wall with ultrathin oversized indoor decorating plates and construction method thereof
CN203867112U (en) * 2014-04-30 2014-10-08 浙江亚厦装饰股份有限公司 Dry-hanging wall tile structure
CN203867131U (en) * 2014-04-30 2014-10-08 浙江亚厦装饰股份有限公司 Wall dry-hanging tile structure
CN208056531U (en) * 2017-12-14 2018-11-06 神州长城国际工程有限公司 A kind of mounting structure of ultra-thin furring tile
CN209179435U (en) * 2018-11-22 2019-07-30 深圳市博深工程技术有限公司 Rule and its ceramic tile external corner metope structure of application
CN211647101U (en) * 2019-08-13 2020-10-09 浙江亚厦装饰股份有限公司 No base plate ceramic tile mounting structure

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2009097209A (en) * 2007-10-16 2009-05-07 Takenaka Komuten Co Ltd Tile mounting structure for mounting tile on concrete panel
CN102691397A (en) * 2012-06-14 2012-09-26 苏州苏明装饰有限公司 Decorative wall with ultrathin oversized indoor decorating plates and construction method thereof
CN203867112U (en) * 2014-04-30 2014-10-08 浙江亚厦装饰股份有限公司 Dry-hanging wall tile structure
CN203867131U (en) * 2014-04-30 2014-10-08 浙江亚厦装饰股份有限公司 Wall dry-hanging tile structure
CN208056531U (en) * 2017-12-14 2018-11-06 神州长城国际工程有限公司 A kind of mounting structure of ultra-thin furring tile
CN209179435U (en) * 2018-11-22 2019-07-30 深圳市博深工程技术有限公司 Rule and its ceramic tile external corner metope structure of application
CN211647101U (en) * 2019-08-13 2020-10-09 浙江亚厦装饰股份有限公司 No base plate ceramic tile mounting structure

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111764574A (en) * 2020-07-31 2020-10-13 广东博智林机器人有限公司 A modular wall panel and combined wall panel
CN111779182A (en) * 2020-07-31 2020-10-16 广东博智林机器人有限公司 A modular wall panel forming structure and a method for forming a modular wall panel
CN111962791A (en) * 2020-09-09 2020-11-20 浙江亚厦装饰股份有限公司 Wall surface hanging type external corner system
CN113175172A (en) * 2021-03-30 2021-07-27 北新集团建材股份有限公司 Decoration integrated board installation system of corner department
CN113502994A (en) * 2021-07-19 2021-10-15 成都百威凯诚科技有限公司 Dry paving process for wall tiles
CN115262906A (en) * 2022-09-26 2022-11-01 和能人居科技(天津)集团股份有限公司 Wall tile mounting structure
CN115506550A (en) * 2022-09-26 2022-12-23 和能人居科技(天津)集团股份有限公司 Wall surface ceramic tile installation method

Also Published As

Publication number Publication date
CN110512821B (en) 2025-04-08

Similar Documents

Publication Publication Date Title
CN110512821A (en) A non-substrate tile installation structure and installation method thereof
US5473851A (en) Limestone curtain wall system and method
CN107178170B (en) Integrated ceiling with integral toilet keel and veneer and construction method
WO2019128242A1 (en) Fabricated toilet and mounting method therefor
CN102003056B (en) Wall connecting part of insertion type integrated insulation board and application method thereof
CN110847534B (en) A stone bathroom wall assembly and installation method thereof
US12134889B2 (en) Support bracket hanger assembly and method
WO2015155492A1 (en) Housing and retaining system for insulation boarding
US20070163191A1 (en) Mold resistant structural drywall track
CN102877622A (en) Mounting structure of outer wall decorative plate
CN211647101U (en) No base plate ceramic tile mounting structure
CN215889107U (en) Bidirectional keel and keel adapter structure
CN115162645A (en) Assembly type kitchen wall assembly and mounting method
MX2011001599A (en) Apparatus for connecting framing components of a builiding to a foundation.
CN113417418A (en) Assembly type wall system with wall boards capable of being installed transversely and vertically in two directions and installation method of assembly type wall system
CN211736163U (en) Wall panel installation assembly
CN217268500U (en) Integral assembled type integral wallboard and integral bathroom wallboard structure
CN109930944B (en) Mounting method of hidden auxiliary sleeve
CN220620841U (en) Kitchen wall structure
CN218758481U (en) Leveling device
JP3302882B2 (en) External heat insulation construction method of building and mounting bracket
CN212405804U (en) Stone toilet wall assembly
CN210659076U (en) Bottom rod, bottom box device and wall panel installation assembly
CN210857822U (en) Shingle nail concatenation subassembly and shingle nail installation assembly
CN211396412U (en) Panel mounting assembly

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant