CN104531931A - 高炉出铁场下部除尘管道安装方法 - Google Patents
高炉出铁场下部除尘管道安装方法 Download PDFInfo
- Publication number
- CN104531931A CN104531931A CN201510026135.XA CN201510026135A CN104531931A CN 104531931 A CN104531931 A CN 104531931A CN 201510026135 A CN201510026135 A CN 201510026135A CN 104531931 A CN104531931 A CN 104531931A
- Authority
- CN
- China
- Prior art keywords
- cleaning shaft
- blast furnace
- lifting
- reinforced concrete
- dedusting
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- C—CHEMISTRY; METALLURGY
- C21—METALLURGY OF IRON
- C21B—MANUFACTURE OF IRON OR STEEL
- C21B7/00—Blast furnaces
- C21B7/22—Dust arresters
-
- C—CHEMISTRY; METALLURGY
- C21—METALLURGY OF IRON
- C21B—MANUFACTURE OF IRON OR STEEL
- C21B7/00—Blast furnaces
- C21B7/14—Discharging devices, e.g. for slag
Landscapes
- Engineering & Computer Science (AREA)
- Chemical & Material Sciences (AREA)
- Manufacturing & Machinery (AREA)
- Materials Engineering (AREA)
- Metallurgy (AREA)
- Organic Chemistry (AREA)
- Cleaning In General (AREA)
- Conveying And Assembling Of Building Elements In Situ (AREA)
Abstract
本发明涉及高炉出铁场设施安装领域,公开了一种高炉出铁场下部除尘管道安装方法。该方法包括以下步骤:a、依照高炉出铁场设计图纸和除尘管道设计图,设计出与除尘管道对应除尘分段吊装区段;b、根据设计好的除尘分段吊装区段,在钢筋砼平台上设计与除尘分段吊装区段对应的吊装预留结构;c、施工修建钢筋砼平台,同时在钢筋砼平台设置吊装预留结构;d、将吊装设备安装于吊装预留结构上,利用吊装设备对除尘管道进行吊装和安装。其解决了出铁场钢筋砼平台下部柱子密布,空间狭小,导致除尘管道吊装困难的问题,使其施工更加方便快捷。
Description
技术领域
本发明涉及高炉出铁场设施安装领域,尤其是一种高炉出铁场下部除尘管道安装方法。
背景技术
目前,在大型管道安设的吊装施工中,通常采用可移动的吊车进行吊装,吊车移动灵活,通用性强,操作施工远比架设龙门吊等方式便捷,使用成本也相对低廉。但是,高炉系统出铁场钢筋砼平台1下部除尘管道8由于其位置的特殊性,管道与钢筋砼平台之间一般只有1-2米的间距,钢筋砼柱子2密布,空间狭小,吊车作业困难;一次设计中,设计单位一般不会过多考虑该部分除尘管道8的安装问题。故造成了该部分除尘管道8安装困难,安装工期长,人工、机械使用成本高等问题。
发明内容
本发明所要解决的技术问题是提供一种高炉出铁场下部除尘管道安装方法,该方法解决了出铁场钢筋砼平台下部柱子密布,空间狭小,导致除尘管道吊装困难的问题,使其施工更加方便快捷。
本发明公开的高炉出铁场下部除尘管道安装方法,包括以下步骤:
a、依照高炉出铁场设计图纸和除尘管道设计图,设计出与除尘管道对应除尘分段吊装区段;
b、根据设计好的除尘分段吊装区段,在钢筋砼平台上设计与除尘分段吊装区段对应的吊装预留结构;
c、施工修建钢筋砼平台,同时在钢筋砼平台设置吊装预留结构;
d、将吊装设备安装于吊装预留结构上,利用吊装设备对除尘管道进行吊装和安装。
优选地,所述吊装设备为倒链机构,所述倒链机构包括滑轮组、卷扬机和钢丝绳;在d步骤中,将滑轮组安装于吊装预留结构上,将除尘管道吊挂于钢丝绳的一端,钢丝绳的另一端绕过滑轮组连接于卷扬机上,启动卷扬机即可实现除尘管道的吊装。
优选地,所述吊装预留结构为吊装孔;进行d步骤时,在吊装孔上方设置支撑件,将吊装设备通过吊装孔连接于支撑件上。
优选地,在d步骤之后,将钢筋砼平台的预留的吊装孔用混凝土封堵。
优选地,进行d步骤之前,首先在除尘管道的各分段对接处搭建施工作业临时平台。
本发明的有益效果是:考虑到高炉出铁场除尘管道的特殊安装环境,本方法利用原本有碍于吊装的钢筋砼平台设置吊装的支点,根据除尘管道的安装位置,预先在钢筋砼平台设置吊装预留结构,再利用预留结构安设吊装设备,将除尘管道快速准确吊装到预定位置,从而加快施工进程,并减少后续处理的工序环节,降低劳动强度。此外,本方法可最大限度的在地面进行除尘管道吊装单元的预制,能有效保证质量,并降低施工的安全风险,确保除尘管道施工质量符合设计要求。
附图说明
图1是本发明的示意图。
附图标记:1-钢筋砼平台,2-钢筋砼柱子,3-吊装孔,4-支撑件,5-滑轮组,6-卷扬机,7-钢丝绳,8-除尘管道。
具体实施方式
下面结合附图对本发明进一步说明。
如图1所示,本发明的高炉出铁场下部除尘管道安装方法,包括以下步骤:
a、依照高炉出铁场设计图纸和除尘管道设计图,设计出与除尘管道对应除尘分段吊装区段;
b、根据设计好的除尘分段吊装区段,在钢筋砼平台1上设计与除尘分段吊装区段对应的吊装预留结构;
c、施工修建钢筋砼平台1,同时在钢筋砼平台1设置吊装预留结构;
d、将吊装设备安装于吊装预留结构上,利用吊装设备对除尘管道8进行吊装和安装。
在高炉出铁场建造前,依照土建专业一次设计图纸,确定钢筋砼平台1纵横梁的位置、长度,楼板厚度,除尘管道8支吊架位置、数量等准确数据;并以此为据,设计出除尘管道8吊装区段,绘制出除尘管道8分段吊装图,依据除尘管道设计图纸,确定平台下部除尘管道8的走向、长度、管径大小、管道分段吊装的节数等数据资料;结合除尘管道分段吊装图,确定出吊装预留结构在平台上的位置、数量、尺寸大小等,并准确计算每段管道的吊装重量,从而可绘制出吊装预留结构的安装施工图,报设计单位确认后,交土建专业施工。施工修筑钢筋砼平台1的同时,则可按设计在平台上预设吊装预留结构,然后在安设除尘管道8时,将吊装设备安装于钢筋砼平台1的吊装预留结构上,即可十分快速方便地完成吊装和安装。
具体而言,吊装设备可以选择如电动葫芦等设备,而作为优选方式,所述吊装设备为倒链机构,所述倒链机构包括滑轮组5、卷扬机6和钢丝绳7;在d步骤中,将滑轮组5安装于吊装预留结构上,将除尘管道8吊挂于钢丝绳7的一端,钢丝绳7的另一端绕过滑轮组5连接于卷扬机6上,启动卷扬机6即可实现除尘管道8的吊装。采用卷扬机6驱动倒链完成吊装,设备结构简单,成本低廉,可省去其他大型吊装设备的费用,同时可以降低劳动强度。
对于吊装预留结构的形式可以有多种选择,例如,预埋螺栓、预埋挂钩等形式,而就本发明而言,如图1所示,作为优选方式,所述吊装预留结构为吊装孔3;进行d步骤时,在吊装孔3上方设置支撑件4,将吊装设备通过吊装孔3连接于支撑件4上。例如,在采用倒链机构作为吊装设备时,就可采用钢丝绳将倒链机构的滑轮组5穿过吊装孔吊挂于支撑件4,然后进行吊装施工。采用吊装孔3形式的吊装预留结构,使钢筋砼平台施工相对简单,而且,在d步骤之后,可将钢筋砼平台1的预留的吊装孔3用混凝土封堵,从而完全抹去吊装预留结构,免除后患。
在对除尘管道8各分段进行对接时,由于对接是在空中进行,操作十分不便,为方便对接,作为优选方式,进行d步骤之前,首先在除尘管道8的各分段对接处搭建施工作业临时平台,如此可十分方便地完成对接。施工作业临时平台可采用脚手架管或门架,参照管道安装高度搭建,每个管段对接处均搭建一座平台。
Claims (5)
1.高炉出铁场下部除尘管道安装方法,其特征在于,包括以下步骤:
a、依照高炉出铁场设计图纸和除尘管道设计图,设计出与除尘管道对应除尘分段吊装区段;
b、根据设计好的除尘分段吊装区段,在钢筋砼平台(1)上设计与除尘分段吊装区段对应的吊装预留结构;
c、施工修建钢筋砼平台(1),同时在钢筋砼平台(1)设置吊装预留结构;
d、将吊装设备安装于吊装预留结构上,利用吊装设备对除尘管道(8)进行吊装和安装。
2.如权利要求1所述的高炉出铁场下部除尘管道安装方法,其特征在于:所述吊装设备为倒链机构,所述倒链机构包括滑轮组(5)、卷扬机(6)和钢丝绳(7);
在d步骤中,将滑轮组(5)安装于吊装预留结构上,将除尘管道(8)吊挂于钢丝绳(7)的一端,钢丝绳(7)的另一端绕过滑轮组(5)连接于卷扬机(6)上,启动卷扬机(6)即可实现除尘管道(8)的吊装。
3.如权利要求1所述的高炉出铁场下部除尘管道安装方法,其特征在于:所述吊装预留结构为吊装孔(3);
进行d步骤时,在吊装孔(3)上方设置支撑件(4),将吊装设备通过吊装孔(3)连接于支撑件(4)上。
4.如权利要求3所述的高炉出铁场下部除尘管道安装方法,其特征在于:在d步骤之后,将钢筋砼平台(1)的预留的吊装孔(3)用混凝土封堵。
5.如权利要求1所述的高炉出铁场下部除尘管道安装方法,其特征在于:进行d步骤之前,首先在除尘管道(8)的各分段对接处搭建施工作业临时平台。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510026135.XA CN104531931B (zh) | 2015-01-19 | 2015-01-19 | 高炉出铁场下部除尘管道安装方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510026135.XA CN104531931B (zh) | 2015-01-19 | 2015-01-19 | 高炉出铁场下部除尘管道安装方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN104531931A true CN104531931A (zh) | 2015-04-22 |
CN104531931B CN104531931B (zh) | 2016-07-20 |
Family
ID=52847550
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201510026135.XA Active CN104531931B (zh) | 2015-01-19 | 2015-01-19 | 高炉出铁场下部除尘管道安装方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN104531931B (zh) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105775991A (zh) * | 2016-05-16 | 2016-07-20 | 兰州兰石重型装备股份有限公司 | 大直径管束起吊装配工装及其使用方法 |
CN110002354A (zh) * | 2019-04-19 | 2019-07-12 | 国电龙源电力技术工程有限责任公司 | 复杂空间重型管道设备吊装系统和吊装方法 |
CN112110336A (zh) * | 2020-09-21 | 2020-12-22 | 中国建筑第八工程局有限公司 | 钢梁安装于楼板用的装置及其施工方法 |
CN112412037A (zh) * | 2020-11-10 | 2021-02-26 | 上海宝冶集团有限公司 | 炼钢厂房与屋面大口径管道的同步施工方法 |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101804501A (zh) * | 2010-04-01 | 2010-08-18 | 中国二十二冶集团有限公司 | 汽化冷却烟道地面组对焊接整体安装施工工艺 |
CN102851421A (zh) * | 2012-04-18 | 2013-01-02 | 天津二十冶建设有限公司 | 一种高炉单管下降管的安装方法 |
CN103043454A (zh) * | 2012-12-25 | 2013-04-17 | 中国华冶科工集团有限公司 | 筒仓上料设备安装方法 |
CN103045784A (zh) * | 2013-01-06 | 2013-04-17 | 莱芜钢铁集团有限公司 | 用于高炉出铁场的除尘装置 |
-
2015
- 2015-01-19 CN CN201510026135.XA patent/CN104531931B/zh active Active
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101804501A (zh) * | 2010-04-01 | 2010-08-18 | 中国二十二冶集团有限公司 | 汽化冷却烟道地面组对焊接整体安装施工工艺 |
CN102851421A (zh) * | 2012-04-18 | 2013-01-02 | 天津二十冶建设有限公司 | 一种高炉单管下降管的安装方法 |
CN103043454A (zh) * | 2012-12-25 | 2013-04-17 | 中国华冶科工集团有限公司 | 筒仓上料设备安装方法 |
CN103045784A (zh) * | 2013-01-06 | 2013-04-17 | 莱芜钢铁集团有限公司 | 用于高炉出铁场的除尘装置 |
Non-Patent Citations (2)
Title |
---|
中国冶金百科全书总编辑委员会《冶金建设》卷编辑委员会等: "《中国冶金百科全书:冶金建设 (上)》", 31 January 1999, article "高炉出铁场", pages: 227-228 * |
杨云等: "大直径高炉煤气钢结构管道制作安装技术", 《中国建筑金属结构》, no. 10, 23 May 2013 (2013-05-23), pages 173 - 176 * |
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105775991A (zh) * | 2016-05-16 | 2016-07-20 | 兰州兰石重型装备股份有限公司 | 大直径管束起吊装配工装及其使用方法 |
CN110002354A (zh) * | 2019-04-19 | 2019-07-12 | 国电龙源电力技术工程有限责任公司 | 复杂空间重型管道设备吊装系统和吊装方法 |
CN110002354B (zh) * | 2019-04-19 | 2024-05-10 | 国能龙源电力技术工程有限责任公司 | 复杂空间重型管道设备吊装系统和吊装方法 |
CN112110336A (zh) * | 2020-09-21 | 2020-12-22 | 中国建筑第八工程局有限公司 | 钢梁安装于楼板用的装置及其施工方法 |
CN112110336B (zh) * | 2020-09-21 | 2022-11-25 | 中国建筑第八工程局有限公司 | 钢梁安装于楼板用的装置及其施工方法 |
CN112412037A (zh) * | 2020-11-10 | 2021-02-26 | 上海宝冶集团有限公司 | 炼钢厂房与屋面大口径管道的同步施工方法 |
Also Published As
Publication number | Publication date |
---|---|
CN104531931B (zh) | 2016-07-20 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104531931A (zh) | 高炉出铁场下部除尘管道安装方法 | |
CN107165191A (zh) | 城市综合管廊模具及其使用方法 | |
CN102877637B (zh) | 一种解决悬挑梁底部墙面施工操作平台的方法 | |
CN104032967B (zh) | 预制装配式框架结构构件吊装施工方法 | |
CN103938856B (zh) | 一种塔状构筑物无支撑杆滑模施工操作平台及施工方法 | |
CN105238420A (zh) | 焦炉上升管更换设备和焦炉上升管更换方法 | |
CN204098021U (zh) | 一种钢筋混凝土灌注桩钢筋笼定位器 | |
CN102733608B (zh) | 一种造粒塔喷头层施工方法 | |
CN207775938U (zh) | 一种检查井的整体式井圈施工用支模拆模装置 | |
CN108868194B (zh) | 一种烟囱拆除装置及烟囱拆除方法 | |
CN104895329A (zh) | 筒仓滑模库壁混凝土的随升输送、浇筑装置 | |
CN204371359U (zh) | 一种用于隧道水沟电缆槽砼灌注施工的台车 | |
CN103835497A (zh) | 螺栓对拉式轨道滑动模板 | |
CN203200719U (zh) | 悬空式倒坡模板装置 | |
CN102767162A (zh) | 混凝土双支撑大型模板及拆、立模方法 | |
CN104018657A (zh) | 一种采用水平滑移平台施工高大挑檐的方法 | |
CN109488017A (zh) | 一种混凝土结构轨顶风道悬挂移动式模架系统及施工方法 | |
CN104404923A (zh) | 拱坝牛腿模板装置及基于该装置的施工方法 | |
CN202117031U (zh) | 一种闸墩液压滑模施工装置 | |
JP5378043B2 (ja) | 鉄塔支持型煙突解体工法 | |
CN103195232B (zh) | 电梯井的施工平台及利用该施工平台对电梯井施工的方法 | |
CN204679074U (zh) | 一种新型表面观测墩结构 | |
CN209509488U (zh) | 一种混凝土结构轨顶风道悬挂移动式模架系统 | |
CN105672363A (zh) | 现浇盖板施工工艺及使用的可伸缩钢管、拆除装置及托架 | |
CN208932786U (zh) | 边沟盖板脱模组件 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant |