CN104266638A - Pit-in-pit fixed-point line laying method - Google Patents
Pit-in-pit fixed-point line laying method Download PDFInfo
- Publication number
- CN104266638A CN104266638A CN201410429850.3A CN201410429850A CN104266638A CN 104266638 A CN104266638 A CN 104266638A CN 201410429850 A CN201410429850 A CN 201410429850A CN 104266638 A CN104266638 A CN 104266638A
- Authority
- CN
- China
- Prior art keywords
- point
- hole
- reference mark
- foundation ditch
- pit
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01C—MEASURING DISTANCES, LEVELS OR BEARINGS; SURVEYING; NAVIGATION; GYROSCOPIC INSTRUMENTS; PHOTOGRAMMETRY OR VIDEOGRAMMETRY
- G01C15/00—Surveying instruments or accessories not provided for in groups G01C1/00 - G01C13/00
Abstract
The invention relates to the field of civil engineering, and specifically relates to a pit-in-pit fixed-point line laying method. The method is characterized by comprising the following steps: step one, introducing a plurality of control point pile positions into a large basic pit; step two, finding an angular point, from which a small basic pit is dug, and two nearest control points, and marking the distance; step three, marking the distances of each angular point of the small basic pit and other small basic pits, and printing the map; step four, releasing a measuring line in the onsite pit; step five, by referring to the step four, finding other angular points of the same basic pit; step six, through the method mentioned above, finding all four angular points of all basic pits. The method is simple and easy to master, the operation is easy to perform, instrument measurement frequency is reduced, the lineation is precise and is not easy to lose, and the requirements on special instruments and operators are reduced.
Description
Technical field
The present invention relates to field of civil engineering, be specially fixed point line-putting method in hole in a kind of hole.
Background technology
In civil engineering foundation pit construction, often run into the excavation comprising several foundation pits in a larger foundation ditch.After the generous amount earth excavation of foundation ditch completes, leave bottom 300mm dark, then the steel plate of welded bands sword on the tooth of digging machine, coordinates the little foundation pit be manually used in excavation pit, strikes off foundation ditch simultaneously.Some foundation pit is than comparatively dense, and workmen needs each angle point determining foundation pit with instrument, sprinkles lime line, but digging process scraping back and forth, and lime line does not see Chu soon.
Summary of the invention
The object of the invention is to, provide in a kind of simple, quick, stable hole and cheat line-putting method.
In order to achieve the above object, the present invention is achieved in that
In a kind of hole, hole fixed point line-putting method, is characterized in that: comprise the steps:
Step 1: in the large foundation ditch dug, at respective angle point and correct position place according to blueprint, by introducing stake position, several reference mark with the method for surveying setting-out, the reference point established is surveyed as follow-up little foundation ditch in this several reference mark;
Step 2, in Electronic Design figure, finds out angle point and nearest two reference mark of the little foundation ditch of required excavation, and marks out the distance at this angle point and these two reference mark;
Step 3, has marked distance by each angle point of this little foundation ditch and other little foundation ditches by step 2, and has been printed by drawing;
Step 4, at the scene in foundation ditch, release the lining rope of angle point length at nearest two reference mark to its place of one section of some little foundation ditch obtained by above step, lining rope one end is fixed on this stake position, reference mark, the other end draws one section of camber line on the ground of the general orientation of little foundation ditch angle point, just can obtain an intersection point of two arcs; Also the length that the free end of two cotton ropes is corresponding can be found respectively, then free end coincide point is pinched at finger tip, roughly direction simultaneously toward this little foundation ditch angle point is moved, until the position that two cotton ropes are all tightened, is the point that will look for immediately below finger correspondence position;
Step 5, with reference to step 4, finds out other several angle point in same foundation hole;
Step 6, just can find four angle points of all foundation pits by above method.
Fixed point line-putting method in hole in described hole, step 3 can also be: the carrier being loaded with Electronic Design figure is transported to operation field, needs which point can directly measure on Electronic Design figure to the distance of certain two point of fixity.
In described hole, hole fixed point line-putting method, lining rope has the sign point that spacing distance is 1 meter.
Fixed point line-putting method in hole in described hole, the reference mark of in earlier stage excavating large foundation ditch and introducing can be selected in selected reference mark.
Fixed point line-putting method in hole in described hole, the height of stake position, set reference mark in one plane.
This method adopts above-mentioned steps, and it has following advantage:
1, the method is easy to learn, and operating personnel grasps comparatively fast, easy to operate, comparatively fast can enter shoveling and bed course staged construction;
2, without the need to always checking complete foundation ditch corner points with instrument, surveying work amount is decreased;
3, decrease the spreading amount of lime line in classic method, decrease and repeat erection instrument, draw the surveying work amounts such as chi;
4, the method only needs two builders according to figure paper size, little foundation ditch angle point can be surveyed and set out, decrease the requirement to special instrument and operating personnel with lining rope.
Accompanying drawing explanation
Fig. 1 is operation schematic diagram of the present invention.
Embodiment
The present invention is further illustrated below by way of specific embodiment.
As described in Figure 1, in a kind of hole, hole fixed point line-putting method, is characterized in that: comprise the steps:
Step 1: in the large foundation ditch dug, at its angle point and center position according to blueprint, by introducing the stake position at reference mark 1, reference mark 2, reference mark 3, reference mark 4, reference mark 5 with the method for surveying setting-out, the reference point established is surveyed as follow-up little foundation ditch in these five reference mark;
Step 2, in Electronic Design figure, finds out angle point and nearest two reference mark of the little foundation ditch of required excavation, and marks out the distance at this angle point and these two reference mark;
Step 3, has marked distance by each angle point of this little foundation ditch and other little foundation ditches by step 2, and has been printed by drawing;
Step 4, at the scene in foundation ditch, release the lining rope (in Fig. 1 L1, L2) of angle point length at nearest two reference mark to its place of one section of some little foundation ditch obtained by above step, lining rope one end is fixed on this stake position, reference mark, the other end draws one section of camber line on the ground of the general orientation of little foundation ditch angle point (in Fig. 1 A), just can obtain an intersection point of two arcs; (also can find the length that the free end of two cotton ropes is corresponding respectively, then free end coincide point is pinched at finger tip, roughly direction simultaneously toward this little foundation ditch angle point is moved, until the position that two cotton ropes are all tightened, is the point that will look for immediately below finger correspondence position);
Step 5, with reference to step 4, finds out other several angle point (in Fig. 1 B, C, D) in same foundation hole;
Step 6, just can find four angle points of all foundation pits by above method.
Fixed point line-putting method in hole in described hole, step 3 can also be: the carrier being loaded with Electronic Design figure is transported to operation field, needs which point can directly measure on Electronic Design figure to the distance of certain two point of fixity.
In described hole, hole fixed point line-putting method, lining rope has the sign point that spacing distance is 1 meter.
Fixed point line-putting method in hole in described hole, the reference mark of in earlier stage excavating large foundation ditch and introducing can be selected in selected reference mark.
Fixed point line-putting method in hole in described hole, the height of stake position, set reference mark in one plane.
This method adopts above-mentioned steps, and it has following advantage:
1, the method is easy to learn, and operating personnel grasps comparatively fast, easy to operate, comparatively fast can enter shoveling and bed course staged construction;
2, without the need to always checking complete foundation ditch corner points with instrument, surveying work amount is decreased;
3, decrease the spreading amount of lime line in classic method, decrease and repeat erection instrument, draw the surveying work amounts such as chi;
4, the method only needs two builders according to figure paper size, little foundation ditch angle point can be surveyed and set out, decrease the requirement to special instrument and operating personnel with lining rope.
Claims (5)
1. a fixed point line-putting method in hole in hole, is characterized in that: comprise the steps:
Step 1: in the large foundation ditch dug, at respective angle point and correct position place according to blueprint, by introducing stake position, several reference mark with the method for surveying setting-out, the reference point established is surveyed as follow-up little foundation ditch in this several reference mark;
Step 2, in Electronic Design figure, finds out angle point and nearest two reference mark of the little foundation ditch of required excavation, and marks out the distance at this angle point and these two reference mark;
Step 3, has marked distance by each angle point of this little foundation ditch and other little foundation ditches by step 2, and has been printed by drawing;
Step 4, at the scene in foundation ditch, release the lining rope of angle point length at nearest two reference mark to its place of one section of some little foundation ditch obtained by above step, lining rope one end is fixed on this stake position, reference mark, the other end draws one section of camber line on the ground of the general orientation of little foundation ditch angle point, just can obtain an intersection point of two arcs; Also the length that the free end of two cotton ropes is corresponding can be found respectively, then free end coincide point is pinched at finger tip, roughly direction simultaneously toward this little foundation ditch angle point is moved, until the position that two cotton ropes are all tightened, is the point that will look for immediately below finger correspondence position;
Step 5, with reference to step 4, finds out other several angle point in same foundation hole;
Step 6, just can find four angle points of all foundation pits by above method.
2. fixed point line-putting method in hole in hole according to claim 1, is characterized in that: step 3 can also be: the carrier being loaded with Electronic Design figure is transported to operation field, needs which point can directly measure on Electronic Design figure to the distance of certain two point of fixity.
3. fixed point line-putting method in hole in hole according to claim 1, is characterized in that: lining rope has the sign point that spacing distance is 1 meter.
4. fixed point line-putting method in hole in hole according to claim 1, is characterized in that: the reference mark of in earlier stage excavating large foundation ditch and introducing can be selected in selected reference mark.
5. fixed point line-putting method in hole in hole according to claim 1, is characterized in that: the height of stake position, set reference mark in one plane.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410429850.3A CN104266638A (en) | 2014-08-28 | 2014-08-28 | Pit-in-pit fixed-point line laying method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410429850.3A CN104266638A (en) | 2014-08-28 | 2014-08-28 | Pit-in-pit fixed-point line laying method |
Publications (1)
Publication Number | Publication Date |
---|---|
CN104266638A true CN104266638A (en) | 2015-01-07 |
Family
ID=52158179
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201410429850.3A Pending CN104266638A (en) | 2014-08-28 | 2014-08-28 | Pit-in-pit fixed-point line laying method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN104266638A (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US10788322B2 (en) * | 2012-09-25 | 2020-09-29 | Trimble Jena Gmbh | Method and apparatus for assigning measuring points to a set of fixed points |
CN113073570A (en) * | 2021-04-12 | 2021-07-06 | 平阳县政府投资项目建设中心 | Construction method for controlling perpendicularity of equal-section thin-wall pier based on two-point distance method |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101216306A (en) * | 2008-01-07 | 2008-07-09 | 曹尔彬 | Architectural engineering pit quick line-putting method |
CN101349563A (en) * | 2008-09-03 | 2009-01-21 | 武汉建工股份有限公司 | Method of laying out line for building construction measurement |
CN102022993A (en) * | 2010-11-02 | 2011-04-20 | 河南省电力公司洛阳供电公司 | Method for separated pits of single pole tower foundation of circuits |
CN102776901A (en) * | 2012-06-25 | 2012-11-14 | 中国华冶科工集团有限公司 | Deep foundation pit delimitation method |
US20140088915A1 (en) * | 2012-09-25 | 2014-03-27 | Trimble Jena Gmbh | Method and apparatus for assigning measuring points to a set of fixed points |
CN103866802A (en) * | 2014-04-02 | 2014-06-18 | 江苏盐城二建集团有限公司 | Ruler-free locating foundation pit tool and using method thereof |
-
2014
- 2014-08-28 CN CN201410429850.3A patent/CN104266638A/en active Pending
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101216306A (en) * | 2008-01-07 | 2008-07-09 | 曹尔彬 | Architectural engineering pit quick line-putting method |
CN101349563A (en) * | 2008-09-03 | 2009-01-21 | 武汉建工股份有限公司 | Method of laying out line for building construction measurement |
CN102022993A (en) * | 2010-11-02 | 2011-04-20 | 河南省电力公司洛阳供电公司 | Method for separated pits of single pole tower foundation of circuits |
CN102776901A (en) * | 2012-06-25 | 2012-11-14 | 中国华冶科工集团有限公司 | Deep foundation pit delimitation method |
US20140088915A1 (en) * | 2012-09-25 | 2014-03-27 | Trimble Jena Gmbh | Method and apparatus for assigning measuring points to a set of fixed points |
CN103866802A (en) * | 2014-04-02 | 2014-06-18 | 江苏盐城二建集团有限公司 | Ruler-free locating foundation pit tool and using method thereof |
Non-Patent Citations (1)
Title |
---|
蒋经纬: "建筑物定位和基础放线", 《价值工程》 * |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US10788322B2 (en) * | 2012-09-25 | 2020-09-29 | Trimble Jena Gmbh | Method and apparatus for assigning measuring points to a set of fixed points |
CN113073570A (en) * | 2021-04-12 | 2021-07-06 | 平阳县政府投资项目建设中心 | Construction method for controlling perpendicularity of equal-section thin-wall pier based on two-point distance method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102322853B (en) | Tunnel back break control laser lofting device | |
CN102022993B (en) | Method for separated pits of single pole tower foundation of circuits | |
CN102095401B (en) | Long-distance shield tunnel breakthrough survey method | |
CN102409703A (en) | Monitoring method for horizontal displacement of foundation pit pile top and monitoring device thereof | |
CN109900208B (en) | Mine method tunnel excavation and primary support quality detection method | |
CN103603330B (en) | Method for using total station instrument to measure horizontal displacement of deep soil | |
CN110513116A (en) | A kind of monitoring device and monitoring method of tunnel jacking construction guiding | |
CN104251688A (en) | Method for linear directional measurement by utilizing laser in pipe jacking engineering | |
CN101705814B (en) | Advancing direction measurement method of vertical and slant orepasses | |
CN102778226A (en) | Calibration method for waist line of underground long-distance tunnel | |
CN102620699A (en) | Method for measuring deformation monitoring directional horizontal displacement by using directional vertical distance method | |
CN104266638A (en) | Pit-in-pit fixed-point line laying method | |
CN103983148A (en) | Full-automatic blast hole setting-out method for tunnel smooth surface blasting | |
CN106767703A (en) | Soil-slope excavates domatic method for quick and device | |
CN108487253A (en) | One kind facing rail and is long placed in bonus point hole and engineering method of removing obstacles after ultra-deep foundation pit | |
CN203811177U (en) | Angle measurement pay-off instrument | |
CN207904918U (en) | A kind of drilled pile casing locating rack | |
JP2023111937A (en) | Tunnel face state display system and tunnel face state display method | |
CN204313844U (en) | A kind of noncontact monitoring measurement controls flag-rod | |
CN106289164A (en) | A kind of cavern section method for fast measuring | |
CN102645198A (en) | Detection method and device for dynamic consolidation foundation material displacement | |
CN105544586A (en) | Power transmission circuit foundation hole digging construction method | |
CN102636161B (en) | Method for laying off plane control points by using wire suspension method | |
CN103487040B (en) | The measuring method that a kind of steel column is installed | |
CN206450213U (en) | A kind of triangular angles detection means |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20150107 |
|
RJ01 | Rejection of invention patent application after publication |