CN103983148A - Full-automatic blast hole setting-out method for tunnel smooth surface blasting - Google Patents

Full-automatic blast hole setting-out method for tunnel smooth surface blasting Download PDF

Info

Publication number
CN103983148A
CN103983148A CN201410167544.7A CN201410167544A CN103983148A CN 103983148 A CN103983148 A CN 103983148A CN 201410167544 A CN201410167544 A CN 201410167544A CN 103983148 A CN103983148 A CN 103983148A
Authority
CN
China
Prior art keywords
tunnel
setting
section
hole
full
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201410167544.7A
Other languages
Chinese (zh)
Other versions
CN103983148B (en
Inventor
高飞
李波
刘学伟
潘红桂
唐满轲
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Second Engineering Co Ltd of CTCE Group
Original Assignee
Second Engineering Co Ltd of CTCE Group
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Second Engineering Co Ltd of CTCE Group filed Critical Second Engineering Co Ltd of CTCE Group
Priority to CN201410167544.7A priority Critical patent/CN103983148B/en
Publication of CN103983148A publication Critical patent/CN103983148A/en
Application granted granted Critical
Publication of CN103983148B publication Critical patent/CN103983148B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The invention discloses a full-automatic blast hole setting-out method for tunnel smooth surface blasting. The method mainly comprises three steps, i.e. instrument equipment and matched software selection, data entry and total station full-automatic blast hole setting-out construction site operation. The method disclosed by the invention has the major advantages that the setting-out efficiency is improved, the smooth surface blasting quality is controlled and the effect of overbreak and underbreak control in tunnel construction is remarkable; compared with the traditional blast hole setting-out method, the skilled labor force is saved, the tunnel operation cycle time is reduced, the overbreak and the underbreak are effectively controlled and the overbreak quantity is reduced.

Description

The full-automatic big gun of tunnel photoface exploision hole setting out method
Technical field
The present invention relates to blasting method, relate in particular to a kind of full-automatic big gun hole setting out method in tunnel employing photoface exploision digging process.
Background technology
Most constructing tunnel still adopts Mining Method, and artificial steel tape is measured the method for explosion periphery hole.In the construction of the curved tunnel of growing up, the requirement that the method more and more can not meet fast, become more meticulous and construct.Newly-built the long 1343m of Tang Tielu pearl ridge tunnel entrance that my company undertakes the construction of, rear hedge tunnel exit 1585m, two stratum, tunnel are Yin Zhiji (γ 5) granite.Granite: canescence folder flesh pink, middle coarse grained texture, massive structure, joint fissure is grown, and master joint occurrence is 80 ° of 75 ° of 240 ° of ∠ and 95 ° of ∠, and spacing is respectively 40~80cm and 30~100cm.II, III level country rock account for construction the more than 75% of mileage, all need to carry out photoface exploision, to bursting quality, require high.If adopt traditional setting out method to have some shortcoming: the one, the setting-out time is longer, affects tunnel operation circulation; The 2nd, setting-out precision lower (adopting traditional centering to draw chi positioning mode etc.), the more difficult control of Tunnel Overbreak & Underbreak; The 3rd, layout point is less, and workman executes and bores randomness greatly.Therefore the full-automatic big gun of tunnel photoface exploision hole setting out method directly has influence on tunnel photoface exploision quality and working procedure duration.
Summary of the invention
Goal of the invention of the present invention is in order to overcome the shortcoming of above-mentioned background technology, according to on-the-spot photoface exploision, needs, and has invented a set of high speed, accurate, full-automatic big gun hole setting out method.
Technical scheme of the present invention is: the full-automatic big gun of a kind of tunnel photoface exploision hole setting out method, the method comprises the steps:
Step 1: instrument and equipment and software kit are selected;
Select instrument and equipment to mainly contain: to select and can carry out the total powerstation of fully-automatic laser non-prism measuring system, supporting transect layout and big gun hole setting-out software, reflecting piece, tripod, single prism group;
Step 2: data typing;
First the operation in newly-built this tunnel in software, secondly typing tunnel cross-section, tunnel line data are horizontal curve, vertical curve, when profile data typing, can adopt CAD to scheme direct lead-in mode, when typing, must note the selection of datum line and the relation between datum line and tunnel line, finally according to the corresponding big gun hole data of tunnel design of smooth blasting, select and typing reliever section;
Step 3: setting-out job site, the full-automatic big gun of total powerstation hole operation;
(1) backsight point setting: backsight point adopts a control point and a construction to draw a composition, in Tunnel, control point adopts two-conductor line setting, distance minimum is 150m, be 200m to the maximum, forming closed hoop with hole outer conductor accurately measures, construction is drawn some tunnel in-cavity construction for convenience and is buried underground a little temporarily, be arranged between two control points, be arranged to two point, distance between two points 5m is distributed in center line both sides, tunnel, utilize hole inside conductor point open traverse to measure, in hole, the measurement of higher degree all adopts three, fourth-order leveling, in tunnel, measurement point protection adopts Φ 100mm steel pipe to protect as casing,
(2) establish station: adopt Free Station mode to be that station is established in resection efficient and convenient, but will notice that rear intersection point distance must be greater than forward sight and two rear intersection points can not be answered minimum 30 ° of selected angle at same straight line, in the time of maximum 120 °, precision is higher;
(3) setting-out: first carrying out the selection of circuit data, is secondly periphery hole section and reliever section according to the suitable section of explosion design alternative, finally by the hole setting-out of the full-automatic big gun of multi-functional excavation stand; In setting-out process when face country rock is poor or tunnel in air quality is poor in conjunction with reflecting piece, can realize measurement can not reflect laser and measurement data time, and can improve setting-out efficiency; When adopting spread pen, paint gauge point, can take to lengthen the mode of spread pen;
(4) technical force's configuration: full-automatic big gun hole setting out method need configure two technical staff, and a people puts mirror, a people to backsight and face measuring point mark;
(5) photoface exploision out break in tunnel is measured: after this circulation setting-out finishes on the quick-fried out break inspection of a circulation light; Adopt section survey software can be full-automatic or manual random measurement go out section out break situation, if adopt all automatic measurement pattern when over excavation and under excavation area is larger, automatically carry out section survey, it is to adopt random detecting pattern only to owing to dig position, to measure that otherwise part exists out break, setting-out finishes rear section survey result can directly go out measurement report on computer section software, can control better like this out break and adjust in time the quick-fried parameter of light.
The invention has the beneficial effects as follows: the advantage of the inventive method maximum is to improve setting-out efficiency, controls photoface exploision quality, in constructing tunnel, for out break, controls and has remarkable result.Compare and save skilled workforce, reduce tunneling operation circulation timei with traditional big gun hole setting out method, effectively control out break, reduce the amount of backbreaking.
Accompanying drawing explanation
Fig. 1 is step schematic diagram of the present invention.
The specific embodiment
The present embodiment is the full-automatic big gun of a kind of tunnel photoface exploision hole setting out method, it is characterized in that the method comprises the steps:
Step 1: instrument and equipment and software kit are selected;
Select instrument and equipment to mainly contain: to select and can carry out the total powerstation of fully-automatic laser non-prism measuring system, supporting transect layout and big gun hole setting-out software, reflecting piece, tripod, single prism group;
Step 2: data typing;
First the operation in newly-built this tunnel in software, secondly typing tunnel cross-section, tunnel line data are horizontal curve, vertical curve, when profile data typing, can adopt CAD to scheme direct lead-in mode, when typing, must note the selection of datum line and the relation between datum line and tunnel line, finally according to the corresponding big gun hole data of tunnel design of smooth blasting, select and typing reliever section;
Step 3: setting-out job site, the full-automatic big gun of total powerstation hole operation;
(1) backsight point setting: backsight point adopts a control point and a construction to draw a composition, in Tunnel, control point adopts two-conductor line setting, distance minimum is 150m, be 200m to the maximum, forming closed hoop with hole outer conductor accurately measures, construction is drawn some tunnel in-cavity construction for convenience and is buried underground a little temporarily, be arranged between two control points, be arranged to two point, distance between two points 5m is distributed in center line both sides, tunnel, utilize hole inside conductor point open traverse to measure, in hole, the measurement of higher degree all adopts three, fourth-order leveling, in tunnel, measurement point protection adopts Φ 100mm steel pipe to protect as casing,
(2) establish station: adopt Free Station mode to be that station is established in resection efficient and convenient, but will notice that rear intersection point distance must be greater than forward sight and two rear intersection points can not be answered minimum 30 ° of selected angle at same straight line, in the time of maximum 120 °, precision is higher;
(3) setting-out: first carrying out the selection of circuit data, is secondly periphery hole section and reliever section according to the suitable section of explosion design alternative, finally by the hole setting-out of the full-automatic big gun of multi-functional excavation stand; In setting-out process when face country rock is poor or tunnel in air quality is poor in conjunction with reflecting piece, can realize measurement can not reflect laser and measurement data time, and can improve setting-out efficiency; When adopting spread pen, paint gauge point, can take to lengthen the mode of spread pen;
(4) technical force's configuration: full-automatic big gun hole setting out method need configure two technical staff, and a people puts mirror, a people to backsight and face measuring point mark;
(5) photoface exploision out break in tunnel is measured: after this circulation setting-out finishes on the quick-fried out break inspection of a circulation light; Adopt section survey software can be full-automatic or manual random measurement go out section out break situation, if adopt all automatic measurement pattern when over excavation and under excavation area is larger, automatically carry out section survey, it is to adopt random detecting pattern only to owing to dig position, to measure that otherwise part exists out break, setting-out finishes rear section survey result can directly go out measurement report on computer section software, can control better like this out break and adjust in time the quick-fried parameter of light.

Claims (1)

1. the full-automatic big gun of a tunnel photoface exploision hole setting out method, is characterized in that the method comprises the steps:
Step 1: instrument and equipment and software kit are selected
Select instrument and equipment to mainly contain: to select and can carry out the total powerstation of fully-automatic laser non-prism measuring system, supporting transect layout and big gun hole setting-out software, reflecting piece, tripod, single prism group;
Step 2: data typing
First the operation in newly-built this tunnel in software, secondly typing tunnel cross-section, tunnel line data are horizontal curve, vertical curve, when profile data typing, can adopt CAD to scheme direct lead-in mode, when typing, must note the selection of datum line and the relation between datum line and tunnel line, finally according to the corresponding big gun hole data of tunnel design of smooth blasting, select and typing reliever section;
Step 3: setting-out job site, the full-automatic big gun of total powerstation hole operation
(1) backsight point setting: backsight point adopts a control point and a construction to draw a composition, in Tunnel, control point adopts two-conductor line setting, distance minimum is 150m, be 200m to the maximum, forming closed hoop with hole outer conductor accurately measures, construction is drawn some tunnel in-cavity construction for convenience and is buried underground a little temporarily, be arranged between two control points, be arranged to two point, distance between two points 5m is distributed in center line both sides, tunnel, utilize hole inside conductor point open traverse to measure, in hole, the measurement of higher degree all adopts three, fourth-order leveling, in tunnel, measurement point protection adopts Φ 100mm steel pipe to protect as casing,
(2) establish station: adopt Free Station mode to be that station is established in resection efficient and convenient, but will notice that rear intersection point distance must be greater than forward sight and two rear intersection points can not be answered minimum 30 ° of selected angle at same straight line, in the time of maximum 120 °, precision is higher;
(3) setting-out: first carrying out the selection of circuit data, is secondly periphery hole section and reliever section according to the suitable section of explosion design alternative, finally by the hole setting-out of the full-automatic big gun of multi-functional excavation stand; In setting-out process when face country rock is poor or tunnel in air quality is poor in conjunction with reflecting piece, can realize measurement can not reflect laser and measurement data time, and can improve setting-out efficiency; When adopting spread pen, paint gauge point, can take to lengthen the mode of spread pen;
(4) technical force's configuration: full-automatic big gun hole setting out method need configure two technical staff, and a people puts mirror, a people to backsight and face measuring point mark;
(5) photoface exploision out break in tunnel is measured: after this circulation setting-out finishes on the quick-fried out break inspection of a circulation light; Adopt section survey software can be full-automatic or manual random measurement go out section out break situation, if adopt all automatic measurement pattern when over excavation and under excavation area is larger, automatically carry out section survey, it is to adopt random detecting pattern only to owing to dig position, to measure that otherwise part exists out break, setting-out finishes rear section survey result can directly go out measurement report on computer section software, can control better like this out break and adjust in time the quick-fried parameter of light.
CN201410167544.7A 2014-04-24 2014-04-24 Tunnel photoface exploision full-automatic big gun hole setting out method Active CN103983148B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410167544.7A CN103983148B (en) 2014-04-24 2014-04-24 Tunnel photoface exploision full-automatic big gun hole setting out method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410167544.7A CN103983148B (en) 2014-04-24 2014-04-24 Tunnel photoface exploision full-automatic big gun hole setting out method

Publications (2)

Publication Number Publication Date
CN103983148A true CN103983148A (en) 2014-08-13
CN103983148B CN103983148B (en) 2015-10-07

Family

ID=51275214

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410167544.7A Active CN103983148B (en) 2014-04-24 2014-04-24 Tunnel photoface exploision full-automatic big gun hole setting out method

Country Status (1)

Country Link
CN (1) CN103983148B (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107816981A (en) * 2017-10-20 2018-03-20 中建三局第建设工程有限责任公司 Tunnel intelligent construction survey setting out method based on BIM
CN108362215A (en) * 2017-10-09 2018-08-03 同济大学 Automatic deformation monitoring system and method for a variety of robot measurement Free Stations
CN108387221A (en) * 2018-01-17 2018-08-10 西安理工大学 A kind of tunnel excavation speedy lofting device and setting out method
CN108398064A (en) * 2018-03-21 2018-08-14 福建海峡科化富兴建设工程有限公司 A kind of room-and-pillar method goaf partition board construction of explosion setting out method
CN109000526A (en) * 2018-08-21 2018-12-14 四川中鼎爆破工程有限公司 A kind of total station setting-out bore distribution method

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101487376A (en) * 2009-02-14 2009-07-22 中国葛洲坝集团股份有限公司 One-time excavation construction method for large-diameter large-depth pressure regulating well pilot shaft
CN102679826A (en) * 2012-03-27 2012-09-19 中钢集团武汉安全环保研究院有限公司 Method for precisely excavating directional window on high and large concrete chimney
CN103017620A (en) * 2012-11-28 2013-04-03 泰兴市第一建筑安装工程有限公司 Controlled blasting construction method for rock foundation pit
CN103017621A (en) * 2012-11-29 2013-04-03 青海山金矿业有限公司 Blasting method for reducing depletion in steeply inclined thin ore body recovery
CN103276649A (en) * 2013-06-21 2013-09-04 云南云岭高速公路桥梁工程有限公司 Method for constructing multi-thickness rockfill embankment with lateral confinement and layering functions
CN103323530A (en) * 2013-06-18 2013-09-25 山东科技大学 Method for detecting stability of roadway group surrounding rock by utilizing blasting operation vibration waves

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101487376A (en) * 2009-02-14 2009-07-22 中国葛洲坝集团股份有限公司 One-time excavation construction method for large-diameter large-depth pressure regulating well pilot shaft
CN102679826A (en) * 2012-03-27 2012-09-19 中钢集团武汉安全环保研究院有限公司 Method for precisely excavating directional window on high and large concrete chimney
CN103017620A (en) * 2012-11-28 2013-04-03 泰兴市第一建筑安装工程有限公司 Controlled blasting construction method for rock foundation pit
CN103017621A (en) * 2012-11-29 2013-04-03 青海山金矿业有限公司 Blasting method for reducing depletion in steeply inclined thin ore body recovery
CN103323530A (en) * 2013-06-18 2013-09-25 山东科技大学 Method for detecting stability of roadway group surrounding rock by utilizing blasting operation vibration waves
CN103276649A (en) * 2013-06-21 2013-09-04 云南云岭高速公路桥梁工程有限公司 Method for constructing multi-thickness rockfill embankment with lateral confinement and layering functions

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108362215A (en) * 2017-10-09 2018-08-03 同济大学 Automatic deformation monitoring system and method for a variety of robot measurement Free Stations
CN108362215B (en) * 2017-10-09 2021-07-16 同济大学 Automatic deformation monitoring system and method for free station setting of multiple measuring robots
CN107816981A (en) * 2017-10-20 2018-03-20 中建三局第建设工程有限责任公司 Tunnel intelligent construction survey setting out method based on BIM
CN108387221A (en) * 2018-01-17 2018-08-10 西安理工大学 A kind of tunnel excavation speedy lofting device and setting out method
CN108398064A (en) * 2018-03-21 2018-08-14 福建海峡科化富兴建设工程有限公司 A kind of room-and-pillar method goaf partition board construction of explosion setting out method
CN109000526A (en) * 2018-08-21 2018-12-14 四川中鼎爆破工程有限公司 A kind of total station setting-out bore distribution method

Also Published As

Publication number Publication date
CN103983148B (en) 2015-10-07

Similar Documents

Publication Publication Date Title
CN103983148B (en) Tunnel photoface exploision full-automatic big gun hole setting out method
CN105178967B (en) Development machine autonomous positioning orientation system and method
CN106382121B (en) A kind of measuring method of subway tunnel shield driving
CN104251688B (en) Pipe-jacking project utilizes laser straight line orientation survey engineering method
CN106840129B (en) Method for rapidly measuring three-dimensional coordinates of center of subway segment
CN102155230B (en) Tunnel curve segment lofting method based on circle coordinates
CN101368472A (en) Method for accurately positioning and orienting drill hole of top arch
CN205537635U (en) Simple and easy control survey system in long distance straight line push pipe center
CN204007587U (en) A kind of automatic measurement guidance system about jacking construction
CN101705814B (en) Advancing direction measurement method of vertical and slant orepasses
CN102636153A (en) Observation method of crown settlement and periphery convergence of tunnel
CN105865416A (en) Leveling rod suspended leveling method for settlement monitoring
CN107328388A (en) It is a kind of high without the high Trigonometric Leveling of prism without instrument
CN107238377B (en) A kind of measurement method suitable for large underground hole speedy lofting bolthole position
CN204831145U (en) Porthole verifying ware
CN113431016A (en) Soft rock large deformation section tunnel shallow-buried underground surface-penetrating building surface monitoring method
CN105627985A (en) Mine shaft elevation transmission method
CN206223091U (en) A kind of push pipe intelligence jacking measuring system
CN106289164A (en) A kind of cavern section method for fast measuring
CN102374861A (en) Centering under point operation method of total station or target for generating plumb laser beam
CN108896015B (en) Double-laser collimation measuring method for tunnel structural surface attitude
CN112146588A (en) Method for rapidly judging blasting quality of mine roadway excavation
CN204329957U (en) Transect layout device
CN114183146B (en) Method and system for controlling super-undermining analysis
CN109764862B (en) Rapid setting-out method for central line in roadway construction

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant