CN104264982B - A kind of scattered spelling early tears down and build building mould system and building method thereof - Google Patents

A kind of scattered spelling early tears down and build building mould system and building method thereof Download PDF

Info

Publication number
CN104264982B
CN104264982B CN201410529351.1A CN201410529351A CN104264982B CN 104264982 B CN104264982 B CN 104264982B CN 201410529351 A CN201410529351 A CN 201410529351A CN 104264982 B CN104264982 B CN 104264982B
Authority
CN
China
Prior art keywords
standard
lining
internal corner
template
vertical
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201410529351.1A
Other languages
Chinese (zh)
Other versions
CN104264982A (en
Inventor
王成义
林俊天
刘顺林
张亮
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
HUI LINDA TECHNOLOGY Co Ltd
Original Assignee
HUI LINDA TECHNOLOGY Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by HUI LINDA TECHNOLOGY Co Ltd filed Critical HUI LINDA TECHNOLOGY Co Ltd
Priority to CN201410529351.1A priority Critical patent/CN104264982B/en
Priority to SG11201604275RA priority patent/SG11201604275RA/en
Priority to PCT/CN2014/091243 priority patent/WO2016054849A1/en
Priority to EP14903527.1A priority patent/EP3205790A4/en
Publication of CN104264982A publication Critical patent/CN104264982A/en
Priority to US15/185,057 priority patent/US20160298344A1/en
Application granted granted Critical
Publication of CN104264982B publication Critical patent/CN104264982B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G11/00Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs
    • E04G11/06Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs for walls, e.g. curved end panels for wall shutterings; filler elements for wall shutterings; shutterings for vertical ducts
    • E04G11/08Forms, which are completely dismantled after setting of the concrete and re-built for next pouring
    • E04G11/087Fill-in form panels in the plane of two adjacent forms
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/16Structures made from masses, e.g. of concrete, cast or similarly formed in situ with or without making use of additional elements, such as permanent forms, substructures to be coated with load-bearing material
    • E04B1/161Structures made from masses, e.g. of concrete, cast or similarly formed in situ with or without making use of additional elements, such as permanent forms, substructures to be coated with load-bearing material with vertical and horizontal slabs, both being partially cast in situ
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B2/00Walls, e.g. partitions, for buildings; Wall construction with regard to insulation; Connections specially adapted to walls
    • E04B2/84Walls made by casting, pouring, or tamping in situ
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G11/00Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs
    • E04G11/02Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs for rooms as a whole by which walls and floors are cast simultaneously, whole storeys, or whole buildings
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G11/00Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs
    • E04G11/06Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs for walls, e.g. curved end panels for wall shutterings; filler elements for wall shutterings; shutterings for vertical ducts
    • E04G11/08Forms, which are completely dismantled after setting of the concrete and re-built for next pouring
    • E04G11/085End form panels for walls
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G11/00Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs
    • E04G11/36Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs for floors, ceilings, or roofs of plane or curved surfaces end formpanels for floor shutterings
    • E04G11/365Stop-end shutterings

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Mechanical Engineering (AREA)
  • Physics & Mathematics (AREA)
  • Electromagnetism (AREA)
  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)
  • Working Measures On Existing Buildindgs (AREA)

Abstract

The present invention is applicable to construction engineering technical field, provide a kind of scattered spelling and early tear down and build building mould system and building method thereof, in this template system, first standard inside wall formwork is near the inner corner trim position of building structure, first non-standard outer wall template is near the external angle position of building structure, make the first vertical setting of types to wire drawing bar group from building structure angle position closer to, improve the template stressing conditions of building structure rotation angle position;The second inside and outside wallboard of standard need not be offered wire drawing rod aperture, immobilization equal to the level interval of wire drawing bar group, highly spacing, standardization, seriation, reduce difficulty of processing and the cost of template, need not repeatedly change with hole when position, improve the turnover utilization rate of template, extend template service life, reduce cost.The structure that bottom gusset, first, second vertical internal corner formwork and lining are constituted, strengthens the structural rigidity of template system, shifts to an earlier date and simplify the horizontal plane school die process of lining, and improve template system builds efficiency.

Description

A kind of scattered spelling early tears down and build building mould system and building method thereof
Technical field
The invention belongs to construction engineering technical field, particularly relate to a kind of scattered spelling and early tear down and build building mould system and building method thereof.
Background technology
Along with the development of building industry, the proportion of high-rise cast-in-place concrete structure increases day by day, and template system has become warp in construction Often use the instrument arrived or equipment.In scattered spelling early-dismantling formwork system, it is mainly included in the inside and outside wallboard being intervally arranged on vertical plane And the floorboard arranged in the horizontal plane, inside, after placing concrete, form body of wall in the middle of Side fascia, toward floorboard on, pouring mixes Solidifying soil forms flooring.In building template system, the vertical direction on wallboard has some through holes, the through hole on inside and outside wallboard Being correspondingly arranged, wear and can connect wire drawing bar group by fixing for two wallboards in through hole, after pouring into concrete, what wallboard was offered is logical Pitch of holes is the least, installation the biggest to wire drawing bar group, thus can be better against coagulation earth lateral pressure.Due to gravity, Bottom body of wall, template is born the extruding force that the extruding force of the concrete template corresponding relative to other positions of body of wall bear and is wanted big, therefore wall The density that the through hole in template corresponding bottom body is offered is relatively big, thus to install within the specific limits and more to support wire drawing bar group Anti-coagulation earth lateral pressure;At body of wall tip position, due to the concrete gravity of flooring, also need to pacify floor template system and have stable Structural strength, to avoid flooring that the bad problems such as crack occur.In existing building template system, the width of wallboard is equal, During arrangement, all arrange successively toward other direction from a direction, until arrangement position be unable to hold one block of wallboard time, use one piece other The wallboard arrangement of width.But, after the height of body of wall or the thickness of body of wall change, body of wall and the flooring extruding force to wallboard Can change, height or the thickness of body of wall are the biggest, and the bad problems such as crack the most easily occur in the angle position of body of wall and flooring. Accordingly, it would be desirable to according to specific circumstances, being spaced the through hole on wallboard and make corresponding adjustment, solution is first by original wall Through hole on plate is filled up, and offers new through hole the most again.But this can produce damage to template, and need to spend substantial amounts of manpower thing Power, for filling up through hole and offering new through hole, adds artificial and material cost, has dragged slowly construction speed.Certainly also can be often The width of block wallboard is made sufficiently small, thus the through hole distance reduced in horizontal direction on two blocks of wallboards, or the hole of vertical direction Interval arrange the closeest, thus can load more to wire drawing bar group with obtain enough power resist higher walls concrete to wall The extruding force of plate, but this needs to install substantial amounts of to wire drawing bar group, need to spend substantial amounts of artificial and material cost equally.
It addition, in existing template system, the bottom surface of every piece of lining all individually connects in advance with one block of bottom gusset in factory, The length of the length connected lining bottom surface of every block of bottom gusset is identical, interconnects mutually between two blocks of adjacent bottom gussets Connect, it is impossible to strengthen the integrally-built rigidity of template system.
Summary of the invention
The technical problem to be solved is that providing one to dissipate spelling early tears down and build building mould system and building method thereof, it is intended to solve The meeting damage template existing for building mould system is early teared down and built in scattered spelling of the prior art, and manually, material cost is high, drag slow construction speed And the problem that template system overall structure rigidity can not be strengthened.
The present invention is achieved in that providing a kind of scattered spelling early tears down and build building mould system, including vertical structure template system, level Stay in place form system and support system;Described vertical structure template system include lining, Side fascia, to wire drawing bar group, vertical Internal corner formwork, vertical external angle formwork and back cord, described back cord is horizontally installed on the position that described inside and outside wallboard is relative, described Vertical internal corner formwork is installed at the inner corner trim of building structure, and described vertical external angle formwork is installed at the external corner of building structure, described perpendicular Adjacent both sides on internal corner formwork are respectively arranged with connecting portion, and the adjacent both sides on described vertical external angle formwork are also respectively provided with There is connecting portion;Described lining includes the first standard lining, the second standard lining, the 3rd standard lining and non-standard interior wall Plate, described Side fascia includes the first standard external wall, the second standard external wall, the 3rd standard external wall, the first non-standard Side fascia And the second non-standard Side fascia;The width of described second standard lining is more than the width of non-standard lining, outside described second standard The width of wallboard is more than the width of the second non-standard Side fascia;
Described vertical internal corner formwork includes the first vertical internal corner formwork and the second vertical internal corner formwork of upper and lower docking, described first, Second vertical internal corner formwork removably connects;Described horizontal structure shuttering system includes bottom gusset;Described second vertical inner corner trim mould Two connecting portions of plate end with one block of described bottom gusset respectively removably connects, two connections on the described first vertical internal corner formwork Described with one piece respectively the first standard lining in portion removably connects, described first standard lining, the second standard lining, All described with the one piece bottom gusset in the bottom surface of three standard linings and non-standard lining removably connects;Described vertical external angle formwork On the side of described with one piece respectively the first non-standard Side fascia of two connecting portions removably connect, two pieces of described first are non-standard The other side of Side fascia first standard external wall described with a piece respectively removably connects;
All offer logical in described first standard lining, the 3rd standard lining, the first standard external wall and the 3rd standard external wall Hole, the lead to the hole site of described first standard lining is corresponding with the lead to the hole site of described first standard external wall, described 3rd standard The lead to the hole site of lining is corresponding with the lead to the hole site of described 3rd standard external wall, described wire drawing bar group is arranged in described in, On Side fascia relative to two through hole and two back cords in.
Described horizontal structure shuttering system also includes the vertical internal corner formwork of level and floor template, and described floor template includes the first standard Floor template, the second standard floor template, non-standard floor template and Os Draconis, described support system includes Adjustable bracing bar and meteor Hammer;Described level vertical internal corner formwork side is removably attachable to the top of lining, and opposite side is removably attachable to described building The side of face die plate, described Os Draconis are removably attachable between the relative two piece vertical internal corner formwork of described level, described Os Draconis edge The alternate setting of length direction of the vertical internal corner formwork of described level, its length direction is parallel with the width of described floor template;Institute State the first standard floor template to be connected between the vertical internal corner formwork of described level and Os Draconis, described second standard floor template and nonstandard Quasi-floor template is removably attachable between two adjacent Os Draconis, and described meteor hammer is connected between two adjacent Os Draconis, described can The top adjusting support bar is detachably connected with described meteor hammer, contacts with flooring bottom it.
The width of the first non-standard outer wall template is described vertical internal corner formwork width and thickness of wall body sum of the two.
The side of described first standard lining removably connects with the described first vertical internal corner formwork, opposite side and the second standard interior wall The side of plate removably connects.
Described 3rd standard lining is removably connected between the second adjacent standard lining or the both sides of non-standard lining, institute The position of first, second and third standard external wall stated is the most corresponding with the position of first, second and third standard lining.
Termination, the side internal corner formwork vertical with level of described first standard floor template removably connects, and opposite side termination and Os Draconis can Dismounting connects.
Described second standard floor template and non-standard floor template are between two adjacent Os Draconis, described second standard floor template Removably connect with Os Draconis with the two ends of non-standard floor template.
The two adjacent longitudinal median planes of the 3rd standard lining at interval coincide with the central plane of Os Draconis.
Described is detachably connected as pin or bolt connection.
Present invention also offers a kind of scattered spelling and tear down and build the building method of building mould system morning, comprise the following steps:
A, place one piece described second vertical internal corner formwork in the inner corner trim position of building structure, and by its two connecting portion respectively with one The end of the bottom gusset described in block connects, until bottom gusset and the second vertical internal corner formwork surround a framework knot closed jointly Structure;
B, on the second vertical internal corner formwork to connecting the described first vertical internal corner formwork, at the first vertical internal corner formwork toward described wall One piece of first described standard lining is connected on the connecting portion in direction in the middle of body plane;
C, connect in one piece of second standard on the side in direction in the middle of described wall plane at the first described standard lining respectively Wallboard;
D, connect in one piece of the 3rd standard on the side in direction in the middle of described wall plane at the second described standard lining respectively Wallboard, connects one piece of second standard at two pieces of the 3rd described standard linings respectively on the side in the middle direction of described wall plane Lining;
E, repetition step d, until the space between two piece of the 3rd adjacent standard lining is less than the width of the second standard lining Time, connect one piece of described non-standard lining according to the concrete width in space;
F, by the bottom surface of the first standard lining, the second standard lining, the 3rd standard lining and non-standard lining all with one Bottom block, gusset connects;
G, building structure external angle position place one piece of described vertical external angle formwork, past at described vertical external angle formwork respectively One block of non-standard Side fascia of described first is connected on the connecting portion in direction in the middle of described wall plane;
H, respectively first, second and third corresponding mark is installed in the wall face position that described first, second and third standard lining is corresponding Quasi-Side fascia;
I, until space between adjacent the 3rd standard external wall of exterior wall plane is less than the width of the second standard external wall time, root Connecting one piece of second non-standard Side fascia according to the concrete width in space, the template i.e. completing a body of wall connects;Then according to same Method of attachment, the connection completing remaining wall form is installed;
Back cord is installed and to wire drawing bar group in j, through hole corresponding on inside and outside wallboard;
K, on the top of lining, enclose the vertical internal corner formwork of the level of setting, between the two relative vertical internal corner formworks of described level, And Os Draconis are installed, in the lower section of each bar keel along its length by regulation on the fore-and-aft plane of the described 3rd standard lining that aligns Spacing installs Adjustable bracing bar, installs meteor hammer, be connected with meteor hammer at the top of Adjustable bracing bar between two adjacent Os Draconis, The bottom of Adjustable bracing bar is contacted with flooring;
L, at the interval of the vertical internal corner formwork of Os Draconis and level, connect upper first standard floor template;
M, from flooring toward middle direction, between two pieces of adjacent Os Draconis, connect the second standard floor template;
N, repetition step m, during until the gap length of adjacent two pieces of Os Draconis is less than the length of the second standard floor template, according to sky The concrete width of gap connects non-standard floor template.
The present invention compared with prior art, has the beneficial effects that: the first standard inside wall formwork of the present invention is removably attachable to close The inner corner trim position of building structure, the first non-standard outer wall template is removably attachable to the external angle position near building structure so that the One vertical setting of types to wire drawing bar group from building structure angle position closer to, be substantially improved the template stressing conditions of building structure rotation angle position;This In template system, the second inside and outside wallboard of standard need not be offered wire drawing rod aperture.In this template system, to the level interval of wire drawing bar group, The highly equal immobilization of spacing, standardization, seriation, greatly reduce the difficulty of processing of template, reduces processing cost, with hole when position Need not repeatedly change, improve the turnover utilization rate of template, extend template service life so that the overall cost of building template is significantly Reduce.Meanwhile, by the vertical internal corner formwork of bottom gusset and second jointly surround one close framework and body of wall on all in The structure that wallboard is connected by the vertical internal corner formwork of bottom gusset and first, greatly enhances the overall structure of template system Rigidity.And, the plane framework surrounded by the vertical internal corner formwork of bottom gusset and second, shift to an earlier date and simplify the water of lining Plane relatively die process, improve template system builds efficiency.
Accompanying drawing explanation
Fig. 1 is that scattered spelling of one that the embodiment of the present invention provides early tears down and build building mould system placing concrete, forms the local after body of wall and stands Body structural representation.
Fig. 2 is that scattered spelling of one that the embodiment of the present invention provides early tears down and build building mould system placing concrete, forms the longitudinal direction after body of wall and cuts open Depending on schematic diagram.
Fig. 3 is the horizontal cross-sectional schematic of Fig. 2.
Fig. 4 is the close-up schematic view of Fig. 3.
Fig. 5 is the schematic top plan view of Fig. 2.
Fig. 6 is to dissipate shown in Fig. 1 to spell early to tear down and build the vertical internal corner formwork of second in building mould system and bottom gusset, the first vertical inner corner trim The installation relation schematic diagram of template.
Detailed description of the invention
In order to make the technical problem to be solved, technical scheme and beneficial effect clearer, below in conjunction with accompanying drawing and Embodiment, is further elaborated to the present invention.Should be appreciated that specific embodiment described herein is only in order to explain this Invention, is not intended to limit the present invention.
As shown in Figures 1 to 6, for a preferred embodiment of the present invention, a kind of scattered spelling early tears down and build building mould system, including vertically tying Structure template system, horizontal structure shuttering system and support system.
Vertical structure template system include lining 1, Side fascia 2, to wire drawing bar group 3, vertical internal corner formwork 4, vertical external corner mould Plate 5 and back cord 6.
Back cord 6 is horizontally installed on the relative position of inside and outside wallboard 1,2, and vertical internal corner formwork 4 is installed on building structure At inner corner trim, vertical external angle formwork 5 is installed at the external corner of building structure, and the adjacent both sides on vertical internal corner formwork 4 are respectively provided with Connecting portion 41, the adjacent both sides on vertical external angle formwork 5 is had also to be respectively arranged with connecting portion 51.
Lining 1 includes the first standard lining the 11, second standard lining the 12, the 3rd standard lining 13 and non-standard interior wall Plate 14.Side fascia 2 includes that first standard external wall the 21, second standard external wall the 22, the 3rd standard external wall 23, first is nonstandard Quasi-Side fascia 24 and the second non-standard Side fascia 25.The width of the second standard lining 12 is more than the width of non-standard lining 14, The width of the second standard external wall 22 is more than the width of the second non-standard Side fascia 25;
Specifically, vertical internal corner formwork 4 includes the vertical internal corner formwork of the first vertical internal corner formwork 40a and second of upper and lower docking 40b, first, second vertical internal corner formwork 40a, 40b removably connect.Horizontal structure shuttering system includes bottom gusset 10; The two connecting portion 401b of the second vertical internal corner formwork 40b respectively with one piece bottom gusset 10 end removably connect.
Two connecting portion 401a on first vertical internal corner formwork 40a removably connect with one piece of first standard lining 11 respectively, the The bottom surface of one standard lining the 11, second standard lining the 12, the 3rd standard lining 13 and non-standard lining 14 is all with one Bottom block, gusset 10 removably connects.Two connecting portions 51 on vertical external angle formwork 5 respectively with one piece of first non-standard Side fascia The side of 24 removably connects, the other side of two piece of first non-standard Side fascia 24 respectively with one piece of first standard external wall 21 Removably connect.
In first standard lining the 11, the 3rd standard lining the 13, first standard external wall 21 and the 3rd standard external wall 23 all Offer through hole (not shown), the lead to the hole site of the first standard lining 11 and the lead to the hole site phase of the first standard external wall 21 Correspondence, the lead to the hole site of the 3rd standard lining 13 and the lead to the hole site of the 3rd standard external wall 23 are corresponding, to wire drawing bar group 3 Be arranged on inside and outside wallboard 1,2 relative to two through hole and two back cords 6 in.
Above-mentioned horizontal structure shuttering system also includes the vertical internal corner formwork of level 7 and floor template 8.Wherein, floor template 8 includes First standard floor template the 81, second standard floor template 82, non-standard floor template 83 and Os Draconis 84.Support system includes Adjustable bracing bar 301 and meteor hammer (not shown).
Level vertical internal corner formwork 7 side is removably attachable to the top of lining 1, and opposite side is removably attachable to flooring mould The side of plate 8, Os Draconis 84 are removably attachable between the relative two piece vertical internal corner formwork of level 7, and Os Draconis 84 are along horizontal vertical The alternate setting of length direction to internal corner formwork 7, its length direction is parallel with the width of floor template 8.First standard building Face die plate 81 is connected between the vertical internal corner formwork of level 7 and Os Draconis 84, the second standard floor template 82 and non-standard flooring mould Plate 83 is removably attachable between two adjacent Os Draconis 84, and meteor hammer is connected between two adjacent Os Draconis 84, adjustable supports The top of bar 301 is detachably connected with meteor hammer, contacts with flooring 200 bottom it.
The width of the first non-standard outer wall template 24 is vertical internal corner formwork 4 width, body of wall 100 thickness sum of the two.First mark The side of quasi-lining 11 removably connects with vertical internal corner formwork 4, and the side of opposite side and the second standard lining 12 is detachable Connect.3rd standard lining 13 is removably connected between the second adjacent standard lining 12 or non-standard lining 14 Both sides, the position of first, second and third standard external wall 21,22,23 and first, second and third standard lining 11,12,13 Position the most corresponding.Termination, the side internal corner formwork vertical with level 7 of the first standard floor template 81 removably connects, separately Termination, side removably connects with Os Draconis 84.
Second standard floor template 82 and non-standard floor template 83 are between two adjacent Os Draconis 84, the second standard flooring mould Its two ends of plate 82 and non-standard floor template 83 removably connects with Os Draconis 84.Two the 3rd adjacent standard interior walls at interval The longitudinal median plane of plate 13 coincides with the central plane of Os Draconis 84.
In the present embodiment, above-mentioned be detachably connected as pin or the bolt mentioned connects.
The first standard inside wall formwork 11 of the present embodiment is removably attachable to the inner corner trim position near building structure, and first is non-standard Outer wall template 24 is removably attachable to the external angle position near building structure so that wire drawing bar group 3 is tied by the first vertical setting of types from building Structure angle position closer to, be substantially improved the template stressing conditions of building structure rotation angle position;In this template system, the second standard is inside and outside Wallboard 12,22 need not be offered wire drawing rod aperture.In this template system, the most solid to level interval, the highly spacing of wire drawing bar group 3 Fixedization, standardization, seriation, greatly reduce the difficulty of processing of template, reduces processing cost, need not repeatedly change with hole when position, Improve the turnover utilization rate of template, extend template service life so that the overall cost of building template is substantially reduced.Make actual During with, the height of body of wall or thickness have a variety of, when the height of body of wall exceeds or falls below this altitude range, can design another The template system that a set of via densities is different.Due to the height of body of wall of floor each in reality or thickness essentially without difference too Greatly, therefore design a few set and can tackle the various bodies of wall run in actual application.
Meanwhile, a framework closed and body of wall 100 are jointly surrounded by bottom gusset 10 and the second vertical internal corner formwork 40b On the structure that is connected with the first vertical internal corner formwork 40a by bottom gusset 10 of all linings 1, greatly enhance The overall structure rigidity of template system.And, the plane framework surrounded with the second vertical internal corner formwork 40b by bottom gusset 10, Shifting to an earlier date and simplify the horizontal plane relatively die process of lining 1, improve template system builds efficiency.
Above-mentioned scattered spelling tears down and build the building method of building mould system morning, comprises the following steps:
A, the inner corner trim position of building structure place one piece of second vertical internal corner formwork 40b, and by its two connecting portion 401b respectively with The end of one block of bottom gusset 10 connects, until bottom gusset 10 and the second vertical internal corner formwork 40b surrounds a closing jointly Frame structure;
B, on the second vertical internal corner formwork 40b to connecting the first vertical internal corner formwork 40a, at the first vertical internal corner formwork 40a One piece of first standard lining 11 is connected on the connecting portion in direction in the middle of wall plane;
C, on the side in direction in the middle of body of wall 100 plane, connect one piece of second standard lining at the first standard lining 11 respectively 12;
D, on the side in direction in the middle of body of wall 100 plane, connect one piece of the 3rd standard lining at the second standard lining 12 respectively 13, on the side in the middle direction of body of wall 100 plane, connect one piece of second standard interior wall at two piece of the 3rd standard lining 13 respectively Plate 12;
E, repetition step d, until the space between two piece of the 3rd adjacent standard lining 13 is less than the second standard lining 12 Width time, connect one piece of non-standard lining 14 according to the concrete width in space;
F, by the first standard lining the 11, second standard lining the 12, the 3rd standard lining 13 and non-standard lining 14 Bottom surface all with one piece bottom gusset 10 be connected;
G, building structure external angle position place one piece of vertical external angle formwork 5, respectively at vertical external angle formwork 5 toward body of wall 400 One piece of first non-standard Side fascia 24 is connected on the connecting portion in direction in the middle of plane;
H, respectively install in the wall face position of first, second and third standard lining 11,12,13 correspondence corresponding first and second, Three standard external wall 21,22,23;
I, until space between adjacent the 3rd standard external wall 23 of exterior wall plane is less than the width of the second standard external wall 22 Time, connecting one piece of second non-standard Side fascia 25 according to the concrete width in space, the template i.e. completing a body of wall 100 connects; Then according to same method of attachment, the connection completing remaining wall form 400 is installed;
Back cord 6 is installed and to wire drawing bar group 3 in j, through hole corresponding on inside and outside wallboard 1,2;
K, on the top of lining 1, enclose the vertical internal corner formwork of the level of setting 7, between the two relative vertical internal corner formworks of level 7, And Os Draconis 84 are installed, in the lower section of each bar keel 84 along its length on the fore-and-aft plane of alignment the 3rd standard lining 13 By prescribed distance, Adjustable bracing bar 301 is installed, meteor hammer is installed between two adjacent Os Draconis 84, by Adjustable bracing bar 301 Top is connected with meteor hammer, is contacted with flooring 100 bottom of Adjustable bracing bar 301;
L, at the interval of Os Draconis 84 and horizontal plate internal corner formwork 7, connect upper first standard floor template 81;
M, from flooring toward middle direction, between two pieces of adjacent Os Draconis 84, connect the second standard floor template 82;
N, repetition step m, during until the gap length of adjacent two pieces of Os Draconis 84 is less than the length of the second standard floor template 82, Concrete width according to space connects non-standard floor template 83.
The foregoing is only presently preferred embodiments of the present invention, not in order to limit the present invention, all in the spirit and principles in the present invention Within any amendment, equivalent and the improvement etc. made, should be included within the scope of the present invention.

Claims (2)

1. dissipate to spell and early tear down and build a building mould system, including vertical structure template system, horizontal structure shuttering system and supporter System;Described vertical structure template system include lining, Side fascia, to wire drawing bar group, vertical internal corner formwork, vertical external corner mould Plate and back cord, described back cord is horizontally installed on the position that described inside and outside wallboard is relative, and described vertical internal corner formwork is installed on At the inner corner trim of building structure, described vertical external angle formwork is installed at the external corner of building structure, the phase on described vertical internal corner formwork Adjacent both sides are respectively arranged with connecting portion, and the adjacent both sides on described vertical external angle formwork are also respectively arranged with connecting portion;It is special Levying and be, described lining includes the first standard lining, the second standard lining, the 3rd standard lining and non-standard interior wall Plate, described Side fascia includes the first standard external wall, the second standard external wall, the 3rd standard external wall, the first non-standard exterior wall Plate and the second non-standard Side fascia;The width of described second standard lining is more than the width of non-standard lining, described second mark The width of quasi-Side fascia is more than the width of the second non-standard Side fascia;
Described vertical internal corner formwork includes the first vertical internal corner formwork and the second vertical internal corner formwork of upper and lower docking, described first, Second vertical internal corner formwork removably connects;Described horizontal structure shuttering system includes bottom gusset;Described second vertical inner corner trim mould Two connecting portions of plate end with one block of described bottom gusset respectively removably connects, and two on the described first vertical internal corner formwork are even The the first standard lining meeting portion described with one piece respectively removably connects, described first standard lining, the second standard lining, All described with the one piece bottom gusset in the bottom surface of the 3rd standard lining and non-standard lining removably connects;Described vertical external corner The side of the first non-standard Side fascia that two connecting portions in template are described with a piece respectively removably connects, two pieces described first The other side of non-standard Side fascia first standard external wall described with a piece respectively removably connects;
All offer in described first standard lining, the 3rd standard lining, the first standard external wall and the 3rd standard external wall Through hole, the lead to the hole site of described first standard lining is corresponding with the lead to the hole site of described first standard external wall, and the described 3rd The lead to the hole site of standard lining is corresponding with the lead to the hole site of described 3rd standard external wall, described wire drawing bar group is arranged in institute State on inside and outside wallboard relative to two through hole and two back cords in;
Described horizontal structure shuttering system also includes the vertical internal corner formwork of level and floor template, and described floor template includes the first mark Quasi-floor template, the second standard floor template, non-standard floor template and Os Draconis, described support system include Adjustable bracing bar and Meteor hammer;Described level vertical internal corner formwork side is removably attachable to the top of lining, and opposite side is removably attachable to The side of described floor template, described Os Draconis are removably attachable between the relative two piece vertical internal corner formwork of described level, institute State the width side of the Os Draconis alternate setting of length direction along the vertical internal corner formwork of described level, its length direction and described floor template To parallel;Described first standard floor template is connected between the vertical internal corner formwork of described level and Os Draconis, described second standard building Face die plate and non-standard floor template are removably attachable between two adjacent Os Draconis, and described meteor hammer is connected to two adjacent dragons Between bone, the top of described Adjustable bracing bar is detachably connected with described meteor hammer, contacts with flooring bottom it;
The width of the first non-standard Side fascia is described vertical internal corner formwork width and thickness of wall body sum of the two;
The side of described first standard lining removably connects, in opposite side and the second standard with the described first vertical internal corner formwork The side of wallboard removably connects;
Described 3rd standard lining is removably connected between the second adjacent standard lining or the both sides of non-standard lining, The position of first, second and third described standard external wall is the most corresponding with the position of first, second and third standard lining;
Termination, the side internal corner formwork vertical with level of described first standard floor template removably connects, opposite side termination and Os Draconis Removably connect;
Described second standard floor template and non-standard floor template are between two adjacent Os Draconis, described second standard flooring mould The two ends of plate and non-standard floor template removably connects with Os Draconis;
The two adjacent longitudinal median planes of the 3rd standard lining at interval coincide with the central plane of Os Draconis;
Described is detachably connected as pin or bolt connection.
2. as claimed in claim 1 dissipating spells the building method early tearing down and building building mould system, comprises the following steps:
A, place one piece described second vertical internal corner formwork in the inner corner trim position of building structure, and by its two connecting portion respectively with one The end of the bottom gusset described in block connects, until bottom gusset and the second vertical internal corner formwork surround a framework closed jointly Structure;
B, on the second vertical internal corner formwork to connecting the described first vertical internal corner formwork, at the first vertical internal corner formwork toward described wall One piece of first described standard lining is connected on the connecting portion in direction in the middle of body plane;
C, connect in one piece of second standard on the side in direction in the middle of described wall plane at the first described standard lining respectively Wallboard;
D, connect in one piece of the 3rd standard on the side in direction in the middle of described wall plane at the second described standard lining respectively Wallboard, connects one piece of second mark at two pieces of the 3rd described standard linings respectively on the side in the middle direction of described wall plane Quasi-lining;
E, repetition step d, until the space between two piece of the 3rd adjacent standard lining is less than the width of the second standard lining Time, connect one piece of described non-standard lining according to the concrete width in space;
F, by the bottom surface of the first standard lining, the second standard lining, the 3rd standard lining and non-standard lining all with one Bottom block, gusset connects;
G, building structure external angle position place one piece of described vertical external angle formwork, past at described vertical external angle formwork respectively One block of non-standard Side fascia of described first is connected on the connecting portion in direction in the middle of described wall plane;
H, respectively first, second and third corresponding mark is installed in the wall face position that described first, second and third standard lining is corresponding Quasi-Side fascia;
I, until space between adjacent the 3rd standard external wall of exterior wall plane is less than the width of the second standard external wall time, Concrete width according to space connects one piece of second non-standard Side fascia, and the template i.e. completing a body of wall connects;Then according to same The method of attachment of sample, the connection completing remaining wall form is installed;
Back cord is installed and to wire drawing bar group in j, through hole corresponding on inside and outside wallboard;
K, on the top of lining, enclose the vertical internal corner formwork of the level of setting, between the two relative vertical internal corner formworks of described level, And Os Draconis are installed, in the lower section of each bar keel along its length by rule on the fore-and-aft plane of the described 3rd standard lining that aligns Determining deviation installs Adjustable bracing bar, installs meteor hammer between two adjacent Os Draconis, by the top of Adjustable bracing bar with meteor hammer even Connect, the bottom of Adjustable bracing bar is contacted with flooring;
L, at the interval of the vertical internal corner formwork of Os Draconis and level, connect upper first standard floor template;
M, from flooring toward middle direction, between two pieces of adjacent Os Draconis, connect the second standard floor template;
N, repetition step m, during until the gap length of adjacent two pieces of Os Draconis is less than the length of the second standard floor template, according to sky The concrete width of gap connects non-standard floor template.
CN201410529351.1A 2014-10-09 2014-10-09 A kind of scattered spelling early tears down and build building mould system and building method thereof Active CN104264982B (en)

Priority Applications (5)

Application Number Priority Date Filing Date Title
CN201410529351.1A CN104264982B (en) 2014-10-09 2014-10-09 A kind of scattered spelling early tears down and build building mould system and building method thereof
SG11201604275RA SG11201604275RA (en) 2014-10-09 2014-11-17 Assembled early-removal building formwork system and erecting method thereof
PCT/CN2014/091243 WO2016054849A1 (en) 2014-10-09 2014-11-17 Assembled early-removal building formwork system and erecting method thereof
EP14903527.1A EP3205790A4 (en) 2014-10-09 2014-11-17 Assembled early-removal building formwork system and erecting method thereof
US15/185,057 US20160298344A1 (en) 2014-10-09 2016-06-17 Assembling and dismantling-beforehand structural template system and construction method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410529351.1A CN104264982B (en) 2014-10-09 2014-10-09 A kind of scattered spelling early tears down and build building mould system and building method thereof

Publications (2)

Publication Number Publication Date
CN104264982A CN104264982A (en) 2015-01-07
CN104264982B true CN104264982B (en) 2016-08-17

Family

ID=52156544

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410529351.1A Active CN104264982B (en) 2014-10-09 2014-10-09 A kind of scattered spelling early tears down and build building mould system and building method thereof

Country Status (5)

Country Link
US (1) US20160298344A1 (en)
EP (1) EP3205790A4 (en)
CN (1) CN104264982B (en)
SG (1) SG11201604275RA (en)
WO (1) WO2016054849A1 (en)

Families Citing this family (51)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US10253511B2 (en) * 2016-04-29 2019-04-09 Donald Sollars Multi-flex forming system
CN105971269A (en) * 2016-06-28 2016-09-28 深圳汇林达科技有限公司 Wallboard structure with template screw hole positions standardized
CN106223602A (en) * 2016-09-09 2016-12-14 深圳市天成达实业有限公司 A kind of sectioned wall template
CN108086589A (en) * 2016-11-23 2018-05-29 北京清华同衡规划设计研究院有限公司 Precast wall body, prefabricated unit body, building system and its construction method
CN107060324A (en) * 2017-03-15 2017-08-18 众建睿德钢模科技(苏州)有限公司 The box-like inner corner trim overlap joint building template of tool group
CN106836796A (en) * 2017-03-15 2017-06-13 众建睿德钢模科技(苏州)有限公司 The box-like irregular corners building template of tool group
CN106812313A (en) * 2017-03-15 2017-06-09 众建睿德钢模科技(苏州)有限公司 The box-like external corner building template of tool group
CN107386629A (en) * 2017-09-11 2017-11-24 广东铝遊家科技有限公司 Build aluminum alloy mould plate combining structure
CN107700828A (en) * 2017-09-26 2018-02-16 福建建工集团有限责任公司 A kind of shear wall corner formwork reinforcement system and preparation method thereof
CN107829556A (en) * 2017-10-23 2018-03-23 南方风机股份有限公司 One kind building aluminum alloy mould plate combined system
CN107700368B (en) * 2017-11-27 2023-12-08 中建一局集团第五建筑有限公司 Cast-in-situ arch ring template system for hollow box of large-span arch bridge and construction method of cast-in-situ arch ring template system
CN107859176A (en) * 2017-11-29 2018-03-30 湖北绿溪建筑科技有限公司 A kind of staggered floor construction in assembled architecture, improve the construction method of form cycling rate
CN108060682B (en) * 2017-12-05 2024-09-24 中易建科技有限公司 Pipe gallery top formwork installation structure, pipe gallery formwork installation system and construction method of pipe gallery top formwork installation system
CN107829408B (en) * 2017-12-15 2023-07-07 内蒙古辽河工程局股份有限公司 Rectangular aqueduct construction steel mould trolley
CN108222322A (en) * 2017-12-19 2018-06-29 浙江绿筑集成科技有限公司 A kind of rod-pulling type faced wall construction method
CN108277977A (en) * 2018-01-17 2018-07-13 曹立英 A kind of column mould reinforcement system and preparation method thereof
CN108049629A (en) * 2018-02-07 2018-05-18 中天建设集团有限公司 A kind of new big section square column formwork system and method
CN108222497B (en) * 2018-02-13 2024-01-19 郑贤斌 Building template system
CN109025268A (en) * 2018-08-17 2018-12-18 重庆中科建设(集团)有限公司 Kitchen and toilet concrete flanging construction method
CN109306664A (en) * 2018-11-05 2019-02-05 云南建投第三建设有限公司 A kind of Thin-walled Hollow Pier slide type inner template
CN109555312B (en) * 2018-12-26 2024-04-05 严雄 Fixing assembly for floor slab template
CN109537889B (en) * 2019-01-25 2024-03-01 曹海峰 Connection system based on universal board construction
CN109853938A (en) * 2019-03-14 2019-06-07 广东博智林机器人有限公司 Building template assembly
CN109881889A (en) * 2019-04-01 2019-06-14 威海兴德建材有限公司 The metal support arm of building template metal external supporting plate and building template
CN110454192B (en) * 2019-08-30 2024-10-18 中铁五局集团第五工程有限责任公司 Tunnel secondary lining trolley end template
CN111058621B (en) * 2019-12-26 2024-06-04 江苏恒桂创科建筑工程科技有限公司 Early system of tearing open of floor template support-free
CN111779260A (en) * 2020-07-10 2020-10-16 广西汇林达科技有限公司 Assembly type combined template system and construction method thereof
WO2022051821A1 (en) * 2020-09-11 2022-03-17 Mrv Engenharia E Participacoes Sa Construction system and method with concrete forms moulded in the building itself
CN112112325B (en) * 2020-10-13 2024-05-28 金螳螂精装科技(苏州)有限公司 Indoor partition wall mounting structure of prefabricated steel construction of assembled
US11739525B2 (en) * 2020-11-10 2023-08-29 Forma Technologies Inc. Composite column formwork and method of use
CN113026999B (en) * 2020-11-24 2024-06-21 浙江亚厦装饰股份有限公司 Module integrated type wall assembly
CN112270034A (en) * 2020-11-24 2021-01-26 筑友智造科技投资有限公司 Wall splitting method, device and system
CN112727066A (en) * 2020-12-24 2021-04-30 重庆新久融科技有限公司 Aluminum alloy template transformation method and device
CN113089897B (en) * 2021-04-14 2022-05-03 河北晶达建筑科技股份有限公司 Construction method for integrally hoisting disassembly-free cement formwork
CN113216616B (en) * 2021-04-30 2022-08-09 中建四局第六建设有限公司 Device for reinforcing cast-in-place stand board of venue and construction method thereof
CN113266400B (en) * 2021-07-08 2024-06-21 中铁隧道局集团有限公司 Trolley for constructing tunnel sewage-cleaning diversion ditch and construction method thereof
CN113585721B (en) * 2021-08-03 2023-02-10 中建五局华东建设有限公司 Internal-bracing external-jacking supporting system for hospital linear accelerator area
CN113719025A (en) * 2021-08-20 2021-11-30 上海建工七建集团有限公司 External wall template structure and construction method thereof
CN113818685B (en) * 2021-09-26 2023-01-13 中国一冶集团有限公司 Bottom die device and building template device with same
CN113967822A (en) * 2021-10-25 2022-01-25 石瀚太 Full-assembly type steel structure self-propelled parking building node hole group machining method
CN114197737A (en) * 2021-11-25 2022-03-18 浙江亚厦装饰股份有限公司 Welt keel structure and mounting mode
CN114000632B (en) * 2021-11-29 2022-10-18 山东高速德建集团有限公司 Laminated slab construction structure free of ash adhesion and construction process thereof
CN114482526B (en) * 2022-03-17 2023-07-21 中交二公局萌兴工程有限公司 Assembled aluminum alloy template, construction method and application thereof
CN114562078B (en) * 2022-03-30 2023-09-08 北京住总第二开发建设有限公司 Tibetan side wall and construction method thereof
CN114905620B (en) * 2022-04-19 2024-05-14 湖南景辰生态环保科技有限公司 Production equipment and production method of self-heat-preservation building block
CN115182574B (en) * 2022-07-13 2024-09-06 中铁上海工程局集团有限公司 Male and female corner construction structure and construction method
CN115110754B (en) * 2022-08-05 2023-07-21 中国十七冶集团有限公司 Assembled aluminum alloy combined template and assembling method
CN115199029A (en) * 2022-09-13 2022-10-18 中国建筑第二工程局有限公司 Cast-in-place beam-slab structure formwork system and construction method thereof
CN115476425A (en) * 2022-10-11 2022-12-16 兰州理工大学 Square PC well chamber prefabricated template and construction assembling and disassembling method
CN115652905A (en) * 2022-11-04 2023-01-31 中建八局第二建设有限公司 Novel brick moulding bed construction method
CN115596198B (en) * 2022-12-13 2023-06-27 中铁建设集团华北工程有限公司 Assembled Z-shaped component, assembling die and construction method thereof

Family Cites Families (44)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3274306A (en) * 1966-09-20 Method for casting concrete structures
US1579822A (en) * 1923-03-23 1926-04-06 Arthur K Knickerbocker Toy
GB273510A (en) * 1926-07-23 1927-07-07 Arthur Earl Troiel Improvements in and relating to plastic wall construction
US1694292A (en) * 1928-02-10 1928-12-04 Fred A Tracey Method of constructing and supporting forms for concrete work
US2017553A (en) * 1931-11-09 1935-10-15 Arthur E Troiel Form for plastic structural work
US2434708A (en) * 1942-12-05 1948-01-20 William R Mathis Molding apparatus for forming buildings
US2442292A (en) * 1944-04-24 1948-05-25 Nicholas Del Genio Form for plastic structural work
US2511584A (en) * 1947-05-12 1950-06-13 Hayden C Hill Wall form construction
US2566528A (en) * 1948-07-15 1951-09-04 Mackie Robert Shuttering for use in the manufacture of concrete structures
US2632228A (en) * 1949-04-13 1953-03-24 William R Huntington Form for molding concrete walls
US3035321A (en) * 1953-03-16 1962-05-22 Victor E O Hennig Demountable concrete form
US2776464A (en) * 1953-08-12 1957-01-08 Lyle E Stewart Concrete form construction
FR1265337A (en) * 1960-05-19 1961-06-30 Recoverable formwork box devices for building construction
US3182374A (en) * 1961-02-08 1965-05-11 Carl E Cook Method of and apparatus for molding concrete buildings monolithically
US3822853A (en) * 1969-12-30 1974-07-09 Shelley Enterprises Apparatus for producing modular boxlike units
US3853452A (en) * 1972-05-22 1974-12-10 E Delmonte Molding machine
US3826460A (en) * 1972-09-13 1974-07-30 J Cast Monolithic structure forming means with metal tubular bracing
DE2323532A1 (en) * 1973-05-10 1974-11-28 Dreiskaemper Gmbh FORMWORK MADE OF GRID FORMWORK ELEMENTS FOR QUICK ASSEMBLY
US4334372A (en) * 1980-03-06 1982-06-15 Colmar Jack E Movable web variable exhibitor
US4446640A (en) * 1982-02-18 1984-05-08 Richard Kenney Price ticket and like displays
FR2544356B1 (en) * 1983-04-18 1987-07-17 Pujol Barcons Salvador CONSTRUCTION ASSEMBLY FOR CASTING MONOLITHIC RIGID STRUCTURES AND METHOD FOR CONSTRUCTING SUCH STRUCTURES
US4593824A (en) * 1984-12-14 1986-06-10 Armstrong Store Fixture Corporation Tag holder
US5419066A (en) * 1992-07-02 1995-05-30 Logigraf Inc. Card holder extrusion
US5794795A (en) * 1996-06-17 1998-08-18 Stemmons; William L. Framework system for electrical/electronic controls
AU3654497A (en) * 1996-06-21 1998-01-07 Fasteners For Retail, Inc. Holder for electronic information carrier
FR2761569B1 (en) * 1997-03-27 1999-06-11 Gino Faccin ELECTRIC WIRING CHASSIS
US6935062B2 (en) * 2002-07-29 2005-08-30 Fast Industries, Ltd. Label holder for electronic labeling devices
KR100557330B1 (en) * 2003-08-26 2006-03-07 주식회사 삼중종합건축사사무소 A Dismonuting Wall And Floor Form
US7367149B2 (en) * 2003-10-14 2008-05-06 Fast Industries, Ltd Label holder
US7287350B2 (en) * 2004-10-08 2007-10-30 Jacob Fast Fixed angle ESL label holder with flex grip and moisture seal
ITMI20050709A1 (en) * 2005-04-20 2006-10-21 Coepte S R L DEVICE FOR SUPPORTING ELECTRICAL COMPONENTS AND WIRING ACCESSORIES WITH HIGH PRACTICAL USE
ITMI20050708A1 (en) * 2005-04-20 2006-10-21 Coepte S R L PROFILE FOR SUPPORTING HIGH VERSATILITY ELECTRICAL COMPONENTS
WO2007079596A1 (en) * 2006-01-13 2007-07-19 Polywheels Manufacturing Ltd. Concrete forming system
JP3905551B1 (en) * 2006-10-20 2007-04-18 株式会社清都組 Formwork structure, panel support material, panel support material for corners, panel support material for exit corners and formwork method
SE534235C2 (en) * 2009-10-23 2011-06-07 Clamco Invest Ab Metal profile, fastening device and housing including fastening system with metal profile and fastening device
DE102009055690A1 (en) * 2009-11-25 2011-05-26 Peri Gmbh Ausschalvorrichtung
CN102477770A (en) * 2010-11-25 2012-05-30 欧文斯科宁知识产权资产有限公司 Structural member for concrete slabs and construction method for pouring concrete slabs
CN202187547U (en) * 2011-06-17 2012-04-11 深圳汇林达科技有限公司 Light and high-strength alloy early-removed template system
CN102828611B (en) * 2011-06-17 2013-10-09 深圳汇林达科技有限公司 Early-removing template system and construction method thereof
CN202220434U (en) * 2011-07-29 2012-05-16 深圳市良创建筑铝模制品有限公司 Aluminum-alloy building formwork component
CN103089004B (en) * 2013-01-31 2015-02-18 朱宏宇 Combination frame module, component frame module and tool set structure and installing and dismantling method thereof
CN104060819B (en) * 2013-03-19 2016-05-04 中建四局第三建筑工程有限公司 Utilize the method for typified form construction shear wall and typified form used
CN203308084U (en) * 2013-06-08 2013-11-27 广东台澳特种铝材有限公司 Aluminum template system for building
CN204163397U (en) * 2014-10-09 2015-02-18 深圳汇林达科技有限公司 A kind of loose spelling early tears down and build building mould system

Also Published As

Publication number Publication date
EP3205790A4 (en) 2018-04-04
EP3205790A1 (en) 2017-08-16
US20160298344A1 (en) 2016-10-13
WO2016054849A1 (en) 2016-04-14
SG11201604275RA (en) 2016-07-28
CN104264982A (en) 2015-01-07

Similar Documents

Publication Publication Date Title
CN104264982B (en) A kind of scattered spelling early tears down and build building mould system and building method thereof
CN104264981B (en) A kind of scattered spelling early tears down and build building mould system and building method thereof
CN106013565B (en) The production method of 3D printing truss cassette ceiling unit
CN104727226B (en) Construction method for steel-concrete composite girder
CN108842623A (en) A kind of hydraulic self-creeping formwork construction method of Bridge High-pier column
CN106088493A (en) A kind of pin key connects mounting structure and the construction thereof of prefabricated bench
CN108582466A (en) A kind of steel reinforcement cage of prefabricated box girder mould
CN104328717A (en) CRTS III type slab ballastless track self-compacting concrete casting tooling and method
CN108049313A (en) A kind of anchor body construction method
CN105113539B (en) Combined multi-functional diaphram wall Core Walls Structure and its construction method in a kind of contrary sequence method
CN108661313A (en) A kind of cast-in-place linkage section mould plate supporting device of tool-type concrete folding plate
CN104088473A (en) Construction structure and method used for underpinning load-bearing wall
CN204475837U (en) A kind of loose spelling early tears down and build building mould system
CN106522094B (en) A kind of Sarasota crosses segment structure and construction method
CN109869153A (en) The whole of rapid construction vertical shaft lining cutting promotes cantilever form device and construction method
CN103741944B (en) Fixation kit, template system containing this fixation kit and body of wall casting method
CN107575025B (en) A kind of basement narrow space external wall construction structure and its construction method
CN204163397U (en) A kind of loose spelling early tears down and build building mould system
CN204781938U (en) Bathroom hangs mould device
CN207685855U (en) A kind of anti-anti-floating large steel moulding plate device that inclines of cast-in-place concrete retaining wall
CN107152112A (en) A kind of modularization Prefabricated stacking floor and its construction method for being used to drop plate region
CN205840190U (en) A kind of pin key connects the mounting structure of prefabricated bench
CN106192767B (en) A kind of device and construction method that can improve bottom concrete bearing capacity
CN205875737U (en) Adopt single side wall body construction of flexible pull rod to use single -side supporting formwork system
CN212421730U (en) Sandwich plate member, vertical mold and forming system of sandwich plate member

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant