CN107575025B - A kind of basement narrow space external wall construction structure and its construction method - Google Patents

A kind of basement narrow space external wall construction structure and its construction method Download PDF

Info

Publication number
CN107575025B
CN107575025B CN201710693037.0A CN201710693037A CN107575025B CN 107575025 B CN107575025 B CN 107575025B CN 201710693037 A CN201710693037 A CN 201710693037A CN 107575025 B CN107575025 B CN 107575025B
Authority
CN
China
Prior art keywords
exterior wall
wall area
outside
narrow space
steel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201710693037.0A
Other languages
Chinese (zh)
Other versions
CN107575025A (en
Inventor
陈腾
肖常春
陈春豹
林雷
赵翔
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Camce Whu Design & Research Co Ltd
Original Assignee
Camce Whu Design & Research Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Camce Whu Design & Research Co Ltd filed Critical Camce Whu Design & Research Co Ltd
Priority to CN201710693037.0A priority Critical patent/CN107575025B/en
Publication of CN107575025A publication Critical patent/CN107575025A/en
Application granted granted Critical
Publication of CN107575025B publication Critical patent/CN107575025B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Underground Structures, Protecting, Testing And Restoring Foundations (AREA)

Abstract

The present invention relates to a kind of basement narrow space external wall construction structure and its construction method, constructing structure includes exterior wall framework of steel reinforcement, raft plate, medial support system and support pile, and exterior wall framework of steel reinforcement is set to the surrounding in exterior wall area;Raft plate is set to the bottom in exterior wall area;Medial support system is set to the inside in exterior wall area;Support pile is set to the outside in exterior wall area;Basement narrow space external wall construction structure further includes the outside-supporting system being set on the outside of exterior wall area, and outside-supporting system includes multiple channel steels, and multiple channel steels are vertically arranged between exterior wall area and support pile.The present invention is linked to be the lateral pressure formed in whole common resistance exterior wall concrete casting process by the way that outside-supporting system, the outside-supporting system are arranged between exterior wall area and support pile with medial support system, it can be ensured that external wall construction quality;Cost is relatively low, and is suitable for all similar narrow space formwork engineerings.

Description

A kind of basement narrow space external wall construction structure and its construction method
Technical field
The present invention relates to building civil construction technical field, more particularly to a kind of basement narrow space external wall construction structures And its construction method.
Background technology
Some engineering outer shear wall of basement are relatively close (within 400mm) with support pile clear distance, when outer wall template is constructed, work People cannot be introduced into this narrow space and go supporting module.Therefore, difficulty of construction greatly increases, and is used at this point, we are contemplated that Inner side of outer wall setting one side formwork installs mode, however during practice of construction, one side formwork easily generates that quick-fried mould, rise mould, Or even the possibility for the mould that collapses, there is uncertain quality risk and security risk.
Invention content
Technical problem to be solved by the invention is to provide a kind of basement narrow space external wall construction structure and its constructions Method, to overcome above-mentioned deficiency in the prior art.
The technical solution that the present invention solves above-mentioned technical problem is as follows:
One side according to the present invention provides a kind of basement narrow space external wall construction structure, including exterior wall steel Tendons skeleton, raft plate, medial support system and support pile, the exterior wall framework of steel reinforcement are set to the surrounding in exterior wall area;The raft plate It is set to the bottom in the exterior wall area;The medial support system is set to the inside in the exterior wall area;The support pile setting Outside in the exterior wall area;The basement narrow space external wall construction structure further includes being set on the outside of the exterior wall area Outside-supporting system, the outside-supporting system include multiple channel steels, and multiple channel steels are vertically set to institute at equal intervals It states between exterior wall area and the support pile, and the channel steel is 16# channel steels, the spacing between the two neighboring channel steel is 300mm to 600mm.
Further:The outside-supporting system further includes Guan Liang, and the Guan Liang is set to the upper end of the support pile, multiple The upper end of the channel steel is both secured in the Guan Liang.
Further:The outside-supporting system further includes the anti-bank of concrete, the anti-bank of concrete be set to it is described outer On the raft plate of wall area corresponding section, the lower end of multiple channel steels, which is supported, to be set on the anti-bank of the concrete.
The above-mentioned advantageous effect into two step schemes is:Channel steel is fixed by the anti-bank of concrete and Guan Liang, makes Guan Liang, concrete Outside-supporting system is collectively formed in anti-bank and channel steel, can help medial support system resist due to when exterior wall concrete pours to The pressure that inside is transmitted, it is ensured that external wall construction quality.
Further:Water-tight concrete is filled between the exterior wall area and the support pile.
The advantageous effect of above-mentioned further scheme is:Make exterior wall that there is good water resistance.
Further:Multiple sealing up screw are equipped on each channel steel, the outside of each sealing up screw is and institute Channel steel is stated to be fixedly connected.
The advantageous effect of above-mentioned further scheme is:It, can when progress exterior wall concrete pours by the way that sealing up screw is arranged Play the role of fixed form, controls concreting thickness;Sealing up screw is equipped with sealing piece simultaneously, it is ensured that exterior wall is not Water penetration.
Further:The medial support system includes multiple steel pipe jackings and multiple template, and multiple templates are respectively provided with Inside in the exterior wall area, and be fixed on the exterior wall framework of steel reinforcement, it is both secured on the inside of each sealing up screw In the template;One end of each steel pipe jacking, which is supported, to be set in the template, the other end of each steel pipe jacking It supports and is set on the raft plate.
Another aspect according to the present invention provides a kind of basement narrow space external wall construction method, including following step Suddenly:
Step S1:In the outside in exterior wall area, outside-supporting system is set;
Step S2:Surrounding in the exterior wall area installs exterior wall framework of steel reinforcement;
Step S3:In the inside in the exterior wall area, medial support system is set;
Wherein:The step S1's is implemented as:
Step S11:Guan Liang is set in the upper end of support pile, concrete corresponding with the exterior wall area is set on raft plate Anti- bank;
Step S12:Multiple vertical channel steels are set between the exterior wall area and the support pile, and by multiple slots The upper end of steel is both secured in the Guan Liang, and the lower end of multiple channel steels, which is supported, to be set on the anti-bank of the concrete;
Step S13:It is respectively provided with multiple sealing up screw on each channel steel, and by the outside of multiple sealing up screw It is fixed on the channel steel.
The advantageous effect of above-mentioned further scheme is:Channel steel is fixed by the anti-bank of concrete and Guan Liang, makes Guan Liang, concrete Outside-supporting system is collectively formed in anti-bank and channel steel, when medial support system can be helped to resist due to concreting inwardly The pressure of transmission, it is ensured that external wall construction quality.
Further:The step S3's is implemented as:
Step S31:Multiple template is set in the inside in the exterior wall area, and the inside of multiple sealing up screw is solid Due in the template;
Step S32:Multiple steel pipe jackings are set in the inside in the exterior wall area, and by one end of each steel pipe jacking To in the template, the other end of each steel pipe jacking supports on the raft plate.
The advantageous effect of above-mentioned further scheme is:It, can when progress exterior wall concrete pours by the way that sealing up screw is arranged Fixed form and channel steel control the effect of concreting thickness;Sealing up screw is equipped with sealing piece simultaneously, it is ensured that exterior wall Impermeability.
Further:After the completion of the step S32, it need to also be filled between the exterior wall area and the support pile impervious mixed Solidifying soil.
The advantageous effect of above-mentioned further scheme is:Make exterior wall that there is good water resistance.
The beneficial effects of the invention are as follows:By the way that outside-supporting system, the outside-supporting are arranged between exterior wall and support pile System is linked to be the lateral pressure formed in whole common resistance exterior wall concrete casting process with medial support system, it can be ensured that exterior wall Construction quality;Cost is relatively low, and is suitable for all similar narrow space formwork engineerings.
Description of the drawings
Fig. 1 is a kind of structural schematic diagram of basement narrow space external wall construction structure of the present invention;
Fig. 2 is the sectional view at A-A ' in Fig. 1;
In figure:1 be exterior wall area, 2 be raft plate, 21 be raft plate edge sealing barricade, 3 be medial support system, 31 be steel pipe jacking, 32 be template, 33 be diagonal brace, 4 be support pile, 5 be outside-supporting system, 51 be channel steel, 52 be Guan Liang, 53 be the anti-bank of concrete, 6 it is water-tight concrete, 7 be sealing up screw, 81 be chemically-planted steel bar, 82 is earth anchor reinforcing bar.
Specific implementation mode
The principle and features of the present invention will be described below with reference to the accompanying drawings, and the given examples are served only to explain the present invention, and It is non-to be used to limit the scope of the present invention.
Embodiment one, a kind of as depicted in figs. 1 and 2, basement narrow space external wall construction structure, including exterior wall reinforcing bar Frame, raft plate 2, medial support system 3 and support pile 4, exterior wall framework of steel reinforcement are set to the surrounding in exterior wall area 1;Raft plate 2 is set to outer The bottom in wall area 1;Medial support system 3 is set to the inside in exterior wall area 1;Support pile 4 is set to the outside in exterior wall area 1;Underground Room narrow space external wall construction structure further includes the outside-supporting system 5 for being set to 1 outside of exterior wall area, and outside-supporting system 5 is wrapped Multiple channel steels 51 are included, multiple channel steels 51 are vertically arranged between exterior wall area 1 and support pile 4.
Multiple vertical channel steels 51 are preferably set between exterior wall area 1 and support pile 4 at equal intervals, multiple channel steels 51 etc. Spacing setting can ensure that 51 stress of each channel steel is identical when pouring exterior wall concrete, and part channel steel 51 is avoided to be made because stress is excessive At damage;Channel steel 51 is preferably 16# channel steels;Spacing between two neighboring channel steel 51 is 300mm to 600mm, preferably 350mm To 550mm, preferably 450mm or so, it is ensured that the external force that each channel steel 51 is born is exactly in its best field of load, neither The waste of meeting resource caused by arrangement is overstocked will not make 51 cracky of channel steel, it is often more important that can avoid out because arrangement is sparse Existing quick-fried mould, the mould that rises, collapse mould phenomenon.
Preferably, outside-supporting system 5 further includes Guan Liang 52, and Guan Liang 52 is set to the upper end of support pile 4, multiple channel steels 51 Upper end be both secured in Guan Liang 52;The upper end of multiple channel steels 51 can be fixed on by chemically-planted steel bar 81 in Guan Liang 52, multiple slots It the upper end of steel 51 can also be by reinforcement welding in Guan Liang 52.
Preferably, outside-supporting system 5 further includes the anti-bank 53 of concrete, and the anti-bank of concrete 53 is set to and 1 phase of exterior wall area On the raft plate 2 of corresponding position, the lower ends of multiple channel steels 51, which is supported, to be set on the anti-bank of concrete 53.Pass through the anti-bank 53 of concrete and Guan Liang 52 fix channel steel 51, make the anti-bank 53 of Guan Liang 52, concrete and channel steel 51 that outside-supporting system 5 be collectively formed, and can help inside Support system 3 resists the pressure due to being transmitted inwardly when exterior wall concrete pours, it is ensured that external wall construction quality.
Preferably, the outside of raft plate 2 is additionally provided with raft plate edge sealing barricade 21, prevents thicker raft plate 2 from temperature occurs in side Crack.
Preferably, water-tight concrete 6 is filled between exterior wall area 1 and support pile 4.Make exterior wall that there is good water proofing property Energy.
Preferably, be equipped with multiple sealing up screw 7 on each channel steel 51, the outside of each sealing up screw 7 with channel steel 51 It is fixedly connected, the inside of each sealing up screw 7 is fixed by screw rod positioning due in template 32;The inside of sealing up screw 7 is solid It is the prior art to determine mode, and details are not described herein.By the way that sealing up screw 7 is arranged, when progress exterior wall concrete pours, can fix Template 32 and channel steel 51 control the effect of concreting thickness;Sealing up screw 7 is equipped with sealing piece simultaneously, it is ensured that outer The impermeability of wall.
Preferably, medial support system 3 includes multiple steel pipe jackings 31 and multiple template 32, and multiple template 32 may be contained within The inside in exterior wall area 1, and be fixed on exterior wall framework of steel reinforcement, the inside of each sealing up screw 7 is both secured in template 32;Each One end of steel pipe jacking 31 is supported and is set in template 32, and the other end of each steel pipe jacking 31, which supports, to be set on raft plate 2.It is interior collateral Support body system 3 further includes multiple diagonal braces 33.
Embodiment two, a kind of basement narrow space external wall construction method, include the following steps:
Step S1:Outside setting outside-supporting system 5 in exterior wall area 1;
Step S2:Surrounding in exterior wall area 1 installs exterior wall framework of steel reinforcement;
Step S3:Inside setting medial support system 3 in exterior wall area 1.
Preferably, step S1 is implemented as:
Step S11:Guan Liang 52 is set in the upper end of support pile 4, coagulation corresponding with exterior wall area 1 is set on raft plate 2 Native anti-bank 53;
Step S12:Multiple vertical channel steels 51 are set between exterior wall area 1 and support pile 4, and by the upper of multiple channel steels 51 End is both secured in Guan Liang 52, and the lower ends of multiple channel steels 51, which is supported, to be set on the anti-bank of concrete 53;
Step S13:It is respectively provided with multiple sealing up screw 7 on each channel steel 51, and the outside of multiple sealing up screw 7 is fixed In on channel steel 51.
Multiple vertical channel steels 51 are preferably set between exterior wall area 1 and support pile 4 at equal intervals, multiple channel steels 51 etc. Spacing setting can ensure that 51 stress of each channel steel is identical when pouring exterior wall concrete, and part channel steel 51 is avoided to be made because stress is excessive At damage;Channel steel 51 is preferably 16# channel steels;Spacing between two neighboring channel steel 51 is 300mm to 600mm, preferably 350mm To 550mm, preferably 450mm or so;Ensure that the external force that each channel steel 51 is born is exactly in its best field of load, neither The waste of meeting resource caused by arrangement is overstocked will not make 51 cracky of channel steel, it is often more important that can avoid out because arrangement is sparse Existing quick-fried mould, the mould that rises, collapse mould phenomenon;The upper end of multiple channel steels 51 can be fixed on by chemically-planted steel bar 81 in Guan Liang 52, multiple channel steels It 51 upper end can also be by reinforcement welding in Guan Liang 52.
Preferably, step S3 is implemented as:
Step S31:Multiple template 32 is set in the inside in exterior wall area 1, template 32 is fixed on exterior wall framework of steel reinforcement;Template 32 pitchs of holes are corresponding with 7 spacing of sealing up screw, this is because in installation form 32, completion has been fixed in the outside of sealing up screw 7; And the inside of multiple sealing up screw 7 is fixed by screw rod positioning due in template 32;The inside fixed form of sealing up screw 7 is The prior art, details are not described herein.
Step S32:Multiple steel pipe jackings 31 are set in the inside in exterior wall area 1, and one end of each steel pipe jacking 31 is supported In template 32, the other end of each steel pipe jacking 31, which supports, to be set on raft plate 2.Withstand template 32 in one end of steel pipe jacking 31 Back cord double steel pipe, the other end of steel pipe jacking 31 withstand the earth anchor reinforcing bar 82 being embedded in raft plate 2.
When basement height is more than 4 meters, steel pipe jacking 31 and diagonal brace 33 can be set simultaneously in the inside in exterior wall area 1, make Steel pipe jacking 31 and diagonal brace 33 are linked to be entirety with inside wall reinforcement system, resist the side pressure formed in exterior wall concrete casting process Power.
By be arranged sealing up screw 7, carry out exterior wall concrete pour when, can fixed form 32 and channel steel 51, control The effect of concreting thickness;Sealing up screw 7 is equipped with sealing piece simultaneously, it is ensured that the impermeability of exterior wall.
Preferably, after the completion of step S32, water-tight concrete 6 need to be also filled between exterior wall area 1 and support pile 4.Enhancing The water resistance of exterior wall.
The present invention by being arranged outside-supporting system 5 between exterior wall area 1 and support pile 4, the outside-supporting system 5 with it is interior Side support system 3 is linked to be the lateral pressure formed in whole common resistance exterior wall concrete casting process, it can be ensured that external wall construction matter Amount;Cost is relatively low, and suitable for the engineering of all similar narrow space installation support systems.
The foregoing is merely a prefered embodiment of the invention, is not intended to limit the invention, all in the spirit and principles in the present invention Within, any modification, equivalent replacement, improvement and so on should all be included in the protection scope of the present invention.

Claims (9)

1. a kind of basement narrow space external wall construction structure, it is characterised in that:Including exterior wall framework of steel reinforcement, raft plate (2), inside Support system (3) and support pile (4), the exterior wall framework of steel reinforcement are set to the surrounding of exterior wall area (1);Raft plate (2) setting In the bottom of the exterior wall area (1);The medial support system (3) is set to the inside of the exterior wall area (1);The support pile (4) it is set to the outside of the exterior wall area (1);The basement narrow space external wall construction structure further includes being set to outside described Outside-supporting system (5) on the outside of wall area (1), the outside-supporting system (5) include multiple channel steels (51), multiple channel steels (51) it is vertically set at equal intervals between the exterior wall area (1) and the support pile (4), and the channel steel (51) is 16# Channel steel, the spacing between the two neighboring channel steel (51) are 300mm to 600mm.
2. a kind of basement narrow space external wall construction structure according to claim 1, it is characterised in that:The outside-supporting System (5) further includes Guan Liang (52), and the Guan Liang (52) is set to the upper end of the support pile (4), multiple channel steels (51) Upper end be both secured in the Guan Liang (52).
3. a kind of basement narrow space external wall construction structure according to claim 2, it is characterised in that:The outside-supporting System (5) further includes the anti-bank of concrete (53), and the anti-bank of concrete (53) is set to and exterior wall area (1) corresponding section On the raft plate (2), the lower end of multiple channel steels (51), which is supported, to be set on the anti-bank of the concrete (53).
4. a kind of basement narrow space external wall construction structure according to claim 3, it is characterised in that:In the exterior wall area (1) water-tight concrete (6) is filled between the support pile (4).
5. a kind of basement narrow space external wall construction structure according to claim 1, it is characterised in that:Each channel steel (51) multiple sealing up screw (7) are equipped on, the outside of each sealing up screw (7), which is fixed with the channel steel (51), to be connected It connects.
6. a kind of basement narrow space external wall construction structure according to claim 5, it is characterised in that:The medial support System (3) includes multiple steel pipe jackings (31) and multiple template (32), and multiple templates (32) may be contained within the exterior wall area (1) inside, and be fixed on the exterior wall framework of steel reinforcement, it is both secured to the mould on the inside of each sealing up screw (7) On plate (32);One end of each steel pipe jacking (31), which is supported, to be set in the template (32), each steel pipe jacking (31) the other end is supported and is set on the raft plate (2).
7. a kind of construction method of basement narrow space external wall construction structure as claimed in any one of claims 1 to 6, special Sign is:Include the following steps:
Step S1:Outside setting outside-supporting system (5) in exterior wall area (1);
Step S2:Exterior wall framework of steel reinforcement is installed in the surrounding of the exterior wall area (1);
Step S3:In the inside of the exterior wall area (1) setting medial support system (3);
Wherein:The step S1's is implemented as:
Step S11:In the upper end of support pile (4) setting Guan Liang (52), setting is opposite with the exterior wall area (1) on raft plate (2) The anti-bank of concrete (53) answered;
Step S12:Multiple vertical channel steels (51) are set between the exterior wall area (1) and the support pile (4), and will be multiple The upper end of the channel steel (51) is both secured in the Guan Liang (52), and the lower end of multiple channel steels (51), which is supported, is set to described mix On the solidifying anti-bank (53) of soil;
Step S13:It is respectively provided with multiple sealing up screw (7) on each channel steel (51), and by multiple sealing up screw (7) Outside be fixed on the channel steel (51).
8. a kind of basement narrow space external wall construction method according to claim 7, it is characterised in that:The step S3's It is implemented as:
Step S31:In the inside of the exterior wall area (1) setting multiple template (32), and by the interior of multiple sealing up screw (7) Side is fixed in the template (32);
Step S32:Multiple steel pipe jackings (31) are set in the inside of the exterior wall area (1), and will each steel pipe jacking (31) one end, which is supported, to be set in the template (32), and the other end of each steel pipe jacking (31), which supports, is set to the raft plate (2) On.
9. a kind of basement narrow space external wall construction method according to claim 8, it is characterised in that:In the step After the completion of S32, water-tight concrete (6) need to be also filled between the exterior wall area (1) and the support pile (4).
CN201710693037.0A 2017-08-14 2017-08-14 A kind of basement narrow space external wall construction structure and its construction method Active CN107575025B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710693037.0A CN107575025B (en) 2017-08-14 2017-08-14 A kind of basement narrow space external wall construction structure and its construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710693037.0A CN107575025B (en) 2017-08-14 2017-08-14 A kind of basement narrow space external wall construction structure and its construction method

Publications (2)

Publication Number Publication Date
CN107575025A CN107575025A (en) 2018-01-12
CN107575025B true CN107575025B (en) 2018-09-28

Family

ID=61035408

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710693037.0A Active CN107575025B (en) 2017-08-14 2017-08-14 A kind of basement narrow space external wall construction structure and its construction method

Country Status (1)

Country Link
CN (1) CN107575025B (en)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109403516B (en) * 2018-01-29 2020-12-04 中铁四局集团建筑工程有限公司 Basement exterior wall construction method
CN109184744B (en) * 2018-09-25 2021-05-25 中国建筑第八工程局有限公司 Formwork device for narrow space and construction method thereof
CN112196092B (en) * 2020-10-12 2021-09-21 福建省锦秋建筑工程有限公司 Basement narrow space outer wall construction structure and construction method thereof

Family Cites Families (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100539697B1 (en) * 2003-03-12 2005-12-29 유대식 Plywood Construction Method Using Wire and Euroform Raker System
CN201883450U (en) * 2010-11-25 2011-06-29 中国京冶工程技术有限公司 Coastal deep-foundation anti-seepage waterproof basement structure
CN204662499U (en) * 2015-03-09 2015-09-23 江苏南通三建集团有限公司 Concrete of basement exterior wall, waterproof, fertile groove integrated construction structure
CN205712125U (en) * 2016-04-28 2016-11-23 昆明理工大学 A kind of pattern foundation pit supporting structure and basement side wall external mold integral structure
CN206233584U (en) * 2016-11-15 2017-06-09 中国建筑第八工程局有限公司 Narrow zone exterior wall formwork erecting structure
CN106677533A (en) * 2017-01-17 2017-05-17 上海建工建集团有限公司 Basement exterior wall single-side formwork supporting system and method

Also Published As

Publication number Publication date
CN107575025A (en) 2018-01-12

Similar Documents

Publication Publication Date Title
KR101713674B1 (en) Underground slab structure and underground construction method using the same
CN104088397B (en) A kind of prefabricated post and precast construction method thereof
CN106013172A (en) Double row pile and diagonal brace combined soft soil deep foundation pit supporting structure and construction method
KR20090002344A (en) Land-side protection wall that use ground structure
CN107575025B (en) A kind of basement narrow space external wall construction structure and its construction method
CN205975626U (en) Strut integrated configuration with stagnant water unification in soft soil layer foundation ditch
CN106088582A (en) Slip form platform and be applied to armored concrete cylinder slding form operation method
KR20090094971A (en) Under ground top-down method
CN107893529A (en) Suitable for deep basal pit outer wall of basement PC template systems and its construction method
CN208844417U (en) A kind of outer precast construction for pier column and its outer prefabricated interior cast-in-place pier column
CN103122642B (en) Construction method of vertical post support change
CN104088473A (en) Construction structure and method used for underpinning load-bearing wall
KR100313720B1 (en) Composite Underground Structure Construction Method
CN210127485U (en) Concrete suction type caisson foundation and thin-wall pier stud connecting structure
CN105401580A (en) Concrete pouring construction method for underground gallery
KR101187170B1 (en) Application of under pinning method in remodeling
CN206956979U (en) A kind of Linear shear wall with fore-set
CN211499326U (en) Synchronous construction structures of concrete infilled wall and cast-in-place structure
KR20110052360A (en) Downward construction method of underground structure that enables continuous basement wall using non-wale and diaphragm action of concrete slab
CN112900854A (en) Template system for slope bottom plate construction and construction method
CN206204954U (en) Double-row pile combines Deep Foundation Pit Support for Soft Soil structure with diagonal brace
JP2004027609A (en) Construction method for subterranean structure and subterranean structure
KR101808833B1 (en) Floor structure of underground floor with reduced floor height using shear reinforcement and the construction method thereof
KR20100118482A (en) To use reclamation steel perimeter beam and slab diaphragm effect in order for one side of the basement outer wall continuous construct was possible ,which the basement infrastructure construction method
CN111926860B (en) Basement steel column water stop treatment method

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant