CN104242142A - 悬吊式管型母线的安装方法 - Google Patents

悬吊式管型母线的安装方法 Download PDF

Info

Publication number
CN104242142A
CN104242142A CN201410418734.1A CN201410418734A CN104242142A CN 104242142 A CN104242142 A CN 104242142A CN 201410418734 A CN201410418734 A CN 201410418734A CN 104242142 A CN104242142 A CN 104242142A
Authority
CN
China
Prior art keywords
tubular busbar
tube type
installation
type bus
hanging point
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201410418734.1A
Other languages
English (en)
Other versions
CN104242142B (zh
Inventor
李宏伟
左魁生
陈颖
刘大伟
刘慧�
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhengzhou Electric Co Of State Grid Henan Power Supply Co
State Grid Corp of China SGCC
Zhengzhou Huali Information Technology Co Ltd
Original Assignee
Zhengzhou Electric Co Of State Grid Henan Power Supply Co
State Grid Corp of China SGCC
Zhengzhou Huali Information Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhengzhou Electric Co Of State Grid Henan Power Supply Co, State Grid Corp of China SGCC, Zhengzhou Huali Information Technology Co Ltd filed Critical Zhengzhou Electric Co Of State Grid Henan Power Supply Co
Priority to CN201410418734.1A priority Critical patent/CN104242142B/zh
Publication of CN104242142A publication Critical patent/CN104242142A/zh
Application granted granted Critical
Publication of CN104242142B publication Critical patent/CN104242142B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

本发明公开了一种悬吊式管型母线的安装方法,通过将管型母线左边的绝缘子串归拢为整体结构、引出的钢丝绳吊挂在吊车的挂钩,将右边的绝缘子串归拢为整体结构后、引出的钢丝绳绕过挂在管母梁上的定滑轮与机动绞磨机连接在一起,使机动绞磨机的牵引和吊车的起吊同步进行;当管母挂点和横梁挂点在一垂线时,将机动绞磨机牵引端挂在管母横梁上的永久挂点上,再使用吊车斜推,将左端绝缘子串送至管母横梁上的永久挂点处。本发明通过归拢圆柱将管型母线的绝缘子串归拢为一整体结构,解决了机动绞磨机太多、同步操作困难的技术问题,同时解决了管母上升轨迹固定、遇到障碍物躲避困难的技术问题,使安装难度大大降低,提高了施工速度,节约了成本和工期,具有良好的经济效益。

Description

悬吊式管型母线的安装方法
[0001] 技术领域:
本发明涉及一种母线的安装方法,特别是涉及一种悬吊式管型母线的安装方法,属于电力维护与安装技术领域。
[0002] 背景技术:
随着电网输送容量的增加,在高电压及大容量的变电所内大都采用铝合金管型母线作为汇流管型母线。使用铝合金管型母线是因为它具有占地空间小、节省用地、布置简洁、维护方便、电气性能好、腐蚀率低而经久耐用、集肤效应系数小等优点。国内电力系统对管型母线的安装一般采用悬吊式、支撑式和分裂式三种。悬吊式管母线具有节约占地空间、空间布局简洁美观、抗地震性能好、不产生微风振动、允许挠度大、电晕起始电压高、构架受力小等优点,在220kV和500kV配电装置中得到广泛应用。
[0003] 悬吊式管型母线是将管母线用绝缘子串吊起来,悬挂在母线龙门架上,是介于耐张软母线和支持式硬管母线之间的一种母线形式。目前国内最常用的安装方法是:管型母线吊装采用尼龙吊装带多点吊装方式,一台30吨吊车和四台5吨机动绞磨机互相配合,吊装时需要指定有经验的人员专门指挥,这样安装操作存在机动绞磨机太多、同步操作困难的问题。
[0004] 发明内容:
本发明所要解决的技术问题是:提供一种悬吊式管型母线的安装方法,来解决机动绞磨机太多、同步操作存在困难的技术问题,同时解决管母上升轨迹固定、遇到障碍物躲避困难的技术问题。
[0005] 本发明为解决技术问题所采取的技术方案是:
一种悬吊式管型母线的安装方法,其具体安装步骤如下:
①将管型母线左边的绝缘子串通过左归拢圆柱归拢为一个整体,引出的钢丝绳吊挂在吊车的挂钩上;
②将管型母线右边的绝缘子串通过右归拢圆柱归拢为一个整体后,引出的钢丝绳绕过挂在管母梁上的上定滑轮和下定滑轮与机动绞磨机连接在一起;
③管型母线的右边通过机动绞磨机的牵引逐渐上升,同时管型母线的左边随着吊车的起吊逐步上升;
④当绝缘子串的管母挂点和横梁挂点在一条垂线上时,先将机动绞磨机牵引的右端挂在管母横梁上的永久挂点上;
⑤使用吊车斜推,将左端的绝缘子串送至管母横梁上的永久挂点处。
[0006] 所述机动绞磨机的牵引和吊车的起吊同步进行。
[0007] 所述管型母线左端的绝缘子串归拢后为一整体结构;所述管型母线左端的绝缘子串归拢后也为一整体结构。
[0008] 本发明的积极有益效果如下:
1、本发明通过归拢圆柱将管型母线一端的绝缘子串归拢为一整体结构,传统技术中一端所需要的两台机动绞磨机可减少为一台,另一端通过同步的吊车起吊,又可减少另外一端的两台机动绞磨机,并且,吊车的起吊具有灵活性,可以左右活动,当管型母线上升过程中遇到障碍物时,可以灵活的进行躲避,使安装难度大大降低。
[0009] 2、本发明通过将传统的四台机动绞磨机配合吊车同时升降的悬挂式管母安装方法简化为一台吊车和一台机动绞磨机配合安装,提高了施工速度,提高了施工安全性,节省了工期,节约了成本,具有良好的经济效益和实用价值。
[0010] 附图说明:
图1为本发明安装方法的结构示意图。
[0011] 具体实施方式:
下面结合附图对本发明作进一步的解释和说明:
参见图1,一种悬吊式管型母线的安装方法,其具体安装步骤如下:
①将管型母线4左边的绝缘子串3通过左归拢圆柱2归拢为一个整体结构,引出的钢丝绳吊挂在吊车I的挂钩上;
②将管型母线4右边的绝缘子串通过右归拢圆柱5归拢为一个整体结构后,引出的钢丝绳绕过挂在管母梁7上的上定滑轮6和下定滑轮8与机动绞磨机9连接在一起;
③管型母线4的右边通过机动绞磨机9的牵引逐渐上升,同时管型母线4的左边随着吊车I的起吊逐步上升;
④当绝缘子串3的管母挂点和横梁挂点在一条垂线上时,先将机动绞磨机9牵引的右端挂在管母横梁上的永久挂点上;
⑤使用吊车斜推,将左端的绝缘子串3送至管母横梁上的永久挂点处。
[0012] 其中:机动绞磨机9的牵引和吊车I的起吊同步进行。
[0013] 本发明通过归拢圆柱将管型母线4 一端的绝缘子串归拢为一整体结构,传统技术中一端所需要的两台机动绞磨机可减少为一台,另一端通过同步的吊车起吊,又可减少另外一端的两台机动绞磨机,并且,吊车的起吊具有灵活性,可以左右活动,当管型母线上升过程中遇到障碍物时,可以灵活的进行躲避,使安装难度大大降低,提高了施工速度,提高了施工安全性,节省了工期,节约了成本,具有良好的经济效益和实用价值。

Claims (3)

1.一种悬吊式管型母线的安装方法,其具体安装步骤如下: ①将管型母线(4)左边的绝缘子串(3)通过左归拢圆柱(2)归拢为一个整体,引出的钢丝绳吊挂在吊车(I)的挂钩上; ②将管型母线(4)右边的绝缘子串通过右归拢圆柱(5)归拢为一个整体后,引出的钢丝绳绕过挂在管母梁(7)上的上定滑轮(6)和下定滑轮(8)与机动绞磨机(9)连接在一起; ③管型母线(4)的右边通过机动绞磨机(9)的牵引逐渐上升,同时管型母线(4)的左边随着吊车(I)的起吊逐步上升; ④当绝缘子串(3)的管母挂点和横梁挂点在一条垂线上时,先将机动绞磨机(9)牵引的右端挂在管母横梁上的永久挂点上; ⑤使用吊车斜推,将左端的绝缘子串(3)送至管母横梁上的永久挂点处。
2.根据权利要求1所述的悬吊式管型母线的安装方法,其特征在于:所述机动绞磨机(9)的牵引和吊车(I)的起吊同步进行。
3.根据权利要求2所述的悬吊式管型母线的安装方法,其特征在于:所述管型母线(4)左端的绝缘子串(3)归拢后为一整体结构;所述管型母线(4)左端的绝缘子串(3)归拢后也为一整体结构。
CN201410418734.1A 2014-08-25 2014-08-25 悬吊式管型母线的安装方法 Active CN104242142B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410418734.1A CN104242142B (zh) 2014-08-25 2014-08-25 悬吊式管型母线的安装方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410418734.1A CN104242142B (zh) 2014-08-25 2014-08-25 悬吊式管型母线的安装方法

Publications (2)

Publication Number Publication Date
CN104242142A true CN104242142A (zh) 2014-12-24
CN104242142B CN104242142B (zh) 2018-04-27

Family

ID=52229739

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410418734.1A Active CN104242142B (zh) 2014-08-25 2014-08-25 悬吊式管型母线的安装方法

Country Status (1)

Country Link
CN (1) CN104242142B (zh)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104638589A (zh) * 2015-03-11 2015-05-20 国网黑龙江省电力有限公司鹤岗供电公司 管型母线吊装专用工具
CN110386543A (zh) * 2019-07-22 2019-10-29 中国电建集团河南工程有限公司 斜拉悬挂式管型母线吊装方法

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
SU1365212A2 (ru) * 1986-04-18 1988-01-07 Винницкий политехнический институт Устройство дл замены гирл нд изол торов воздушной линии электропередачи,наход щейс под напр жением
CN202094562U (zh) * 2011-04-07 2011-12-28 葛洲坝集团电力有限责任公司 悬吊式管型母线同步吊装系统
CN203339567U (zh) * 2013-07-10 2013-12-11 葛洲坝集团电力有限责任公司 特高压刚性硬质跳线同步吊装系统
CN203589482U (zh) * 2013-12-10 2014-05-07 中国电力工程顾问集团西南电力设计院 一种750kV悬吊管母线进出线结构

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
SU1365212A2 (ru) * 1986-04-18 1988-01-07 Винницкий политехнический институт Устройство дл замены гирл нд изол торов воздушной линии электропередачи,наход щейс под напр жением
CN202094562U (zh) * 2011-04-07 2011-12-28 葛洲坝集团电力有限责任公司 悬吊式管型母线同步吊装系统
CN203339567U (zh) * 2013-07-10 2013-12-11 葛洲坝集团电力有限责任公司 特高压刚性硬质跳线同步吊装系统
CN203589482U (zh) * 2013-12-10 2014-05-07 中国电力工程顾问集团西南电力设计院 一种750kV悬吊管母线进出线结构

Non-Patent Citations (3)

* Cited by examiner, † Cited by third party
Title
刘志文等: "500kV悬挂式管型母线施工方法改进", 《广东输电与变电技术》 *
张安志: "侯村500kV变电站管型母线安装", 《山西电力技术》 *
潘业斌: "500kV悬吊式大口径管型母线吊装工艺改进", 《电力建设》 *

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104638589A (zh) * 2015-03-11 2015-05-20 国网黑龙江省电力有限公司鹤岗供电公司 管型母线吊装专用工具
CN104638589B (zh) * 2015-03-11 2017-01-25 国网黑龙江省电力有限公司鹤岗供电公司 管型母线吊装专用工具
CN110386543A (zh) * 2019-07-22 2019-10-29 中国电建集团河南工程有限公司 斜拉悬挂式管型母线吊装方法
CN110386543B (zh) * 2019-07-22 2020-12-25 中国电建集团河南工程有限公司 斜拉悬挂式管型母线吊装方法

Also Published As

Publication number Publication date
CN104242142B (zh) 2018-04-27

Similar Documents

Publication Publication Date Title
CN101582572B (zh) 一种特高压张力架线的方法
CN201785175U (zh) 用于高压线铁塔的吊篮
CN104242142A (zh) 悬吊式管型母线的安装方法
CN206148848U (zh) 一种大吨位带电导线的提升装置
CN102364779A (zh) 三相管母同步起吊辅助装置
CN202260254U (zh) 一种带电更换四分裂导线直线整串绝缘子可调式卡具
CN204835355U (zh) 一种高压线路分裂导线带电拆除异物工具
CN203445520U (zh) 带电跨越装置
CN203367865U (zh) 输电线路检修用辅助支架
CN105048726B (zh) 一种用于水电站定子线棒拆除的设备
CN202704912U (zh) 一种应用于钻井绞车上的排绳装置
CN102208777A (zh) V形串导线滑车并列悬挂施工方法
CN202856238U (zh) 带电更换线路多回塔中相绝缘子串的工具
CN203151001U (zh) 一种电力线缆提升装置
CN203589536U (zh) Gw6型隔离开关快装检修支架
CN204012462U (zh) 一种用于架设导线的吊具
CN204391612U (zh) 一种高压线高空维护吊篮装置
CN209948529U (zh) 一种10kV配网线路直线段三相导线带电提升器
CN203392754U (zh) 一种变压器吊装装置
CN203976285U (zh) 与双电杆配套使用的配电台吊装导链
CN202268650U (zh) 一种输电导线提线器绝缘拉板
CN203891535U (zh) 引流作业法专用门型电线杆
CN205753203U (zh) 带电作业起吊工器具
CN203312693U (zh) 架空地线升降器
CN202602168U (zh) 架空输电线路跨越式铝合金软梯头

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
CB02 Change of applicant information
CB02 Change of applicant information

Address after: 450006 Huaihe West Road, Henan, China, No. 19, No.

Applicant after: Zhengzhou electric company of State Grid Henan Power Supply Company

Applicant after: Zhengzhou Huali Information Technology Co., Ltd.

Applicant after: State Grid Corporation of China

Address before: 100033 West Chang'an Avenue, Beijing, No. 86, No.

Applicant before: State Grid Corporation of China

Applicant before: Zhengzhou Huali Information Technology Co., Ltd.

Applicant before: Zhengzhou electric company of State Grid Henan Power Supply Company

CB03 Change of inventor or designer information
CB03 Change of inventor or designer information

Inventor after: Zhang Shaohui

Inventor after: Li Hongwei

Inventor after: Zheng Yang

Inventor after: Niu Gang

Inventor after: Liang Qingyun

Inventor after: Geng Fang

Inventor after: Yang Lin

Inventor after: Zuo Kuisheng

Inventor before: Li Hongwei

Inventor before: Zuo Kuisheng

Inventor before: Chen Ying

Inventor before: Liu Dawei

Inventor before: Liu Hui

GR01 Patent grant
GR01 Patent grant