CN104242142B - 悬吊式管型母线的安装方法 - Google Patents

悬吊式管型母线的安装方法 Download PDF

Info

Publication number
CN104242142B
CN104242142B CN201410418734.1A CN201410418734A CN104242142B CN 104242142 B CN104242142 B CN 104242142B CN 201410418734 A CN201410418734 A CN 201410418734A CN 104242142 B CN104242142 B CN 104242142B
Authority
CN
China
Prior art keywords
crane
tubular busbar
hanging point
traction
pipe mother
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201410418734.1A
Other languages
English (en)
Other versions
CN104242142A (zh
Inventor
张绍辉
李宏伟
郑阳
牛罡
梁青云
耿芳
杨琳
左魁生
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhengzhou Xianghe Group Co ltd
Zhengzhou Power Supply Co of State Grid Henan Electric Power Co Ltd
State Grid Corp of China SGCC
Original Assignee
Zhengzhou Power Supply Co of Henan Electric Power Co
Zhengzhou Huali Information Technology Co Ltd
State Grid Corp of China SGCC
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhengzhou Power Supply Co of Henan Electric Power Co, Zhengzhou Huali Information Technology Co Ltd, State Grid Corp of China SGCC filed Critical Zhengzhou Power Supply Co of Henan Electric Power Co
Priority to CN201410418734.1A priority Critical patent/CN104242142B/zh
Publication of CN104242142A publication Critical patent/CN104242142A/zh
Application granted granted Critical
Publication of CN104242142B publication Critical patent/CN104242142B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Gas-Insulated Switchgears (AREA)
  • Electric Cable Installation (AREA)

Abstract

本发明公开了一种悬吊式管型母线的安装方法,通过将管型母线左边的绝缘子串归拢为整体结构、引出的钢丝绳吊挂在吊车的挂钩,将右边的绝缘子串归拢为整体结构后、引出的钢丝绳绕过挂在管母梁上的定滑轮与机动绞磨机连接在一起,使机动绞磨机的牵引和吊车的起吊同步进行;当管母挂点和横梁挂点在一垂线时,将机动绞磨机牵引端挂在管母横梁上的永久挂点上,再使用吊车斜推,将左端绝缘子串送至管母横梁上的永久挂点处。本发明通过归拢圆柱将管型母线的绝缘子串归拢为一整体结构,解决了机动绞磨机太多、同步操作困难的技术问题,同时解决了管母上升轨迹固定、遇到障碍物躲避困难的技术问题,使安装难度大大降低,提高了施工速度,节约了成本和工期,具有良好的经济效益。

Description

悬吊式管型母线的安装方法
技术领域:
本发明涉及一种母线的安装方法,特别是涉及一种悬吊式管型母线的安装方法,属于电力维护与安装技术领域。
背景技术:
随着电网输送容量的增加,在高电压及大容量的变电所内大都采用铝合金管型母线作为汇流管型母线。使用铝合金管型母线是因为它具有占地空间小、节省用地、布置简洁、维护方便、电气性能好、腐蚀率低而经久耐用、集肤效应系数小等优点。国内电力系统对管型母线的安装一般采用悬吊式、支撑式和分裂式三种。悬吊式管母线具有节约占地空间、空间布局简洁美观、抗地震性能好、不产生微风振动、允许挠度大、电晕起始电压高、构架受力小等优点,在220kV和500kV配电装置中得到广泛应用。
悬吊式管型母线是将管母线用绝缘子串吊起来,悬挂在母线龙门架上,是介于耐张软母线和支持式硬管母线之间的一种母线形式。目前国内最常用的安装方法是:管型母线吊装采用尼龙吊装带多点吊装方式,一台30吨吊车和四台5吨机动绞磨机互相配合,吊装时需要指定有经验的人员专门指挥,这样安装操作存在机动绞磨机太多、同步操作困难的问题。
发明内容:
本发明所要解决的技术问题是:提供一种悬吊式管型母线的安装方法,来解决机动绞磨机太多、同步操作存在困难的技术问题,同时解决管母上升轨迹固定、遇到障碍物躲避困难的技术问题。
本发明为解决技术问题所采取的技术方案是:
一种悬吊式管型母线的安装方法,其具体安装步骤如下:
①将管型母线左边的绝缘子串通过左归拢圆柱归拢为一个整体,引出的钢丝绳吊挂在吊车的挂钩上;
②将管型母线右边的绝缘子串通过右归拢圆柱归拢为一个整体后,引出的钢丝绳绕过挂在管母梁上的上定滑轮和下定滑轮与机动绞磨机连接在一起;
③管型母线的右边通过机动绞磨机的牵引逐渐上升,同时管型母线的左边随着吊车的起吊逐步上升;
④当绝缘子串的管母挂点和横梁挂点在一条垂线上时,先将机动绞磨机牵引的右端挂在管母横梁上的永久挂点上;
⑤使用吊车斜推,将左端的绝缘子串送至管母横梁上的永久挂点处。
所述机动绞磨机的牵引和吊车的起吊同步进行。
所述管型母线左端的绝缘子串归拢后为一整体结构;所述管型母线左端的绝缘子串归拢后也为一整体结构。
本发明的积极有益效果如下:
1、本发明通过归拢圆柱将管型母线一端的绝缘子串归拢为一整体结构,传统技术中一端所需要的两台机动绞磨机可减少为一台,另一端通过同步的吊车起吊,又可减少另外一端的两台机动绞磨机,并且,吊车的起吊具有灵活性,可以左右活动,当管型母线上升过程中遇到障碍物时,可以灵活的进行躲避,使安装难度大大降低。
2、本发明通过将传统的四台机动绞磨机配合吊车同时升降的悬挂式管母安装方法简化为一台吊车和一台机动绞磨机配合安装,提高了施工速度,提高了施工安全性,节省了工期,节约了成本,具有良好的经济效益和实用价值。
附图说明:
图1为本发明安装方法的结构示意图。
具体实施方式:
下面结合附图对本发明作进一步的解释和说明:
参见图1,一种悬吊式管型母线的安装方法,其具体安装步骤如下:
①将管型母线4左边的绝缘子串3通过左归拢圆柱2归拢为一个整体结构,引出的钢丝绳吊挂在吊车1的挂钩上;
②将管型母线4右边的绝缘子串通过右归拢圆柱5归拢为一个整体结构后,引出的钢丝绳绕过挂在管母梁7上的上定滑轮6和下定滑轮8与机动绞磨机9连接在一起;
③管型母线4的右边通过机动绞磨机9的牵引逐渐上升,同时管型母线4的左边随着吊车1的起吊逐步上升;
④当绝缘子串3的管母挂点和横梁挂点在一条垂线上时,先将机动绞磨机9牵引的右端挂在管母横梁上的永久挂点上;
⑤使用吊车斜推,将左端的绝缘子串3送至管母横梁上的永久挂点处。
其中:机动绞磨机9的牵引和吊车1的起吊同步进行。
本发明通过归拢圆柱将管型母线4一端的绝缘子串归拢为一整体结构,传统技术中一端所需要的两台机动绞磨机可减少为一台,另一端通过同步的吊车起吊,又可减少另外一端的两台机动绞磨机,并且,吊车的起吊具有灵活性,可以左右活动,当管型母线上升过程中遇到障碍物时,可以灵活的进行躲避,使安装难度大大降低,提高了施工速度,提高了施工安全性,节省了工期,节约了成本,具有良好的经济效益和实用价值。

Claims (2)

1.一种悬吊式管型母线的安装方法,其具体安装步骤如下:
①将管型母线(4)左边的绝缘子串(3)通过左归拢圆柱(2)归拢为一个整体,引出的钢丝绳吊挂在吊车(1)的挂钩上;
②将管型母线(4)右边的绝缘子串通过右归拢圆柱(5)归拢为一个整体后,引出的钢丝绳绕过挂在管母梁(7)上的上定滑轮(6)和下定滑轮(8)与机动绞磨机(9)连接在一起;
③管型母线(4)的右边通过机动绞磨机(9)的牵引逐渐上升,同时管型母线(4)的左边随着吊车(1)的起吊逐步上升;
④当绝缘子串(3)的管母挂点和横梁挂点在一条垂线上时,先将机动绞磨机(9)牵引的右端挂在管母横梁上的永久挂点上;
⑤使用吊车斜推,将左端的绝缘子串(3)送至管母横梁上的永久挂点处。
2.根据权利要求1所述的悬吊式管型母线的安装方法,其特征在于:所述机动绞磨机(9)的牵引和吊车(1)的起吊同步进行。
CN201410418734.1A 2014-08-25 2014-08-25 悬吊式管型母线的安装方法 Active CN104242142B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410418734.1A CN104242142B (zh) 2014-08-25 2014-08-25 悬吊式管型母线的安装方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410418734.1A CN104242142B (zh) 2014-08-25 2014-08-25 悬吊式管型母线的安装方法

Publications (2)

Publication Number Publication Date
CN104242142A CN104242142A (zh) 2014-12-24
CN104242142B true CN104242142B (zh) 2018-04-27

Family

ID=52229739

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410418734.1A Active CN104242142B (zh) 2014-08-25 2014-08-25 悬吊式管型母线的安装方法

Country Status (1)

Country Link
CN (1) CN104242142B (zh)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104638589B (zh) * 2015-03-11 2017-01-25 国网黑龙江省电力有限公司鹤岗供电公司 管型母线吊装专用工具
CN110386543B (zh) * 2019-07-22 2020-12-25 中国电建集团河南工程有限公司 斜拉悬挂式管型母线吊装方法
CN112320650B (zh) * 2020-11-18 2022-04-22 青海送变电工程有限公司 一种斜拉式绝缘子串超长型管型母线吊装方法

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
SU1365212A2 (ru) * 1986-04-18 1988-01-07 Винницкий политехнический институт Устройство дл замены гирл нд изол торов воздушной линии электропередачи,наход щейс под напр жением
CN202094562U (zh) * 2011-04-07 2011-12-28 葛洲坝集团电力有限责任公司 悬吊式管型母线同步吊装系统
CN203339567U (zh) * 2013-07-10 2013-12-11 葛洲坝集团电力有限责任公司 特高压刚性硬质跳线同步吊装系统
CN203589482U (zh) * 2013-12-10 2014-05-07 中国电力工程顾问集团西南电力设计院 一种750kV悬吊管母线进出线结构

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
SU1365212A2 (ru) * 1986-04-18 1988-01-07 Винницкий политехнический институт Устройство дл замены гирл нд изол торов воздушной линии электропередачи,наход щейс под напр жением
CN202094562U (zh) * 2011-04-07 2011-12-28 葛洲坝集团电力有限责任公司 悬吊式管型母线同步吊装系统
CN203339567U (zh) * 2013-07-10 2013-12-11 葛洲坝集团电力有限责任公司 特高压刚性硬质跳线同步吊装系统
CN203589482U (zh) * 2013-12-10 2014-05-07 中国电力工程顾问集团西南电力设计院 一种750kV悬吊管母线进出线结构

Non-Patent Citations (3)

* Cited by examiner, † Cited by third party
Title
500kV悬吊式大口径管型母线吊装工艺改进;潘业斌;《电力建设》;20091001;第30卷(第10期);第102页 *
500kV悬挂式管型母线施工方法改进;刘志文等;《广东输电与变电技术》;20050110;第38-41段 *
侯村500kV变电站管型母线安装;张安志;《山西电力技术》;19940220;第14卷(第1期);第49-53段 *

Also Published As

Publication number Publication date
CN104242142A (zh) 2014-12-24

Similar Documents

Publication Publication Date Title
CN103573011B (zh) 一种构建组立式跨越架的装置及方法
CN104242142B (zh) 悬吊式管型母线的安装方法
CN201674159U (zh) 双角钢挂点绝缘子串带电更换工具
CN202094562U (zh) 悬吊式管型母线同步吊装系统
CN205265149U (zh) 一种应用于输电线路作业的分裂导线提线器
CN103779809B (zh) 带电调整双分裂子导线间距作业方法
CN203135316U (zh) 一种滑轮式单导线滑车
CN202197048U (zh) 一种塔用双角钢挂点起重连接工具
CN206379675U (zh) 带电更换直线塔v串绝缘子导线的联板卡
CN203569959U (zh) 一种构建组立式跨越架的装置
CN103683098A (zh) 不落线更换耐张型电杆法
CN202444204U (zh) 高空线路工器具牵引升降装置
CN203445520U (zh) 带电跨越装置
CN202373939U (zh) 一种带电作业双导线提线器
CN208226440U (zh) 可调节式直线单片绝缘子更换装置
CN202444205U (zh) 免登杆悬挂接地线
CN201008028Y (zh) 鼠笼式刚性跳线装置
CN105977860B (zh) 一种更换架空输电线路复合横担绝缘子装置及方法
CN103532052A (zh) 一种adss光缆带电架设简易跨越架及实施方法
CN203119361U (zh) 带电作业绝缘挂梯封门拉钩
CN207977667U (zh) 一种用于输电线路架空导线绞式悬垂金具的更换装置
CN202057866U (zh) 输电线路直线铁塔光缆专用双钩提升器
CN102312600B (zh) 输电线路多棱插接式钢管杆
CN202004370U (zh) 一种用于杆塔改造过程中迁移架空地线的工具
CN202268650U (zh) 一种输电导线提线器绝缘拉板

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
CB02 Change of applicant information
CB02 Change of applicant information

Address after: 450006 Huaihe West Road, Henan, China, No. 19, No.

Applicant after: STATE GRID HENAN ELECTRIC POWER COMPANY ZHENGZHOU POWER SUPPLY Co.

Applicant after: ZHENGZHOU HUALI INFORMATION TECHNOLOGY Co.,Ltd.

Applicant after: State Grid Corporation of China

Address before: 100033 West Chang'an Avenue, Beijing, No. 86, No.

Applicant before: State Grid Corporation of China

Applicant before: ZHENGZHOU HUALI INFORMATION TECHNOLOGY Co.,Ltd.

Applicant before: STATE GRID HENAN ELECTRIC POWER COMPANY ZHENGZHOU POWER SUPPLY Co.

CB03 Change of inventor or designer information
CB03 Change of inventor or designer information

Inventor after: Zhang Shaohui

Inventor after: Li Hongwei

Inventor after: Zheng Yang

Inventor after: Niu Gang

Inventor after: Liang Qingyun

Inventor after: Geng Fang

Inventor after: Yang Lin

Inventor after: Zuo Kuisheng

Inventor before: Li Hongwei

Inventor before: Zuo Kuisheng

Inventor before: Chen Ying

Inventor before: Liu Dawei

Inventor before: Liu Hui

GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20220817

Address after: 450000 Huaihe West Road, Zhongyuan District, Zhengzhou, Henan Province, 19

Patentee after: STATE GRID HENAN ELECTRIC POWER COMPANY ZHENGZHOU POWER SUPPLY Co.

Patentee after: ZHENGZHOU XIANGHE GROUP Co.,Ltd.

Patentee after: State Grid Corporation of China

Address before: No.19, Huaihe West Road, Zhengzhou, Henan 450006

Patentee before: STATE GRID HENAN ELECTRIC POWER COMPANY ZHENGZHOU POWER SUPPLY Co.

Patentee before: ZHENGZHOU HUALI INFORMATION TECHNOLOGY Co.,Ltd.

Patentee before: State Grid Corporation of China