CN104206065A - Device for improving farmland soil of coastal mud flat reclamation areas by combining short-term rapid drainage desalination with long-term control accumulation of salt, and drainage method thereof - Google Patents
Device for improving farmland soil of coastal mud flat reclamation areas by combining short-term rapid drainage desalination with long-term control accumulation of salt, and drainage method thereof Download PDFInfo
- Publication number
- CN104206065A CN104206065A CN201410418389.1A CN201410418389A CN104206065A CN 104206065 A CN104206065 A CN 104206065A CN 201410418389 A CN201410418389 A CN 201410418389A CN 104206065 A CN104206065 A CN 104206065A
- Authority
- CN
- China
- Prior art keywords
- term
- short
- salt
- gap
- shallow
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02A—TECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
- Y02A40/00—Adaptation technologies in agriculture, forestry, livestock or agroalimentary production
- Y02A40/10—Adaptation technologies in agriculture, forestry, livestock or agroalimentary production in agriculture
Landscapes
- Investigation Of Foundation Soil And Reinforcement Of Foundation Soil By Compacting Or Drainage (AREA)
Abstract
The invention provides a double-layer composite underground drainage device for improving farmland soil of coastal mud flat reclamation areas by combining short-term rapid drainage desalination with long-term control accumulation of salt. The device comprises a short-term shallow straw gap underground drainage system salt leaching channel, a stream collecting and fixing water absorption subdrain and an open drain on the coastal mud flat saline-alkali soils, wherein the salt leaching channel is positioned above the stream collecting and fixing water absorption subdrain and is arranged with the stream collecting and fixing water absorption subdrain in parallel; the open drain is arranged at the water outlet end of the subdrain and the salt leaching channel; the water head difference is formed between the open drain and the coastal mud flat ground surface. The drainage method method comprises the steps of leaching the salt in the coastal mud flat soil by using the percolation generated by irrigation or rainfall, enabling the salt to enter into the shallow straw underground drainage system salt leaching channel and the stream collecting and fixing water absorption subdrain along the stream, discharging the salt in the soil along the water, and leading to the open drain. After the underground drainage system salt leaching channel formed by shallow straw gaps is deformed caused by pressure, the channel can still keep excellent drainage and salt elimination performance, so that the technical problems that the plastic corrugated subdrain is easy to deform and not suitable for shallow burying after being subjected with burying and operation agricultural implements dynamic load pressure can be solved.
Description
Technical field
The present invention relates to bilayer combination underground drainage device and the water discharge method thereof of the improvement Coastal beach reclamation area agricultural land soil that the desalination of a kind of short-term Quick drainage combines with the long-term control accumulation of salt in the surface soil.
Background technology
Very long and the plain coast large percentage in China coastline, and containing more salt and alkali component in the Coastal beach soil body, the suppression that its bad physico chemical property cause the growth of most plants to be subject in various degree, even can not survive.The large-area Coastal beach salt affected soil of modified utilization effectively and rationally, can alleviate that arable land is day by day reduced, freshwater resources are not enough and population constantly increase between contradiction.
So far, China administers and utilizes saline soil substantially to have two kinds of approach: one is comprise the abiotic technical measures such as cultivation and fertilization, soverlay technique, water resources industry, chemical measure, electromagnetism improvement.The method changes water and soil character and ecotope by dropping in a large number, to adapt to plant growth, but the deficiency of Coastal beach ground freshwater resources, the scale that the reclamation of salinep-alkali soil is utilized and effect are difficult to there is large breakthrough for a long time.Two is the modified utilization approach containing the biotechnologys such as Screening of Germplasm, distant hybridization cultivation, gene engineering cultivation.The method adopts excavation, introduces, screens, cultivates a kind of development mode that the salt-tolerant plant with certain economic value carries out alkaline land improving.
At present, the utilization of China in saline land with administer to improve etc. in defined some single technologies, possessed certain technological reserve.But because various places exist difference in saline and alkaline the barrer types, physioclimate resource, economic society feature etc.; be difficult to agriculture and forestry efficiency utilization supporting technology and the application model thereof of unified use standard when zones of different, dissimilar alkaline land improving, thus many technical measures also have with a certain distance from scale application.Therefore, seeking suitable technical measures, is the core determining reclamation result, is also the key factor of early development benefit height.
Saline land is typically employed in underground and arranges the mode that fixed current collect hidden pipe and realize salt discharge, hidden pipe material adopts plastic film capicitor usually, but plastic ripple hidden pipe exist be subject to burying mutability after soil and operation farm machinery dynamic load pressure, should not the technical barrier of shallow embedding, way is in the past lay open drain shallow and close in a large number in field to accelerate Soil Desalting mostly, and the method soil pressure is useless many, easily silt is shallow, quantities large, invest high, weak effect.
Summary of the invention
The object of this invention is to provide a kind of not only can Quick drainage desalination in a short time, but also can the bilayer combination underground drainage device of improvement Coastal beach reclamation area agricultural land soil of the long-term control accumulation of salt in the surface soil and water discharge method thereof, accomplish that quick desalination is combined with the control accumulation of salt in the surface soil, short-term desalination control salt be combined with long-term.This apparatus structure is reasonable, construction install convenience, and cost of gathering materials on the spot is low, just can produce good economic benefit in a short time, accomplishes that the object in improvement cycle is used, shortened to limit improvement lateral dominance.
First object of the present invention is achieved through the following technical solutions, a bilayer combination underground drainage device for the improvement Coastal beach reclamation area agricultural land soil of the desalination of short-term Quick drainage, the long-term control accumulation of salt in the surface soil, the short-term shallow-layer stalk comprised on Coastal beach saline land descends displacement hull pouring salt passage with gap, current collect fixing water suction hidden pipe and open drain; Described current collect fixing water suction hidden pipe and arrange according to meeting Coastal beach alkaline land soil accumulation of salt in the surface soil control overflow, what current collected fixing water suction hidden pipe buries spacing 17 ~ 25m, the depth of burying 1 ~ 2m underground, current collect fixing water suction hidden pipe and are obliquely installed, and current collect fixing water suction hidden pipe water inlet higher than its water side;
Described short-term shallow-layer stalk descends displacement hull to drench salt passage to be positioned at described current and to collect above fixing water suction hidden pipe with gap, short-term shallow-layer stalk descends displacement hull pouring salt passage and described current to collect the fixing hidden pipe that absorbs water with gap and be arranged in parallel, short-term shallow-layer stalk descends displacement hull to drench salt passage with gap and is obliquely installed, short-term shallow-layer stalk descends displacement hull to drench salt passage water inlet higher than its water side with gap, described short-term shallow-layer stalk descend with gap displacement hull drench salt passage bury spacing 4 ~ 6m underground, the depth of burying 0.4 ~ 0.5m, it is larger by hardness that short-term shallow-layer stalk descends displacement hull to drench salt passage with gap, wrap up permeable geotextile materials outside relatively corrosion resistant straw to make, it is 13-16cm that short-term shallow-layer stalk descends displacement hull to drench salt passage diameter with gap,
Described current collect fixing water suction hidden pipe water side, short-term shallow-layer stalk descend displacement hull pouring salt passage water side to arrange open drain with gap, form head difference between the Coastal beach ground surface that open drain and current collect hidden pipe water inlet.
Further, described hardness more greatly, relatively corrosion resistant straw refers to reed straw on Coastal beach or Value of Spartina Anglica stalk.
Further, it is plastic tube that described current collect fixing water suction hidden pipe, and plastics pipe shaft evenly punches and wraps up permeable geotextiles.
Further, described adjacent current collect and to arrange the shallow-layer stalk that 3 ~ 5 described short-terms play a role above fixing water suction hidden pipe and descend displacement hull pouring salt passage with gap.
Second object of the present invention is to provide the bilayer combination underground drainage method of improvement Coastal beach reclamation area agricultural land soil of the desalination of a kind of short-term Quick drainage, the long-term control accumulation of salt in the surface soil, comprises the following steps:
(1) the bilayer combination underground drainage device of improvement Coastal beach reclamation area agricultural land soil of the desalination of short-term Quick drainage, the long-term control accumulation of salt in the surface soil is arranged: short-term shallow-layer stalk is set on Coastal beach saline land and descend that displacement hull drenches salt passage, current collect fixing hidden pipe and the open drain of absorbing water with gap; Described current collect fixing water suction hidden pipe and arrange according to meeting Coastal beach alkaline land soil accumulation of salt in the surface soil control overflow, what current collected fixing water suction hidden pipe buries spacing 17 ~ 25m, the depth of burying 1 ~ 2m underground, current collect fixing water suction hidden pipe and are obliquely installed, and current collect fixing water suction hidden pipe water inlet higher than its water side;
Described short-term shallow-layer stalk descends displacement hull to drench salt passage to be positioned at described current and to collect above fixing water suction hidden pipe with gap, short-term shallow-layer stalk descends displacement hull pouring salt passage and described current to collect the fixing hidden pipe that absorbs water with gap and be arranged in parallel, short-term shallow-layer stalk descends displacement hull to drench salt passage with gap and is obliquely installed, short-term shallow-layer stalk descends displacement hull to drench salt passage water inlet higher than its water side with gap, described short-term shallow-layer stalk descend with gap displacement hull drench salt passage bury spacing 4 ~ 6m underground, the depth of burying 0.3 ~ 0.7m, short-term shallow-layer stalk descends displacement hull to drench salt passage with gap and makes by wrapping up permeable geotextile materials outside straw, it is 13 ~ 16cm that short-term shallow-layer stalk descends displacement hull to drench salt passage diameter with gap,
Described current collect fixing water suction hidden pipe water side, short-term shallow-layer stalk descend displacement hull pouring salt passage water side to arrange open drain with gap, form head difference between the Coastal beach ground surface that open drain and current collect hidden pipe water inlet;
(2) salt is drenched: keep described short-term shallow-layer stalk to descend displacement hull to drench salt passage not by Sediment Siltation with gap, the seepage flow utilizing irrigation or rainfall to produce makes the salinity leaching in Coastal beach ground soil, and with current enter short-term shallow-layer stalk descend with gap displacement hull drench salt passage, by this pouring salt passage, the salinity in thin solum is discharged with water, utilize the head difference formed between Coastal beach face, field, ground and open drain that pouring salt passage is gone out current and guide to drain ditch;
(3) draining suppresses anti-salt: current collect fixing water suction hidden pipe compilation steps (2) short-term shallow-layer stalk and descend displacement hull pouring salt passage part to go out current in current and agricultural land soil with gap, utilize the head difference formed between Coastal beach face, field, ground and open drain that described fixed plastics hidden pipe current are guided to drain ditch.
Further, described hardness more greatly, relatively corrosion resistant straw refers to reed straw on Coastal beach or Value of Spartina Anglica stalk.
Further, it is plastic tube that described current collect fixing water suction hidden pipe, and plastics pipe shaft evenly punches and wraps up permeable geotextiles.
Further, described often adjacent current collect and arrange 3 ~ 5 described short-term shallow-layer stalks above fixing water suction hidden pipe and descend displacement hull pouring salt passage with gap.
Compared with prior art, the present invention has following beneficial effect:
The first, the shallow-layer straw underdrainage system of intensive layout, within 3 ~ 4 shorter years, can ensure topsoil quick desalination, quick improvement soil; Consistent with topsoil desalination speed, stalk is humification progressively, becomes the organic matter useful to reclamation of saline soil, completes the task of quick desalination in a short time; This technology there is the area of filling with row condition can large scale application, be specially adapted to the improve of Coastal beach reclamation area strongly salined soil.
The second, shallow-layer stalk underground drainage body still can keep good drainage performance after the effect of being under pressure produces distortion, solve plastic ripple hidden pipe be subject to burying mutability after soil and operation farm machinery dynamic load pressure, should not the technical barrier of shallow embedding.
3rd, burying relatively dark, that spacing is larger plastic hidden pipe underground is fixed underground drainage system, can ensure the permanently effective control soil accumulation of salt in the surface soil.This open drain hidden pipe combines, shallow-layer combines with deep layer, short-term and the double-deck subsurface drainage organic assembling combined for a long time, can better realize preventing and treating the integration objective combined.
Accompanying drawing explanation
Fig. 1 is the floor map of improvement Coastal beach reclamation area agricultural land soil bilayer combination underground drainage device of short-term Quick drainage of the present invention desalination, the long-term control accumulation of salt in the surface soil;
Fig. 2 is the schematic cross section of improvement Coastal beach reclamation area agricultural land soil bilayer combination underground drainage device of short-term Quick drainage of the present invention desalination, the long-term control accumulation of salt in the surface soil;
Fig. 3 is the vertical section schematic diagram of improvement Coastal beach reclamation area agricultural land soil bilayer combination underground drainage device of short-term Quick drainage of the present invention desalination, the long-term control accumulation of salt in the surface soil;
Fig. 4 is short-term Quick drainage of the present invention desalination, the short-term shallow-layer stalk of the improvement Coastal beach reclamation area agricultural land soil bilayer combination underground drainage device of the long-term control accumulation of salt in the surface soil descends displacement hull to drench the structural representation of salt passage with gap;
Fig. 5 is short-term Quick drainage of the present invention desalination, the short-term shallow-layer stalk of the improvement Coastal beach reclamation area agricultural land soil bilayer combination underground drainage device of the long-term control accumulation of salt in the surface soil descends displacement hull to drench the schematic cross section of salt passage with gap;
In figure: 1 current collect fixing water suction hidden pipe, 2 short-term shallow-layer stalks descend displacement hull pouring salt passage with gap, 3 open drains, 4, soil layer, 5 straws, 6 permeable geotextiles, 7 ridges, 8 draining spaces, 9 strappings.
Embodiment
As Figure 1-4, a device for the improvement Coastal beach reclamation area agricultural land soil of the desalination of short-term Quick drainage, the long-term control accumulation of salt in the surface soil, the short-term shallow-layer stalk comprised on Coastal beach saline land descends displacement hull pouring salt passage 2 with gap, current collect fixing water suction hidden pipe 1 and open drain 3.
Current collect fixing water suction hidden pipe and arrange according to meeting Coastal beach alkaline land soil accumulation of salt in the surface soil control overflow, what current collected fixing water suction hidden pipe buries spacing 17 ~ 25m, the depth of burying 1 ~ 2m underground, current collect fixing water suction hidden pipe and are obliquely installed, and current collect fixing water suction hidden pipe water inlet higher than its water side.It is plastic tube that current collect fixing water suction hidden pipe, and plastics pipe shaft evenly punches and wraps up permeable geotextiles.
Short-term shallow-layer stalk descends displacement hull to drench salt passage to be positioned at described current and to collect above fixing water suction hidden pipe with gap, short-term shallow-layer stalk descends displacement hull pouring salt passage and described current to collect the fixing hidden pipe that absorbs water with gap and be arranged in parallel, short-term shallow-layer stalk descends displacement hull to drench salt passage with gap and is obliquely installed, short-term shallow-layer stalk descends displacement hull to drench salt passage water inlet higher than its water side with gap, described short-term shallow-layer stalk descend with gap displacement hull drench salt passage bury spacing 4 ~ 6m underground, the depth of burying 0.4 ~ 0.5m, short-term shallow-layer stalk descends displacement hull to drench salt passage with gap and makes by wrapping up permeable geotextile materials outside straw 5, it is 13 ~ 16cm that short-term shallow-layer stalk descends displacement hull to drench salt passage diameter with gap.Corrosion resistant straw can be reed straw on Coastal beach or Value of Spartina Anglica stalk.Draining space 8 is formed between stalk.Permeable geotextile materials can be permeable geotextiles 6.Permeable geotextiles is by strapping 9 colligation.Every 0.25-0.35m colligation strapping in permeable geotextiles.
Current collect fixing water suction hidden pipe water side, short-term shallow-layer stalk descends displacement hull pouring salt passage water side to arrange open drain with gap, open drain next-door neighbour's ridge 7.Head difference is formed between the Coastal beach ground surface soil layer 4 that open drain and current collect hidden pipe water inlet.
Often adjacent current collect and arrange 3 ~ 5 short-term shallow-layer stalks above fixing water suction hidden pipe and descend displacement hull pouring salt passage with gap.
A bilayer combination underground drainage method for the improvement Coastal beach reclamation area agricultural land soil of the desalination of short-term Quick drainage, the long-term control accumulation of salt in the surface soil, comprises the following steps:
(1) Quick drainage desalination improvement Coastal beach reclamation area agricultural land soil device is arranged: the double-deck underground drainage device arranging Quick drainage desalination improvement Coastal beach reclamation area agricultural land soil: short-term shallow-layer stalk is set on Coastal beach saline land and descend that displacement hull drenches salt passage, current collect fixing hidden pipe and the open drain of absorbing water with gap; Described current collect fixing water suction hidden pipe and arrange according to meeting Coastal beach alkaline land soil accumulation of salt in the surface soil control overflow, what current collected fixing water suction hidden pipe buries spacing 17 ~ 25m, the depth of burying 1 ~ 2m underground, current collect fixing water suction hidden pipe and are obliquely installed, and current collect fixing water suction hidden pipe water inlet higher than its water side;
Described short-term shallow-layer stalk descends displacement hull to drench salt passage to be positioned at described current and to collect above fixing water suction hidden pipe with gap, short-term shallow-layer stalk descends displacement hull pouring salt passage and described current to collect the fixing hidden pipe that absorbs water with gap and be arranged in parallel, short-term shallow-layer stalk descends displacement hull to drench salt passage with gap and is obliquely installed, short-term shallow-layer stalk descends displacement hull to drench salt passage water inlet higher than its water side with gap, described short-term shallow-layer stalk descend with gap displacement hull drench salt passage bury spacing 4 ~ 6m underground, the depth of burying 0.4 ~ 0.5m, short-term shallow-layer stalk descends displacement hull to drench salt passage with gap and makes by wrapping up permeable geotextile materials outside straw, it is 13 ~ 16cm that short-term shallow-layer stalk descends displacement hull to drench salt passage diameter with gap,
Described current collect fixing water suction hidden pipe water side, short-term shallow-layer stalk descend displacement hull pouring salt passage water side to arrange open drain with gap, form head difference between the Coastal beach ground surface that open drain and current collect hidden pipe water inlet;
(2) salt is drenched: keep described short-term shallow-layer stalk to descend displacement hull to drench salt passage not by Sediment Siltation with gap, the seepage flow utilizing irrigation or rainfall to produce makes the salinity leaching in Coastal beach ground soil, and with current enter short-term shallow-layer stalk descend with gap displacement hull drench salt passage, by this pouring salt passage, the salinity in thin solum is discharged with water, utilize the head difference formed between Coastal beach face, field, ground and open drain that pouring salt passage is gone out current and guide to drain ditch;
(3) draining suppresses anti-salt: current collect fixing water suction hidden pipe compilation steps (2) short-term shallow-layer stalk and descend displacement hull pouring salt passage part to go out current in current and agricultural land soil with gap, utilize the head difference formed between Coastal beach face, field, ground and open drain that described fixed plastics hidden pipe current are guided to drain ditch.
The shallow-layer straw gap underdrainage system of intensive layout, can accelerate topsoil desalination, quick improvement soil; Consistent with topsoil desalination speed, stalk is humification progressively, becomes the organic matter useful to reclamation of saline soil, completes the task of quick desalination in a short time; The area that this technology has filling row condition can be applicable, and is specially adapted to the improve of Coastal beach reclamation area strongly salined soil.
Shallow-layer stalk underground drainage body still can keep good drainage performance after the effect of being under pressure produces distortion, solve plastic ripple hidden pipe be subject to burying mutability after soil and operation farm machinery dynamic load pressure, should not the technical barrier of shallow embedding.
Burying relatively dark, that spacing is larger plastic hidden pipe underground is fixed underground drainage system, can ensure the permanently effective control soil accumulation of salt in the surface soil.The bilayer combination subsurface drainage system that this open drain hidden pipe combines, shallow-layer combines with deep layer, short-term is combined with Stationary liquid, well achieves the integration objective that control combines.
Shallow-layer stalk underdrainage system is short-term mole drainage, and the salinity of principal security fast eliminating crop topsoil, realizes saline and alkaline management goal; The farmland plastic hidden pipe of relative deep layer is fixed underground drainage system, the principal security permanently effective control soil accumulation of salt in the surface soil.The present invention is rational in infrastructure, construction install convenience, and cost of gathering materials on the spot is low, just can produce good economic benefit in a short time, reaches the object that the improvement cycle was used, shortened to limit improvement lateral dominance.Particularly shallow-layer stalk underground drainage body its stalk gap after the effect of being under pressure produces distortion still can keep good draining, salt discharge performance, solve plastic ripple hidden pipe be subject to burying mutability after soil and operation farm machinery dynamic load pressure, should not the technical barrier of shallow embedding.
Claims (8)
1. the bilayer combination underground drainage device of improvement Coastal beach reclamation area agricultural land soil that combines with the long-term control accumulation of salt in the surface soil of short-term Quick drainage desalination, the current comprised on Coastal beach saline land collect fixing water suction hidden pipe and open drain, it is characterized in that, Coastal beach saline land is provided with short-term shallow-layer stalk and descends displacement hull to drench salt passage with gap; Described current collect fixing water suction hidden pipe and arrange according to meeting Coastal beach alkaline land soil accumulation of salt in the surface soil control overflow, the spacing of burying underground that current collect fixing water suction hidden pipe is 17 ~ 25m, depth of burying 1-2m, current collect fixing water suction hidden pipe and are obliquely installed, and current collect fixing water suction hidden pipe water inlet higher than its water side;
Described short-term shallow-layer stalk descends displacement hull to drench salt passage to be positioned at described current and to collect above fixing water suction hidden pipe with gap, short-term shallow-layer stalk descends displacement hull pouring salt passage and described current to collect the fixing hidden pipe that absorbs water with gap and be arranged in parallel, short-term shallow-layer stalk descends displacement hull to drench salt passage with gap and is obliquely installed, short-term shallow-layer stalk descends displacement hull to drench salt passage water inlet higher than its water side with gap, described short-term shallow-layer stalk descend with gap displacement hull drench salt passage bury spacing 4 ~ 6m underground, the depth of burying 0.4 ~ 0.5m, it is larger by hardness that short-term shallow-layer stalk descends displacement hull to drench salt passage with gap, the permeable geotextile materials of relatively corrosion resistant straw and outside parcel is made, it is 13 ~ 16cm that short-term shallow-layer stalk descends displacement hull to drench salt passage diameter with gap,
Described current collect fixing water suction hidden pipe water side, short-term shallow-layer stalk descend displacement hull pouring salt passage water side to arrange open drain with gap, form head difference between the Coastal beach ground surface that open drain and current collect hidden pipe water inlet.
2. the bilayer combination underground drainage device of improvement Coastal beach reclamation area agricultural land soil that combines with the long-term control accumulation of salt in the surface soil of short-term Quick drainage according to claim 1 desalination, it is characterized in that, described hardness more greatly, relatively corrosion resistant straw refers to reed straw on Coastal beach or Value of Spartina Anglica stalk.
3. the bilayer combination underground drainage device of improvement Coastal beach reclamation area agricultural land soil that combines with the long-term control accumulation of salt in the surface soil of short-term Quick drainage according to claim 1 desalination, it is characterized in that, it is plastic tube that described current collect fixing water suction hidden pipe, and plastics pipe shaft evenly punches and wraps up permeable geotextiles.
4. the bilayer combination underground drainage device of improvement Coastal beach reclamation area agricultural land soil that combines with the long-term control accumulation of salt in the surface soil of short-term Quick drainage according to claim 1 desalination, it is characterized in that, described often adjacent current collect and arrange 3 ~ 5 described short-term shallow-layer stalks above fixing water suction hidden pipe and descend displacement hull pouring salt passage with gap.
5. the bilayer combination underground drainage method of improvement Coastal beach reclamation area agricultural land soil that combines with the long-term control accumulation of salt in the surface soil of short-term Quick drainage desalination, is characterized in that, comprise the following steps:
(1) the bilayer combination underground drainage device of Quick drainage desalination improvement Coastal beach reclamation area agricultural land soil is arranged: short-term shallow-layer stalk is set on Coastal beach saline land and descend that displacement hull drenches salt passage, current collect fixing hidden pipe and the open drain of absorbing water with gap; Described current collect fixing water suction hidden pipe and arrange according to meeting Coastal beach alkaline land soil accumulation of salt in the surface soil control overflow, what current collected fixing water suction hidden pipe buries spacing 17 ~ 25m, the depth of burying 1 ~ 2m underground, current collect fixing water suction hidden pipe and are obliquely installed, and current collect fixing water suction hidden pipe water inlet higher than its water side;
Described short-term shallow-layer stalk descends displacement hull to drench salt passage to be positioned at described current and to collect above fixing water suction hidden pipe with gap, short-term shallow-layer stalk descends displacement hull pouring salt passage and described current to collect the fixing hidden pipe that absorbs water with gap and be arranged in parallel, short-term shallow-layer stalk descends displacement hull to drench salt passage with gap and is obliquely installed, short-term shallow-layer stalk descends displacement hull to drench salt passage water inlet higher than its water side with gap, described short-term shallow-layer stalk descend with gap displacement hull drench salt passage bury spacing 4 ~ 6m underground, depth of burying 0.4m-0.5m, it is larger by hardness that short-term shallow-layer stalk descends displacement hull to drench salt passage with gap, the permeable geotextile materials of relatively corrosion resistant straw and outside parcel is made, it is 13 ~ 16cm that short-term shallow-layer stalk descends displacement hull to drench salt passage diameter with gap,
Described current collect fixing water suction hidden pipe water side, short-term shallow-layer stalk descend displacement hull pouring salt passage water side to arrange open drain with gap, form head difference between the Coastal beach ground surface that open drain and current collect hidden pipe water inlet;
(2) salt is drenched: keep described short-term shallow-layer stalk to descend displacement hull to drench salt passage not by Sediment Siltation with gap, the seepage flow utilizing irrigation or rainfall to produce makes the salinity leaching in Coastal beach ground soil, and with current enter short-term shallow-layer stalk descend with gap displacement hull drench salt passage, by this pouring salt passage, the salinity in thin solum is discharged with water, utilize the head difference formed between Coastal beach face, field, ground and open drain that pouring salt passage is gone out current and guide to drain ditch;
(3) draining suppresses anti-salt: current collect fixing water suction hidden pipe compilation steps (2) short-term shallow-layer stalk and descend displacement hull pouring salt passage part to go out current in current and agricultural land soil with gap, utilize the head difference formed between Coastal beach face, field, ground and open drain that described fixed plastics hidden pipe current are guided to drain ditch.
6. the bilayer combination underground drainage method of improvement Coastal beach reclamation area agricultural land soil that combines with the long-term control accumulation of salt in the surface soil of short-term Quick drainage according to claim 5 desalination, it is characterized in that, described corrosion resistant straw refers to reed straw on Coastal beach or Value of Spartina Anglica stalk.
7. the bilayer combination underground drainage method of improvement Coastal beach reclamation area agricultural land soil that combines with the long-term control accumulation of salt in the surface soil of short-term Quick drainage according to claim 5 desalination, it is characterized in that, it is plastic tube that described current collect fixing water suction hidden pipe, and plastics pipe shaft evenly punches and wraps up permeable geotextiles.
8. the bilayer combination underground drainage method of improvement Coastal beach reclamation area agricultural land soil that combines with the long-term control accumulation of salt in the surface soil of short-term Quick drainage according to claim 5 desalination, it is characterized in that, described adjacent current collect and arrange 3-5 described short-term shallow-layer stalk above fixing water suction hidden pipe and descend displacement hull pouring salt passage with gap.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410418389.1A CN104206065A (en) | 2014-08-25 | 2014-08-25 | Device for improving farmland soil of coastal mud flat reclamation areas by combining short-term rapid drainage desalination with long-term control accumulation of salt, and drainage method thereof |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410418389.1A CN104206065A (en) | 2014-08-25 | 2014-08-25 | Device for improving farmland soil of coastal mud flat reclamation areas by combining short-term rapid drainage desalination with long-term control accumulation of salt, and drainage method thereof |
Publications (1)
Publication Number | Publication Date |
---|---|
CN104206065A true CN104206065A (en) | 2014-12-17 |
Family
ID=52088290
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201410418389.1A Pending CN104206065A (en) | 2014-08-25 | 2014-08-25 | Device for improving farmland soil of coastal mud flat reclamation areas by combining short-term rapid drainage desalination with long-term control accumulation of salt, and drainage method thereof |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN104206065A (en) |
Cited By (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104604387A (en) * | 2015-01-07 | 2015-05-13 | 李阳铭 | Saline land improvement and high-yield cultivation method |
CN106171114A (en) * | 2016-07-30 | 2016-12-07 | 山东胜伟园林科技有限公司 | A kind of method using puncture-resistant hidden pipe to carry out salt discharge and the application in coastal tidal alkaline land improving thereof |
CN106942020A (en) * | 2017-04-17 | 2017-07-14 | 盐城师范学院 | Agriculture fishery rapidly and efficiently fills drainage system |
CN109235392A (en) * | 2018-10-23 | 2019-01-18 | 山东农业大学 | A kind of draining of pipe well combination wind-light-electricity complementary changes salt system and its application method |
CN111350173A (en) * | 2020-03-17 | 2020-06-30 | 中国水利水电科学研究院 | Method for improving drainage of field shallow buried concealed pipe |
CN112385348A (en) * | 2020-11-04 | 2021-02-23 | 山东农业大学 | Method for treating high-saline-alkali soil by using salt resistance and salt discharge of reed |
CN114731792A (en) * | 2022-04-20 | 2022-07-12 | 自然资源部国土整治中心 | Double-layer concealed pipe salt discharging method and system |
US12024839B2 (en) | 2021-12-27 | 2024-07-02 | Nanjing Hydraulic Research Institute | Water-salt regulation system and method for coastal regions |
Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPS60203718A (en) * | 1984-03-26 | 1985-10-15 | Idemitsu Kosan Co Ltd | Buried structure of underground drainage pipe |
RU2338030C1 (en) * | 2007-03-12 | 2008-11-10 | Федеральное государственное образовательное учреждение высшего профессионального образования "Калининградский государственный технический университет" | Method of subsoil waters drainage |
CN101946573A (en) * | 2010-08-17 | 2011-01-19 | 北京师范大学 | Method for ameliorating saline and alkaline land |
CN201830631U (en) * | 2010-09-07 | 2011-05-18 | 深圳市文科园艺实业有限公司 | Greening and desalting system for saline-alkali soil |
CN201928604U (en) * | 2010-12-29 | 2011-08-17 | 济南大学 | Device for treating saline land |
CN102487619A (en) * | 2011-12-28 | 2012-06-13 | 杨玉明 | Device for transforming saline-alkali soil |
CN103329658A (en) * | 2013-06-21 | 2013-10-02 | 河海大学 | Sectional three-dimensional structure for fast desalting and soil improvement of saline-alkali soil of new tidal marsh reclamation area |
CN204316973U (en) * | 2014-08-25 | 2015-05-13 | 扬州大学 | The device of the improvement Coastal beach reclamation area agricultural land soil that the desalination of short-term Quick drainage combines with the long-term control accumulation of salt in the surface soil |
-
2014
- 2014-08-25 CN CN201410418389.1A patent/CN104206065A/en active Pending
Patent Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPS60203718A (en) * | 1984-03-26 | 1985-10-15 | Idemitsu Kosan Co Ltd | Buried structure of underground drainage pipe |
RU2338030C1 (en) * | 2007-03-12 | 2008-11-10 | Федеральное государственное образовательное учреждение высшего профессионального образования "Калининградский государственный технический университет" | Method of subsoil waters drainage |
CN101946573A (en) * | 2010-08-17 | 2011-01-19 | 北京师范大学 | Method for ameliorating saline and alkaline land |
CN201830631U (en) * | 2010-09-07 | 2011-05-18 | 深圳市文科园艺实业有限公司 | Greening and desalting system for saline-alkali soil |
CN201928604U (en) * | 2010-12-29 | 2011-08-17 | 济南大学 | Device for treating saline land |
CN102487619A (en) * | 2011-12-28 | 2012-06-13 | 杨玉明 | Device for transforming saline-alkali soil |
CN103329658A (en) * | 2013-06-21 | 2013-10-02 | 河海大学 | Sectional three-dimensional structure for fast desalting and soil improvement of saline-alkali soil of new tidal marsh reclamation area |
CN204316973U (en) * | 2014-08-25 | 2015-05-13 | 扬州大学 | The device of the improvement Coastal beach reclamation area agricultural land soil that the desalination of short-term Quick drainage combines with the long-term control accumulation of salt in the surface soil |
Cited By (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104604387A (en) * | 2015-01-07 | 2015-05-13 | 李阳铭 | Saline land improvement and high-yield cultivation method |
CN106171114A (en) * | 2016-07-30 | 2016-12-07 | 山东胜伟园林科技有限公司 | A kind of method using puncture-resistant hidden pipe to carry out salt discharge and the application in coastal tidal alkaline land improving thereof |
CN106942020A (en) * | 2017-04-17 | 2017-07-14 | 盐城师范学院 | Agriculture fishery rapidly and efficiently fills drainage system |
CN109235392A (en) * | 2018-10-23 | 2019-01-18 | 山东农业大学 | A kind of draining of pipe well combination wind-light-electricity complementary changes salt system and its application method |
CN111350173A (en) * | 2020-03-17 | 2020-06-30 | 中国水利水电科学研究院 | Method for improving drainage of field shallow buried concealed pipe |
CN112385348A (en) * | 2020-11-04 | 2021-02-23 | 山东农业大学 | Method for treating high-saline-alkali soil by using salt resistance and salt discharge of reed |
CN112385348B (en) * | 2020-11-04 | 2022-05-13 | 山东农业大学 | Method for treating high-saline-alkali soil by using salt resistance and salt discharge of reed |
US12024839B2 (en) | 2021-12-27 | 2024-07-02 | Nanjing Hydraulic Research Institute | Water-salt regulation system and method for coastal regions |
CN114731792A (en) * | 2022-04-20 | 2022-07-12 | 自然资源部国土整治中心 | Double-layer concealed pipe salt discharging method and system |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104206065A (en) | Device for improving farmland soil of coastal mud flat reclamation areas by combining short-term rapid drainage desalination with long-term control accumulation of salt, and drainage method thereof | |
CN104145552A (en) | Horizontal and vertical combined underdrainage device for improving interlayer soil of coastal mud flat reclamation area farmland and drainage method thereof | |
CN102160480B (en) | Saline-alkali soil irrigation and drainage ecological improvement method | |
CN102612882B (en) | Method for improving coastal beach by burying plant stalks in ditches, and salt leaching and inhibiting system | |
CN204157245U (en) | The level of improvement farmland, Coastal beach reclamation area interlayer soil and vertical cartel underground drainage device | |
US8877048B1 (en) | Cascading system of floodway stormwater containment basins | |
CN102900059B (en) | The compound drainage control salt system in a kind of salt-soda soil | |
CN103073151A (en) | Control system and technology of agricultural non-point source pollution based on hedgerows and multilayer percolation ponds | |
Shakya et al. | New drainage technologies for salt-affected waterlogged areas of southwest Punjab, India | |
CN204498610U (en) | Saline land desalting system | |
CN105672399A (en) | Irrigation device | |
CN105706555B (en) | Saline land greening engineering original soil structure-improved and its construction method | |
CN103548440B (en) | Hair row formula pipe drainage method under a kind of shallow embedding condition | |
CN102383408B (en) | Greening method for high water level impermeable saline and alkaline lands and greening system | |
CN205934941U (en) | Utilization is permeated water and is managed and protected soil and water conservation structure on slope | |
CN204316973U (en) | The device of the improvement Coastal beach reclamation area agricultural land soil that the desalination of short-term Quick drainage combines with the long-term control accumulation of salt in the surface soil | |
CN204940363U (en) | Groundwater pollution treatment system | |
Olson et al. | Multifunctional Mississippi River leveed bottomlands and settling basins: Sny Island Levee Drainage District | |
Jones et al. | Living with a trespasser: Riparian names and medieval settlement on the River Trent floodplain | |
CN202503889U (en) | Salt spraying and salt inhibiting system for trench-buried plant straw improved coastal tidal flat | |
CN107926185A (en) | The vertical shaft Salt discharge method improved the soil for salt-soda soil | |
CN107690861A (en) | A kind of stalk groove and its method for embedding | |
Pauline et al. | Adoption of Rain water harvesting structures in dry land areas of Tamil Nadu, India | |
CN205389381U (en) | Good structure of former land reform of saline and alkaline land greening engineering | |
CN105821820A (en) | Underground storing, permeating and draining system |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20141217 |