CN104074267B - Dismantled and assembled sledge steel loading structure mobile field camp - Google Patents

Dismantled and assembled sledge steel loading structure mobile field camp Download PDF

Info

Publication number
CN104074267B
CN104074267B CN201410317620.8A CN201410317620A CN104074267B CN 104074267 B CN104074267 B CN 104074267B CN 201410317620 A CN201410317620 A CN 201410317620A CN 104074267 B CN104074267 B CN 104074267B
Authority
CN
China
Prior art keywords
frame
wall
sledge
steel
column
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201410317620.8A
Other languages
Chinese (zh)
Other versions
CN104074267A (en
Inventor
何文侨
杭国敏
刘子学
张辉
尹庆武
王鹏
梁雪莲
罗莉萍
侯祥群
张林杰
孙小花
郑国柱
王宏亮
董鹏
张海东
陈军
商学鑫
王爱华
崔华东
杨磊
胡大海
李蕴杰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Scheldt Sino Canada (tianjin) Steel & Wood Structure Engineering Co Ltd
CHINA PETROLEUM GROUP CHANGCHENG DRILLING ENGINEERING Co Ltd ENGINEERING SERVICE Co Ltd
Original Assignee
Scheldt Sino Canada (tianjin) Steel & Wood Structure Engineering Co Ltd
CHINA PETROLEUM GROUP CHANGCHENG DRILLING ENGINEERING Co Ltd ENGINEERING SERVICE Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Scheldt Sino Canada (tianjin) Steel & Wood Structure Engineering Co Ltd, CHINA PETROLEUM GROUP CHANGCHENG DRILLING ENGINEERING Co Ltd ENGINEERING SERVICE Co Ltd filed Critical Scheldt Sino Canada (tianjin) Steel & Wood Structure Engineering Co Ltd
Priority to CN201410317620.8A priority Critical patent/CN104074267B/en
Publication of CN104074267A publication Critical patent/CN104074267A/en
Application granted granted Critical
Publication of CN104074267B publication Critical patent/CN104074267B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Door And Window Frames Mounted To Openings (AREA)

Abstract

The invention discloses a kind of dismantled and assembled sledge steel loading structure mobile field camp.The present invention includes end sledge, floor frame, corner post, wall column, module wall and ceiling frame;Described floor frame is welded on end sledge as overall;Corner post and wall column are welded to connect plate by upper and lower side and fix with floor frame and ceiling frame respectively, and module wall is composed of a fixed connection integral wall by the U-shaped column of the square tube of both sides and corner post and wall column both sides.Sledge steel loading structure mobile field camp of the present invention, mobile field camp assembly bulk shipment Assembling, the field works such as transportation volume is little, dramatically saves on freight, it is adaptable to exploration, drilling well, mining, building.

Description

Dismantled and assembled sledge steel loading structure mobile field camp
Technical field
The present invention relates to movable dwellings field, more specifically, relate to a kind of sledge dress with dismounting function Steel construction mobile field camp.
Background technology
Existing sledge steel loading structure mobile field camp is to assemble in plant construction, then by Large-scale professional transporting equipment It is transported to integral skid mounting steel construction mobile field camp use scene.Transportation always there will be and take up room greatly, Transport space is caused to waste, and the problem such as freight charges are high.
Summary of the invention
The technical problem to be solved is, overcomes the deficiencies in the prior art, it is provided that a kind of ratio Common sledge steel loading structure mobile field camp transportation volume is little, the dismantled and assembled sledge steel loading structure mobile field camp that freight charges are cheap.
The present invention dismantled and assembled sledge steel loading structure mobile field camp, is achieved by following technical proposals, including end sledge, Floor frame, corner post, wall column, module wall and ceiling frame;
Two long margin frames of sledge of the described end are I-steel, and two short frames are seamless steel pipe, between two long margin frames Doing stull with multiple welded tubes, two short frames also serve as pulling thick stick, and two trapezes cross two long margin frames;Limit Four ends of frame weld the anticollision post that seamless pipes are made, and this anticollision post is also used for when packing closed assembly Support sledge at the bottom of top;
The circumferential side frame of described floor frame is made up of square tube, and four frames are respectively provided with locating dowel, frame Weld corner post connecting plate on corner, two long margin frames are respectively welded wall upright post connecting plate, the angle on frame The connecting hole of mantle fiber it is respectively provided with, the inner side welding water fender of four frames on column and wall upright post connecting plate; Do full weld iron plate bottom joist, frame and joist by multiple C-type steel between two long margin frames, fill out between joist Filling heat-preservation cotton, indoor decorative floor is laid on joist top, fixes a drainpipe between joist, reserved between joist The feedwater mouth of pipe;
Described module wall includes wall four frame, and the frame of the left and right sides welds square tube, and left and right side frame was arranged Hole uses for in-site installation electric wire, and lower frame arranges hole, location, and upper side frame welding locating dowel, in upper side frame Side welding square tube makees water fender, and upper side frame arranges two holes for hoist, and the outdoor facade of frame is the packaging of welding Box corrugated steel plate, the indoor facade of frame is Indoor decorative plate, the indoor facade of frame and outdoor facade it Between install Os Draconis, between Os Draconis fill heat-preservation cotton;
Described corner post is converted into right angle by steel plate, and the termination of two right-angle sides is converted into right angle the most respectively and is formed interior Right-angle side, each interior right-angle side is respectively welded the U-shaped column being converted into by steel plate;Wall column is converted into flat U by steel plate Type column, flat U-shaped column dual-side is respectively welded the U-shaped column being converted into by steel plate;Corner post and wall column Upper and lower end face in be respectively welded connecting plate, connecting plate has circular hole;
The frame of described ceiling frame is that square tube is made, two steel anti-Le blocks of each welding on two long margin frames, The lower surface at four angles of frame is respectively welded corner post connecting plate, the lower surface welding wall column of every long margin frame The connecting hole of mantle fiber it is respectively provided with on connecting plate, corner post on frame and wall upright post connecting plate;Each edge frame Lower surface be provided with location hole;Ceiling frame upper surface welding container-type corrugated steel plate, under ceiling frame Surface is Indoor decorative plate, installs Os Draconis between the upper and lower surface of ceiling frame, fills insulation between Os Draconis Cotton;
Described floor frame is welded on end sledge as overall;Corner post and wall column are by upper and lower side welding even Fishplate bar is fixed with ceiling frame and floor frame respectively, and module wall is stood with corner post and wall by the square tube of both sides The U-shaped column of post both sides is composed of a fixed connection integral wall.
The square tube of described module wall both sides arranges welded nut, and the U-shaped column of corner post and wall column both sides sets Putting slotted hole, bolt is fixed through slotted hole by nut.
Leave a door unlocked in advance on described module wall, window opening;Module wall indoor facade is installed for furniture and electrical equipment solid Fixed liner plate, module wall outdoor facade is installed quickly for plug.
Arrange containing mantle fiber on corner post connecting plate on described floor frame and ceiling frame and wall upright post connecting plate Connecting hole.
Arranging partition wall in described barracks, the framework of partition wall is made up of wood section, described framework upper and lower Installing Os Draconis between frame, fill heat-preservation cotton between Os Draconis, framework two side elevation is respectively mounted Indoor decorative plate. Reserved door-window opening on described partition wall.
Sledge steel loading structure mobile field camp of the present invention, mobile field camp assembly bulk shipment Assembling, transportation volume is little, Dramatically saves on freight, it is adaptable to exploration, drilling well, mining, the field work such as building.The present invention Dismantled and assembled sledge steel loading structure mobile field camp, scene need not welding, uses on-the-spot quickly assembling.The end of the present invention Sledge, floor frame, ceiling frame, module wall, corner post, wall column, it is factory's module straight-lined manufacturing, Then modularization assembling is carried out, easy to use.The present invention dismantled and assembled sledge steel loading structure mobile field camp, arranges angle and stands Post, wall column, body of wall arranges framework, is bolted and is integrally formed, and bulk strength is big, solid, resistance to With, it is adaptable to use under field extreme environment.
Accompanying drawing explanation
Fig. 1 is end sledge and Floor frame structure schematic diagram;
Fig. 2 is corner pillar structure schematic diagram;
Fig. 3 is wall pillar construction schematic diagram;
Fig. 4 is module wall cross-sectional cross section structure schematic diagram;
Fig. 5 is that ceiling frame is perpendicular cuts open schematic cross-section;
Fig. 6 is partition wall structural representation;
Fig. 7 is the decomposing schematic representation of whole barracks;
Fig. 8 is dismantled and assembled sledge steel loading structure mobile field camp three packing closed assembly transport schematic diagram;
Fig. 9 is in-site installation complete lifting schematic diagram.
Detailed description of the invention
Below in conjunction with the accompanying drawings the present invention is described further.
The present invention dismantled and assembled sledge steel loading structure mobile field camp is by end sledge 1, floor frame 2, corner post 3, wall column 4, module wall 5, ceiling frame 6, partition wall 7 forms.
It is illustrated in figure 1 end sledge and floor frame:
End sledge: two long margin frames are 28# I-steel, does stull with multiple 4 cun of welded tubes between two long margin frames, Two short frames are 108*8 seamless pipe, and two short frames also serve as pulling thick stick, and two trapezes 11 cross two Long margin frame;108*8 seamless steel pipe makees trapeze and pull thick stick, and it is anti-that sledge every side in the end has that 108*8 seamless pipe makes Collision post 12 is used for protecting barracks body of wall to be damaged because of collision, and this anticollision post is also used at packing closed assembly Time support sledge at the bottom of top.End sledge is when transport and floor frame welding fabrication, on-the-spot overall package.
Floor frame: circumferential side frame is made up of 120*4.5 square tube, four frames are respectively provided with locating dowel 13, During for being connected with module wall, location uses, and frame corner is welded corner post connecting plate 14, two long margin frames On be respectively welded wall upright post connecting plate 15, corner post connecting plate on frame and wall upright post connecting plate are arranged and contain The connecting hole of mantle fiber, for in-site installation time and corner post, the connecting plate on wall column carries out bolt connection Time use, the inner side of four frames welding water fender, water fender is that 40mm is high, and thickness is the steel plate of 5mm, For waterproof;Full weld ferrum bottom joist, frame and joist is done with multiple 100C shaped steel between two long margin frames Plate, mopping, the sealing bottom barracks and anticorrosion, fill heat-preservation cotton between joist, joist top is laid Indoor decorative floor, fixes a drainpipe between joist, and keeps for hose nozzle, the on-the-spot bright dress of feed pipe.
It is illustrated in figure 2 corner post:
Corner post 3 is converted into right angle by 5mm steel plate, and the termination of two right-angle sides is converted into right angle the most respectively and is formed Interior right-angle side (as shown: the 5mm steel plate of 460mm length, is first converted into both sides and is respectively the straight of 230mm Angular shape, then bends inwards at a right angle by each right-angle side end 80mm length, i.e. interior right angle length of side 80mm), Each interior right-angle side is respectively welded the U-shaped column 16 being converted into by 5mm steel plate;
It is illustrated in figure 3 wall column:
Wall column 4 is converted into flat U-shaped column by 5mm steel plate, and flat U-shaped column dual-side is respectively welded by 5mm The U-shaped column 16 that steel plate is converted into,
Arranging slotted hole on above-mentioned U-shaped column, for corner post, wall column wears bolt when being connected with module wall, Fixing use.
It is respectively welded connecting plate 17 in the upper and lower end face of corner post and wall column, connecting plate has circular hole, is used for Corner post, wall column is worn bolt when being connected with floor ceiling frame, is fixed and use.
It is illustrated in figure 4 the cross-sectional schematic cross-section of module wall:
Four frames of module wall are 100*50*4.5 rectangular tube, and the frame of the left and right sides welds 60*4.5 side Pipe 18, square tube arranges welded nut, for on-the-spot and corner post, time the U-shaped column of wall column connects Fixing with bolt, and left and right side frame arranges via and uses for in-site installation electric wire, lower frame arranges location Hole, blocks with the locating dowel on the frame of floor when in-site installation, and location uses, upper side frame welding location Post, blocks with the hole, location on variola frame when in-site installation, and location uses, and welds inside upper side frame 20 square tube water fenders, for dash, upper side frame arranges two holes for hoist, for onsite application lifting device, Using when lifting, the outdoor facade of frame is the container-type corrugated steel plate 19 of welding, and the indoor of frame are stood Face is Indoor decorative plate 20, installs Os Draconis 21, fill out between Os Draconis between indoor facade and the outdoor facade of frame Fill heat-preservation cotton 22.If having door and window on module wall, need reserved opening, in-site installation door and window.Indoor furniture And arrester location reserves liner plate, fixing when in-site installation use.Install on exterior wall container corrugated steel plate Quickly for plug, power use for barracks.
It is illustrated in figure 5 the perpendicular schematic cross-section that cuts open of ceiling frame:
The frame of ceiling frame is that 80*4.5 square tube is made, two anti-Le of steel of each welding on two long margin frames Block, after Assembling completes, blocks steel wire rope during lifting barracks, prevents steel wire rope from damaging sky caul-fat Material, the lower surface at four angles of frame is respectively welded corner post connecting plate 14, the lower surface welding of two long margin frames The connecting hole of mantle fiber it is respectively provided with, for scene on wall upright post connecting plate 15, corner post and wall upright post connecting plate When installation and corner post, the connecting plate on wall column carries out using when bolt connects;The following table of each edge frame Face is provided with hole 23, location, and in time being connected with module wall, location uses;Ceiling frame upper surface welding collection Vanning formula corrugated steel plate 19, ceiling frame lower surface is Indoor decorative plate 20, the upper and lower table of ceiling frame Os Draconis are installed between face, between Os Draconis, fill heat-preservation cotton.
It is illustrated in figure 6 partition wall:
Partition wall: framework is made up of the wood section of 2*4, installs Os Draconis between the upper and lower frame of described framework 21, fill heat-preservation cotton 22 between Os Draconis, framework two side elevation is respectively mounted Indoor decorative plate 20, wherein has one The Indoor decorative plate of facade needs on-the-spot partition wall is fixed on module wall to install, during in-site installation later again Wait 2*4 wood section framework, after the side without Indoor decorative plate is fixed on module wall lining plate, fill Heat-preservation cotton, then the Indoor decorative plate in this face is installed.If there being door and window on partition wall, need reserved opening, on-the-spot Door and window is installed.
Fig. 7 is the decomposing schematic representation of whole barracks, as it is shown in figure 5, the assembling process of barracks is as follows:
The first step: end sledge good for welding assembly and floor frame are placed on stable region, accurate good each Plant assembly and instrument prepares to assemble;
Second step: corner post, wall column is by the connecting plate in corner post and wall column and floor frame Connecting plate be bolted, fixation;
3rd step: module wall, is placed between corner post and wall column and between wall column and wall column, Wherein the locating dowel on the frame of floor is stuck in the hole, location under module wall frame, on module wall frame both sides Rectangular tube and corner post, the U-shaped column on wall column is bolted, and fixation subsequently completes battalion The circuit in room connects.
4th step: install ceiling frame, the hole, location of variola frame bottom is stuck in determining of module wall frame top In the post of position, the connecting plate of variola frame bottom and corner post, the connecting plate in wall column carries out bolt connection;
5th step: indoor wall corner post and wall column link position and body of wall and floor, variola link position,
6th step: indoor install partition wall as required;Carry out water power connection, erection of doors and windows, furniture subsequently Install, the operation such as sanitary equipment installation.
Fig. 8 is dismantled and assembled sledge steel loading structure mobile field camp three packing closed assembly transport schematic diagram.
Fig. 9 is in-site installation complete lifting schematic diagram.
Embodiment described above is only to be described the preferred embodiment for the present invention, not to the present invention Spirit and scope be defined, on the premise of without departing from design philosophy of the present invention, unskilled labor in this area Various deformation that technical scheme is made by journey technical staff and improvement, all should belong to the guarantor of the present invention Protect scope.

Claims (5)

1. a dismantled and assembled sledge steel loading structure mobile field camp, is characterized in that, including end sledge, floor frame, angle Column, wall column, module wall and ceiling frame;
Two long margin frames of sledge of the described end are I-steel, and two short frames are seamless steel pipe, two long margin frames it Between do stull with multiple welded tubes, two short frames are as pulling thick stick, and two trapezes cross two long margin frames; The anticollision post that four end welding seamless pipes of frame are made;
The circumferential side frame of described floor frame is made up of square tube, and four frames are respectively provided with locating dowel, limit Weld corner post connecting plate on frame corner, two long margin frames are respectively welded wall upright post connecting plate, on frame Corner post and wall upright post connecting plate on be respectively provided with the connecting hole of band mantle fiber, the inner side welding of four frames Water fender;Full weld iron plate bottom joist, frame and joist is done by multiple C-type steel between two long margin frames, Filling heat-preservation cotton between joist, joist top is laid indoor decorative floor, is fixed a drainpipe between joist, Hose nozzle is kept between joist;
Described module wall includes wall four frame, and the frame of the left and right sides welds square tube, and left and right side frame is arranged Via uses for in-site installation electric wire, and lower frame arranges hole, location, upper side frame welding locating dowel, top Welding square tube inside frame and make water fender, upper side frame arranges two holes for hoist, and the outdoor facade of frame is welding Container-type corrugated steel plate, the indoor facade of frame is Indoor decorative plate, the indoor facade of frame and room Os Draconis are installed between alien invasion, between Os Draconis, fill heat-preservation cotton;
Described corner post is converted into right angle by steel plate, and the termination of two right-angle sides is converted into right angle the most respectively and is formed Interior right-angle side, each interior right-angle side is respectively welded the U-shaped column being converted into by steel plate;Wall column is rolled over by steel plate Flat U-shaped column, flat U-shaped column dual-side is become to be respectively welded the U-shaped column being converted into by steel plate;Corner post Be respectively welded connecting plate in the upper and lower end face of wall column, connecting plate has circular hole;
The frame of described ceiling frame is that square tube is made, two steel anti-Le blocks of each welding on two long margin frames, The lower surface at four angles of frame is respectively welded corner post connecting plate, and the lower surface welding wall of every long margin frame stands The connecting hole of mantle fiber it is respectively provided with on post connecting plate, corner post on frame and wall upright post connecting plate;Every The lower surface of frame is provided with hole, location;Ceiling frame upper surface welding container-type corrugated steel plate, variola Frame lower surface is Indoor decorative plate, installs Os Draconis, between Os Draconis between the upper and lower surface of ceiling frame Fill heat-preservation cotton;
Described floor frame is welded on end sledge as overall;Corner post and wall column are welded by upper and lower side Connecting plate is fixed with ceiling frame and floor frame respectively, module wall by the square tube of both sides and corner post and The U-shaped column of wall column both sides is composed of a fixed connection integral wall.
Dismantled and assembled sledge steel loading structure mobile field camp the most according to claim 1, is characterized in that, described mould The square tube of block wall both sides arranges welded nut, and the U-shaped column of corner post and wall column both sides arranges slotted hole, Bolt is fixed through slotted hole by nut.
Dismantled and assembled sledge steel loading structure mobile field camp the most according to claim 1, is characterized in that, described mould Leave a door unlocked in advance on block wall, window opening;Module wall indoor facade installs the liner plate fixed for furniture and electrical equipment, Module wall outdoor facade is installed quickly for plug.
Dismantled and assembled sledge steel loading structure mobile field camp the most according to claim 1, is characterized in that, described battalion Arranging partition wall in room, the framework of partition wall is made up of wood section, between the upper and lower frame of described framework Installing Os Draconis, fill heat-preservation cotton between Os Draconis, framework two side elevation is respectively mounted Indoor decorative plate.
Dismantled and assembled sledge steel loading structure mobile field camp the most according to claim 4, is characterized in that, described every Reserved door-window opening on disconnected wall.
CN201410317620.8A 2014-07-04 2014-07-04 Dismantled and assembled sledge steel loading structure mobile field camp Active CN104074267B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410317620.8A CN104074267B (en) 2014-07-04 2014-07-04 Dismantled and assembled sledge steel loading structure mobile field camp

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410317620.8A CN104074267B (en) 2014-07-04 2014-07-04 Dismantled and assembled sledge steel loading structure mobile field camp

Publications (2)

Publication Number Publication Date
CN104074267A CN104074267A (en) 2014-10-01
CN104074267B true CN104074267B (en) 2016-08-24

Family

ID=51595838

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410317620.8A Active CN104074267B (en) 2014-07-04 2014-07-04 Dismantled and assembled sledge steel loading structure mobile field camp

Country Status (1)

Country Link
CN (1) CN104074267B (en)

Families Citing this family (17)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104358311A (en) * 2014-10-28 2015-02-18 四川华铁钢结构有限公司 High-strength building structure convenient to construct
CN104358309A (en) * 2014-10-28 2015-02-18 四川华铁钢结构有限公司 Quickly installed high-strength house structure
CN104563546B (en) * 2014-11-28 2017-03-15 沧州市华油飞达石油装备有限公司 Assembling And Welding formula mobile field camp
CN104466737B (en) * 2014-12-17 2016-06-29 安徽启光能源科技研究院有限公司 A kind of packaging type body structure for energy-accumulating power station
CN105649207B (en) * 2015-03-16 2018-10-30 中国建筑第四工程局有限公司 A kind of construction method and structure of pin-connected panel standard relocation housing
CN105742988B (en) * 2016-01-04 2019-03-12 国网内蒙古东部电力有限公司电力科学研究院 Box for box-type transformer substation
CN105908836B (en) * 2016-04-22 2018-12-11 上海莫腾科技有限公司 A kind of Portakabin
CN106801494A (en) * 2016-12-17 2017-06-06 中建钢构有限公司 A kind of container finishing systems for being applied to steel building alien invasion
CN106759923A (en) * 2017-01-24 2017-05-31 江苏海陆科技股份有限公司 Externally picking tyoe bilayer fast-assembling container house
CN107905376A (en) * 2017-12-10 2018-04-13 柳州市雅泰活动板房厂 Easy-dismounting portable building
CN108331374B (en) * 2018-01-24 2021-03-19 河海大学 Steel-ice combined structure field scientific investigation room and assembling method thereof
CN108979203B (en) * 2018-08-03 2020-05-05 柯世轮 Movable house with drainage system
CN109138523A (en) * 2018-10-25 2019-01-04 中冶天工(天津)装备制造有限公司 The removable assembling type steel structure of corner post builds single open-door toilette modules
CN109138170A (en) * 2018-10-25 2019-01-04 中冶天工(天津)装备制造有限公司 The removable assembling type steel structure of corner post builds standalone module
CN109138524A (en) * 2018-10-25 2019-01-04 中冶天工(天津)装备制造有限公司 The removable assembling type steel structure of corner post builds double door toilette modules
CN110219394B (en) * 2019-04-12 2024-06-04 深圳全景空间工业有限公司 Internal tension wall
CN114182983A (en) * 2021-12-08 2022-03-15 青岛鑫光正钢结构股份有限公司 Steel structure house and construction method thereof

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH10306525A (en) * 1998-02-13 1998-11-17 Corona Giken Kk Fitting structure of bearing wall panel
CN2358746Y (en) * 1999-03-22 2000-01-19 王国治 Assembly type mosaic composite board camp house capable of lifting
CN2787754Y (en) * 2005-02-18 2006-06-14 戴志刚 Quickly assembled and disassembled multi-purpose light decorative cabinet wall structure
WO2009108986A1 (en) * 2008-03-07 2009-09-11 Francesco Antonio Martino A transportable building including a roof structure for stacking of multiple buildings
CN201343784Y (en) * 2009-01-09 2009-11-11 吐哈石油勘探开发指挥部 Large-span combined camping house
CN202865996U (en) * 2012-07-26 2013-04-10 中广核工程有限公司 Room modular structure for nuclear power plant
CN202969982U (en) * 2012-11-14 2013-06-05 何红星 Mobile board room
CN203531136U (en) * 2013-09-23 2014-04-09 张建忠 Prefabricated assembling type steel structure house constructing system

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH10306525A (en) * 1998-02-13 1998-11-17 Corona Giken Kk Fitting structure of bearing wall panel
CN2358746Y (en) * 1999-03-22 2000-01-19 王国治 Assembly type mosaic composite board camp house capable of lifting
CN2787754Y (en) * 2005-02-18 2006-06-14 戴志刚 Quickly assembled and disassembled multi-purpose light decorative cabinet wall structure
WO2009108986A1 (en) * 2008-03-07 2009-09-11 Francesco Antonio Martino A transportable building including a roof structure for stacking of multiple buildings
CN201343784Y (en) * 2009-01-09 2009-11-11 吐哈石油勘探开发指挥部 Large-span combined camping house
CN202865996U (en) * 2012-07-26 2013-04-10 中广核工程有限公司 Room modular structure for nuclear power plant
CN202969982U (en) * 2012-11-14 2013-06-05 何红星 Mobile board room
CN203531136U (en) * 2013-09-23 2014-04-09 张建忠 Prefabricated assembling type steel structure house constructing system

Also Published As

Publication number Publication date
CN104074267A (en) 2014-10-01

Similar Documents

Publication Publication Date Title
CN104074267B (en) Dismantled and assembled sledge steel loading structure mobile field camp
CN203716294U (en) Detachable-type house box
CN108560725A (en) A kind of container house column and panel wall system
CN104775522A (en) Detachable house box
CN107476446B (en) Banded enhancement mode node that H shaped steel roof beam and wide steel core concrete column minor face are connected
CN103114733A (en) Rectangular steel pipe concrete column steel beam lower bolt upper welding outer rib annular plate node construction method
CN104358309A (en) Quickly installed high-strength house structure
CN104213637A (en) Integrated type steel structure building
CN204112483U (en) Integrated form steel building
CN109138235B (en) Combined GRC wallboard, GRC panel and GRC curtain wall
CN103104038A (en) Rectangular tubular column jointing inner sleeve bolt connection node
CN204645281U (en) Combined container house room water-tight device
CN204570938U (en) The connected system of building module adjacent cells
CN104358318A (en) Building house adopting concrete steel structure uprights
CN103912141B (en) A kind of mobile field camp and manufacture method thereof
CN105804416A (en) Connecting structure for prefabricated assembling type building tower crane
CN203034615U (en) Novel outer sleeve tube type connecting node of cold-bending rectangular steel tube column and H-shaped steel girder
CN203808557U (en) Camping house
CN103104035A (en) Bolt connection node of rectangular tubular column splicing externally-sleeved connection piece
CN201649708U (en) Hanging type corridor structure of integrated house
CN110241924B (en) Assembly type beam-column connecting structure and construction method thereof
CN106088398A (en) A kind of combined wall board
CN208718346U (en) Building engineering outer scaffold wall connector
CN206800711U (en) One kind spraying mortar beams encased in steel hoops interior wall pipe clamp connecting node
CN104563546B (en) Assembling And Welding formula mobile field camp

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant