CN201649708U - Hanging type corridor structure of integrated house - Google Patents

Hanging type corridor structure of integrated house Download PDF

Info

Publication number
CN201649708U
CN201649708U CN2010201672215U CN201020167221U CN201649708U CN 201649708 U CN201649708 U CN 201649708U CN 2010201672215 U CN2010201672215 U CN 2010201672215U CN 201020167221 U CN201020167221 U CN 201020167221U CN 201649708 U CN201649708 U CN 201649708U
Authority
CN
China
Prior art keywords
corridor
integrated house
house
utility
model
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2010201672215U
Other languages
Chinese (zh)
Inventor
凌红兵
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
ANHUI YAOHAI STEEL STRUCTURE Co Ltd
Original Assignee
ANHUI YAOHAI STEEL STRUCTURE Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by ANHUI YAOHAI STEEL STRUCTURE Co Ltd filed Critical ANHUI YAOHAI STEEL STRUCTURE Co Ltd
Priority to CN2010201672215U priority Critical patent/CN201649708U/en
Application granted granted Critical
Publication of CN201649708U publication Critical patent/CN201649708U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Abstract

The utility model relates to a hanging type corridor structure of an integrated house which combines an integrated house main frame with a stair structure into an integral structure, comprising corridor bottom beams, a corridor floor layer and a protective fence. The corridor structure is characterized in that the corridor bottom beams are uniformly distributed, one end is fixed and connected with a ring beam or ground beam of the integrated house, and the other end is upwards fixed and connected with a reverse Y-shaped beam corresponding to the roof through a vertical upright post; the protective fence is arranged between the upright posts; and the floor layer is paved on the corridor bottom beam. The utility model integrates the corridor and the house integral frame into the integral structure, and eliminates the overlapping structure of the corridor and house integral frame, the corridor bottom beam is fixed and connected on the corresponding reverse Y-shaped beam through the upright post, and a hanging type corridor structure is formed, thereby greatly enhancing the completeness and safety of corridor and integrated house. Simultaneously, by removing the traditional corridor support upright post, the ground space is saved, and the integral strength of the integrated house is ensured. The utility model also has the advantages of simple and reasonable structure, and convenient detachment and assembly.

Description

The suspension corridor structure of integrated house
Technical field
The utility model relates to the light-weight house technical field of civilian or industrial construction class, specifically a kind of suspension corridor structure of integrated house.
Background technology
As everyone knows, the building integrated house is the interim inhabitation of building operations personnel and the place of office normally, belongs to one off houses, mainly comprises: light body integrated house, face build a house room and box house.Simultaneously, the building integrated house also can be used as the usefulness of storage buildings such as safedeposit, material.In addition, also be useful on the one off houses of earthquake relief work, and when holding comings and goings, interim construction face the room that builds a house.At present, owing to constructional materials, structural member manufacture craft, mounting method etc. are all, the building integrated house can't wholely move after building is finished, can only dismantle, and the neither environmental protection of this way, also uneconomical.The building integrated house spillage of material that this frame mode is built is big, and on-the-spot installation is loaded down with trivial details, and a large amount of welding procedures that adopt in the structural member manufacturing process, wastes energy, and produces a large amount of pernicious gases, is unfavorable for environmental protection; Reuse factor is low, and wind resistance and shock resistance are relatively poor.In view of this, how to make the building integrated house construction material can repeatedly use, Recycling, how to make the generalization of building integrated house, standardization, make the integrated house builing industry can really realize suitability for industrialized production, this is the place of the initial motivation of the utility model design just.
In the market the integrated room of light body of Shi Yonging, face build a house room and box house, main one deck and the double-layer structure of adopting, and be to adopt standardized production in factory, its critical piece, as: beam, column, shingle nail unit, roof panel unit, roof girder, door, window and relevant connection accessory etc., adopt assembled on site to realize.For double-layer structure and because of the irregular one deck structure in ground all needs stair and corridor are set, and the stair and the corridor that use on light body integrated house on the market all are only structures, during construction, depend on the beam and column in the light body integrated house outside.This corridor structure relative complex is easy to the whole disconnection of integrated house, and discontinuity, so poor safety performance
Summary of the invention
The purpose of this utility model provides the suspension corridor structure of the integrated house that a kind of integrated house body frame and corridor structure be structure as a whole.
The purpose of this utility model is achieved in that it includes the corridor bottom girder, the corridor floor layer, protective guard, it is characterized in that: equally distributed corridor bottom girder, wherein an end is fixedlyed connected with the collar tie beam or the grade beam of integrated house, the other end is then upwards fixedlyed connected with the pairing herringbone beam in roof by vertical pillars, and is provided with protective guard between the column, is equipped with floor layer on the bottom girder of corridor.
Install and field stripping for the ease of the scene, so that recuperation is used again, then the corridor bottom girder adopts bolt to be connected with the collar tie beam or the grade beam of integrated house.
Vertical pillars described in the utility model is upwards fixedlyed connected with the oblique straining beam on the roof herringbone beam; Because, there is a component that upwards reaches near the integrated house pulling for vertical pillars in the oblique straining beam on the roof herringbone beam, has therefore increased this suspention corridor safety factor relatively.
The utility model is owing to the whole roof truss with integrated house corridor and integrated house forms integrative-structure, cancelled the bridging arrangement of said two devices, and equally distributed corridor bottom girder is fixedly connected on the pairing herringbone beam (roof girder) by vertical pillars, formed suspension corridor structure, therefore, the integrality and the safety of corridor and integrated house have been improved greatly.Simultaneously,, discharged ground space, guaranteed the bulk strength of integrated house having cancelled traditional corridor support post.The ability of opposing wind and snow and rainwater also strengthens greatly, the stability of integrated house is improved greatly, and the external form in house is more attractive in appearance, thereby realizes the purpose of this utility model.The utility model also has simple and reasonable, is convenient to dismounting and assembling, makes suspension of the present utility model corridor repeat repeatedly to use and safe and reliable, energy-conservation, and cost is low, long service life, characteristics such as range of application is wide.
Description of drawings
Fig. 1 is a structural representation sketch of the present utility model;
Fig. 2 be among Fig. 1 A to amplifying simplified schematic diagram;
Fig. 3 be among Fig. 1 B to amplifying simplified schematic diagram;
Fig. 4 is the state simplified schematic diagram of installing and using of the present utility model.
Below in conjunction with accompanying drawing and by example the utility model is described in further detail; but following example only is one of them a example of the utility model; the rights protection scope of not representing the utility model and being limited, rights protection scope of the present utility model is as the criterion with claims.
The specific embodiment
Example 1:
As Figure 1-3, among the figure 1 is the corridor bottom girder, 2 is protective guard, 15 is the corridor floor layer, equally distributed corridor bottom girder 1 on the position in needs installation corridor corridor, wherein bottom girder 1 one ends in corridor are fixedlyed connected with the collar tie beam 11 of integrated house by connecting bolt 13, and the other end is then upwards fixedlyed connected with the roof herringbone beam (be equivalent to rain and take the position) who leans out in the roofing wall outside by vertical pillars 3; Described herringbone beam is mainly by roofing cable-stayed beam 4, the straining beam 5 that connects two oblique straining beams 4, and the lacing wire between oblique straining beam 4 and the straining beam 58 is formed, specifically, vertical pillars 3 is upwards fixedlyed connected at the oblique straining beam 4 in the roofing wall outside with leaning out, then be fixed together by horizontal straining beam 7 between two adjacent herringbone beams, roof panel 6 then is laid on the top of horizontal straining beam 7; And between vertical pillars 3, be horizontally arranged with protective guard 2; On corridor bottom girder 1, be equipped with floor layer 15.In addition, for the ease of determining the locations of structures at place, suspension corridor, the position of associated fitting and name are called: as 9 among Fig. 1 is roof girder, and 10 is the upper walls column, and 11 is collar tie beam, and 12 is lower floor's wall column; As 14 among Fig. 2 be roof girder 9 with the roof herringbone beam between be connected column, be rainproof catch on the C shaped steel collar tie beam as 16 among Fig. 3,17 braces that connect for ease of bolt are the stair in suspension corridor as 18 among Fig. 4,19 is two layers of integrated house.

Claims (3)

1. the suspension corridor structure of an integrated house, it includes the corridor bottom girder, the corridor floor layer, protective guard, it is characterized in that: equally distributed corridor bottom girder, wherein an end is fixedlyed connected with the collar tie beam or the grade beam of integrated house, and the other end is then upwards fixedlyed connected with the pairing herringbone beam in roof by vertical pillars, and be provided with protective guard between the column, on the bottom girder of corridor, be equipped with floor layer.
2. the suspension corridor structure of integrated house according to claim 1, it is characterized in that: the collar tie beam of corridor bottom girder and integrated house is bolted to connection.
3. the suspension corridor structure of integrated house according to claim 1, it is characterized in that: vertical pillars is upwards fixedlyed connected with the oblique straining beam on the roof herringbone beam.
CN2010201672215U 2010-04-23 2010-04-23 Hanging type corridor structure of integrated house Expired - Fee Related CN201649708U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2010201672215U CN201649708U (en) 2010-04-23 2010-04-23 Hanging type corridor structure of integrated house

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2010201672215U CN201649708U (en) 2010-04-23 2010-04-23 Hanging type corridor structure of integrated house

Publications (1)

Publication Number Publication Date
CN201649708U true CN201649708U (en) 2010-11-24

Family

ID=43114937

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2010201672215U Expired - Fee Related CN201649708U (en) 2010-04-23 2010-04-23 Hanging type corridor structure of integrated house

Country Status (1)

Country Link
CN (1) CN201649708U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105507614A (en) * 2016-01-08 2016-04-20 徐忠方 Rapid, convenient, environment-friendly and movable villa
CN109440940A (en) * 2018-12-25 2019-03-08 郑州九冶三维化工机械有限公司 A kind of prefabricated buildings with inside corridor
CN113338669A (en) * 2021-06-02 2021-09-03 昌达建筑科技有限公司 Assembled anti-seismic residential building structure

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105507614A (en) * 2016-01-08 2016-04-20 徐忠方 Rapid, convenient, environment-friendly and movable villa
CN105507614B (en) * 2016-01-08 2018-05-11 徐忠方 Fast and convenient environment protection movable villa
CN109440940A (en) * 2018-12-25 2019-03-08 郑州九冶三维化工机械有限公司 A kind of prefabricated buildings with inside corridor
CN113338669A (en) * 2021-06-02 2021-09-03 昌达建筑科技有限公司 Assembled anti-seismic residential building structure

Similar Documents

Publication Publication Date Title
CN102587693B (en) Two-storey modular villa building and construction method thereof
CN103046755B (en) The construction method of the light steel integrated house of pastoral area assembling
CN102691352B (en) Modular integrated house
CN101418592A (en) Combined light steel structure house and mounting method thereof
CN101440635A (en) One layer combined type light steel structure house and installation method thereof
CN207260319U (en) Integrated module assembled arthitecutral structure
CN205955263U (en) Building structure consolidates to reform transform and uses overcoat frame
CN105971304B (en) A kind of building structure strengthening transformation jacketing frame
CN104631857A (en) Mobile house
CN101818579B (en) Bridge cutoff type integrated house and installation method thereof
CN205444984U (en) Pin -connected panel sanitation room
CN201649708U (en) Hanging type corridor structure of integrated house
CN107762161B (en) A kind of energy-saving assembled system of steel residential structure and installation method
CN2921139Y (en) Combined hollow large panel ceiling for storied building
CN201704967U (en) Broken cold and heat bridge type integrated house
CN107476643A (en) Fast Installation steel wood rescue tent
JP5302441B2 (en) Construction method of concrete container house
CN201276862Y (en) Heat-preserving environment-friendly shockproof house
CN107989248A (en) A kind of composite protective roof system and its construction method for building site one off houses
CN102561731B (en) Module constructed one-layer villa and construction method thereof
CN205617566U (en) Combined -type steel structure house
CN106677603A (en) Tent structure and putting up method thereof
CN207761141U (en) A kind of composite protective roof system for building site one off houses
CN100366856C (en) Sightseeing marking tower
JP3782802B2 (en) Renovation structure of building

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20101124

Termination date: 20140423