CN103982185B - Upright opening and lateral aperture work in coordination with the mechanization sublevel cut and fill method of back production - Google Patents

Upright opening and lateral aperture work in coordination with the mechanization sublevel cut and fill method of back production Download PDF

Info

Publication number
CN103982185B
CN103982185B CN201410257493.7A CN201410257493A CN103982185B CN 103982185 B CN103982185 B CN 103982185B CN 201410257493 A CN201410257493 A CN 201410257493A CN 103982185 B CN103982185 B CN 103982185B
Authority
CN
China
Prior art keywords
back production
upright opening
lateral aperture
unit
segmentation
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201410257493.7A
Other languages
Chinese (zh)
Other versions
CN103982185A (en
Inventor
李启月
王卫华
尹土兵
张瑞华
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Central South University
Original Assignee
Central South University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Central South University filed Critical Central South University
Priority to CN201410257493.7A priority Critical patent/CN103982185B/en
Publication of CN103982185A publication Critical patent/CN103982185A/en
Application granted granted Critical
Publication of CN103982185B publication Critical patent/CN103982185B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The invention discloses the mechanization sublevel cut and fill method that a kind of upright opening and lateral aperture work in coordination with back production, ore body segmentation is exploited, and collaboratively in substoping unit carries out upright opening back production and lateral aperture pressure is adopted; Upright opening is divided into pre-ceasma and Luo Kuang hole, most of ore body in vertical Luo Kuang hole back production unit, unit top board is adopted by lateral aperture pressure and is formed, unit two helps profile to be controlled by vertical pre-ceasma, after pressure is adopted and is protected top, Common LHD and remote-controlled scraper work in coordination with ore removal, unit goaf primary filling, and on adopt next segmentation and leave rock drilling space.Circulation like this, until a whole step stope mining is complete.The present invention had both played the feature of the high strength of point section mining, high efficiency, low cost, and the profile utilizing again presplit blasting to control substoping unit two to help, adopts the profile controlling back production unit top board simultaneously by lateral aperture pressure.It is simple that the present invention has safe and efficient, technique, the advantage that loss and dilution is little and mechanization degree is high.

Description

Upright opening and lateral aperture work in coordination with the mechanization sublevel cut and fill method of back production
Technical field
The present invention relates to a kind of mining codes, particularly relate to the mechanization sublevel cut and fill method that a kind of upright opening and lateral aperture work in coordination with back production, be applicable to more than ore deposit rock moderately stable, tilt or Slowly inclined large and thick ore body, the safety of high-dipping middle thickness orebody, high-efficiency mining.
Background technology
Along with updating and development of mining technique and plant equipment, the shortcomings such as production efficiency is low when exploiting big thick ore body, cost of winning is high for stratified filling method, two rate indexs are high expose gradually, filling method develops out sublevel fill stoping method and Mass filling method day by day, and Mass filling method is comparatively strict to the requirement of orebody occurrence, then sublevel fill stoping method more adopt by mine.
Sublevel fill stoping method is existed in exploitation process to the problem of roof safety, traditional sublevel fill stoping method adopts the mode of Pre-control roof usually, and the method complex process, cost is higher, and concussion of blasting easily damages supporting.
Summary of the invention
Under technical problem to be solved by this invention is to provide a kind of prerequisite ensureing job safety, the upright opening that the safe and efficient low cost realizing big thick ore body is exploited and lateral aperture work in coordination with the mechanization sublevel cut and fill method of back production.
In order to solve the problems of the technologies described above, upright opening provided by the invention and lateral aperture work in coordination with the mechanization sublevel cut and fill method of back production, ore body is divided into stage casing in short transverse, segmentation is further subdivided in stage casing, rational mineral building length and width is determined, in this, as a back production unit according to ore-rock stability; The outer trackless of arteries and veins is adopted to adopt standard, by stope connection roadway, slice drift, segmentation connection lane by ore body and stage haulage way or ramp UNICOM; Bottom the first segmentation, form pulling end space and construct artificial false bottom, for this segmentation exploitation provides the rock drilling space of upright opening; Be upright opening and lateral aperture two back production regions by back production dividing elements, the most of ore body in upright opening back production unit, unit top board is adopted by lateral aperture pressure and is formed, and unit two helps profile to be controlled by vertical pre-ceasma; Carry out protecting top operation after pressure adopts end, adopt Common LHD and remote-controlled scraper to work in coordination with ore removal, unit goaf primary filling subsequently, and adopt next segmentation on being and leave rock drilling space, so circulate, until a whole step stope mining is complete.
Further, two of upright opening and lateral aperture two back production regions help profile to be controlled by vertical pre-ceasma onepull, and upright opening, pre-ceasma and upright opening homogeneous detonate simultaneously.
The upright opening of technique scheme and lateral aperture is adopted to work in coordination with the mechanization sublevel cut and fill method of back production, for the problems referred to above that sublevel fill stoping method exists in recovery process, creatively proposition upright opening and lateral aperture work in coordination with the mechanization sublevel cut and fill method of back production, under the prerequisite ensureing job safety, realize the safe and efficient low cost exploitation of big thick ore body.
Adopt the present invention, beneficial effect is:
1. stoping safety is high
Be upright opening and lateral aperture two back production regions by back production dividing elements, the miner that falls does the major part that upright opening region completes this segmentation, and help profile by presplit blasting control back production unit two, lateral aperture back production region is carried out pressure and is adopted operation on upright opening shrink heap, and by controlled blasting controlroof profile.
2. back production efficiency is high, production capacity is large
Segmentation is exploited, and drastically increases back production efficiency and the production capacity of stope,
3. mechanization degree is high, labour intensity is low
Trackless adopts standard, and the use of the advanced random copolyether such as jumbo, remote-controlled scraper, electric truck, rock bolting jumbo, whitewashing chassis, drastically increases the mechanization degree of production, significantly reduce the labour intensity of workman.
4. adopt cost low, resources loss is few
Accurate cutting is adopted in segmentation, substoping, sublevel fill stoping, and technique is simple, and cost is low; Can serialization exploit, resources loss is few.
The present invention had both played the feature of the high strength of point section mining, high efficiency, low cost, and the profile utilizing again presplit blasting to control substoping unit two to help, adopts the profile controlling back production unit top board simultaneously by lateral aperture pressure.It is simple that the present invention has safe and efficient, technique, the advantage that loss and dilution is little and mechanization degree is high.
In sum, the present invention is under a kind of prerequisite ensureing job safety, and the upright opening that the safe and efficient low cost realizing big thick ore body is exploited and lateral aperture work in coordination with the mechanization sublevel cut and fill method of back production.
Accompanying drawing explanation
Fig. 1 is mining methods structure perspective view of the present invention.
Fig. 2 is II of accompanying drawing 1--II section.
Fig. 3 is III of accompanying drawing 1--III section.
Fig. 4 is IV of accompanying drawing 1--IV section.
In figure: 1-stage haulage way; 2-drop shaft; 3-drop shaft connecting taxiway; 4-slice drift; 5-cemented fill; 6-artificial false bottom; 7-fore-set; 8-pulling end space; 9-upright opening; 10-vertical pre-ceasma; 11-broken ore; 12-upright opening back production region; 13-lateral aperture back production region.
Detailed description of the invention
Upright opening provided by the invention and lateral aperture work in coordination with the mechanization sublevel cut and fill method of back production, and technical scheme is as follows:
(1), by ore body be divided into stage casing along short transverse, in stage casing, be further subdivided into segmentation, ore body across pitch or capwise are arranged mineral building, determines rational mineral building length and width according to ore-rock stability, in this, as a back production unit;
(2), segmentation tunnel is arranged on parallel ore bodies border, each segmentation tunnel respectively by segmentation connecting taxiway and ramp through, stope is communicated with segmentation tunnel by stope connection roadway, and stage haulage way is by drop shaft and slice drift UNICOM, thus outside forming arteries and veins, trackless adopts Barebone;
(3), bottom the first segmentation tunnel the tunnel that undercuts, then expand side formation pulling end space, and construct artificial false bottom, pulling end space is then for this substoping provides rock drilling space and compensation space;
(4), by back production dividing elements be upright opening and lateral aperture two back production regions, after adopting accurate cutting, upwards Drilling upright opening, upright opening completes the ore deposit operation that falls in this region, and vertical pre-ceasma controls two of back production unit and helps profile; The back production in lateral aperture back production region, enters stope from the stope connection roadway of upper segmentation and adopts horizontal shallow hole pressure to adopt, by controlled blasting controlroof profile in ore deposit heap;
(5), after explosion ventilates, carry out protecting top operation, adopt Common LHD and remote-controlled scraper to work in coordination with a large amount of ore removal subsequently;
(6), carry out primary filling immediately after this segmentation ore removal, and reserve the rock drilling space of certain altitude for upper sectional vertical hole back production, so circulation is until a whole step stope mining is complete and carry out Tight filling.
Below with reference to figure and instantiation, the present invention is described in further detail:
Embodiments of the invention: for certain gold mine-580m ~-620m stage casing.
Concrete implementation step is as follows:
(1), vertical orebody trend divides mineral building ore pillar, and the wide 8m of mineral building, the wide 7m of ore pillar, 8 ~ 10 mineral building ore pillars are as a panel.Back production in two steps in panel, room of first digging up mine, then post of digging up mine, during two step back production, stope two is helped to be cemented fill.Divide stage casing along short transverse, be further subdivided into segmentation in stage casing, miding level height is 50m, and height of lift is 10.5m, back production all from bottom to top in segmentation.
(2), segmentation tunnel is arranged on parallel ore bodies lower wall border, each segmentation tunnel respectively by connecting taxiway and main ramp through, stope is communicated with segmentation tunnel by stope connection roadway, and stage haulage way is by ore pass and slice drift UNICOM, thus outside forming arteries and veins, trackless adopts Barebone; As shown in accompanying drawing 1, accompanying drawing 2, accompanying drawing 3 and accompanying drawing 4, in figure: 1-stage haulage way; 2-drop shaft; 3-drop shaft connecting taxiway; 4-slice drift; 5-cemented fill; 6-artificial false bottom; 7-fore-set; 8-pulling end space; 9-upright opening; 10-vertical pre-ceasma; 11-broken ore; 12-upright opening back production region; 13-lateral aperture back production region.
(3), bottom the first segmentation, tunnel 3.5m × 3.5m cutting lane, then lane expansion side will be cut to 8.8m, and the thick ore body of working to the rise 1.5m, make control heights of roofs be 5m.Bottom mineral building, build artificial false bottom, thus form pulling end space, in this, as the rock drilling space in this segmentation upright opening region.
, form pulling end space in stope after, upwards Drilling upright opening, once by the avalanche of 7m height ore, and adopts the mode of presplit blasting to control two of whole back production unit to help profile.Then enter stope from upper segmentation and adopt horizontal shallow hole pressure to adopt 3.5m height ore body in ore deposit heap, controlled blasting makes top board form 1/4 basket handle arch.Wherein, during upright opening explosion, the hole depth in Luo Kuang hole is 7m, and the hole depth of pre-ceasma is 10m, thus realizes upright opening Advance presplitting and adopt two help profile with level of control hole pressure.
, explosion ventilate after, ore deposit heap on adopt anchor pole to carry out protecting top, local Area cracked adopt anchor pole+wire lath+whitewashing combined supporting.
(6), adopt Common LHD and remote-controlled scraper to work in coordination with a large amount of ore removal.
(7), carry out a consolidated fill immediately after segmentation ore removal, and reserve the rock drilling space of certain altitude for upper sectional vertical hole back production, so circulate, until a whole step stope mining is complete.

Claims (2)

1. a upright opening and lateral aperture work in coordination with the mechanization sublevel cut and fill method of back production, it is characterized in that: ore body is divided into stage casing in short transverse, be further subdivided into segmentation in stage casing, determine rational mineral building length and width according to ore-rock stability, in this, as a back production unit; The outer trackless of arteries and veins is adopted to adopt standard, by stope connection roadway, slice drift, segmentation connection lane by ore body and stage haulage way or ramp UNICOM; Bottom the first segmentation, form pulling end space and construct artificial false bottom, for this segmentation exploitation provides the rock drilling space of upright opening; Be upright opening and lateral aperture two back production regions by back production dividing elements, the most of ore body in upright opening back production unit, unit top board is adopted by lateral aperture pressure and is formed, and unit two helps profile to be controlled by vertical pre-ceasma; Carry out protecting top operation after pressure adopts end, adopt Common LHD and remote-controlled scraper to work in coordination with ore removal, unit goaf primary filling subsequently, and adopt next segmentation on being and leave rock drilling space, so circulate, until a whole step stope mining is complete.
2. upright opening according to claim 1 and lateral aperture work in coordination with the mechanization sublevel cut and fill method of back production, it is characterized in that: two of upright opening and lateral aperture two back production regions help profile to be controlled by vertical pre-ceasma onepull, and vertical pre-ceasma detonates with vertical Luo Kuang hole homogeneous simultaneously.
CN201410257493.7A 2014-06-11 2014-06-11 Upright opening and lateral aperture work in coordination with the mechanization sublevel cut and fill method of back production Expired - Fee Related CN103982185B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410257493.7A CN103982185B (en) 2014-06-11 2014-06-11 Upright opening and lateral aperture work in coordination with the mechanization sublevel cut and fill method of back production

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410257493.7A CN103982185B (en) 2014-06-11 2014-06-11 Upright opening and lateral aperture work in coordination with the mechanization sublevel cut and fill method of back production

Publications (2)

Publication Number Publication Date
CN103982185A CN103982185A (en) 2014-08-13
CN103982185B true CN103982185B (en) 2016-01-13

Family

ID=51274327

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410257493.7A Expired - Fee Related CN103982185B (en) 2014-06-11 2014-06-11 Upright opening and lateral aperture work in coordination with the mechanization sublevel cut and fill method of back production

Country Status (1)

Country Link
CN (1) CN103982185B (en)

Families Citing this family (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106869931B (en) * 2017-02-14 2019-09-20 广西高峰矿业有限责任公司 A kind of barren rock and cementing layering wedging mining with stowing technique and its structure
CN111550248B (en) * 2020-05-20 2021-06-01 长沙矿山研究院有限责任公司 Pre-roof-protecting sublevel open-stoping subsequent filling mining method
CN112012744A (en) * 2020-09-18 2020-12-01 陕西华源矿业有限责任公司 Comprehensive mechanized ore breaking layered filling mining method
CN114562268B (en) * 2022-02-23 2023-04-11 长沙矿山研究院有限责任公司 Partitioned unloading and sublevel filling mining method based on rhombic stoping structure

Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4309059A (en) * 1978-01-11 1982-01-05 Walsh Myles A Mining method

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
SE412623B (en) * 1978-08-03 1980-03-10 Graenges Ab PROCEDURE FOR SELECTIVE UNDERGRADUATION AND STABILIZATION OF BACKGROUND

Patent Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4309059A (en) * 1978-01-11 1982-01-05 Walsh Myles A Mining method

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
新城金矿二步矿房采矿方法优选研究;姚银佩;《矿业研究与开发》;20101031;第30卷(第5期);第6-8页,图1-3 *
机械化盘区上向分层充填采矿法试验研究;赵国彦;《金属矿山》;19990630(第276期);第1-4页,图1 *

Also Published As

Publication number Publication date
CN103982185A (en) 2014-08-13

Similar Documents

Publication Publication Date Title
CN104806244B (en) Filling mining method for slant middle-thick ore body
CN108661646B (en) False roof pillar type shrinkage and post filling mining method
CN102619513B (en) Room and pillar type medium-length hole filling mining method using bottom ore withdrawal structures simultaneously arranged in original rock
CN101338674B (en) Non-pillar sublevel caving mining method for direct loading for ore
CN108612530A (en) A kind of mining methods of upper disk rock crusher slant middle thick orebody
CN107829742B (en) Caving-filling-open stope-caving mining method
CN102953732A (en) Room-and-pillar major-diameter longhole inverted-step-like segmented lateral caving subsequent filling mining method
CN102168579A (en) Rib-pillar-free continuous sublevel filling method for mining preparation in medium-thickness slope crushed ore body vein
CN104481543B (en) Stage shrink caved stopes
CN105041314A (en) Method for united mining of deep subsequent stoping chamber and layered stoping jamb
CN104847352A (en) Chamber and overhand cut combined cut-and-filling stoping method in pre-roof-protecting stage
CN111828007B (en) Stoping method for residual studs in underground mine goaf
CN103590831A (en) Novel mining method of gently-inclined thin and medium thickness ore bodies
CN102635356A (en) Medium-length hole mining method in multiple blasting free faces of high dipping thin veins
CN1982649A (en) Mining method
CN103032070A (en) Boundary-controlled room column type sublevel open stoping subsequent stage filling mining method
CN106121643A (en) The reserved retaining wall ore deposit two step nesting combination method of mining by the way of filling
CN104153780A (en) Sublevel caving shrinkage continuous recovery process for thin ore body
CN110043263B (en) Zone pre-control roof-based medium-deep hole reinforcement mining method for gently-inclined broken ore deposit
CN103075156A (en) Chessboard chamber pre-protection top upward middle-length hole ore-breaking segmented filling mining method
CN103982185B (en) Upright opening and lateral aperture work in coordination with the mechanization sublevel cut and fill method of back production
CN111706328B (en) Mining method for treating goaf left pillars by filling method
CN103089267A (en) Thin-ore-body shallow hole shrinkage method without sill pillar
CN104453900A (en) Filling mining method of near-horizontal ore body
CN111997617B (en) Zonal upward layered filling mining method for medium-thickness steeply-inclined extremely-crushed ore body

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20160113

Termination date: 20200611