CN103981808A - 大型钢箱梁高胎位总拼装暨步履式顶推施工方法及步履式顶推设备 - Google Patents

大型钢箱梁高胎位总拼装暨步履式顶推施工方法及步履式顶推设备 Download PDF

Info

Publication number
CN103981808A
CN103981808A CN201410206519.5A CN201410206519A CN103981808A CN 103981808 A CN103981808 A CN 103981808A CN 201410206519 A CN201410206519 A CN 201410206519A CN 103981808 A CN103981808 A CN 103981808A
Authority
CN
China
Prior art keywords
bridge
pushing tow
pushing
walking
steel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201410206519.5A
Other languages
English (en)
Inventor
刘召宁
卢保会
彭飞
曹伟
崔文科
刘飞
赵丽红
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CRBBG Tycoon Industrial Development Co Ltd
Original Assignee
CRBBG Tycoon Industrial Development Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CRBBG Tycoon Industrial Development Co Ltd filed Critical CRBBG Tycoon Industrial Development Co Ltd
Priority to CN201410206519.5A priority Critical patent/CN103981808A/zh
Publication of CN103981808A publication Critical patent/CN103981808A/zh
Pending legal-status Critical Current

Links

Abstract

本发明目提出一种在内陆大断面钢箱梁建设中大型钢箱梁高胎位总拼装暨步履式顶推施工方法,根据工程的特征和现场情况,在桥址一端或两端设置与桥墩基本等高的钢箱梁总装平台,在平台内及沿桥梁前进方向设置步履式顶推设备安装临时墩以及在钢梁前端设计导梁;钢梁板单元运输到桥位现场后拼装成设计断面,安装顶推设备和导梁,向另一端或桥梁中心顶推,全桥采用逐步拼装逐步顶推实现安装架设;所述顶推步骤是先将主桥整体顶升托起;然后顶推平移油缸向前推送一个行程,之后将主桥整体下降置于临时垫梁上;顶推平移油缸再缩缸到底,完成一个行程的顶推;继续进行下一个循环,通过往复顶推步骤,最终将钢桥顶推到预定的位置。

Description

大型钢箱梁高胎位总拼装暨步履式顶推施工方法及步履式顶推设备
技术领域
本发明属于钢桥梁安装工程,涉及范围为大型桥梁跨既有线、跨河安装施工。
背景技术
随着道路建设的快速发展及着眼未来考虑,道路设计的时速、桥梁的宽度愈来愈大,过去在大江大河上才采用的大断面钢箱梁在内陆道路建成中已相继出现,且以跨既有铁路、公路或河流居多,在城市道路中该桥很多时候为标志性建筑。
大断面钢箱梁设置在大江大河上可以在江边或海边建设工厂,加工成200~300吨整体段,采用船舶运输,浮吊提升架设,但在内陆大型钢箱梁建设就不可能有跨江河安装的优势,所以急待有新的工艺方法满足此类桥梁的安装架设。
发明内容
本发明目的是提出一种在内陆大断面钢箱梁建设中,无法采用水路运输或可以运输但在跨既有铁路、公路或河流无法采用膺架法及别的安装方法的情况下,采用高胎位总拼装暨步履式顶推施工技术完成钢箱梁安装架设。
大型钢箱梁高胎位总拼装暨步履式顶推施工方法,其特征是根据工程的特征和现场情况,在桥址一端或两端设置与桥墩基本等高的钢箱梁总装平台,在平台内及沿桥梁前进方向设置步履式顶推设备安装临时墩以及在钢梁前端设计导梁;钢梁板单元运输到桥位现场后拼装成设计断面,安装顶推设备和导梁,向另一端或桥梁中心顶推,全桥采用逐步拼装逐步顶推实现安装架设;所述顶推步骤是先将主桥整体顶升托起;然后顶推平移油缸向前推送一个行程,之后将主桥整体下降置于临时垫梁上;顶推平移油缸再缩缸到底,完成一个行程的顶推;继续进行下一个循环,通过往复顶推步骤,最终将钢桥顶推到预定的位置。
实现所述方法的步履式顶推设备,其由一套带支撑顶升油缸、顶推平移油缸、横向调整油缸的机械结构系统,利用液压泵站的驱动来实现顶推。
本发明具有以下有益效果:
1、钢箱梁高胎位总拼装暨步履式顶推施工技术是钢梁制作及安装方法的一次创新,对内陆钢箱梁跨既有铁路、公路或河流安装架设起到积极的推动作用。
2、步履式顶推滑动摩擦全部是在顶推设备内部进行的,临时墩不受水平载荷,基础要求较低,施工成本相对较低。
3、多点推进,钢箱梁受力均匀,结构破坏机率小,安全程度高。
4、钢箱梁横向偏差通过顶推设备调整,无需其余横向纠偏措施,施工方便。
附图及附图说明:
图1顶推施工总布置示意图
图2顶推过程流程示意图,其中图2-1、2-2、2-3、2-4、2-5分别为步骤1-5示意图。
根据工程的特征和现场情况,在桥址一端或两端设置与桥墩基本等高的钢箱梁总装平台,依据力学计算在平台内及沿桥梁前进方向设置顶推设备安装临时墩以及在钢梁前端设计导梁。钢梁板单元运输到桥位现场后拼装成设计断面,安装顶推设备和导梁,向另一端或桥梁中心顶推,全桥采用逐步拼装逐步顶推实现安装架设。顶推采用步履式顶推设备。
1、顶推设备简介:整套设备集顶升、平移、横向调整于一体具有顶升、平移、横向调整功能,可实现钢桥梁竖向、顺桥向、横桥向的移动或调整。该套顶推设备主要由一套带支撑顶升油缸、顶推平移油缸、横向调整油缸的机械结构系统,利用液压泵站的驱动来实现顶推。该设备利用“顶”“推”“降”“缩”的四个步骤交替进行,先将主桥整体顶升托起;然后顶推平移油缸向前推送一个行程,之后将主桥整体下降置于临时垫梁上;顶推平移油缸再缩缸到底,完成一个行程的顶推;继续进行下一个循环,通过往复顶推步骤,最终将钢桥顶推到预定的位置。
施工步骤:
2、根据桥梁特征设计施工拼装胎架、临时墩及其基础,设计导梁及顶推流程图。
3、基础施工,临时胎架制作和安装,顶推设备就位。
4、钢梁整体拼装并焊接成形。
5、安装导梁,设备调试,钢梁顶推。
顶推步骤:
步骤1:顶推准备,顶推设备顶部低于钢箱梁底100mm,顶推平移油缸前进轴外露350mm。
步骤2:支撑油缸工作,顶推设备向上顶起200mm,将钢箱梁抬高100mm。
步骤3:顶推油缸工作,顶推梁往前移动350mm。
步骤4:支撑油缸工作,顶推设备降下200mm,将钢箱梁放置于垫梁上。
步骤5:顶推油缸工作,顶推设备后退350mm,从而回到步骤1的状态。
重复步骤1~5实现往复顶推,以上顶推流程如图2所示。
6、拼装后续钢梁并按设计流程进行顶推施工,直至钢梁顶推到位。
7、纠正纵横向偏差,逐步落梁,完成架设。

Claims (3)

1.大型钢箱梁高胎位总拼装暨步履式顶推施工方法,其特征是根据工程的特征和现场情况,在桥址一端或两端设置与桥墩基本等高的钢箱梁总装平台,在平台内及沿桥梁前进方向设置步履式顶推设备安装临时墩以及在钢梁前端设计导梁;钢梁板单元运输到桥位现场后拼装成设计断面,安装顶推设备和导梁,向另一端或桥梁中心顶推,全桥采用逐步拼装逐步顶推实现安装架设;所述顶推步骤是先将主桥整体顶升托起;然后顶推平移油缸向前推送一个行程,之后将主桥整体下降置于临时垫梁上;顶推平移油缸再缩缸到底,完成一个行程的顶推;继续进行下一个循环,通过往复顶推步骤,最终将钢桥顶推到预定的位置。
2.根据权利要求1所述的大型钢箱梁高胎位总拼装暨步履式顶推施工方法,其特征是按照如下步骤实施:
(1)根据桥梁特征设计施工拼装胎架、临时墩及其基础,设计导梁及顶推流程图;
(2)基础施工,临时胎架制作和安装,顶推设备就位;
(3)钢梁整体拼装并焊接成形;
(4)安装导梁,设备调试,钢梁顶推;并且顶推步骤为:
步骤1:顶推准备,顶推设备顶部低于钢箱梁底100mm,顶推平移油缸前进轴外露350mm;
步骤2:支撑油缸工作,顶推设备向上顶起200mm,将钢箱梁抬高100mm;
步骤3:顶推油缸工作,顶推梁往前移动350mm;
步骤4:支撑油缸工作,顶推设备降下200mm,将钢箱梁放置于垫梁上;
步骤5:顶推油缸工作,顶推设备后退350mm,从而回到步骤1的状态;
重复步骤1~5实现往复顶推。
(5)拼装后续钢梁并按设计流程进行顶推施工,直至钢梁顶推到位;
(6)纠正纵横向偏差,逐步落梁,完成架设。
3.实现如权利要求1或2所述方法的步履式顶推设备,其特征是它由一套带支撑顶升油缸、顶推平移油缸、横向调整油缸的机械结构系统,利用液压泵站的驱动来实现顶推。
CN201410206519.5A 2014-05-15 2014-05-15 大型钢箱梁高胎位总拼装暨步履式顶推施工方法及步履式顶推设备 Pending CN103981808A (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410206519.5A CN103981808A (zh) 2014-05-15 2014-05-15 大型钢箱梁高胎位总拼装暨步履式顶推施工方法及步履式顶推设备

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410206519.5A CN103981808A (zh) 2014-05-15 2014-05-15 大型钢箱梁高胎位总拼装暨步履式顶推施工方法及步履式顶推设备

Publications (1)

Publication Number Publication Date
CN103981808A true CN103981808A (zh) 2014-08-13

Family

ID=51273963

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410206519.5A Pending CN103981808A (zh) 2014-05-15 2014-05-15 大型钢箱梁高胎位总拼装暨步履式顶推施工方法及步履式顶推设备

Country Status (1)

Country Link
CN (1) CN103981808A (zh)

Cited By (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104179127A (zh) * 2014-09-03 2014-12-03 长沙理工大学 顶推变曲率竖曲线梁支点标高确定方法
CN104631325A (zh) * 2014-12-22 2015-05-20 盈都桥梁钢构工程有限公司 一种高架桥的单跨钢箱梁顶推方法
CN105350457A (zh) * 2015-11-13 2016-02-24 中铁大桥局集团第一工程有限公司 一种桥梁步履式顶推施工中钢槽梁落梁的方法
CN106087747A (zh) * 2016-06-17 2016-11-09 柳州黔桥工程材料有限公司 步履顶推施工纠偏方法
CN106894346A (zh) * 2017-04-28 2017-06-27 山西省交通科学研究院 一种连续梁桥施工方法
CN107244388A (zh) * 2017-05-17 2017-10-13 中铁十九局集团有限公司 用于安装钢梁的浮拖船以及桥梁架设系统、方法
CN107761568A (zh) * 2017-09-09 2018-03-06 湖南金海集团有限公司 一种利用气囊载运的钢结构桥梁安装方法
CN107841957A (zh) * 2017-12-25 2018-03-27 中铁二局第五工程有限公司 一种大吨位钢箱梁顶推装置、顶推系统及顶推方法
CN108221710A (zh) * 2018-02-13 2018-06-29 上海工程技术大学 一种可自动调整梁底标高的桥梁顶推施工设备
CN108457188A (zh) * 2018-01-16 2018-08-28 闫相明 一种步履式多点同步顶推施工工法
CN108867316A (zh) * 2018-07-18 2018-11-23 中交第三航务工程局有限公司 独塔自锚式悬索桥大跨度钢箱梁步履式顶推施工工艺
CN109518604A (zh) * 2018-07-23 2019-03-26 中铁重工有限公司 一种用于大曲率钢箱梁顶推施工方法
CN111155446A (zh) * 2020-01-18 2020-05-15 中交二航局第四工程有限公司 一种桥梁梁体无轨道滑移系统及其施工方法

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100719305B1 (ko) * 2005-01-21 2007-05-18 박순근 교량의 프리스트레스 콘크리트 빔 시공방법
CN103266566A (zh) * 2013-04-24 2013-08-28 中交武汉港湾工程设计研究院有限公司 一种步履式连续顶推系统及施工方法

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100719305B1 (ko) * 2005-01-21 2007-05-18 박순근 교량의 프리스트레스 콘크리트 빔 시공방법
CN103266566A (zh) * 2013-04-24 2013-08-28 中交武汉港湾工程设计研究院有限公司 一种步履式连续顶推系统及施工方法

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
刘召宁: "大型钢箱梁高胎位总拼装暨步履式顶推施工技术", 《钢结构》, vol. 28, no. 11, 31 December 2013 (2013-12-31) *
檀兴华等: "九堡大桥钢槽梁顶推施工方法研究", 《公路》, no. 6, 30 June 2010 (2010-06-30) *

Cited By (16)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104179127B (zh) * 2014-09-03 2016-01-20 长沙理工大学 顶推变曲率竖曲线梁支点标高确定方法
CN104179127A (zh) * 2014-09-03 2014-12-03 长沙理工大学 顶推变曲率竖曲线梁支点标高确定方法
CN104631325A (zh) * 2014-12-22 2015-05-20 盈都桥梁钢构工程有限公司 一种高架桥的单跨钢箱梁顶推方法
CN105350457A (zh) * 2015-11-13 2016-02-24 中铁大桥局集团第一工程有限公司 一种桥梁步履式顶推施工中钢槽梁落梁的方法
CN106087747A (zh) * 2016-06-17 2016-11-09 柳州黔桥工程材料有限公司 步履顶推施工纠偏方法
CN106894346A (zh) * 2017-04-28 2017-06-27 山西省交通科学研究院 一种连续梁桥施工方法
CN107244388A (zh) * 2017-05-17 2017-10-13 中铁十九局集团有限公司 用于安装钢梁的浮拖船以及桥梁架设系统、方法
CN107761568B (zh) * 2017-09-09 2019-09-17 湖南金海集团有限公司 一种利用气囊载运的钢结构桥梁安装方法
CN107761568A (zh) * 2017-09-09 2018-03-06 湖南金海集团有限公司 一种利用气囊载运的钢结构桥梁安装方法
CN107841957A (zh) * 2017-12-25 2018-03-27 中铁二局第五工程有限公司 一种大吨位钢箱梁顶推装置、顶推系统及顶推方法
CN108457188A (zh) * 2018-01-16 2018-08-28 闫相明 一种步履式多点同步顶推施工工法
CN108457188B (zh) * 2018-01-16 2019-09-20 闫相明 一种步履式多点同步顶推施工工法
CN108221710A (zh) * 2018-02-13 2018-06-29 上海工程技术大学 一种可自动调整梁底标高的桥梁顶推施工设备
CN108867316A (zh) * 2018-07-18 2018-11-23 中交第三航务工程局有限公司 独塔自锚式悬索桥大跨度钢箱梁步履式顶推施工工艺
CN109518604A (zh) * 2018-07-23 2019-03-26 中铁重工有限公司 一种用于大曲率钢箱梁顶推施工方法
CN111155446A (zh) * 2020-01-18 2020-05-15 中交二航局第四工程有限公司 一种桥梁梁体无轨道滑移系统及其施工方法

Similar Documents

Publication Publication Date Title
CN103981808A (zh) 大型钢箱梁高胎位总拼装暨步履式顶推施工方法及步履式顶推设备
CN102587281A (zh) 步履式多点顶推施工方法
CN103266566A (zh) 一种步履式连续顶推系统及施工方法
CN103993560B (zh) 大跨度钢混结合梁步履式顶推施工方法及装置
CN202492807U (zh) 钢箱梁步履式多点顶推施工系统
CN204266134U (zh) 重载大跨度钢桁梁步履式顶推装置
CN105274942A (zh) 大跨度连续钢桁梁多点同步自动循环交替滑靴顶推系统及其施工方法
CN102587291A (zh) 一种钢箱梁步履式多点顶推施工方法及施工系统
CN101761032A (zh) 一种桥梁顶推架设设备
CN105603881A (zh) 一种大型跨海拱桥的整体架设系统及其施工方法
CN108265618B (zh) 一种高架桥柱墩基础地下逆向增层施工方法
CN205399220U (zh) 一种大型跨海拱桥的整体架设系统
CN103938880A (zh) 大跨度异形空间网格管桁架整体滑移施工方法
CN103774558A (zh) 一种用于桥梁施工的自动走行式移动模架
CN103774543A (zh) 一种上乘式索拱组合结构桥
CN110172922B (zh) 一种环境友好型下行自行式钢栈桥结构施工方法
CN108999427B (zh) 一种建筑物迁移就位时移动荷载的支撑结构及其施工方法
CN201560397U (zh) 用于钢箱梁精确定位安装的全支架
CN105293322A (zh) 一种轧机牌坊吊装方法
CN104314009A (zh) 大节段提升机构及使用方法
CN203716044U (zh) 一种下承或中承式索拱组合结构桥
CN205276140U (zh) 大跨度连续钢桁梁多点同步自动循环交替滑靴顶推系统
RU165497U1 (ru) Сборное плитно-балочное пролетное строение автодорожного моста
RU180628U1 (ru) Консольный кран для установки плоской опоры металлической эстакады
CN203741729U (zh) 一种用于桥梁顶推施工的预应力支撑系统

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C12 Rejection of a patent application after its publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20140813