CN103981308A - 一种钒钛矿冶炼高炉的装料新方法 - Google Patents

一种钒钛矿冶炼高炉的装料新方法 Download PDF

Info

Publication number
CN103981308A
CN103981308A CN201410124674.2A CN201410124674A CN103981308A CN 103981308 A CN103981308 A CN 103981308A CN 201410124674 A CN201410124674 A CN 201410124674A CN 103981308 A CN103981308 A CN 103981308A
Authority
CN
China
Prior art keywords
coke
add
ore
angle
blast furnace
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201410124674.2A
Other languages
English (en)
Other versions
CN103981308B (zh
Inventor
王宁
季书民
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Xinjiang Bayi Iron and Steel Co Ltd
Original Assignee
Baosteel Group Xinjiang Bayi Iron and Steel Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Baosteel Group Xinjiang Bayi Iron and Steel Co Ltd filed Critical Baosteel Group Xinjiang Bayi Iron and Steel Co Ltd
Priority to CN201410124674.2A priority Critical patent/CN103981308B/zh
Publication of CN103981308A publication Critical patent/CN103981308A/zh
Application granted granted Critical
Publication of CN103981308B publication Critical patent/CN103981308B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Manufacture Of Iron (AREA)

Abstract

本发明提供的一种钒钛矿冶炼高炉的装料新方法,430m3高炉的炉内矿石与焦炭采用双环布料,即每批料先按两个角度加完矿石后按两个角度加完加焦炭,再加中心焦的模式;其中矿石与焦炭布料α角取27°、33°,角差αΔ固定控制在6°;在矿石、焦炭双环投料循环5次后,随后加入中心焦炭,其加入量为5次循环加入焦炭总量的1/5,中心加入焦炭时,按照α=16°β角旋转2-3圈加入。该高炉的矿石、焦炭、中心焦经称量筛分后,加入料车送往炉顶布料器,然后加入炉内。

Description

一种钒钛矿冶炼高炉的装料新方法
技术领域
本发明涉及高炉冶炼技术,尤其适应钒钛矿冶炼,该方法对高炉的产量、焦比起决定性的作用。
背景技术
高炉布料指高炉炼铁过程中,炉料(矿石和焦炭)在高炉炉喉的分布,高炉布料的基本规律是高炉冶炼工艺理论的重要组成部分,控制高炉布料是高炉操作的一个重要手段,习惯上称之为“上部调剂”。通常高炉炉料是分批装入高炉炉喉的,根据经验确定一批料的矿石量与按焦炭负荷确定的批料焦炭量组成料批,通过布料设备双钟或旋转布料器装入炉喉,从炉体纵剖面上看,矿石与焦炭呈分层重叠结构,煤气在高炉下部产生,而后上升穿过料层;炉料从上部下降与煤气作用,完成加热、还原、造渣、熔化等冶炼过程。
高炉布料方法的原则是保证煤气合理分布,充分煤气的热能和化学能,保证高炉顺行,在钒钛矿冶炼的条件下,高炉顺行就显得尤其重要,高炉布料对高炉的稳定顺行及煤气利用起关键的作用,也即对高炉的技术经济指标,产量、焦比有决定性的作用,但是以上装料制度以及单纯的多环布料方法在钒钛矿生产过程中均具有其局限性,比如,煤气流调整困难,中心煤气流不够发展,炉缸工作不均匀活跃,冷却壁易烧坏,煤气中的CO2含量偏低,通过高炉中修停炉发现炉缸象脚侵蚀严重,说明中心气流不畅,钒钛矿冶炼沿用原有布料方式已不能适应现有的原料条件。
本发明的高炉布料方法,有效实现发展中心,稳定边缘,保证两道气流稳定,使高炉中心保持一定的温度,控制焦炭堆积数量,维持良好的透液性和透气性,有利于下部调剂,选择合适的鼓风动能,使回旋区形状和大小适宜,达到均匀活跃炉缸的目的,为企业的节能降耗起到了示范作用。
发明内容
本发明的目的在于:采用矿焦双环布料结合中心加焦的布料方式,节约能源,降低生产成本。
本发明的目的是这样实现的:一种钒钛矿冶炼高炉的装料新方法,用430m3高炉,炉内矿石与焦炭采用双环布料,即每批料先按两个角度加完矿石后按两个角度加完加焦炭,再加中心焦的模式:
其中P表示为矿石,K表示为焦炭,n表示为α角旋转圈数,33、27、16分别表示为α角;3、4分别表示为α角的旋转圈数;箭头表示布料器的节流阀关闭。
分步操作如下:
1)控制两车矿石加完时的溜槽旋转圈数在10-12圈,先按照α=33°β角旋转4圈加入,之后剩余矿石按照α=27°β角旋转n圈加入,n=6-8圈;两车矿石加完,即加入两车焦炭,控制两车焦炭加完时的溜槽旋转圈数在8-10圈,两车焦炭按照α=33°β角旋转3圈加入,之后剩余焦炭按照α=27°β角旋转n圈加入,n=5-7圈;在矿石、焦炭双环投料循环5次后,随后加入中心焦炭,其加入量为5次循环加入焦炭总量的1/5,中心加入焦炭时,按照α=16°β角旋转n圈加入,n=2-3圈;
2)高炉径向矿石和焦炭的厚度比为常数,确定炉喉焦炭层的厚度为400-450mm,即得出每批料中矿石的加入量为11.5-12t,综合负荷控制在3.0-3.05t;其中综合负荷中焦炭的总量为每批焦炭的量与中心1批焦炭的1/5的和,每批矿石的加入量为每批焦炭的量*综合负荷;
3)布料器溜槽在布矿石和焦炭时的倾角差αΔCO为1°以内;
4)双环布料时相邻环之间布料器溜槽倾角差αΔ为5°-6°。
本发明采用的高炉无钟炉顶布料技术,采用双环布料结合中心加焦的布料方式,中心加焦的焦炭量占入炉焦炭总量的1/5,布料器布料时溜槽倾角随着布料环数的改变而改变,当角差αΔ固定控制在6°,α角取27°、33°组时指标最优;以上操作保持了炉况顺行,使煤气中的CO2含量提高1%以上,完全满足了钒钛矿冶炼的物理“热”、化学“凉”需求,确保了高炉的炉温稳定,降低生产成本,彰显技术进步。
附图说明
本发明结合附图作进一步说明。
附图为炉内矿石与焦炭分层添加与中心加焦的示意图;
如图所示:1-溜槽、2-矿石、3-焦炭、4-中心焦炭。
具体实施方式
本发明结合实施例作进一步说明。
实施例
选用的高炉容积为430m3
采用矿、焦双环布料,即两个角度布料,与正分装,即每批料先加矿石后加焦炭,再加中心焦的模式:
其中矿石为P、焦炭为K、n为α角旋转圈数、33、27分别为α角;3、4分别表示为α角的旋转圈数;箭头向下表示放完料后布料器的节流阀处于关闭状态。
1)控制两车矿石加完时的溜槽旋转圈数在11圈,先按照α=33°β角旋转4圈加入,之后剩余矿石按照α=27°β角旋转7圈加入,两车矿石加完后,加入两车焦炭,控制两车焦炭加完时的溜槽旋转圈数在9圈,两车焦炭按照α=33°β角旋转3圈加入,之后剩余焦炭按照α=27°β角旋转6圈加入;在双环布料矿石、焦炭投加循环5次后,集中加入1批净焦炭,即为中心焦炭,中心焦炭的加入量仅为双环5次加入焦炭总量的1/5,中心焦炭按照α=16°β角旋转3圈加入。
2)当沿高炉径向矿石和焦炭的厚度比为常数时,确定炉喉焦炭层厚度为450mm,即得出每批料矿石量为12t,综合负荷控制在3.05t,综合负荷中焦炭的总量为每批焦炭的量与中心1批焦炭的1/5的和,每批矿石的加入量:每批焦炭的量*综合负荷。
3)布料器溜槽在布矿石和焦炭时的倾角差αΔCO为1°以内。
4)出现低料线时,布料器布料时溜槽倾角随着布料环数的改变而改变,开始布料的倾角α控制在25°。
5)双环布料时相邻环之间布料器溜槽倾角差αΔ为6°。
6)当出现低料线为500mm时,停止使用此布料模式,根据料线的深浅布料选择为单环布料模式,即矿,焦均选取同一角度进行加料,待料线正常后再恢复此布料模式。
7)矿石、焦炭、中心焦是根据配料料单中由每组矿石、焦炭称量筛分后加入料车,送往炉顶,由布料器加入炉内;α角的设定按照配料单中给定角度编入自动加料程序中,在实际操作中α角的设定可根据实际矿石焦炭的粒度变化进行微调(调整范围在0.5°之内)。
本发明方法的效果验证:
以上操作能保持高炉炉况顺行,使煤气中的CO2含量提高1%以上,炉况顺行后每吨铁焦比降低10kg,同时高炉顺行,降低焦比后,确保了高炉炉温稳定,其中铁水中[Si]控制在0.40-0.60%,[Si]+[Ti]控制在0.55-0.75%,铁水物理温度能控制在1350-1400℃,既节约能源又降低生产成本。

Claims (3)

1.一种钒钛矿冶炼高炉的装料新方法,其特征在于: 430m3容积的高炉内矿石与焦炭采用双环布料,即每批料先按两个角度加完矿石后按两个角度加完加焦炭,再加中心焦的模式:
,其中P示为矿石、K示为焦炭、n 示为α角旋转圈数 、33、27分别示为α角;3、4分别示为β角的旋转圈数;箭头表示布料器的节流阀关闭;
分步操作如下:
1)控制两车矿石加完时的溜槽旋转圈数在10-12圈,先按照α=33°β角旋转4圈加入,之后剩余矿石按照α=27°β角旋转n圈加入, n=6-8圈;两车矿石加完,即加入两车焦炭,控制两车焦炭加完时的溜槽旋转圈数在8-10圈,两车焦炭按照α=33°β角旋转3圈加入,之后剩余焦炭按照α=27°β角旋转n圈加入,n=5-7圈;在矿石、焦炭双环投料循环5次后,随后加入中心焦炭,其加入量为5次循环加入焦炭总量的1/5,中心加入焦炭时,按照α=16°β角旋转n圈加入,n =2-3圈;
2)当高炉径向矿石和焦炭的厚度比为常数时,确定炉喉焦炭层的厚度为400-450mm,即得出每批料中矿石的加入量为11.5-12t,综合负荷控制在3.0-3.05 t;其中综合负荷中焦炭的总量为每批焦炭的量与中心1批焦炭的1/5的和,每批矿石的加入量为每批焦炭的量*综合负荷;
3)布料器溜槽在布矿石和焦炭时的倾角差αΔCO为1°以内;
4)双环布料时相邻环之间布料器溜槽倾角差αΔ为5°-6°。
2.依据权利要求1所述新方法,其特征在于:当料线低于500mm时,停止使用此布料模式,先采用矿、焦的同一角度布料,待料线正常后,再恢复此布料模式。
3.依据权利要求1所述新方法,其特征在于:该高炉的矿石、焦炭、中心焦经称量筛分,加入料车送往炉顶布料器中布料,然后加入炉内。
CN201410124674.2A 2014-03-28 2014-03-28 一种钒钛矿冶炼高炉的装料新方法 Active CN103981308B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410124674.2A CN103981308B (zh) 2014-03-28 2014-03-28 一种钒钛矿冶炼高炉的装料新方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410124674.2A CN103981308B (zh) 2014-03-28 2014-03-28 一种钒钛矿冶炼高炉的装料新方法

Publications (2)

Publication Number Publication Date
CN103981308A true CN103981308A (zh) 2014-08-13
CN103981308B CN103981308B (zh) 2015-12-02

Family

ID=51273479

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410124674.2A Active CN103981308B (zh) 2014-03-28 2014-03-28 一种钒钛矿冶炼高炉的装料新方法

Country Status (1)

Country Link
CN (1) CN103981308B (zh)

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106636504A (zh) * 2016-11-11 2017-05-10 攀钢集团西昌钢钒有限公司 提高钒钛矿高炉煤气利用率的方法
CN108959760A (zh) * 2018-06-29 2018-12-07 首钢京唐钢铁联合有限责任公司 一种跳跃式中间加焦布料的方法及装置
CN111020088A (zh) * 2019-12-23 2020-04-17 攀钢集团西昌钢钒有限公司 一种提高钒钛矿冶炼高炉冷却壁寿命的方法
CN111172336A (zh) * 2018-11-09 2020-05-19 新疆八一钢铁股份有限公司 一种改进的钒钛矿冶炼高炉布料方法
CN111455119A (zh) * 2020-04-07 2020-07-28 攀钢集团攀枝花钢钒有限公司 用于高炉冶炼的中心引火方法
CN111635970A (zh) * 2020-06-12 2020-09-08 武钢集团昆明钢铁股份有限公司 一种高炉中钛渣的强化冶炼方法
CN113930559A (zh) * 2021-10-15 2022-01-14 本溪北营钢铁(集团)股份有限公司 一种高炉焦炭分等级入炉的新型布料方法
CN114959133A (zh) * 2022-05-27 2022-08-30 武汉钢铁有限公司 一种取消高炉中心加焦的布料方法

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2000204406A (ja) * 1998-01-23 2000-07-25 Nippon Steel Corp 高炉における炉中心部への装入物装入方法
CN101250602A (zh) * 2008-03-20 2008-08-27 重庆钢铁(集团)有限责任公司 高炉溜槽多环布料方法
CN101880739A (zh) * 2010-06-02 2010-11-10 首钢总公司 高炉无钟炉顶多环矩阵布料中心加焦方法
CN102994670A (zh) * 2012-10-29 2013-03-27 首钢京唐钢铁联合有限责任公司 高炉布料方法
CN103468844A (zh) * 2013-09-30 2013-12-25 攀钢集团攀枝花钢钒有限公司 高炉冶炼钒钛磁铁矿的方法

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2000204406A (ja) * 1998-01-23 2000-07-25 Nippon Steel Corp 高炉における炉中心部への装入物装入方法
JP3787238B2 (ja) * 1998-01-23 2006-06-21 新日本製鐵株式会社 高炉における炉中心部への装入物装入方法
CN101250602A (zh) * 2008-03-20 2008-08-27 重庆钢铁(集团)有限责任公司 高炉溜槽多环布料方法
CN101880739A (zh) * 2010-06-02 2010-11-10 首钢总公司 高炉无钟炉顶多环矩阵布料中心加焦方法
CN102994670A (zh) * 2012-10-29 2013-03-27 首钢京唐钢铁联合有限责任公司 高炉布料方法
CN103468844A (zh) * 2013-09-30 2013-12-25 攀钢集团攀枝花钢钒有限公司 高炉冶炼钒钛磁铁矿的方法

Non-Patent Citations (3)

* Cited by examiner, † Cited by third party
Title
付卫国等: "攀钢四高炉无钟炉顶多环布料试验研究", 《钢铁钒钛》, vol. 17, no. 1, 31 March 1996 (1996-03-31), pages 1 - 7 *
杜鹤桂等: "攀钢高炉炉顶布料模型的研究", 《钢铁钒钛》, no. 3, 31 December 1987 (1987-12-31), pages 14 - 20 *
车奎生: "大负角差多环布料在承德建龙钒钛矿冶炼炉型失常高炉上的成功运用", 《2012年全国炼铁原料技术创新与烧结低温余热利用技术研讨会 会议论文集》, 31 December 2012 (2012-12-31), pages 149 - 152 *

Cited By (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106636504A (zh) * 2016-11-11 2017-05-10 攀钢集团西昌钢钒有限公司 提高钒钛矿高炉煤气利用率的方法
CN108959760A (zh) * 2018-06-29 2018-12-07 首钢京唐钢铁联合有限责任公司 一种跳跃式中间加焦布料的方法及装置
CN108959760B (zh) * 2018-06-29 2023-04-07 首钢京唐钢铁联合有限责任公司 一种跳跃式中间加焦布料的方法及装置
CN111172336A (zh) * 2018-11-09 2020-05-19 新疆八一钢铁股份有限公司 一种改进的钒钛矿冶炼高炉布料方法
CN111020088A (zh) * 2019-12-23 2020-04-17 攀钢集团西昌钢钒有限公司 一种提高钒钛矿冶炼高炉冷却壁寿命的方法
CN111020088B (zh) * 2019-12-23 2021-08-13 攀钢集团西昌钢钒有限公司 一种提高钒钛矿冶炼高炉冷却壁寿命的方法
CN111455119A (zh) * 2020-04-07 2020-07-28 攀钢集团攀枝花钢钒有限公司 用于高炉冶炼的中心引火方法
CN111635970A (zh) * 2020-06-12 2020-09-08 武钢集团昆明钢铁股份有限公司 一种高炉中钛渣的强化冶炼方法
CN111635970B (zh) * 2020-06-12 2022-02-11 武钢集团昆明钢铁股份有限公司 一种高炉中钛渣的强化冶炼方法
CN113930559A (zh) * 2021-10-15 2022-01-14 本溪北营钢铁(集团)股份有限公司 一种高炉焦炭分等级入炉的新型布料方法
CN114959133A (zh) * 2022-05-27 2022-08-30 武汉钢铁有限公司 一种取消高炉中心加焦的布料方法
CN114959133B (zh) * 2022-05-27 2023-09-22 武汉钢铁有限公司 一种取消高炉中心加焦的布料方法

Also Published As

Publication number Publication date
CN103981308B (zh) 2015-12-02

Similar Documents

Publication Publication Date Title
CN103981308B (zh) 一种钒钛矿冶炼高炉的装料新方法
CN111748667B (zh) 一种降低欧冶炉燃料比的炼铁方法
CN104556036A (zh) 制备固态电石的方法
CN101476001B (zh) 高炉冶炼中钛渣的方法
CN102102147B (zh) 链篦机回转窑生产镁质球团工艺
CN103334004B (zh) 大型烧结机配用袁家村精矿粉生产烧结矿的方法
CN102933727A (zh) 用于制备粒状金属的方法
CN104099466A (zh) 一种双层结构球团的制造方法及生产设备
CN107008914A (zh) 一种改善还原铁粉性能的还原铁粉生产工艺
CN104593585A (zh) 铬矿球团预还原直供矿热炉的系统及预还原直供方法
CN105087902A (zh) 新型球团矿的冶金方法
CN104313308A (zh) 铁矿石低炭烧结方法
CN108774683B (zh) 一种高镁复合烧结矿及其生产方法
CN111100981B (zh) 一种提高富锰渣冶炼锰烧结矿冶金性能的方法
CN102634654A (zh) 利用复合含碳球团生产金属化球团的方法及链带式焙烧机
CN111172336A (zh) 一种改进的钒钛矿冶炼高炉布料方法
CN106636627B (zh) 一种生产水泥熟料和氧化球团矿的方法
CN205772057U (zh) 一种高炉槽下排料装置
CN102021255A (zh) 无料钟高炉高比例球团矿炉料结构布料方法
CN105838839A (zh) 制备粒铁的方法和制备粒铁的系统
CN102268533A (zh) 水平移动-固定床式磁化还原焙烧工艺
CN106414778A (zh) 粒状金属铁的制造方法
CN105087913A (zh) 新型球团矿的冶金方法
CN110129499A (zh) 一种高炉添加废钢生产铁水的方法
CN106480247B (zh) 一种以热固结含碳球团作为部分炉料的高炉操作方法

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20180717

Address after: 830022 No. 1 Bayi Road, Toutun River District, Urumqi, the Xinjiang Uygur Autonomous Region

Patentee after: Xinjiang Bayi Iron & Steel Co., Ltd.

Address before: 830022 No. 1 Bayi Road, Toutun River District, Urumqi, the Xinjiang Uygur Autonomous Region

Patentee before: Baosteel Group Xinjiang Bayi Iron & Steel Co., Ltd.