CN103967539A - 核电汽轮发电机冷却器罩装配焊接的工艺方法 - Google Patents

核电汽轮发电机冷却器罩装配焊接的工艺方法 Download PDF

Info

Publication number
CN103967539A
CN103967539A CN201410228264.2A CN201410228264A CN103967539A CN 103967539 A CN103967539 A CN 103967539A CN 201410228264 A CN201410228264 A CN 201410228264A CN 103967539 A CN103967539 A CN 103967539A
Authority
CN
China
Prior art keywords
welding
cooler
plate
cooler cover
cover
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201410228264.2A
Other languages
English (en)
Other versions
CN103967539B (zh
Inventor
乔宏来
邱希亮
杜金程
杨长泳
龚彬
李滨
魏方锴
徐睦忠
关富雷
闫海滨
甘洪丰
段伟赞
刘玉兰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Harbin Electric Machinery Co Ltd
Original Assignee
Harbin Electric Machinery Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Harbin Electric Machinery Co Ltd filed Critical Harbin Electric Machinery Co Ltd
Priority to CN201410228264.2A priority Critical patent/CN103967539B/zh
Publication of CN103967539A publication Critical patent/CN103967539A/zh
Application granted granted Critical
Publication of CN103967539B publication Critical patent/CN103967539B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

本发明涉及一种核电汽轮发电机冷却器罩装配焊接的工艺方法,将励端与汽端叠装后焊接,叠装件两端采用支撑环固定,焊接完毕后拆解,将励端与汽端对装,最后装配冷却器挡板。本发明的优点在于,卧式装配工艺可以消除大型构件重力影响,提高装配精度;分段装配则有利于底板的下料并保障底板平面度;采用叠装焊接方法,可以增加焊接件的刚度,抵消焊接应力,减小焊接变形;通过支撑环的应用,可以提高叠装件的稳定性,减小焊接变形;在V型架上焊接有利于调整焊接位置,降低施焊难度,提升焊缝成型质量;将盖板和挡板同孔把合后再进行焊接装配,可以有效防止焊接变形导致把合孔错位。

Description

核电汽轮发电机冷却器罩装配焊接的工艺方法
技术领域:
本发明涉一种核电汽轮发电机冷却器罩装配焊接的工艺方法。
背景技术:
百万千瓦级核电汽轮发电机属于国内新开发的产品,其配套的冷却器是维持发电机正常运转的重要部件。相对于传统的冷却器罩,百万千瓦级核电汽轮发电机冷却器罩,体积巨大,由钢板焊接组装而成,要求其具有足够的强度和气密性,且装配焊接精度要求均较高。
目前,国外对于百万千瓦级核电汽轮发电机冷却器罩采用的装配方法是立式装配法,该方法采用将端板平置,底板立装于端板之上,其它组件也均在垂直立置的底板上组装焊接,这种装配方法需要考虑各大型组件的重力影响,对于吊装设备及吊装技术的要求较高,目前国内采用该方法时安装精度难以保证。另外,国外在分别装配冷却器罩励端与汽端部分后,进行焊接工艺时采用的是分别焊接的方法,这种方法焊接时,两端的焊接变形均难以控制,焊接完成后,两端对装也容易产生两个端面尺寸适配的问题。
发明内容:
本发明提出了一套可行的百万千瓦级核电汽轮发电机冷却器罩装配焊接方法,该方法可操作性强,能够提高装焊效率、保证装焊精度。
本发明涉及精密装配、预防焊接变形等技术问题。本发明的技术方案为:
(1)冷却器罩组件备料:冷却器罩组件包括冷却器罩组件和冷却器挡板组件,冷却器罩组件包括励端底板和汽端底板、励端端板和汽端端板、外壳、隔板、筋板、吊攀、气管,冷却器挡板组件包括挡板、盖板、筋板、螺栓、单耳止动垫圈、密封垫、支撑角钢、结构钢管;
(2)冷却器罩采用卧式装配:将冷却器罩底板吊放于平台上,平置,然后在其上装配端板、隔板、加强筋板及外皮等组件;
(3)冷却器罩采用分段装配:将冷却器罩分为励端和汽端两段分别进行装配焊接,之后再组装成整体,其步骤为:依次吊装励端底板、汽端底板、励端端板、汽端端板、隔板、筋板、气体导管、励端外皮和汽端外皮;
(4)冷却器罩两段叠装焊接,其步骤为:将励端和汽端两瓣冷却器罩叠装,两端采用支撑环固定,叠装完毕后将其置于滚轮架或V型架上,调整位置使工件尽量处于平焊或立焊位置,固定后再分别焊接,焊接完毕后将叠装件解体;
(5)冷却器罩两段对装焊接,其步骤为:将叠装焊接完毕后解体的两瓣冷却器罩对放调整,之后依次焊接中间隔板、两段冷却器罩接口焊缝、外壳与底板间未焊焊缝、两段底板间焊缝、吊攀,装配弯气管;
(6)冷却器挡板装配:挡板装配时,要求将盖板与挡板采用螺 栓把合后再进行焊接,盖板与挡板间放置防变形垫,之后依次装配焊接挡板各组件;
(7)冷却器罩整件喷砂、清理、涂漆、标识、检查,完成装配。
技术效果:
本发明是核电汽轮发电机冷却器罩装配焊接新工艺方法,兼顾了制作成本和性能要求,是核电汽轮发电机冷却器罩装配焊接工艺的开拓和创新。本发明具有以下技术优点:
1、针对百万千瓦级核电汽轮发电机冷却器罩组件尺寸及重量较大的特点,采用传统的立式装配时,其各组件的重力影响难以消除,组件间的装配精度难以保证。采用本发明提供的卧式装配工艺,可以消除装配过程中的构件重力加剧焊接收缩的程度,使得各部件吊装过程中更容易定位,有利于提高装配精度;
2、采用本发明提出的分段装配的方法,有利于底板的下料,更容易保障底板平面度;
3、采用传统方法,对汽端和励端分别进行焊接时,由于焊接应力的存在及单件刚度的不足,往往会产生不可控制的焊接变形,这种焊接变形不仅影响两瓣冷却器罩的最终尺寸精度,而且容易造成汽端和励端端面尺寸适配,进而难以完成两段对装。采用本发明提出的针对冷却器罩的叠装焊接方法,可以实现冷却器罩励端部分与汽端部分互为固定支撑,增加焊接件的刚度,实现焊接过程中的焊接应力抵消效果,进而减小焊接变形,保障装焊尺寸精度,还可以有效保障汽端与励端对装时两端面的尺寸匹配精度;
4、根据本发明技术方案,通过叠装焊接过程中支撑环的应用,可以提高汽端与励端的叠装稳定性,增加工件刚性,减小焊接变形;
5、根据本发明技术方案,通过叠装焊接过程中滚轮架或V型架的应用,可以快速调整叠装件内部各组件的焊接位置,使其始终处于平焊或立焊位置,降低施焊难度,提高焊缝成型质量;
6、在挡板装配的过程中,采用本发明提出的盖板和挡板同孔把合后再进行焊接装配的方法,可以有效防止焊接变形导致把合孔错位,降低装配难度。
附图说明
图1是核电汽轮发电机冷却器罩结构示意图
图2是核电汽轮发电机冷却器罩叠装结构示意图
图3是盖板和挡板同孔把合示意图
具体实施方式:
本发明是一种核电汽轮发电机冷却器罩装配焊接新工艺方法。本发明的具体实施方式为:
(1)冷却器罩组件备料:冷却器罩组件包括冷却器罩组件和冷却器挡板组件,冷却器罩组件包括励端底板1和汽端底板2、励端端板3和汽端端板4、励端外壳5、汽端外壳6、隔板、筋板、吊攀、气管,如图1所示;冷却器挡板组件包括挡板10、盖板11、筋板、螺栓、单耳止动垫圈、密封垫、支撑角钢、结构钢管,如图3所示;
(2)冷却器罩采用卧式装配:如图1所示,将冷却器罩励端底板1和汽端底板2吊放于平台上,平置,然后在其上装配其余组件;
(3)冷却器罩采用分段装配:将冷却器罩分为励端和汽端两段分别进行装配焊接,之后再组装成整体,其步骤为:依次吊装励端底板1、汽端底板2、励端端板3、汽端端板4、隔板、筋板、气体导管、励端外皮5和汽端外皮6;
(4)冷却器罩两段叠装焊接,如图2所示,其步骤为:将励端和汽端两瓣冷却器罩叠装,两端采用支撑环7、支撑环8固定,由于汽端长度小于励端,因此在叠装时汽端一侧加装延长筋板9,以提高固定效果,叠装完毕后将其置于滚轮架或V型架上,调整位置使工件尽量处于平焊或立焊位置,固定后再分别焊接,焊接完毕后将叠装件解体;
(5)冷却器罩两段对装焊接,如图1所示,其步骤为:将叠装焊接完毕后解体的两瓣冷却器罩对放调整,之后依次焊接中间隔板、两段冷却器罩接口焊缝、外壳与底板间未焊焊缝、两段底板间焊缝、吊攀,装配弯气管;
(6)冷却器挡板装配:挡板装配时,要求将挡板10与盖板11采用螺栓把合后再进行焊接,如图3所示。之后依次装配焊接挡板各组件;
(7)冷却器罩整件喷砂、清理、涂漆、标识、检查,完成装配。
需用装备:
●数控气割机
●半自动气割机
●油压机
●钻床
●角向砂轮机
●弯管机
●熔化极气体保护焊机
●喷砂间。

Claims (1)

1.一种核电汽轮发电机冷却器罩装配焊接的工艺方法,该方法包括步骤:
(1)冷却器罩组件备料:冷却器罩组件包括冷却器罩组件和冷却器挡板组件,冷却器罩组件包括励端底板和汽端底板、励端端板和汽端端板、外壳、隔板、筋板、吊攀、气管,冷却器挡板组件包括挡板、盖板、筋板、螺栓、单耳止动垫圈、密封垫、支撑角钢、结构钢管;
(2)冷却器罩采用卧式装配:将冷却器罩底板吊放于平台上,平置,然后在其上装配端板、隔板、加强筋板及外皮等组件;
(3)冷却器罩采用分段装配:将冷却器罩分为励端和汽端两段分别进行装配焊接,之后再组装成整体,其步骤为:依次吊装励端底板、汽端底板、励端端板、汽端端板、隔板、筋板、气体导管、励端外皮和汽端外皮;
(4)冷却器罩两段叠装焊接,其步骤为:将励端和汽端两瓣冷却器罩叠装,两端采用支撑环固定,叠装完毕后将其置于滚轮架或V型架上,调整位置使工件尽量处于平焊或立焊位置,固定后再分别焊接,焊接完毕后将叠装件解体;
(5)冷却器罩两段对装焊接,其步骤为:将叠装焊接完毕后解体的两瓣冷却器罩对放调整,之后依次焊接中间隔板、两段冷却器罩接口焊缝、外壳与底板间未焊焊缝、两段底板间焊缝、吊攀,装配弯气管;
(6)冷却器挡板装配:挡板装配时,要求将盖板与挡板采用螺栓把合后再进行焊接,盖板与挡板间放置防变形垫,之后依次装配焊接挡板各组件;
(7)冷却器罩整件喷砂、清理、涂漆、标识、检查,完成装配,上述步骤即为核电汽轮发电机冷却器罩装配焊接的工艺方法。
CN201410228264.2A 2014-05-28 2014-05-28 核电汽轮发电机冷却器罩装配焊接的工艺方法 Active CN103967539B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410228264.2A CN103967539B (zh) 2014-05-28 2014-05-28 核电汽轮发电机冷却器罩装配焊接的工艺方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410228264.2A CN103967539B (zh) 2014-05-28 2014-05-28 核电汽轮发电机冷却器罩装配焊接的工艺方法

Publications (2)

Publication Number Publication Date
CN103967539A true CN103967539A (zh) 2014-08-06
CN103967539B CN103967539B (zh) 2015-08-19

Family

ID=51237495

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410228264.2A Active CN103967539B (zh) 2014-05-28 2014-05-28 核电汽轮发电机冷却器罩装配焊接的工艺方法

Country Status (1)

Country Link
CN (1) CN103967539B (zh)

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201118363Y (zh) * 2007-10-31 2008-09-17 哈尔滨电机厂有限责任公司 内含轴向通风道的冷却器罩
US20090042049A1 (en) * 2007-08-11 2009-02-12 Edouard Stuart Sandoz Sealed weld element for attachment to a vehicle component and method
CN102909479A (zh) * 2012-09-29 2013-02-06 郑州市嵩阳煤机制造有限公司 方形长钢梁焊接方法
CN103009002A (zh) * 2012-12-21 2013-04-03 上海电气电站设备有限公司 汽轮机蒸汽室与喷嘴组装配及加工工艺

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20090042049A1 (en) * 2007-08-11 2009-02-12 Edouard Stuart Sandoz Sealed weld element for attachment to a vehicle component and method
CN201118363Y (zh) * 2007-10-31 2008-09-17 哈尔滨电机厂有限责任公司 内含轴向通风道的冷却器罩
CN102909479A (zh) * 2012-09-29 2013-02-06 郑州市嵩阳煤机制造有限公司 方形长钢梁焊接方法
CN103009002A (zh) * 2012-12-21 2013-04-03 上海电气电站设备有限公司 汽轮机蒸汽室与喷嘴组装配及加工工艺

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
高兆宽 等: "美国GE公司324机座装配及焊接工艺", 《东方电机》 *

Also Published As

Publication number Publication date
CN103967539B (zh) 2015-08-19

Similar Documents

Publication Publication Date Title
CN102029473B (zh) 钢套筒高空焊接方法
CN104263902A (zh) 一种热振复合时效残余应力均化装置
CN101693336B (zh) 吊装工具的圆环箱型梁加工工艺
CN102632370B (zh) 全氢罩式炉内罩制作工艺
CN107695156A (zh) 一种Ф3350mm椭球瓜瓣法向孔凸孔模具及工艺
CN103921081A (zh) 一种核电发电外机座的加工工艺
CN103967539A (zh) 核电汽轮发电机冷却器罩装配焊接的工艺方法
CN101001034A (zh) 箱式发电机机壳组焊工艺
CN102922096A (zh) 大型铝塔现场组对焊接方法
CN204818385U (zh) 一种用于盾构机壳体平焊的工装
CN207788079U (zh) 船用柴油机机架开口管焊接底座的装配装置
RU2010100554A (ru) Способ снятия остаточных напряжений в сварных соединениях металлов
CN105003305A (zh) 一种汽轮发电机整体机座及其装配工艺
CN204983463U (zh) 一种圆弧形金属板包柱结构
CN203062126U (zh) 高效焊接机
RU134840U1 (ru) Оборудование для сборки и сварки корпуса самоходной бронированной машины
CN102019512B (zh) T形柱对接焊施工方法
CN112746889B (zh) 一种船用柴油机竖式scr反应器装配方法
CN105618901A (zh) 一种管道焊接用左挡板及气体保护装置和焊接工装
CN102935571B (zh) 减速机座的拼焊方法
CN102935570B (zh) 减速机座拼焊装置
CN204470853U (zh) 承载式燃油箱钢结构组对焊接一体式工装
CN205043368U (zh) 油箱轨迹模拟焊接圈
CN204565603U (zh) 压力钢管加劲环安装调整校正装置
CN210306192U (zh) 一种弧焊安装设备

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant