CN103887736A - 更换铁塔主材装置 - Google Patents
更换铁塔主材装置 Download PDFInfo
- Publication number
- CN103887736A CN103887736A CN201410121277.XA CN201410121277A CN103887736A CN 103887736 A CN103887736 A CN 103887736A CN 201410121277 A CN201410121277 A CN 201410121277A CN 103887736 A CN103887736 A CN 103887736A
- Authority
- CN
- China
- Prior art keywords
- top power
- main material
- screw
- iron
- leading screw
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Images
Abstract
本发明属于电力施工工具,特别涉及一种更换铁塔主材装置,主材支铁(1)的竖直外侧面上用连接螺栓螺母(18)连接装有背铁二(19),主材支铁(1)的水平外侧面上用连接螺栓螺母(18)连接装有背铁一(15),顶力丝杠一连接座(13)与顶力丝杠一(2)为一体,棘轮搬手(3)上分别装有方向控制钮(11),顶力丝杠二(5)与顶力丝杠二连接座(9)为一体,顶力丝杠二连接座(9)分别装有底脚支铁(6)左端的竖直壁和水平壁的端面上,底脚支铁(6)右端的竖直壁和水平壁上分别用底座卡具(7)连接底座支铁(8),锁紧螺栓(16)螺纹连接装在底座卡具(7)上,更换铁塔主材装置额定承载能力大,结构紧凑简单,单件重量轻,方便运输和使用,不受地形地貌的限制,作业人员少,劳动强度低,生产效率高,安全系数大。
Description
技术领域
本发明属于电力施工工具,特别涉及一种更换铁塔主材装置。
背景技术
随着输电线路的发展建设以及输电线路所处地质、地形条件越来越复杂,难免遇到山体垮塌、地震等自然灾害或人为破坏造成铁塔受损,给输电线路造成严重事故,危及线路正常运行,以往更换铁塔主材一般是采用组立铁塔所用的抱杆对铁塔进行临时支撑,抱杆上悬挂链条葫芦,将待更换铁塔主材的受力通过链条葫芦传递到抱杆上,然后进行铁塔主材的更换,还有利用吊车固定进行铁塔主材的更换,以上两种施工方法比较复杂,施工人员多,安全系数低,施工时间长,所用的工器具多及结构复杂,单件重量重,不方便运输和使用。
发明内容
本发明的目的在于克服上述技术不足,提供一种结构简单,重量轻,方便运输和使用的更换铁塔主材装置。
本发明解决技术问题采用的技术方案是:更换铁塔主材装置包括主材支铁、底脚支架、底座支铁、连接螺栓螺母、锁紧螺栓、连接螺栓,其特点是主材支铁的竖直外侧面上用连接螺栓螺母连接装有背铁二,背铁二上设有两个背铁二连接孔,主材支铁的水平外侧面上用连接螺栓螺母连接装有背铁一,背铁一上设有两个背铁一连接孔,主材支铁右端的竖直壁和水平壁的端面上分别装有一个顶力丝杠一连接座,顶力丝杠一连接座与主材支铁之间用连接螺栓锁紧固定,顶力丝杠一连接座与顶力丝杠一为一体,顶力丝杠一上分别螺纹连接顶力丝母一,顶力丝母一上装有顶丝二,顶力丝母一右侧的顶力丝杠一上分别装有棘轮搬手,棘轮搬手上分别装有方向控制钮,棘轮搬手右侧装有顶力丝母二,顶力丝母二上分别装有顶丝一,顶力丝母二左端分别螺纹连接顶力丝杠一,顶力丝母二右端分别螺纹连接顶力丝杠二,顶力丝杠二与顶力丝杠二连接座为一体,顶力丝杠二连接座分别装有底脚支铁左端的竖直壁和水平壁的端面上,并用连接螺栓锁紧固定,底脚支铁右端的竖直壁和水平壁上分别用底座卡具连接底座支铁,并用锁紧螺栓锁紧固定,锁紧螺栓螺纹连接装在底座卡具上。
本发明的有益效果是:更换铁塔主材装置额定承载能力大,结构紧凑简单,单件重量轻,方便运输和使用,不受地形地貌的限制,作业人员少,劳动强度低,生产效率高,安全系数大。
附图说明
以下结合附图以实施例具体说明。
图1是更换铁塔主材装置结构图。
图2是图1中主材支铁与背铁一和背铁二之间连接状态图。
图中,1-主材支铁;2-顶力丝杠一;3-棘轮搬手;4-顶力丝母二;5-顶力丝杠二;6-底脚支铁;7-底座卡具;8-底座支铁;9-顶力丝杠二连接座;10-顶丝一;11-方向控制钮;12-顶丝二;13-顶力丝杠一连接座;14-顶力丝母一;15-背铁一;15-1-背铁一连接孔;16-锁紧螺栓;17-连接螺栓;18-连接螺栓螺母;19-背铁二;19-1-背铁二连接孔。
具体实施方式
实施例,参照附图1、2,更换铁塔主材装置的主材支铁1的竖直外侧面上用连接螺栓螺母18连接装有背铁二19,背铁二19上设有两个背铁二连接孔19-1,主材支铁1的水平外侧面上用连接螺栓螺母18连接装有背铁二15,背铁一15上设有两个背铁一连接孔15-1。主材支铁1右端的竖直壁和水平壁的端面上分别装有一个顶力丝杠一连接座13,顶力丝杠一连接座13与主材支铁1之间用连接螺栓17锁紧固定,顶力丝杠一连接座13与顶力丝杠一2为一体,顶力丝杠一2上分别螺纹连接顶力丝母一14,顶力丝母一14上装有顶丝二12。顶力丝母一14右侧的顶力丝杠一2上分别装有棘轮搬手3,棘轮搬手3上分别装有方向控制钮11,棘轮搬手3右侧装有顶力丝母二4,顶力丝母二4上分别装有顶丝一10。顶力丝母二4左端分别螺纹力丝杠一2,顶力母二4右端分别螺纹连接顶力丝杠二5,顶力丝杠二5与顶力丝杠二连接座9为一体,顶力丝杠二连接座9分别装有在底脚 支铁6左端的竖直壁和水平擘的端面上,并用连接螺栓17锁紧固定,底脚支铁6右端的竖直壁和水平壁上分别用底座卡具7连接底座支铁8,并用锁紧螺栓16锁紧固定,锁紧螺栓16螺纹连接装在底座卡具7上。
更换铁塔主材装置的使用方法是:使用时,首先将上层劲主材和受损主材之间的背铁上与上层主材连接螺栓的螺母卸下,将背铁一连接孔15-1和背铁二连接孔19-1分别套装在卸下螺母的螺栓上,重新用卸下的螺母将主材支铁1锁紧固定在背铁上,同时底脚支铁6竖直壁和水平壁上的两个底座卡具7分别连接底座支铁8并用锁紧螺栓16锁紧固定,分别锁紧顶丝一10并旋转顶力丝母二4向左移动,锁紧顶丝二12,然后分别顺时针搬动棘轮搬手3实施微调推动顶力丝母一14,顶力母一14带动顶力丝杠一2,顶力丝杠一2带动顶力丝杠一连接座13向左移动,使待更换铁塔主材的受力安全平稳地转移到更换铁塔主材装置上。这时作业人员再将下层受损待更换主材背铁和铁塔底座的螺丝松开拆下待更换受损主材,然后更换上新的铁塔主材。
Claims (1)
1.一种更换铁塔主材装置,包括主材支铁(1)、底脚支架(6)、底座支铁(8)、连接螺栓螺母(18)、锁紧螺栓(16)、连接螺栓(17),其特征在于主材支铁(1)的竖直外侧面上用连接螺栓螺母(18)连接装有背铁二(19),背铁二(19)上设有两个背铁二连接孔(19-1),主材支铁(1)的水平外侧面上用连接螺栓螺母(18)连接装有背铁一(15),背铁一(15)上设有两个背铁一连接孔(15-1),主材支铁(1)右端的竖直壁和水平壁的端面上分别装有一个顶力丝杠一连接座(13),顶力丝杠一连接座(13)与主材支铁(1)之间用连接螺栓(17)锁紧固定,顶力丝杠一连接座(13)与顶力丝杠一(2)为一体,顶力丝杠一(2)上分别螺纹连接顶力丝母一(14),顶力丝母一(14)上装有顶丝二(12),顶力丝母一(14)右侧的顶力丝杠一(2)上分别装有棘轮搬手(3),棘轮搬手(3)上分别装有方向控制钮(11),棘轮搬手(3)右侧装有顶力丝母二(4),顶力丝母二(4)上分别装有顶丝一(10),顶力丝母二(4)左端分别螺纹连接顶力丝杠一(2),顶力丝母二(4)右端分别螺纹连接顶力丝杠二(5),顶力丝杠二(5)与顶力丝杠二连接座(9)为一体,顶力丝杠二连接座(9)分别装有底脚支铁(6)左端的竖直壁和水平壁的端面上,并用连接螺栓(17)锁紧固定,底脚支铁(6)右端的竖直壁和水平壁上分别用底座卡具(7)连接底座支铁(8),并用锁紧螺栓(16)锁紧固定,锁紧螺栓(16)螺纹连接装在底座卡具(7)上。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410121277.XA CN103887736B (zh) | 2014-03-28 | 2014-03-28 | 更换铁塔主材装置 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410121277.XA CN103887736B (zh) | 2014-03-28 | 2014-03-28 | 更换铁塔主材装置 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN103887736A true CN103887736A (zh) | 2014-06-25 |
CN103887736B CN103887736B (zh) | 2016-04-20 |
Family
ID=50956515
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201410121277.XA Active CN103887736B (zh) | 2014-03-28 | 2014-03-28 | 更换铁塔主材装置 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN103887736B (zh) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105317236A (zh) * | 2015-11-25 | 2016-02-10 | 国家电网公司 | 一种输电线路轻便式更换铁塔主材包钢的装置 |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20040134155A1 (en) * | 2002-10-03 | 2004-07-15 | Lockwood James D. | System and method for strengthening tubular and round tower members |
CN101806151A (zh) * | 2010-03-19 | 2010-08-18 | 四川电力送变电建设公司 | 铁塔主材更换装置 |
CN201656339U (zh) * | 2010-04-21 | 2010-11-24 | 尹维崴 | 拉线门型塔带电更换二七四号铁专用卡具 |
KR101031292B1 (ko) * | 2010-07-26 | 2011-04-29 | 김민선 | 교량용 외장재 조립장치 |
CN203787856U (zh) * | 2014-03-28 | 2014-08-20 | 国家电网公司 | 更换铁塔主材装置 |
-
2014
- 2014-03-28 CN CN201410121277.XA patent/CN103887736B/zh active Active
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20040134155A1 (en) * | 2002-10-03 | 2004-07-15 | Lockwood James D. | System and method for strengthening tubular and round tower members |
CN101806151A (zh) * | 2010-03-19 | 2010-08-18 | 四川电力送变电建设公司 | 铁塔主材更换装置 |
CN201656339U (zh) * | 2010-04-21 | 2010-11-24 | 尹维崴 | 拉线门型塔带电更换二七四号铁专用卡具 |
KR101031292B1 (ko) * | 2010-07-26 | 2011-04-29 | 김민선 | 교량용 외장재 조립장치 |
CN203787856U (zh) * | 2014-03-28 | 2014-08-20 | 国家电网公司 | 更换铁塔主材装置 |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105317236A (zh) * | 2015-11-25 | 2016-02-10 | 国家电网公司 | 一种输电线路轻便式更换铁塔主材包钢的装置 |
CN105317236B (zh) * | 2015-11-25 | 2017-07-11 | 国家电网公司 | 一种输电线路轻便式更换铁塔主材包钢的装置 |
Also Published As
Publication number | Publication date |
---|---|
CN103887736B (zh) | 2016-04-20 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102071651B (zh) | 悬索桥吊索换索方法 | |
CN110303341B (zh) | 一种多功能钢结构切割钻孔装置 | |
CN203787856U (zh) | 更换铁塔主材装置 | |
CN103887736B (zh) | 更换铁塔主材装置 | |
CN201952742U (zh) | 悬索桥吊索换索设备 | |
CN202280256U (zh) | 单元幕墙吊具 | |
CN204689552U (zh) | 一种z字形的设备顶升装置 | |
CN113511583B (zh) | 一种多功能高安全性装配式建筑吊运夹具 | |
CN204357139U (zh) | 吊具 | |
CN202023353U (zh) | 建筑施工整体提升脚手架 | |
CN107313597A (zh) | 用于装配式建筑的模块化快装式卸料平台 | |
CN211004188U (zh) | 一种市政施工吊装工具 | |
CN210825173U (zh) | 一种道路桥梁用施工提升装置 | |
CN106532556A (zh) | 一种供电线路检修用电力工具存放施工架 | |
CN207934427U (zh) | 一种升降式装修工作台 | |
CN204825666U (zh) | 一种防落梁吊装安装装置 | |
CN214161949U (zh) | 一种用于钢结构生产的工装夹具 | |
CN217808250U (zh) | 一种互感器吊装夹具 | |
CN211806215U (zh) | 一种快速固定夹具 | |
CN212773629U (zh) | 一种土木建筑用支撑装置 | |
CN205117246U (zh) | 一种油田起下油管抬放装置 | |
CN205294711U (zh) | 一种高效调整抽油机平衡的专用工具 | |
CN213037300U (zh) | 一种建筑施工起吊用稳定辅助装置 | |
CN203797592U (zh) | 可移动组装式工程照明台 | |
CN217921178U (zh) | 一种建筑用塔吊扶墙连接装置 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant |