CN101806151A - 铁塔主材更换装置 - Google Patents
铁塔主材更换装置 Download PDFInfo
- Publication number
- CN101806151A CN101806151A CN 201010127917 CN201010127917A CN101806151A CN 101806151 A CN101806151 A CN 101806151A CN 201010127917 CN201010127917 CN 201010127917 CN 201010127917 A CN201010127917 A CN 201010127917A CN 101806151 A CN101806151 A CN 101806151A
- Authority
- CN
- China
- Prior art keywords
- main material
- iron tower
- angle steel
- tower main
- hydraulic cylinder
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- XEEYBQQBJWHFJM-UHFFFAOYSA-N Iron Chemical compound [Fe] XEEYBQQBJWHFJM-UHFFFAOYSA-N 0.000 title claims abstract description 60
- 239000000463 material Substances 0.000 title claims abstract description 35
- 229910052742 iron Inorganic materials 0.000 title claims abstract description 30
- 229910000831 Steel Inorganic materials 0.000 claims description 34
- 239000010959 steel Substances 0.000 claims description 34
- 210000005069 ears Anatomy 0.000 claims description 15
- NJPPVKZQTLUDBO-UHFFFAOYSA-N novaluron Chemical compound C1=C(Cl)C(OC(F)(F)C(OC(F)(F)F)F)=CC=C1NC(=O)NC(=O)C1=C(F)C=CC=C1F NJPPVKZQTLUDBO-UHFFFAOYSA-N 0.000 claims description 8
- 230000008878 coupling Effects 0.000 claims description 3
- 238000010168 coupling process Methods 0.000 claims description 3
- 238000005859 coupling reaction Methods 0.000 claims description 3
- 238000003466 welding Methods 0.000 claims description 3
- 238000010276 construction Methods 0.000 abstract description 5
- 230000005540 biological transmission Effects 0.000 abstract description 4
- 238000012544 monitoring process Methods 0.000 abstract description 3
- 229910000746 Structural steel Inorganic materials 0.000 abstract 2
- 230000005611 electricity Effects 0.000 description 3
- 238000000034 method Methods 0.000 description 2
- 230000003014 reinforcing effect Effects 0.000 description 2
- 230000006378 damage Effects 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 239000010720 hydraulic oil Substances 0.000 description 1
- 230000001771 impaired effect Effects 0.000 description 1
- 238000009434 installation Methods 0.000 description 1
- 210000003205 muscle Anatomy 0.000 description 1
Images
Landscapes
- Working Measures On Existing Buildindgs (AREA)
Abstract
Description
Claims (3)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201010127917XA CN101806151B (zh) | 2010-03-19 | 2010-03-19 | 铁塔主材更换装置 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201010127917XA CN101806151B (zh) | 2010-03-19 | 2010-03-19 | 铁塔主材更换装置 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN101806151A true CN101806151A (zh) | 2010-08-18 |
CN101806151B CN101806151B (zh) | 2011-11-09 |
Family
ID=42608088
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201010127917XA Active CN101806151B (zh) | 2010-03-19 | 2010-03-19 | 铁塔主材更换装置 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN101806151B (zh) |
Cited By (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102661057A (zh) * | 2012-05-30 | 2012-09-12 | 衡水供电公司 | 电力转角塔拉腿主材更换方法以及专用主材卡具 |
CN103887736A (zh) * | 2014-03-28 | 2014-06-25 | 国家电网公司 | 更换铁塔主材装置 |
JP2015017428A (ja) * | 2013-07-11 | 2015-01-29 | 株式会社アイ・ティ・シ・コンサルティング | 鉄骨構造物の補強装置 |
CN104831945A (zh) * | 2015-05-14 | 2015-08-12 | 中国电力科学研究院 | 一种用于更换输电铁塔主材的装置 |
CN109577733A (zh) * | 2018-11-29 | 2019-04-05 | 同济大学 | 通信铁塔角钢的无损加固装置及其施工方法 |
CN112922385A (zh) * | 2021-04-01 | 2021-06-08 | 大连理工大学 | 一种多孔包钢式输电塔主材不停电加固装置 |
CN113833344A (zh) * | 2021-10-22 | 2021-12-24 | 河北汇智电力工程设计有限公司 | 一种防弯扭失稳的输电塔加固装置 |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20040134155A1 (en) * | 2002-10-03 | 2004-07-15 | Lockwood James D. | System and method for strengthening tubular and round tower members |
CN101463667A (zh) * | 2009-01-16 | 2009-06-24 | 天津市电力公司 | 输电铁塔的加固方法 |
WO2009098528A1 (en) * | 2008-02-04 | 2009-08-13 | Meir Silber | Methods for reinforcing existing lattice frame structures having hollow steel primary elements, particularly steel towers with tubular legs |
CN201318045Y (zh) * | 2008-12-04 | 2009-09-30 | 新疆电力公司乌鲁木齐电业局 | 输电线路铁塔包铁提升器 |
CN201635416U (zh) * | 2010-03-19 | 2010-11-17 | 四川电力送变电建设公司 | 铁塔主材更换装置 |
-
2010
- 2010-03-19 CN CN201010127917XA patent/CN101806151B/zh active Active
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20040134155A1 (en) * | 2002-10-03 | 2004-07-15 | Lockwood James D. | System and method for strengthening tubular and round tower members |
WO2009098528A1 (en) * | 2008-02-04 | 2009-08-13 | Meir Silber | Methods for reinforcing existing lattice frame structures having hollow steel primary elements, particularly steel towers with tubular legs |
CN201318045Y (zh) * | 2008-12-04 | 2009-09-30 | 新疆电力公司乌鲁木齐电业局 | 输电线路铁塔包铁提升器 |
CN101463667A (zh) * | 2009-01-16 | 2009-06-24 | 天津市电力公司 | 输电铁塔的加固方法 |
CN201635416U (zh) * | 2010-03-19 | 2010-11-17 | 四川电力送变电建设公司 | 铁塔主材更换装置 |
Cited By (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102661057A (zh) * | 2012-05-30 | 2012-09-12 | 衡水供电公司 | 电力转角塔拉腿主材更换方法以及专用主材卡具 |
CN102661057B (zh) * | 2012-05-30 | 2015-01-21 | 国家电网公司 | 电力转角塔拉腿主材更换方法以及专用主材卡具 |
JP2015017428A (ja) * | 2013-07-11 | 2015-01-29 | 株式会社アイ・ティ・シ・コンサルティング | 鉄骨構造物の補強装置 |
CN103887736A (zh) * | 2014-03-28 | 2014-06-25 | 国家电网公司 | 更换铁塔主材装置 |
CN103887736B (zh) * | 2014-03-28 | 2016-04-20 | 国家电网公司 | 更换铁塔主材装置 |
CN104831945A (zh) * | 2015-05-14 | 2015-08-12 | 中国电力科学研究院 | 一种用于更换输电铁塔主材的装置 |
CN104831945B (zh) * | 2015-05-14 | 2017-09-01 | 中国电力科学研究院 | 一种用于更换输电铁塔主材的装置 |
CN109577733A (zh) * | 2018-11-29 | 2019-04-05 | 同济大学 | 通信铁塔角钢的无损加固装置及其施工方法 |
CN112922385A (zh) * | 2021-04-01 | 2021-06-08 | 大连理工大学 | 一种多孔包钢式输电塔主材不停电加固装置 |
CN113833344A (zh) * | 2021-10-22 | 2021-12-24 | 河北汇智电力工程设计有限公司 | 一种防弯扭失稳的输电塔加固装置 |
Also Published As
Publication number | Publication date |
---|---|
CN101806151B (zh) | 2011-11-09 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN101806151B (zh) | 铁塔主材更换装置 | |
CN201635416U (zh) | 铁塔主材更换装置 | |
CN103866986B (zh) | 大跨度变截面螺栓球节点网壳安装方法 | |
CN206145311U (zh) | 一种减振可拆卸式水利管道连接件 | |
CN104110086A (zh) | 弦支穹顶与平面预应力组合结构、张拉工装及施工方法 | |
CN110130234B (zh) | 一种新型桥梁加固体系及其施工方法 | |
CN112049028A (zh) | 一种减震抗倾覆独柱墩桥梁加固装置及安装方法 | |
CN106088136B (zh) | 一种带有支架的风力发电塔基础及其施工工艺 | |
CN105586826B (zh) | 一种混凝土系杆拱桥吊杆下锚端连接结构及其施工方法 | |
CN101812927B (zh) | 铁塔液压扶正系统 | |
CN210422095U (zh) | 铁塔基础加固支架及铁塔支撑结构 | |
CN201818099U (zh) | 铁塔液压扶正系统 | |
CN206418600U (zh) | 一种柔性支架端部调节节点装置 | |
CN213271380U (zh) | 门型单侧双向抗震支吊架 | |
CN208859081U (zh) | 一种基于橡胶阻尼减振的抗震支吊架 | |
CN203684109U (zh) | 一种悬索桥吊索索力和高程的调整装置 | |
CN208899751U (zh) | 可更换螺纹套筒延性钢筋连接装置 | |
CN208250889U (zh) | 一种拱桥吊杆结构 | |
CN102286923A (zh) | 海上高架桥建造方法 | |
CN205479959U (zh) | 大口径钢制管道应急挤压截流装置 | |
CN219259298U (zh) | 一种钢模板表面处理吊架夹具 | |
CN102798569B (zh) | 一种隧洞手孔插筋拉拔装置及其拉拔方法 | |
CN110265907A (zh) | 一种柔直阀塔层间绝缘子检修装置及方法 | |
CN205894833U (zh) | 一种通信塔的矩阵组合式基座 | |
CN207593670U (zh) | 一种水轮发电机组补气管分段拆装工具 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
ASS | Succession or assignment of patent right |
Owner name: STATE GRID CORPORATION OF CHINA Effective date: 20121226 |
|
C41 | Transfer of patent application or patent right or utility model | ||
TR01 | Transfer of patent right |
Effective date of registration: 20121226 Address after: 610051 Chenghua District, Chengdu, Cui Cui shop north road, No. 1, No. 6, Sichuan Patentee after: Sichuan Electric Power Transmission & Transformation Construction Co., Ltd. Patentee after: State Grid Corporation of China Address before: 610051 Chenghua District, Chengdu, Cui Cui shop north road, No. 1, No. 6, Sichuan Patentee before: Sichuan Electric Power Transmission & Transformation Construction Co., Ltd. |