CN101812927B - 铁塔液压扶正系统 - Google Patents

铁塔液压扶正系统 Download PDF

Info

Publication number
CN101812927B
CN101812927B CN2010101331056A CN201010133105A CN101812927B CN 101812927 B CN101812927 B CN 101812927B CN 2010101331056 A CN2010101331056 A CN 2010101331056A CN 201010133105 A CN201010133105 A CN 201010133105A CN 101812927 B CN101812927 B CN 101812927B
Authority
CN
China
Prior art keywords
welded
angle steel
iron tower
base plate
hydraulic cylinder
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN2010101331056A
Other languages
English (en)
Other versions
CN101812927A (zh
Inventor
王光祥
景文川
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sichuan Electric Power Transmission & Transformation Construction Co Ltd
State Grid Corp of China SGCC
Original Assignee
Sichuan Electric Power Transmission & Transformation Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sichuan Electric Power Transmission & Transformation Construction Co Ltd filed Critical Sichuan Electric Power Transmission & Transformation Construction Co Ltd
Priority to CN2010101331056A priority Critical patent/CN101812927B/zh
Publication of CN101812927A publication Critical patent/CN101812927A/zh
Application granted granted Critical
Publication of CN101812927B publication Critical patent/CN101812927B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Clamps And Clips (AREA)

Abstract

一种铁塔液压扶正系统,属输电线路抢险时扶正铁塔的施工装置。它由底座组件、液压连接座、液压缸、压力传感器、连接耳、角钢卡具顺次连接组成。它具有重量轻、力学性能好、便于装配拆卸的优点。

Description

铁塔液压扶正系统
技术领域
本发明涉及电力建设机具设备,特别是输电线路抢险时扶正铁塔的液压施工装置。
背景技术
随着输电线路的发展建设以及输电线路所处地质、地形条件越来越复杂,难免遇到山体垮塌、地震、地基不均匀沉降等自然灾害或人为破坏造成的铁塔倾斜,需要扶正铁塔。
以往扶正铁塔的方法一般是采用组立铁塔用的抱杆上端悬挂链条葫芦,通过链条葫芦提升扶正铁塔,这种方法存在工器具用量大、现场布置繁杂、工作量大、劳动强度大、整体稳定性能差、安全风险大的缺点。
发明内容
本发明的目的是提供一种额定承载能力大、结构简单、安全可靠、整体稳定性高的铁塔液压扶正系统。
本发明的目的是这样实现的:一种铁塔液压扶正系统,包括液压缸,液压显示单元,底座组件结构为:底板由上下对称、左右对称的四块钢板拼接组成,整个底板形状为正方形,且底板中部有一正方形孔,相邻两块钢板的接合位置处各自焊接有用作采用螺栓连接并与铁塔基础立柱顶部相固定的角钢,底板上面沿正方形对角线方向均布焊接有四对耳板,底板下面正方形四个角位置处分别焊接有一个下斜角钢,相邻两个下斜角钢之间焊接有斜框板;底座组件的底板上的四对耳板中,每对耳板上经螺栓固定有一个液压缸连接座,每一液压缸连接座上固定有一个所述液压缸,每一液压缸的活塞杆外端卡接在连接耳的卡座底部开孔中,压力传感器压接在活塞杆外端与卡座之间;用作经螺栓连接固定在铁塔腿部主材上的四个角钢卡子的结构均为:形状为矩形的两个侧板相互垂直,每一侧板的两个对边上各自焊接有一个三角形筋板,支撑耳沿两个侧板夹角中线方向设置,一个三角形筋板的另一边焊接在支撑耳的板面上方,另一三角形筋板的另一边焊接在支撑耳的板面下方,且两个三角形筋板相互对称设置;每一角钢卡子的支撑耳均经螺栓固定在一个连接耳的双叉板上。
上述底座组件中的所有下斜角钢和斜框板均有相对于竖直方向8度的倾角。
上述角钢卡子上的四个三角形筋板均为去角三角形筋板,且四个筋板后部焊接有一后板。
上述底座组件中正方形底板的边长为1801mm,底板中部正方形孔的边长为950mm。
简言之,本发明铁塔液压扶正系统主要由底座组件、液压缸连接座、液压缸、压力传感器、连接耳以及由四个角钢卡子组成的角钢卡具构成。液压系统(主要由四个液压缸组成)产生的工作压力由压力传感器测得,压力传感器的信号输出至由单片机控制的显示器,并在显示器上直观显示出来,以便对液压器进行控制和调整。
与现有技术相比,本发明的有益效果是:结构紧凑、总体及单件重量轻、方便运输和使用、承载能力大、系统受力实现实时数字监控、系统安全可靠。
附图说明
图1是铁塔液压扶正系统安装在铁塔支脚上的示意图;
图2、图3分别是图1所示连接耳的主视图和左视图;
图4、图5分别是图1所示一个角铁卡子的主视图和左视图;
图6是图5所示支撑耳的俯视图;
图7是图5所示四个角钢卡子经螺栓连接固定在铁塔支脚上的主视图;
图8、图9分别是图1所示底座组件的俯视图和主视图;
图8-1、图8-2分别是图8所示框板的主视图和俯视图;
图8-3、图8-4、图8-5分别是图8所示斜框板的主视图、俯视图和后视图;
图8-6是图8所示下斜角钢的主视图;
图8-7是图8所示拼接组成底板的四个钢板中的一个钢板的主视图;
图10、图11、图12分别是液压缸连接座的主视图、左视图和俯视图。
具体实施方式
图1示出,本发明包括液压缸3,液压显示单元,底座组件1结构为:底板12由上下对称、左右对称的四块钢板拼接组成,整个底板形状为正方形,且底板中部有一正方形孔,相邻两块钢板的接合位置处各自焊接有用作采用螺栓19连接并与铁塔基础立柱顶部相固定的角钢113,底板上面沿正方形对角线方向均布焊接有四对耳板16,底板下面正方形四个角位置处分别焊接有一个下斜角钢13,相邻两个下斜角钢13、117之间焊接有斜框板11;底座组件1的底板12上的四对耳板16中,每对耳板上经螺栓固定有一个液压缸连接座2,每一液压缸连接座2上固定有一个所述液压缸3,每一液压缸的活塞杆31外端卡接在连接耳5的卡座51底部开孔中,压力传感器4压接在活塞杆外端与卡座51之间;用作经螺栓连接固定在铁塔腿部主材上的四个角钢卡子6的结构均为:形状为矩形的两个侧板62相互垂直,每一侧板的两个对边上各自焊接有一个三角形筋板63,支撑耳64沿两个侧板62夹角中线方向设置,一个三角形筋板63的另一边焊接在支撑耳64的板面上方,另一三角形筋板的另一边焊接在支撑耳的板面下方,且两个三角形筋板相互对称设置;每一角钢卡子6的支撑耳64均经螺栓固定在一个连接耳5的双叉板54上(参见图4、图5、图6、图7、图8)。压力传感器的输出信号接至压力显示单元,如液晶显示器,对液压系统的压力进行实时显示。
底座组件1中的所有下斜角钢和斜框板均有相对于竖直方向8度的倾角(参见图8-3、图8-4、图8-5以及图8-6)。
角钢卡子6上的四个三角形筋板63均为去角三角形筋板,且四个筋板后部焊接有一后板61(参见图5)。底座组件1中正方形底板12的边长为1801mm,底板中部正方形孔的边长为950mm。
图8中,底板上四对耳板16分别位于边长为1063mm的正方形的四个角点上,图7中,四个角钢卡子经螺栓连接固定在铁塔支脚上后,四块支撑耳上的螺栓固定用孔对同样分别位于边长为1063mm的正方形的四个角点上。
图1中,由四个角钢卡子(参见图4、图5)组成角钢卡具6。
图2、图3中,圆形卡座51上焊接有圆形底板52,圆形底板上焊接有两块双叉板54,双叉板上焊有加强筋53。
图8、图9中,11、斜框板(4件);12、底板(4件);13、下斜角钢(2件,形状与下斜角钢117对称);14、框板(4件);15、连接耳横筋(4件);16、耳板;17、角筋;18、角筋;19、螺栓;110、垫片;111、螺母;112、下角钢;113、连接角钢;114、角钢;115、斜角筋;116、边角筋;117、下斜角钢。
图10中,21、耳板;22、角筋;23、圆底板;24、缸座角筋;25、缸座;26、螺柱。

Claims (4)

1.一种铁塔液压扶正系统,包括,液压缸(3),液压显示单元,其特征是:底座组件(1)结构为:底板(12)由上下对称、左右对称的四块钢板拼接组成,整个底板形状为正方形,且底板中部有一正方形孔,相邻两块钢板的接合位置处各自焊接有采用螺栓(19)连接并与铁塔基础立柱顶部相固定的角钢(113),底板上面沿正方形对角线方向均布焊接有四对耳板(16),底板下面正方形四个角位置处分别焊接有一个下斜角钢(13),相邻两个下斜角钢(13、117)之间焊接有斜框板(11);底座组件(1)的底板(12)上的四对耳板(16)中,每对耳板上经螺栓固定有一个液压缸连接座(2),每一液压缸连接座(2)上固定有一个所述液压缸(3),每一液压缸的活塞杆(31)外端卡接在连接耳(5)的卡座(51)底部开孔中,压力传感器(4)压接在活塞杆外端与卡座(51)之间;经螺栓连接固定在铁塔腿部主材上的四个角钢卡子(6)的结构均为:形状为矩形的两个侧板(62)相互垂直,每一侧板的两个对边上各自焊接有一个三角形筋板(63),支撑耳(64)沿两个侧板(62)夹角中线方向设置,一个三角形筋板(63)的另一边焊接在支撑耳(64)的板面上方,另一三角形筋板的另一边焊接在支撑耳的板面下方,且两个三角形筋板相互对称设置;每一角钢卡子(6)的支撑耳(64)均经螺栓固定在一个连接耳(5)的双叉板(54)上。
2.根据权利要求1所述铁塔液压扶正系统,其特征是:所述底座组件(1)中的所有下斜角钢和斜框板均有相对于竖直方向8度的倾角。
3.根据权利要求2所述铁塔液压扶正系统,其特征是:所述角钢卡子(6)上的四个三角形筋板(63)均为去角三角形筋板,且四个筋板后部焊接有一后板(61)。
4.根据权利要求3所述铁塔液压扶正系统,其特征是:所述底座组件(1)中正方形底板(12)的边长为1801mm,底板中部正方形孔的边长为950mm。
CN2010101331056A 2010-03-26 2010-03-26 铁塔液压扶正系统 Active CN101812927B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2010101331056A CN101812927B (zh) 2010-03-26 2010-03-26 铁塔液压扶正系统

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2010101331056A CN101812927B (zh) 2010-03-26 2010-03-26 铁塔液压扶正系统

Publications (2)

Publication Number Publication Date
CN101812927A CN101812927A (zh) 2010-08-25
CN101812927B true CN101812927B (zh) 2011-09-28

Family

ID=42620281

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2010101331056A Active CN101812927B (zh) 2010-03-26 2010-03-26 铁塔液压扶正系统

Country Status (1)

Country Link
CN (1) CN101812927B (zh)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103982051A (zh) * 2014-05-28 2014-08-13 扬州大学 古建筑歪闪木构架张拉顶撑复位装置

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106197819A (zh) * 2016-06-29 2016-12-07 安徽电信工程有限责任公司 一种防止通信铁塔螺栓松动的监测方法
CN109610878B (zh) * 2018-12-17 2023-07-18 济南王府园林古建筑工程有限公司 多功能墙体矫正仪器及墙体矫正方法
CN112714508B (zh) * 2020-12-17 2022-05-17 嘉兴恒创电力设计研究院有限公司 一种环境自适应电力通信共享塔装置

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2094615U (zh) * 1991-03-05 1992-01-29 大庆石油管理局第三采油厂 连接悬吊管扶正对中机械手
CN2397251Y (zh) * 1999-08-30 2000-09-20 段红军 一种油田井架用扶正机械手
CN2484400Y (zh) * 2001-05-24 2002-04-03 辽河石油勘探局工程技术研究院 液压式套管扶正装置
CN2550489Y (zh) * 2002-07-08 2003-05-14 大庆石油管理局 可变径套管扶正器
CN2616659Y (zh) * 2003-01-13 2004-05-19 兰州腾达液压气动成套有限责任公司 全液压套管扶正机

Family Cites Families (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2009249995A (ja) * 2008-04-10 2009-10-29 Kyushu Electric Power Co Inc 鋼管鉄塔主柱材取替工法およびその工法に用いる接続金具構成体
CN201818099U (zh) * 2010-03-26 2011-05-04 四川电力送变电建设公司 铁塔液压扶正系统

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2094615U (zh) * 1991-03-05 1992-01-29 大庆石油管理局第三采油厂 连接悬吊管扶正对中机械手
CN2397251Y (zh) * 1999-08-30 2000-09-20 段红军 一种油田井架用扶正机械手
CN2484400Y (zh) * 2001-05-24 2002-04-03 辽河石油勘探局工程技术研究院 液压式套管扶正装置
CN2550489Y (zh) * 2002-07-08 2003-05-14 大庆石油管理局 可变径套管扶正器
CN2616659Y (zh) * 2003-01-13 2004-05-19 兰州腾达液压气动成套有限责任公司 全液压套管扶正机

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
JP特开2009-249995A 2009.10.29

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103982051A (zh) * 2014-05-28 2014-08-13 扬州大学 古建筑歪闪木构架张拉顶撑复位装置
CN103982051B (zh) * 2014-05-28 2016-01-20 扬州大学 古建筑歪闪木构架张拉顶撑复位装置

Also Published As

Publication number Publication date
CN101812927A (zh) 2010-08-25

Similar Documents

Publication Publication Date Title
CN101812927B (zh) 铁塔液压扶正系统
CN201818099U (zh) 铁塔液压扶正系统
CN101892812B (zh) 一种冲击钻或电钻支架
CN101806151B (zh) 铁塔主材更换装置
CN103938663A (zh) 一种单拼角钢主材的倾斜输电铁塔纠偏装置
CN207585577U (zh) 一种用于在隧道围岩上安装埋入式混凝土应变计的装置
CN210029819U (zh) 一种悬臂吊起重机立柱加固装置
CN201635416U (zh) 铁塔主材更换装置
CN106284852A (zh) 一种平面可调位置的钢筋连接器
CN202745208U (zh) 重组竹框架结构节点连接
CN205329738U (zh) 一种新型伞状地基承载力检测装置
CN203594058U (zh) 一种单拼角钢主材的倾斜输电铁塔纠偏装置
CN201924350U (zh) 一种用于抗拔管桩的插销式机械连接卡
CN211421332U (zh) 沟槽边坡修整测量定位工具
CN209685126U (zh) 一种钢连廊整体提升吊耳装置
CN106120880A (zh) 一种海上风电单桩基础抗压承载力试验装置
CN209960150U (zh) 一种加固型监控杆
CN202577132U (zh) V形钢管混凝土桥墩的锚箱结构
CN204456164U (zh) 一种通信塔的拼接式基座
CN105113426A (zh) 一种扣索联结器及钢桁拱桥扣索联结的方法
CN207296567U (zh) 一种智能通信杆
CN206987428U (zh) 一种建筑机械专用简易支撑架
CN201310147Y (zh) 一种桁架
CN204959605U (zh) 扣索联结器
CN206015740U (zh) 一种海上风电单桩基础抗压承载力试验装置

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
ASS Succession or assignment of patent right

Owner name: STATE GRID CORPORATION OF CHINA

Effective date: 20121224

C41 Transfer of patent application or patent right or utility model
TR01 Transfer of patent right

Effective date of registration: 20121224

Address after: 610051 Chenghua District, Chengdu, Cui Cui shop north road, No. 1, No. 6, Sichuan

Patentee after: Sichuan Electric Power Transmission & Transformation Construction Co., Ltd.

Patentee after: State Grid Corporation of China

Address before: 610051 Chenghua District, Chengdu, Cui Cui shop north road, No. 1, No. 6, Sichuan

Patentee before: Sichuan Electric Power Transmission & Transformation Construction Co., Ltd.