CN102071651B - 悬索桥吊索换索方法 - Google Patents

悬索桥吊索换索方法 Download PDF

Info

Publication number
CN102071651B
CN102071651B CN 201010587451 CN201010587451A CN102071651B CN 102071651 B CN102071651 B CN 102071651B CN 201010587451 CN201010587451 CN 201010587451 CN 201010587451 A CN201010587451 A CN 201010587451A CN 102071651 B CN102071651 B CN 102071651B
Authority
CN
China
Prior art keywords
hoist cable
new
sling
bolt
nut
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN 201010587451
Other languages
English (en)
Other versions
CN102071651A (zh
Inventor
宁世伟
赵军
徐文磊
薛花娟
周祝兵
姚永峰
吴琼
赵成哲
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Fasten Group Co Ltd
Jiangsu Fasten Nippon Steel Cable Co Ltd
Original Assignee
Fasten Group Co Ltd
Jiangsu Fasten Nippon Steel Cable Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Fasten Group Co Ltd, Jiangsu Fasten Nippon Steel Cable Co Ltd filed Critical Fasten Group Co Ltd
Priority to CN 201010587451 priority Critical patent/CN102071651B/zh
Publication of CN102071651A publication Critical patent/CN102071651A/zh
Application granted granted Critical
Publication of CN102071651B publication Critical patent/CN102071651B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

本发明涉及一种悬索桥吊索换索方法,包括以下工艺过程:在悬索桥的主缆上安装临时索夹;在临时索夹上架设辅助索;在吊装孔上安装主拉杆,在主拉杆端部拧上螺母,将小拉杆穿过垫板两边的四孔位,并在小拉杆端部安装螺栓拉拔器或千斤顶;启动螺栓拉拔器或千斤顶开始张拉,并不断敲击原旧吊索下耳板中销轴,直至敲出该销轴,拧紧主拉杆上的螺母;提升原旧吊索,将原旧吊索上耳板中的销轴敲出,取下原旧吊索,将新吊索换上,安装新吊索方法与卸旧吊索方法相反。新吊索换完后,松开所述螺栓拉拔器或千斤顶上的螺母,卸压,并松开主拉杆上的螺母,重复上述操作,直至新吊索完全张紧;拆除辅助索、垫板、主拉杆、小拉杆和临时索夹。本发明悬索桥吊索换索方法施工方便,安全可靠。

Description

悬索桥吊索换索方法
技术领域
本发明涉及一种悬索桥用吊索更换的方法,属桥梁建筑工程技术领域。
背景技术
悬索桥通常由缆索系统(包括主缆和吊索)、桥塔、加劲梁和锚碇四部分组成。其安装结构如图1和图2所示。加劲梁通过吊索将桥面荷载传给主缆,主缆将载荷作用在桥塔及锚碇上。因此吊索是悬索桥的主要传力构件。由于悬索桥设计寿命一般为100年到200年,而吊索作为一种可更换的构件,一般寿命为30年到50年,加上一些不可预计的外界因素的影响,悬索桥在整个运营寿命期内需要更换吊索,以保证整体结构的寿命。但目前还没有成熟的换索方法。
发明内容
本发明的目的在于克服上述不足,提供一种施工方便、安全可靠的悬索桥吊索换索方法。
本发明的目的是这样实现的:一种悬索桥吊索换索方法,所述方法包括以下工艺过程:
1)在悬索桥的主缆上安装临时索夹,临时索夹内垫橡胶板;
2)在临时索夹上架设两辅助索,辅助索中间绕过临时索夹索槽,两端连接小拉杆,辅助索用紧固件临时固定;
3)在悬索桥的梁上的联接耳板的吊装孔上安装一主拉杆,在主拉杆上通过垫板中间的孔位套上垫板,在主拉杆端部拧上螺母,再将四小拉杆穿过垫板两边的四孔位,并在各小拉杆端部安装一螺栓拉拔器或千斤顶;
4)测量原旧索上下耳板孔距离,并根据此距离调整新索长度;
5)启动所述小拉杆端部的螺栓拉拔器或千斤顶进行预拉伸,测量所述垫板四角高度差,卸压后,根据上述高度差调整螺栓拉拔器或千斤顶中的螺母,并用水平尺沿纵横两方向检查,保证螺栓拉拔器或千斤顶拉伸时垫板保持水平;
6)启动所述螺栓拉拔器或千斤顶开始张拉,并使垫板保持水平,螺栓拉拔器或千斤顶拉拔后,将主拉杆上的螺母拧紧,重复进行上述过程,并不断敲击原旧吊索下耳板中销轴,直至敲出该销轴,拧紧主拉杆上的螺母,在销轴敲击过程中喷润滑剂,以帮助销轴的顺利卸出;
7)提升原旧吊索,将原旧吊索上耳板中的销轴敲出,取下原旧吊索,处理其上下耳板连接处,立即将新吊索换上,安装新吊索方法与卸旧吊索方法相反;
8)旧吊索拆下后立即张拉测长,与新吊索进行比对,确保新吊索长度准确;
9)新吊索换完后,松开所述螺栓拉拔器或千斤顶上的螺母,卸压,并松开主拉杆上的螺母,重复上述操作,直至新吊索完全张紧;
10)螺栓拉拔器或千斤顶对主拉杆进行卸载的过程中,需实施对比两根新换吊索的松紧程度,以确保最终新吊索受力均匀;
11)测量新吊索上下耳板孔距离,并和原旧吊索上下耳板孔之间距离进行比较,如两者距离相同,则证明新旧吊索受力相同;若两者距离差异较大,需进行调整,直至满足要求;
12)新吊索更换完成后,拆除辅助索、垫板、主拉杆、小拉杆和临时索夹;
13)对新吊索上下耳板销轴部位,用密封胶进行防腐处理,原旧吊索销轴卸出后,若发现其上下耳板孔位有锈蚀情况,进行防锈处理。
本发明的有益效果是: 
本发明悬索桥吊索换索方法施工方便,安全可靠。
附图说明
图1为本发明涉及的悬索桥吊索立面图。
图2为图1的A-A剖示图。
图3为本发明的实施过程示意图。
图4为本发明涉及的临时索夹示意图。
图中附图标记:
索夹1、锚具2、缓冲器3、吊索4、减震架5、梁上的联接耳板6、主缆7、桥面板销孔8、临时索夹9、辅助索10、小拉杆11、螺母12、垫板13、螺栓拉拔器或千斤顶14、主拉杆15。
具体实施方式
参见图3和图4,图3为本发明的实施过程示意图。图4为本发明涉及的临时索夹示意图。本发明涉及的悬索桥吊索换索方法,所述方法包括以下工艺过程:
1)在悬索桥的主缆7上安装临时索夹9,临时索夹内垫橡胶板,以防止临时索夹损伤主缆防护层。
2)在临时索夹上架设两辅助索10,两辅助索中间绕过临时索夹索槽,两端共连接四条小拉杆11,辅助索用紧固件临时固定,以防滑脱。
3)在悬索桥的梁上的联接耳板6的吊装孔上安装主拉杆15,在主拉杆上通过垫板中间的孔位套上垫板13,在主拉杆端部拧上螺母,再将四小拉杆11穿过垫板两边的四孔位,并在四小拉杆端部共安装四个螺栓拉拔器或千斤顶14固定小拉杆。
4)测量原旧索上下耳板孔距离,并根据此距离调整新索长度。
5)启动所述小拉杆端部的螺栓拉拔器或千斤顶进行预拉伸,测量所述垫板四角高度差,卸压后,根据上述高度差调整螺栓拉拔器或千斤顶中的螺母,并用水平尺沿纵横两方向检查,保证螺栓拉拔器或千斤顶拉伸时垫板保持水平。
6)启动所述螺栓拉拔器或千斤顶开始张拉,并使垫板保持水平,四个螺栓拉拔器或千斤顶拉拔后,将主拉杆上的螺母拧紧。重复进行上述过程,并不断敲击原旧吊索下耳板中销轴,直至敲出该销轴,拧紧主拉杆上的螺母。在销轴敲击过程中喷润滑剂,以帮助销轴的顺利卸出。
7)提升原旧吊索,将原旧吊索上耳板中的销轴敲出,取下原旧吊索,处理其上下耳板连接处,并立即将新吊索换上;安装新吊索方法与卸旧吊索方法相反。
8)旧吊索拆下后立即张拉测长,与新吊索进行比对,确保新吊索长度准确。
9)新吊索换完后,松开所述螺栓拉拔器或千斤顶上的螺母,卸压,并松开主拉杆上的螺母,重复上述操作,直至新吊索完全张紧。
10)螺栓拉拔器或千斤顶对主拉杆进行卸载的过程中,需实施对比两根新换吊索的松紧程度,以确保最终新吊索受力均匀。
11)测量新吊索上下耳板孔距离,并和原旧吊索上下耳板孔之间距离进行比较,如两者距离相同,则证明新旧吊索受力相同;若两者距离差异较大,需进行调整,直至满足要求。
12)新吊索更换完成后,拆除辅助索、垫板、主拉杆、小拉杆和临时索夹等辅助工装。
13)对新吊索上下耳板销轴部位,用密封胶进行防腐处理,原旧吊索销轴卸出后,若发现其上下耳板孔位有锈蚀情况,应立即进行防锈处理。
图3中,桥面板销孔8。
图4中,螺母12,螺栓拉拔器或千斤顶14。

Claims (1)

1. 一种悬索桥吊索换索方法,其特征在于:所述方法包括以下工艺过程:
1)在悬索桥的主缆上安装临时索夹,临时索夹内垫橡胶板;
2)在临时索夹上架设两辅助索,辅助索中间绕过临时索夹索槽,两端连接小拉杆,辅助索用紧固件临时固定,
3)在悬索桥的梁上的联接耳板的吊装孔上安装一主拉杆,在主拉杆上通过垫板中间的孔位套上垫板,在主拉杆端部拧上螺母,再将四小拉杆穿过垫板两边的四孔位,并在各小拉杆端部安装一螺栓拉拔器或千斤顶;
4)测量原旧索上下耳板孔距离,并根据此距离调整新索长度;
5)启动所述小拉杆端部的螺栓拉拔器或千斤顶进行预拉伸,测量所述垫板四角高度差,卸压后,根据上述高度差调整螺栓拉拔器或千斤顶中的螺母,并用水平尺沿纵横两方向检查,保证螺栓拉拔器或千斤顶拉伸时垫板保持水平;
6)启动所述螺栓拉拔器或千斤顶开始张拉,并使垫板保持水平,螺栓拉拔器或千斤顶拉拔后,将主拉杆上的螺母拧紧,重复进行上述过程,并不断敲击原旧吊索下耳板中销轴,直至敲出该销轴,拧紧主拉杆上的螺母,在销轴敲击过程中喷润滑剂,以帮助销轴的顺利卸出;
7)提升原旧吊索,将原旧吊索上耳板中的销轴敲出,取下原旧吊索,处理其上下耳板连接处,立即将新吊索换上,安装新吊索方法与卸旧吊索方法相反;
8)旧吊索拆下后立即张拉测长,与新吊索进行比对,确保新吊索长度准确;
9)新吊索换完后,松开所述螺栓拉拔器或千斤顶上的螺母,卸压,并松开主拉杆上的螺母,重复上述操作,直至新吊索完全张紧;
10)螺栓拉拔器或千斤顶对主拉杆进行卸载的过程中,需实施对比两根新换吊索的松紧程度,以确保最终新吊索受力均匀;
11)测量新吊索上下耳板孔距离,并和原旧吊索上下耳板孔之间距离进行比较,如两者距离相同,则证明新旧吊索受力相同;若两者距离差异较大,需进行调整,直至满足要求;
12)新吊索更换完成后,拆除辅助索、垫板、主拉杆、小拉杆和临时索夹;
13)对新吊索上下耳板销轴部位,用密封胶进行防腐处理,原旧吊索销轴卸出后,若发现其上下耳板孔位有锈蚀情况,进行防锈处理。
CN 201010587451 2010-12-15 2010-12-15 悬索桥吊索换索方法 Active CN102071651B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201010587451 CN102071651B (zh) 2010-12-15 2010-12-15 悬索桥吊索换索方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201010587451 CN102071651B (zh) 2010-12-15 2010-12-15 悬索桥吊索换索方法

Publications (2)

Publication Number Publication Date
CN102071651A CN102071651A (zh) 2011-05-25
CN102071651B true CN102071651B (zh) 2012-06-27

Family

ID=44030390

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201010587451 Active CN102071651B (zh) 2010-12-15 2010-12-15 悬索桥吊索换索方法

Country Status (1)

Country Link
CN (1) CN102071651B (zh)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103225269A (zh) * 2013-04-17 2013-07-31 河海大学 悬索桥吊索自动控制更换装置及基于该更换装置的吊索更换方法

Families Citing this family (20)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102286943B (zh) * 2011-08-23 2013-03-06 河海大学 悬索桥吊索更换装置
CN102561215B (zh) * 2012-02-20 2013-12-18 四川天元机械工程股份有限公司 一种悬索桥散索套更换方法
CN102561216B (zh) * 2012-03-09 2013-12-25 中交第一公路勘察设计研究院有限公司 悬索桥吊拉组合体系加固结构的计算方法
CN103526699B (zh) * 2013-10-21 2015-06-10 中国石油化工股份有限公司 一种管道桥悬吊钢索的更换方法
CN103643636B (zh) * 2013-11-27 2015-12-09 南京润华市政建设有限公司 一种刚性吊杆顶推滑移装置及其滑移方法
CN103696371B (zh) * 2013-12-25 2015-09-23 中铁大桥局集团第四工程有限公司 一种用于自锚式悬索桥吊索的张拉装置及方法
CN104631326A (zh) * 2014-12-22 2015-05-20 广东省公路勘察规划设计院股份有限公司 自锚式悬索桥主梁斜拉悬挂成梁工艺方法
CN104631328B (zh) * 2014-12-30 2017-09-12 上海市基础工程集团有限公司 圆弧形桥梁水平环索的施工工艺
CN105401532B (zh) * 2015-12-16 2017-05-03 柳州欧维姆工程有限公司 一种牵引摩擦式锚固吊杆更换用装置及其用于钢管拱桥吊杆更换的方法
CN105887701B (zh) * 2016-04-18 2018-01-30 武汉二航路桥特种工程有限责任公司 悬索桥上部结构拆除与更换安装方法
CN106087770B (zh) * 2016-08-12 2017-10-31 柳州欧维姆工程有限公司 用于钢管桁架混凝土拱桥吊杆更换的抱箍式工具吊杆装置
CN107587429B (zh) * 2017-08-04 2018-10-23 东南大学 悬索桥索夹安装位置修正方法
CN107663831A (zh) * 2017-11-13 2018-02-06 湖南省交通规划勘察设计院有限公司 一种拉吊索锚固结构件及拉吊索更换方法
CN110593138A (zh) * 2018-06-12 2019-12-20 王双其 悬索桥主缆索更换方法
CN109056529B (zh) * 2018-09-25 2024-03-08 中铁二院工程集团有限责任公司 一种适用于铁路钢桁梁悬索桥销接式吊索的钢锚箱
CN109487689B (zh) * 2018-10-12 2019-10-01 西南交通大学 一种分体式销接型缆索用索夹
CN109235284A (zh) * 2018-11-30 2019-01-18 中交二公局第五工程有限公司 一种无吊索梁段的施工设备及方法
CN110878517B (zh) * 2019-11-22 2021-02-12 柳州欧维姆机械股份有限公司 一种悬索桥更换主缆用的连接结构、固定结构、新主缆系统及施工方法
CN111305033B (zh) * 2019-11-22 2021-04-13 柳州欧维姆机械股份有限公司 一种悬索桥更换主缆用的连接结构、固定结构、新主缆系统及施工方法
CN113322834B (zh) * 2021-04-15 2022-11-25 江苏法尔胜缆索有限公司 一种悬索桥单吊点张拉更换吊索方法

Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR2745829A1 (fr) * 1996-03-08 1997-09-12 Baudin Chateauneuf Procede et dispositif pour le remplacement d'un cable ou organe analogue de transmission d'efforts
CN2305449Y (zh) * 1997-07-16 1999-01-27 中外合资柳州欧维姆建筑机械有限公司 预应力锚碇
FR2806428A1 (fr) * 2000-03-14 2001-09-21 Freyssinet Int Stup Procede pour ancrer un nouveau cable a un massif d'ancrage preexistant sur lequel est deja ancre un cable d'origine
CN2739227Y (zh) * 2004-11-06 2005-11-09 柳州欧维姆机械股份有限公司 可换式悬索桥锚碇预应力锚固体系
CN2801876Y (zh) * 2005-06-08 2006-08-02 汤朋 用于桥梁吊杆和拉索的破断预警及在线拆换装置
CN201047059Y (zh) * 2007-05-15 2008-04-16 四川天元机械工程有限责任公司 悬索桥的悬挂结构及其索夹
CN101215822A (zh) * 2008-01-08 2008-07-09 中交第二公路勘察设计研究院有限公司 悬索桥锚碇可更换式预应力的方法及装置
CN101509231A (zh) * 2009-03-26 2009-08-19 周孝余 快速拆卸斜拉桥拉索的施工方法
CN201347537Y (zh) * 2009-01-14 2009-11-18 陈耀章 桥梁吊索单绞线可抽换结构

Patent Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR2745829A1 (fr) * 1996-03-08 1997-09-12 Baudin Chateauneuf Procede et dispositif pour le remplacement d'un cable ou organe analogue de transmission d'efforts
CN2305449Y (zh) * 1997-07-16 1999-01-27 中外合资柳州欧维姆建筑机械有限公司 预应力锚碇
FR2806428A1 (fr) * 2000-03-14 2001-09-21 Freyssinet Int Stup Procede pour ancrer un nouveau cable a un massif d'ancrage preexistant sur lequel est deja ancre un cable d'origine
CN2739227Y (zh) * 2004-11-06 2005-11-09 柳州欧维姆机械股份有限公司 可换式悬索桥锚碇预应力锚固体系
CN2801876Y (zh) * 2005-06-08 2006-08-02 汤朋 用于桥梁吊杆和拉索的破断预警及在线拆换装置
CN201047059Y (zh) * 2007-05-15 2008-04-16 四川天元机械工程有限责任公司 悬索桥的悬挂结构及其索夹
CN101215822A (zh) * 2008-01-08 2008-07-09 中交第二公路勘察设计研究院有限公司 悬索桥锚碇可更换式预应力的方法及装置
CN201347537Y (zh) * 2009-01-14 2009-11-18 陈耀章 桥梁吊索单绞线可抽换结构
CN101509231A (zh) * 2009-03-26 2009-08-19 周孝余 快速拆卸斜拉桥拉索的施工方法

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103225269A (zh) * 2013-04-17 2013-07-31 河海大学 悬索桥吊索自动控制更换装置及基于该更换装置的吊索更换方法
CN103225269B (zh) * 2013-04-17 2014-09-10 河海大学 悬索桥吊索自动控制更换装置及基于该更换装置的吊索更换方法

Also Published As

Publication number Publication date
CN102071651A (zh) 2011-05-25

Similar Documents

Publication Publication Date Title
CN102071651B (zh) 悬索桥吊索换索方法
CA2998110C (en) System and method for installing a tensioning tendon in a wind turbine tower
JP6725559B2 (ja) 吊材取替装置及びそれを用いた吊材取替工法
CN109736213B (zh) 用于夹片群锚式钢绞线拉索快速更换的工装及其拆除施工方法
CN109487709B (zh) 一侧骑跨式临时索自平衡顶推式悬索桥吊索更换托换装置
CN104695752B (zh) 快速抢修塔系统及其架设方法
CN113966435A (zh) 风力发电机安装和拆卸装置及利用此装置的施工方法
CN209397501U (zh) 桥面吊机
CN203794498U (zh) 一种内置式自升塔吊装置
CN110820522A (zh) 一种悬索桥更换主缆用吊索转换装置、吊索及施工方法
CN216341336U (zh) 一种750×750mm截面抱杆系统的可调节式倒装架构造
CN201952742U (zh) 悬索桥吊索换索设备
CN109537476B (zh) 销耳式双临时索自平衡拽拉式悬索桥吊索更换托换装置
CN108625289B (zh) 一种适用于悬索桥加劲梁的架设装置及架设方法
CN104989092B (zh) 一种高空悬挑叠合式钢桁架承重平台的施工方法
CN204609435U (zh) 抢修塔辅助起升塔
CN104018684B (zh) 一种大跨度实腹式弧形梁双索提升装置及其提升方法
CN202519621U (zh) 用于悬空支撑系统的钢抱箍
CN107642049B (zh) 一种用于悬索桥主缆索夹更换的装置及其安装方法
CN115680313A (zh) 用于张弦桁架结构的叉戟式拉索智能更换及索力监测装置
CN209837061U (zh) 一种加固桥梁水下钢围堰快捷下压的装置
CN104033340A (zh) 一种风力发电预制混凝土塔架体内预应力张拉方法
CN104088468B (zh) 一种钢结构多节柱吊装自动脱钩装置
CN203787856U (zh) 更换铁塔主材装置
CN221320697U (zh) 一种桥梁施工附着式可调节托架

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant