CN107642049B CN201710731656.4A CN201710731656A CN107642049B CN 107642049 B CN107642049 B CN 107642049B CN 201710731656 A CN201710731656 A CN 201710731656A CN 107642049 B CN107642049 B CN 107642049B
Authority
CN
China
Prior art keywords
main cable
anchor ear
temporary anchor
hanger
steel wire
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201710731656.4A
Other languages
English (en)
Other versions
CN107642049A (zh
Inventor
窦勇芝
韦福堂
甘科
李长乐
黎祖金
宁绍锋
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Liuzhou Ovm Engineering Co ltd
Liuzhou OVM Machinery Co Ltd
Original Assignee
Liuzhou Ovm Engineering Co ltd
Liuzhou OVM Machinery Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Liuzhou Ovm Engineering Co ltd, Liuzhou OVM Machinery Co Ltd filed Critical Liuzhou Ovm Engineering Co ltd
Priority to CN201710731656.4A priority Critical patent/CN107642049B/zh
Publication of CN107642049A publication Critical patent/CN107642049A/zh
Application granted granted Critical
Publication of CN107642049B publication Critical patent/CN107642049B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

本发明公开了一种用于悬索桥主缆索夹更换的装置及其安装方法,包括临时抱箍、橡胶垫、吊架、钢丝绳和耳板,吊架由多个节段拼装而成,临时抱箍分别设置在主缆索夹两侧与主缆可拆卸连接,临时抱箍与主缆之间安装橡胶垫,临时抱箍下部连接有耳板,钢丝绳一端连接耳板,另一端连接吊架。本发明以节段式拼装的吊架为施工平台,有效的利用了悬索桥主缆下部空间,以锚固于主缆上的临时抱箍为反力支点,构造轻型,施工费用经济,安装便捷,便于标准化施工,工期短,对结构受力影响较小的优点。

Description

一种用于悬索桥主缆索夹更换的装置及其安装方法
技术领域
本发明涉及一种悬索桥检测维修技术领域,具体是一种用于悬索桥主缆索夹更换的装置及其安装方法。
背景技术
目前,用于悬索桥主缆索夹更换的主缆下方作业平台,大多采取自桥面以上搭设满堂支架方式,如中国专利CN105887701A,提供了一种悬索桥上部结构拆除与更换安装方法,包括以下步骤:a.在悬索桥外侧搭设与其平行的栈桥,栈桥两端与对应的悬索桥两端的引桥连接;b.检查悬索桥两端的锚碇,确定其处于正常工作状态;c.分段拆除悬索桥上部的原加劲梁;d.拆除原加劲梁对应的原吊杆、原索夹;e.通过履带吊起吊主缆实现悬索桥上部原主缆的拆除;f.通过履带吊起吊新主缆实现安装;g.通过测量放样在相应位置安装新索夹及新吊杆;h.履带吊分节起吊各段新加劲梁节段至指定位置,待全部新加劲梁节段安装完毕后,将所有节段连接成为整体,该方法能减少因悬索桥上部结构拆除与更换所带来的负面影响,但存在如下缺点:施工周期长,费用高,搭设施工平台作业面大,安装困难,工作强度高。
发明内容
本发明的目的是提供一种用于悬索桥主缆索夹更换的装置及其安装方法,结合悬索桥结构特点,以吊架为施工平台进行索夹更换施工代替传统的自桥面以上搭设满堂支架方式,解决主缆索夹更换施工周期长,费用高,进度慢,搭设作业面大,工作强度高的问题。
本发明技术方案如下:一种用于悬索桥主缆索夹更换的装置,包括临时抱箍(1)、橡胶垫(2)、吊架(4)、钢丝绳(5)和耳板(8),吊架(4)由多个吊架节段(41)拼装而成,可根据实际施工现场情况,调整节段数量增减而调节吊架(4)长度;临时抱箍(1)分别设置在主缆索夹(6)两侧,临时抱箍(1)与主缆(7)为可拆卸连接,临时抱箍(1)与主缆(7)之间安装橡胶垫(2),增加了临时抱箍(1)与主缆(7)的摩擦力,提高了固定的可靠性,临时抱箍(1)下部连接有耳板(8);钢丝绳(5)的一端连接耳板(8),另一端连接在耳板(8)下方相对的吊架(4)上。本发明有效的利用了悬索桥主缆(7)下部的空间,以锚固于主缆(7)上的临时抱箍(1)为反力支点,通过钢丝绳(5)将临时抱箍(1)与吊架(4)连接,以吊架(4)为施工平台,构造轻型,施工费用经济,安装便捷,便于标准化施工,工期短,对结构受力影响较小的优点。
优选的,临时抱箍(1)包括临时抱箍上半部(101)和下半部(102),临时抱箍上半部(101)和下半部(102)通过螺栓(3)连接并夹紧主缆(7),结构简单,有利于临时抱箍的拆卸,且夹紧力可调。
优选的,螺栓(3)设置在临时抱箍(1)的两侧,螺栓(3)在每一侧的数量为至少两个且沿主缆(7)轴向均匀分布,临时抱箍上半部(101)和下半部(102)连接受力均匀,连接可靠性高。
优选的,钢丝绳(5)与吊架(4)的连接点为两个以上,采用多点固定,防止吊架(4)侧翻,保证了吊架(4)连接的稳定性和可靠性。
优选的,吊架节段(41)包括吊架节点(412)和吊架杆件(411),吊架节点(412)由三条钢管三维垂直交叉连接而成,吊架节点(412)上连接有分别与钢管垂直的三块钢板,横向、纵向和竖向的吊架杆件(411)安装在吊架节点(412)的钢管内,斜向的吊架杆件(411)连接吊架节点(412)的钢板,拼装简单,便于标准化施工,降低成本。
优选的,吊架节点(412)和吊架杆件(411)采用螺栓连接,连接可拆,加工简单,施工费用经济。
一种用于悬索桥主缆索夹更换的装置的安装方法,包括如下步骤:
步骤1,在桥面上以汽车吊通过钢丝绳连接吊篮,将临时抱箍(1)依次吊到主缆索夹(6)两侧;
步骤2,将橡胶垫(2)安装在临时抱箍(1)与主缆(7)之间,将临时抱箍(1)固定安装夹紧在主缆(7)上;
步骤3,在桥面上拼装吊架(4),采用将钢丝绳(5)一端吊架(4),然后以提升装置通过钢丝绳(5)起吊吊架(4)到主缆索夹(6)下方指定位置;
步骤4,将钢丝绳(5)另一端连接耳板(8),完成安装。
该安装方法施工费用经济,安装步骤简单。
本发明的有益效果:
1.本发明以节段式拼装的吊架为施工平台,有效的利用了悬索桥主缆,以锚固于主缆上的临时抱箍为反力支点,通过钢丝绳将临时抱箍与吊架连接,从而为更换主缆索夹提供作业平台。
2.采用拼装结构吊架和可拆卸的连接结构,可根据实际施工要求调整工作平台大小,结构简单轻便,提高了安装的灵活性,适用性强。
该抱箍式吊架装置具有构造轻型,施工费用经济,安装便捷,便于标准化施工,工期短,对结构受力影响较小的优点。
附图说明
图1是本发明所述的一种用于悬索桥主缆索夹更换的装置的结构示意图。
图2是本发明所述的一种用于悬索桥主缆索夹更换的装置的吊架的结构示意图。
图3是本发明所述的一种用于悬索桥主缆索夹更换的装置的临时抱箍的结构示意图。
图4是图2中B处的局部放大图。
图5是本发明所述的一种用于悬索桥主缆索夹更换的装置的吊架节点的结构示意图。
图中:1、临时抱箍,101、临时抱箍上半部,102、临时抱箍下半部,2、橡胶垫,3、螺栓,4、吊架,41、吊架节段,411、吊架杆件,412、吊架节点,5、钢丝绳,6、主缆索夹,7、主缆,8、耳板。
具体实施方式:
为详细说明本发明的技术内容、所实现目的及效果,以下结合实施方式并配合附图予以说明。
如图1和图2所示:一种用于悬索桥主缆索夹更换的装置,包括临时抱箍(1)、橡胶垫(2)、吊架(4)、钢丝绳(5)和耳板(8),吊架(4)由多个吊架节段(41)拼装而成,可根据实际施工现场情况,调整节段数量增减而调节吊架(4)长度;临时抱箍(1)分别设置在主缆索夹(6)两侧,临时抱箍(1)与主缆(7)为可拆卸连接,临时抱箍(1)与主缆(7)之间安装橡胶垫(2),增加了临时抱箍(1)与主缆(7)的摩擦力,提高了固定的可靠性,临时抱箍(1)下部连接有耳板(8);钢丝绳(5)的一端连接耳板(8),另一端连接在耳板(8)下方相对的吊架(4)上。本发明有效的利用了悬索桥主缆(7)下部的空间,以锚固于主缆(7)上的临时抱箍(1)为反力支点,通过钢丝绳(5)将临时抱箍(1)与吊架(4)连接,以吊架(4)为施工平台,构造轻型,施工费用经济,安装便捷,便于标准化施工,工期短,对结构受力影响较小的优点。
如图3所示,临时抱箍(1)包括临时抱箍上半部(101)和下半部(102),临时抱箍上半部(101)和下半部(102)通过螺栓(3)连接并夹紧主缆(7),结构简单,有利于临时抱箍的拆卸,且夹紧力可调。
如图3所示,螺栓(3)设置在临时抱箍(1)的两侧,螺栓(3)在每一侧的数量为至少两个且沿主缆(7)轴向均匀分布,临时抱箍上半部(101)和下半部(102)连接受力均匀,连接可靠性高。
如图2所示,钢丝绳(5)与吊架(4)的连接点为两个以上,采用多点固定,防止吊架(4)侧翻,保证了吊架(4)连接的稳定性和可靠性。
如图4所示:吊架节段(41)包括吊架节点(412)和吊架杆件(411),吊架节点(412)由三条钢管三维垂直交叉连接而成,吊架节点(412)上连接有分别与钢管垂直的三块钢板,横向、纵向和竖向的吊架杆件(411)安装在吊架节点(412)的钢管内,斜向的吊架杆件(411)连接吊架节点(412)的钢板,拼装简单,便于标准化施工,降低成本。
如图5所示:吊架节点(412)和吊架杆件(411)采用螺栓连接,连接可拆,加工简单,施工费用经济。
该装置的安装方法,包括如下步骤:
步骤1,在桥面上以汽车吊通过钢丝绳连接吊篮,将临时抱箍(1)依次吊到主缆索夹(6)两侧;
步骤2,将橡胶垫(2)安装在临时抱箍(1)与主缆(7)之间,将临时抱箍(1)固定安装夹紧在主缆(7)上;
步骤3,在桥面上拼装吊架(4),采用将钢丝绳(5)一端吊架(4),然后以提升装置通过钢丝绳(5)起吊吊架(4)到主缆索夹(6)下方指定位置;
步骤4,将钢丝绳(5)另一端连接耳板(8),完成安装。

Claims (1)

1.一种用于悬索桥主缆索夹更换的装置的安装方法,其特征在于包括用于悬索桥主缆索夹更换的装置,所述用于悬索桥主缆索夹更换的装置包括临时抱箍(1)、橡胶垫(2)、吊架(4)、钢丝绳(5)和耳板(8),所述吊架(4)由一个以上吊架节段(41)拼装而成,所述临时抱箍(1)设置在主缆索夹(6)的两侧与主缆(7)可拆卸地连接,所述临时抱箍(1)与主缆(7)之间安装橡胶垫(2),所述临时抱箍(1)下部连接有耳板(8),所述钢丝绳(5)的一端连接所述耳板(8),另一端连接在所述耳板(8)下方相对的所述吊架(4)上;
所述临时抱箍(1)包括临时抱箍上半部(101)和下半部(102),所述临时抱箍上半部(101)和所述下半部(102)通过螺栓(3)连接并夹紧所述主缆(7);
所述螺栓(3)设置在所述临时抱箍(1)的两侧,所述螺栓(3)在每一侧的数量为至少两个且沿主缆(7)轴向均匀分布;
所述钢丝绳(5)为两组以上;
所述吊架节段(41)包括吊架节点(412)和吊架杆件(411),所述吊架节点(412)由三条钢管三维垂直交叉连接而成,所述吊架节点(412)上连接有分别与所述钢管垂直的三块钢板,横向、纵向和竖向的所述吊架杆件(411)安装在所述吊架节点(412)的钢管内,斜向的所述吊架杆件(411)连接所述吊架节点(412)的钢板;
所述吊架节点(412)和吊架杆件(411)采用螺栓连接;
包括如下步骤:
步骤1,在桥面上以汽车吊通过钢丝绳连接吊篮,将所述临时抱箍(1)依次吊到所述主缆索夹(6)两侧;
步骤2,将所述橡胶垫(2)安装在所述临时抱箍(1)与主缆(7)之间,将所述临时抱箍(1)固定安装夹紧在主缆(7)上;
步骤3,在桥面上拼装所述吊架(4),采用将所述钢丝绳(5)一端所述吊架(4),然后以提升装置通过所述钢丝绳(5)起吊所述吊架(4)到所述主缆索夹(6)下方指定位置;
步骤4,将所述钢丝绳(5)另一端连接耳板(8),完成安装。
CN201710731656.4A 2017-08-23 2017-08-23 一种用于悬索桥主缆索夹更换的装置及其安装方法 Active CN107642049B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710731656.4A CN107642049B (zh) 2017-08-23 2017-08-23 一种用于悬索桥主缆索夹更换的装置及其安装方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710731656.4A CN107642049B (zh) 2017-08-23 2017-08-23 一种用于悬索桥主缆索夹更换的装置及其安装方法

Publications (2)

Publication Number Publication Date
CN107642049A CN107642049A (zh) 2018-01-30
CN107642049B true CN107642049B (zh) 2023-07-07

Family

ID=61110480

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710731656.4A Active CN107642049B (zh) 2017-08-23 2017-08-23 一种用于悬索桥主缆索夹更换的装置及其安装方法

Country Status (1)

Country Link
CN (1) CN107642049B (zh)

Families Citing this family (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108442256A (zh) * 2018-05-25 2018-08-24 中交四公局第五工程有限公司 一种悬索桥散索套安装的双约束架和施工方法
CN110878517B (zh) * 2019-11-22 2021-02-12 柳州欧维姆机械股份有限公司 一种悬索桥更换主缆用的连接结构、固定结构、新主缆系统及施工方法
CN115031943A (zh) * 2022-06-09 2022-09-09 中交第二公路工程局有限公司 一种悬索桥主缆防护施工试验装置及其制作方法
CN118668607B (zh) * 2024-08-22 2024-11-29 中交二公局第一工程有限公司 一种悬索桥缆索系统拆除支架及其使用方法

Citations (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE19526964A1 (de) * 1995-07-24 1997-01-30 Otto Huneke Arbeitsbühne, insbesondere Brückensanierungsbühne
AU3895901A (en) * 1997-12-05 2001-06-28 Aerobus International, Inc. A force equalizing assembly for use in an elevated cableway system
CN202131060U (zh) * 2011-06-20 2012-02-01 青岛北海船舶重工有限责任公司 散货船货舱移动升降式工作平台
CN102619166A (zh) * 2012-04-14 2012-08-01 无锡科通工程机械制造有限公司 铁路大桥检测维修吊篮
JP2012144004A (ja) * 2011-01-14 2012-08-02 Canon Inc プリンタ装置
CN102776834A (zh) * 2012-07-09 2012-11-14 镇江蓝舶工程科技有限公司 悬索桥主缆工作车
CN103422432A (zh) * 2012-05-25 2013-12-04 中铁工程设计咨询集团有限公司 一种单索面斜拉桥斜拉索的检修系统及其应用
CN203654191U (zh) * 2013-11-29 2014-06-18 中交一公局厦门工程有限公司 一种用于斜拉索吊运上桥的装置
CN105752894A (zh) * 2016-03-23 2016-07-13 姚超 悬索桥主缆自爬升维修平台小车
CN205688343U (zh) * 2016-05-31 2016-11-16 北京市政建设集团有限责任公司 一种钢桁梁检修车
CN106758860A (zh) * 2017-03-13 2017-05-31 中交第四公路工程局有限公司 一种跨缆行走索夹吊运安装装置及方法
CN106988227A (zh) * 2017-05-10 2017-07-28 中交第四公路工程局有限公司 一种悬索桥钢桁梁转体装置及施工方法

Family Cites Families (14)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP3017463B2 (ja) * 1997-09-08 2000-03-06 住友金属建材株式会社 足場板、吊り足場およびその仮設方法
CN200967927Y (zh) * 2006-10-27 2007-10-31 湖南省交通厅 悬索桥多跨索道运梁机
CN100570067C (zh) * 2008-01-08 2009-12-16 中交第二公路勘察设计研究院有限公司 悬索桥锚碇可更换式预应力的方法及装置
CN101514542B (zh) * 2009-03-18 2010-11-03 上海同演建筑科技有限公司 悬挂缆索式大桥引桥桥墩、盖梁、箱梁检修装置
CN101832020B (zh) * 2010-05-15 2012-07-04 朱虹 一种桁架式操作平台
CN202755300U (zh) * 2012-07-09 2013-02-27 镇江蓝舶工程科技有限公司 主缆工作车吊篮
CN102808378B (zh) * 2012-07-09 2014-07-30 镇江蓝舶工程科技有限公司 主缆工作车纠偏装置
CN203559351U (zh) * 2013-11-14 2014-04-23 重庆桥都桥梁技术有限公司 悬挂式桥梁检修工作台
JP6059176B2 (ja) * 2014-04-15 2017-01-11 大裕株式会社 仮設高架桟橋組立て用の移動昇降足場
CN205088572U (zh) * 2015-10-30 2016-03-16 成都市新筑路桥机械股份有限公司 一种具有防滑移功能的悬索桥主缆索夹
CN205223851U (zh) * 2015-11-25 2016-05-11 深圳市索杆桥梁工程检测有限公司 一种用于悬索桥主缆检测维修工作的爬行平台
CN106193568A (zh) * 2016-08-26 2016-12-07 中建三局安装工程有限公司 移动式钢桁架操作平台
CN106948261A (zh) * 2017-04-27 2017-07-14 武大巨成结构股份有限公司 一种同步折叠桁架
CN207362717U (zh) * 2017-08-23 2018-05-15 柳州欧维姆机械股份有限公司 一种用于悬索桥主缆索夹更换的装置

Patent Citations (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE19526964A1 (de) * 1995-07-24 1997-01-30 Otto Huneke Arbeitsbühne, insbesondere Brückensanierungsbühne
AU3895901A (en) * 1997-12-05 2001-06-28 Aerobus International, Inc. A force equalizing assembly for use in an elevated cableway system
JP2012144004A (ja) * 2011-01-14 2012-08-02 Canon Inc プリンタ装置
CN202131060U (zh) * 2011-06-20 2012-02-01 青岛北海船舶重工有限责任公司 散货船货舱移动升降式工作平台
CN102619166A (zh) * 2012-04-14 2012-08-01 无锡科通工程机械制造有限公司 铁路大桥检测维修吊篮
CN103422432A (zh) * 2012-05-25 2013-12-04 中铁工程设计咨询集团有限公司 一种单索面斜拉桥斜拉索的检修系统及其应用
CN102776834A (zh) * 2012-07-09 2012-11-14 镇江蓝舶工程科技有限公司 悬索桥主缆工作车
CN203654191U (zh) * 2013-11-29 2014-06-18 中交一公局厦门工程有限公司 一种用于斜拉索吊运上桥的装置
CN105752894A (zh) * 2016-03-23 2016-07-13 姚超 悬索桥主缆自爬升维修平台小车
CN205688343U (zh) * 2016-05-31 2016-11-16 北京市政建设集团有限责任公司 一种钢桁梁检修车
CN106758860A (zh) * 2017-03-13 2017-05-31 中交第四公路工程局有限公司 一种跨缆行走索夹吊运安装装置及方法
CN106988227A (zh) * 2017-05-10 2017-07-28 中交第四公路工程局有限公司 一种悬索桥钢桁梁转体装置及施工方法

Non-Patent Citations (3)

* Cited by examiner, † Cited by third party
Title
桂林丽君桥主缆、吊杆施工技术;甘科;施工技术;第33卷(第9期);正文第40-41页 *
桥梁索体系病害分析及特殊检测维修技术;林阳子;广东土木与建筑;第21卷(第11期);正文第52-56页 *
缆载吊机主缆上行走原理和安装工艺的探索与实践;刘显晖等;施工技术;第44卷(第S2期);正文第213-217页 *

Also Published As

Publication number Publication date
CN107642049A (zh) 2018-01-30

Similar Documents

Publication Publication Date Title
CN107642049B (zh) 一种用于悬索桥主缆索夹更换的装置及其安装方法
JP6725559B2 (ja) 吊材取替装置及びそれを用いた吊材取替工法
JP6798082B2 (ja) 吊り橋の主ケーブルの取替方法
CN103866986B (zh) 大跨度变截面螺栓球节点网壳安装方法
CN104831844B (zh) 弧形单向双索倒锥型拉索幕墙施工方法
CN108316479B (zh) 一种桁架拱门系统及其施工方法
CN111254803A (zh) 一种三跨连续钢箱梁悬索桥的无索区线形控制方法
CN103437283B (zh) 一种能快速组装的吊篮桁架
CN110318344B (zh) 一种新型钢箱梁0号块支架及0号块搭设施工方法
CN109083395B (zh) 一种大跨度悬索操作平台及其搭设方法
CN207362717U (zh) 一种用于悬索桥主缆索夹更换的装置
CN211034860U (zh) 钢结构网架液压提升施工作业装置
CN106906756B (zh) 可快速安装拆除的检修施工平台及其构建方法
CN105274940B (zh) 一种桥梁拱肋整体安装方法
CN207062787U (zh) 可快速安装拆除的检修施工平台
CN215166467U (zh) 一种适于分段提升施工的钢结构下吊管廊
CN210420898U (zh) 一种新型钢箱梁0号块支架
CN204491413U (zh) 锚固钢绞线张紧装置
CN209584864U (zh) 一种用于顶推钢桁梁的外挂式后锚装置
CN101457516B (zh) 多层水平拉索的挂设方法
CN103938555B (zh) 一种检测加固用预应力可调支架的设计方法
CN205347998U (zh) 抵抗桥墩水平力装置
CN112340595B (zh) 一种用于桥梁工程的钢梁起吊装置及其工作方法
CN220789467U (zh) 桥梁t梁加固的施工平台
CN210797275U (zh) 一种后张法预应力张拉千斤顶定位装置

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant