CN103869219A - Fault handling method and device for power transmission network - Google Patents

Fault handling method and device for power transmission network Download PDF

Info

Publication number
CN103869219A
CN103869219A CN201210545288.1A CN201210545288A CN103869219A CN 103869219 A CN103869219 A CN 103869219A CN 201210545288 A CN201210545288 A CN 201210545288A CN 103869219 A CN103869219 A CN 103869219A
Authority
CN
China
Prior art keywords
fault
faulty line
information
line
indication information
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201210545288.1A
Other languages
Chinese (zh)
Inventor
刘畅
施翔
董光哲
余康
王林群
杨仑
姚磊
王国龙
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
Beijing Electric Power Corp
Original Assignee
State Grid Corp of China SGCC
Beijing Electric Power Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Corp of China SGCC, Beijing Electric Power Corp filed Critical State Grid Corp of China SGCC
Priority to CN201210545288.1A priority Critical patent/CN103869219A/en
Publication of CN103869219A publication Critical patent/CN103869219A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • Locating Faults (AREA)

Abstract

The invention discloses a fault handling method and a fault handling device for a power transmission network. The method comprises the following steps of acquiring line information of a faulty line; determining a fault reason and/or position information of the faulty line according to the line information; generating indication information for handling a fault of the faulty line according to the fault reason and/or the position information. The method and the device solve the technical problem that faults of the power transmission network are difficultly handled effectively because the line condition of the power transmission network cannot be automatically detected and handled in the related technologies.

Description

The fault handling method of power transmission network and device
Technical field
The present invention relates to the communications field, in particular to a kind of fault handling method and device of power transmission network.
Background technology
At present, in correlation technique, be not also applied to professional fault processing system and the method for power transmission network.The processing mode main or the artificial reception and registration of employing of the fault to power transmission network is carried out, and the needed data message of processing of line fault to power transmission network is to be all generally distributed in different application systems, also do not form the set of the professional fault handling information based on power transmission network.
In transmission of electricity professional production process, also there is no complete data acquisition, lack the horizontal association of transmission of electricity specialized information simultaneously yet and share and comprehensive data analysis targetedly.Although relevant electric power operator has formed comparatively comprehensively infosystem in inside, but relevant information in these infosystems is all dispersed in each professional system, do not have forming surface to the data acquisition of transmission of electricity professional production management.Because the data in each professional system are all to set up for the management function demand of each business visual angle or specialty, therefore between the information of each professional system, lack integrated design, association and sharing between information are poor.When to fault handling, existing power supply trouble processing mode is mainly also to upload failure message by manual type, or assigns fault handling order,
In the professional fault treating procedure of transmission of electricity, information management is all to adopt recording mode afterwards mostly,, after handling fault, fault handling personnel carry out again the record of corresponding failure message or fault handling information, and do not have to form and the interaction support of operation field and the supervision to fault in-situ, do not realize the mutual support of early warning in advance and production decision at a specified future date yet.
For above-mentioned problem, effective solution is not yet proposed at present.
Summary of the invention
The embodiment of the present invention provides a kind of fault handling method and device of power transmission network, still adopts artificial mode to report with fault order to assign and the fault handling lower technical matters of efficiency not in time that causes to the fault of transmission of electricity process at least to solve in prior art.。
According to the embodiment of the present invention aspect, a kind of fault handling method of power transmission network is provided, comprising: the line information that obtains faulty line; Determine the failure cause of above-mentioned faulty line and/or the positional information of above-mentioned faulty line according to above-mentioned line information; Generate according to above-mentioned failure cause and/or above-mentioned positional information the indication information that above-mentioned faulty line is carried out to fault handling.
Preferably, the line information of above-mentioned faulty line comprise following one of at least: the thunder and lightning location of the device name of above-mentioned faulty line, the time of breaking down, fault type, protection action situation corresponding to the substation accident resultant signal of above-mentioned faulty line, above-mentioned fault signaling, protection fault localization, the weather information of above-mentioned faulty line region, above-mentioned faulty line region.
Preferably, generating above-mentioned indication information according to above-mentioned failure cause and/or above-mentioned positional information comprises: determine according to above-mentioned failure cause and/or above-mentioned positional information the prediction scheme content that the fault of above-mentioned faulty line is processed, wherein, above-mentioned prediction scheme content comprise following one of at least: required personnel, equipment needed thereby, required operating process, the dangerous point of above-mentioned fault is carried out to control mode; Using above-mentioned prediction scheme content as above-mentioned indication information.
Preferably, after generating according to above-mentioned failure cause and/or above-mentioned positional information above-mentioned faulty line is carried out to the indication information of fault handling, said method also comprises: above-mentioned indication information is sent to treatment people by the mode with note and/or phone; Adopt GPS locator meams to obtain the fault handling on-the-spot execution treatment people of above-mentioned indication information and the situation of equipment at above-mentioned faulty line, and according to the situation of above-mentioned treatment people and equipment, above-mentioned treatment people and equipment are allocated.
Preferably, send to above-mentioned treatment people to comprise above-mentioned indication information in the mode of said short message and/or phone: the staff list of determining the treatment people of needs notice according to the priority of the fault of above-mentioned faulty line; Above-mentioned indication information is notified the treatment people indicated to above-noted persons' list by mode by said short message and/or phone.
Preferably, after determining above-mentioned positional information according to above-mentioned line information, said method also comprises: the position display above-mentioned faulty line corresponding with the above-mentioned positional information power system operating mode after fault occurs on map.
Preferably, after generating above-mentioned indication information according to above-mentioned failure cause and/or above-mentioned positional information, said method also comprises: the entrance that provides the progress of the fault handling of failure condition to above-mentioned faulty line and/or above-mentioned faulty line to inquire about.
According to the embodiment of the present invention on the other hand, provide a kind of fault treating apparatus of power transmission network, having comprised: acquiring unit, for obtaining the line information of faulty line; Determining unit, for determining the failure cause of above-mentioned faulty line and/or the positional information of above-mentioned faulty line according to above-mentioned line information; Processing unit, for generating according to above-mentioned failure cause and/or above-mentioned positional information the indication information that above-mentioned faulty line is carried out to fault handling.
Preferably, above-mentioned processing unit comprises: determination module, for determining according to above-mentioned failure cause and/or above-mentioned positional information the prediction scheme content that the fault of above-mentioned faulty line is processed, wherein, above-mentioned prediction scheme content comprise following one of at least: required personnel, equipment needed thereby, required operating process, the dangerous point of above-mentioned fault is carried out to control mode; Processing module, for using above-mentioned prediction scheme content as above-mentioned indication information.
Preferably, said apparatus also comprises: transmitting element, for after generating according to above-mentioned failure cause and/or above-mentioned positional information above-mentioned faulty line is carried out to the indication information of fault handling, in the mode of note and/or phone, above-mentioned indication information is sent to treatment people; Deployment unit, for adopting GPS locator meams to obtain the fault handling on-the-spot execution treatment people of above-mentioned indication information and the situation of equipment at above-mentioned faulty line, and allocates above-mentioned treatment people and equipment according to the situation of above-mentioned treatment people and equipment.
In embodiments of the present invention, by circuit being monitored to the positional information of the circuit breaking down with quick obtaining and the reason of fault, the information of then according to the generation of obtaining, this faulty line being processed.Efficiently solve by the way the fault that cannot automatically realize the power transmission network that the line conditions of power transmission network is detected and processed and causes in correlation technique and be difficult to the technical matters of effectively processing, reach and in time the line fault of power transmission network has been processed, improved the technique effect of the safety and stability of power transmission network.
Accompanying drawing explanation
Accompanying drawing described herein is used to provide a further understanding of the present invention, forms the application's a part, and schematic description and description of the present invention is used for explaining the present invention, does not form inappropriate limitation of the present invention.In the accompanying drawings:
Fig. 1 is a kind of preferred flow charts according to the fault handling method of the power transmission network of the embodiment of the present invention;
Fig. 2 is the another kind of preferred flow charts according to the fault handling method of the power transmission network of the embodiment of the present invention;
Fig. 3 is a kind of preferred structure block diagram according to the fault treating apparatus of the power transmission network of the embodiment of the present invention;
Fig. 4 is a kind of preferred structure block diagram according to the fault treating apparatus of the power transmission network of the embodiment of the present invention;
Fig. 5 is a kind of preferred structure block diagram according to the fault treating apparatus of the power transmission network of the embodiment of the present invention.
Embodiment
Hereinafter also describe the present invention in detail with reference to accompanying drawing in conjunction with the embodiments.It should be noted that, in the situation that not conflicting, the feature in embodiment and embodiment in the application can combine mutually.
The embodiment of the present invention provides a kind of fault handling method of preferred power transmission network, and as shown in Figure 1, the method comprises the following steps:
Step S102: the line information that obtains faulty line;
Step S104: determine the failure cause of faulty line and/or the positional information of faulty line according to above-mentioned line information;
Step S106: generate the indication information that this faulty line is carried out to fault handling according to above-mentioned failure cause and/or positional information.
In above-mentioned preferred implementation, by circuit being monitored to the positional information of the circuit breaking down with quick obtaining and the reason of fault, the information of then according to the generation of obtaining, this faulty line being processed.Efficiently solve by the way the fault that cannot automatically realize the power transmission network that the line conditions of power transmission network is detected and processed and causes in correlation technique and be difficult to the technical matters of effectively processing, reach and in time the line fault of power transmission network has been processed, improved the technique effect of the safety and stability of power transmission network.
The line information of above-mentioned faulty line can include but not limited to following one of at least: the thunder and lightning location of the device name of described faulty line, the time of breaking down, fault type, protection action situation corresponding to the substation accident resultant signal of described faulty line, described fault signaling, protection fault localization, the weather information of described faulty line region, described faulty line region.
In above-mentioned steps S106, the indication information generating can be that the fault of this faulty line is processed to required personnel and equipment, in a preferred implementation, generating described indication information according to described failure cause and/or described positional information comprises: determine according to described failure cause and/or described positional information the prediction scheme content that the fault of described faulty line is processed, wherein, described prediction scheme content comprise following one of at least: required personnel, equipment needed thereby, required operating process, the dangerous point of described fault is carried out to control mode; Using described prediction scheme content as described indication information.That is, generate the processing prediction scheme that this faulty line is processed, make to allocate timely and effectively personnel this fault is processed.
After generating according to described failure cause and/or described positional information described faulty line is carried out to the indication information of fault handling, as shown in Figure 2, said method also comprises:
Step S202: indication information is sent to treatment people by the mode with note and/or phone;
Step S204: adopt GPS locator meams to obtain the fault handling on-the-spot execution treatment people of indication information and the situation of equipment at this faulty line, and according to the situation for the treatment of people and equipment, treatment people and equipment are allocated.
That is, in above-mentioned preferred implementation, can monitor in real time fault handling scene, thereby effectively be allocated as personnel and the equipment that this fault handling configures.
Contact method that can pre-stored multiple treatment peoples in system, preferably, above-mentioned steps S202 can realize in such a way: the staff list of determining the treatment people that needs notice according to the priority of the fault of described faulty line; Described indication information is notified the treatment people indicated to described staff list by mode by described note and/or phone.
In order to know more intuitively the trouble spot of transmission line of electricity or more clearly to know curator's reason and the corresponding treatment situation to each trouble spot, a map can be set, mark on the relevant position of trouble spot according to line information, inquiry is got up more intuitively also more convenient like this.In a kind of preferred implementation, after determining described positional information according to described line information, said method also comprises: the power system operating mode of faulty line after fault occurs described in the position display corresponding with described positional information on map.
Preferably, the entrance that the progress of fault handling is inquired about can be set, can inquire about entrance by this and carry out the inquiry of fault handling progress, thereby can realize the effective monitoring to fault.In a preferred implementation, after generating described indication information according to described failure cause and/or described positional information, said method also comprises: the entrance that provides the progress of the fault handling of failure condition to described faulty line and/or described faulty line to inquire about.
The fault treating apparatus that a kind of power transmission network is also provided in the present embodiment, this device is used for realizing above-described embodiment and preferred implementation, has carried out repeating no more of explanation.As used below, term " unit " or " module " can realize the combination of software and/or the hardware of predetermined function.Although the described device of following examples is preferably realized with software, hardware, or the realization of the combination of software and hardware also may and be conceived.Fig. 3 is a kind of preferred structure block diagram according to the fault treating apparatus of the power transmission network of the embodiment of the present invention, as shown in Figure 3, comprising: acquiring unit 302, determining unit 304 and processing unit 306, describe this structure below.
Acquiring unit 302, for obtaining the line information of faulty line;
Determining unit 304, is coupled with acquiring unit 302, for determine the failure cause of described faulty line and/or the positional information of described faulty line according to described line information;
Processing unit 306, is coupled with determining unit 304, for generating according to described failure cause and/or described positional information the indication information that described faulty line is carried out to fault handling.
In a preferred implementation, as shown in Figure 4, above-mentioned processing unit 306 comprises: determination module 402, for determining according to described failure cause and/or described positional information the prediction scheme content that the fault of described faulty line is processed, wherein, described prediction scheme content comprise following one of at least: required personnel, equipment needed thereby, required operating process, the dangerous point of described fault is carried out to control mode; Processing module 404, is coupled with determination module 402, for using described prediction scheme content as described indication information.
In a preferred implementation, as shown in Figure 5, the fault treating apparatus of above-mentioned power transmission network also comprises: transmitting element 502, be coupled with processing unit 306, for after determining the positional information of described faulty line according to described line information, in the mode of note and/or phone, described indication information is sent to treatment people; Deployment unit 504, be coupled with transmitting element 502, for adopting GPS locator meams to obtain the fault handling on-the-spot execution treatment people of described indication information and the situation of equipment at described faulty line, and according to the situation of described treatment people and equipment, described treatment people and equipment are allocated.
The embodiment of the present invention also provides a kind of preferred embodiment to come further the present invention to be made an explanation, but it should be noted that the preferred embodiment, just in order better to describe the present invention, does not form the present invention is limited improperly.
The related content of the fault processing system to this power transmission network is described below, and this system mainly completes following functions:
1) system can realize inquiry and the demonstration of overhead line structures essential information.
For example, this system can provide the inquiry entrance of the essential information of checking circuit that event of failure is related and shaft tower, wherein, essential information can include but not limited to following one of at least: the information such as equipment account, defect, hidden danger account, trilinear chart basis, scissors crossing, line alignment.
2) this system can realize the analysis of event of failure and the automatic spring of information and demonstration.
This system can be carried out comprehensive analysis and calculation according to the relevant information such as meteorology and thunder and lightning location in the device name of relevant device on the title of faulty line and faulty line, fault-time, fault type, substation accident resultant signal, protection action situation, protection fault localization, this region, thereby calculates faulty line and possible failure cause and position.Preferably, can also be in the background of two-dimensional map or three-dimensional map the abort situation of circuit and the fault power system operating mode after occurring automatically.
3) this system can realize the institutional query display of fault system, comprising: the relevant information such as staff list and contact method of fault system staff list and contact method thereof, relevant unit and department.Preferably, this system can realize typing and the updating maintenance function of fault countermeasure, and can carry out inquiry and the demonstration of fault countermeasure.In this system, realize typing and the updating maintenance function of fault countermeasure, and can be according to different event of failure types, inquiry and demonstration fault countermeasure content, wherein, above-mentioned prediction scheme content comprises: the contents such as personnel, vehicle, Work tool, standby redundancy, technological means, operating process and dangerous point control.Meanwhile, the relevant information that can also transfer as required personnel, vehicle, Work tool, standby redundancy is carried out concrete inquiry and demonstration.
Preferably, this system can also be notified event of failure information to relevant unit and relevant departments by liaison mode or short message mode automatically, thereby know that relevant unit and department carry out the work, also can on map background, the GPS location situation to current vehicle and personnel check, carry out the rational allocation of field staff and vehicle simultaneously.This system can also be classified to event of failure, and the fault rank of definite event of failure, shows respectively according to the type of fault and rank, and this system can also arrange different advice range and content of announcement according to the order of importance and emergency of event of failure.
4) this system can also be brandished commander to the process of fault handling, and for example, the speedily carry out rescue work essential information of personnel, vehicle of essential information, the field failure that can show event of failure on map background also provides the query function to these information simultaneously.Preferably, the spatial geographic information that can also provide by three-dimensional scenic and on-the-spot video information, show the specific geographic and ambient conditions in event of failure place, by speedily carry out rescue work personnel's the information sharing of mobile terminal feasible system and field failure.
This system can also realize record and the summary to event of failure, for example, can monitor the overall process of event of failure, comprising: recording of information and the reports such as order is assigned, tasks carrying, process processing.Wherein, process process information can include but not limited to following one of at least: the relevant informations such as video, picture, voice, data.Preferably, can also recording content Direct Analysis and summing up the problem and shortage in troubleshooting process process according to the aspect such as response time and response speed of links in troubleshooting process.
Can improve by the way the processing speed of fault and the efficiency of processing, can locate fast the position of trouble spot and the relevant machine account information of faulty line by power transmission failure disposal system simultaneously, improve the work efficiency of fault handling, also made production run personnel can understand in time all information of faulty line; Meanwhile, realize by power transmission failure disposal system the management and the control that produce the overall process fault handling completes from fault.
In another embodiment, also provide a kind of software, the technical scheme that this software is described for carrying out above-described embodiment and preferred implementation.
In another embodiment, also provide a kind of storage medium, stored above-mentioned software in this storage medium, this storage medium includes but not limited to: CD, floppy disk, hard disk, scratch pad memory etc.
Obviously, those skilled in the art should be understood that, above-mentioned of the present invention each module or each step can realize with general calculation element, they can concentrate on single calculation element, or be distributed on the network that multiple calculation elements form, alternatively, they can be realized with the executable program code of calculation element, thereby, they can be stored in memory storage and be carried out by calculation element, and in some cases, can carry out shown or described step with the order being different from herein, or they are made into respectively to each integrated circuit modules, or the multiple modules in them or step are made into single integrated circuit module to be realized.Like this, the present invention is not restricted to any specific hardware and software combination.
The foregoing is only the preferred embodiments of the present invention, be not limited to the present invention, for a person skilled in the art, the present invention can have various modifications and variations.Within the spirit and principles in the present invention all, any modification of doing, be equal to replacement, improvement etc., within all should being included in protection scope of the present invention.

Claims (10)

1. a fault handling method for power transmission network, is characterized in that, comprising:
Obtain the line information of faulty line;
Determine the failure cause of described faulty line and/or the positional information of described faulty line according to described line information;
Generate according to described failure cause and/or described positional information the indication information that described faulty line is carried out to fault handling.
2. method according to claim 1, is characterized in that, the line information of described faulty line comprise following one of at least:
The thunder and lightning location of the device name of described faulty line, the time of breaking down, fault type, protection action situation corresponding to the substation accident resultant signal of described faulty line, described fault signaling, protection fault localization, the weather information of described faulty line region, described faulty line region.
3. method according to claim 1 and 2, is characterized in that, generates described indication information comprise according to described failure cause and/or described positional information:
Determine according to described failure cause and/or described positional information the prediction scheme content that the fault of described faulty line is processed, wherein, described prediction scheme content comprise following one of at least: required personnel, equipment needed thereby, required operating process, the dangerous point of described fault is carried out to control mode;
Using described prediction scheme content as described indication information.
4. method according to claim 1, is characterized in that, is generating according to described failure cause and/or described positional information
After described faulty line being carried out to the indication information of fault handling, described method also comprises:
Described indication information is sent to treatment people by mode with note and/or phone;
Adopt GPS locator meams to obtain the fault handling on-the-spot execution treatment people of described indication information and the situation of equipment at described faulty line, and according to the situation of described treatment people and equipment, described treatment people and equipment are allocated.
5. method according to claim 4, is characterized in that, sends to described treatment people to comprise described indication information in the mode of described note and/or phone:
Determine the staff list of the treatment people that needs notice according to the priority of the fault of described faulty line;
Described indication information is notified the treatment people indicated to described staff list by mode by described note and/or phone.
6. according to the method described in any one in claim 1 to 5, it is characterized in that, after determining described positional information according to described line information, described method also comprises:
The power system operating mode of faulty line after fault occurs described in the position display corresponding with described positional information on map.
7. according to the method described in any one in claim 1 to 5, it is characterized in that, after generating described indication information according to described failure cause and/or described positional information, described method also comprises:
The entrance that provides the progress of the fault handling of failure condition to described faulty line and/or described faulty line to inquire about.
8. a fault treating apparatus for power transmission network, is characterized in that, comprising:
Acquiring unit, for obtaining the line information of faulty line;
Determining unit, for determining the failure cause of described faulty line and/or the positional information of described faulty line according to described line information;
Processing unit, for generating according to described failure cause and/or described positional information the indication information that described faulty line is carried out to fault handling.
9. device according to claim 8, is characterized in that, described processing unit comprises:
Determination module, for determining according to described failure cause and/or described positional information the prediction scheme content that the fault of described faulty line is processed, wherein, described prediction scheme content comprise following one of at least: required personnel, equipment needed thereby, required operating process, the dangerous point of described fault is carried out to control mode;
Processing module, for using described prediction scheme content as described indication information.
10. device according to claim 9, is characterized in that, also comprises:
Transmitting element, for after generating according to described failure cause and/or described positional information described faulty line is carried out to the indication information of fault handling, sends to treatment people in the mode of note and/or phone by described indication information;
Deployment unit, for adopting GPS locator meams to obtain the fault handling on-the-spot execution treatment people of described indication information and the situation of equipment at described faulty line, and allocates described treatment people and equipment according to the situation of described treatment people and equipment.
CN201210545288.1A 2012-12-14 2012-12-14 Fault handling method and device for power transmission network Pending CN103869219A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201210545288.1A CN103869219A (en) 2012-12-14 2012-12-14 Fault handling method and device for power transmission network

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201210545288.1A CN103869219A (en) 2012-12-14 2012-12-14 Fault handling method and device for power transmission network

Publications (1)

Publication Number Publication Date
CN103869219A true CN103869219A (en) 2014-06-18

Family

ID=50907964

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201210545288.1A Pending CN103869219A (en) 2012-12-14 2012-12-14 Fault handling method and device for power transmission network

Country Status (1)

Country Link
CN (1) CN103869219A (en)

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104036374A (en) * 2014-07-08 2014-09-10 国网辽宁省电力有限公司 Method for assisting in disposing operating accidents of power grid
CN105894199A (en) * 2016-03-31 2016-08-24 国网北京市电力公司 Work order processing method and device
CN105894250A (en) * 2016-03-31 2016-08-24 国网北京市电力公司 Work order processing method and work order processing device
CN105894247A (en) * 2016-03-31 2016-08-24 国网北京市电力公司 Work order processing method and device
CN105913169A (en) * 2016-03-31 2016-08-31 国网北京市电力公司 Work order processing method and device
CN106846168A (en) * 2016-12-09 2017-06-13 国网北京市电力公司 The processing unit and system of transmission line of electricity scissors crossing
CN108512223A (en) * 2018-04-11 2018-09-07 江苏电力信息技术有限公司 Transformer substation switch tripping intelligence auxiliary analysis method in power transmission and transformation fortune inspection control platform
CN110445107A (en) * 2019-07-25 2019-11-12 国网河北省电力有限公司衡水供电分公司 Processing method for 110kV line fault tripping
CN110543954A (en) * 2019-09-06 2019-12-06 云南电网有限责任公司电力科学研究院 Power distribution network fault solving method and power distribution network fault solving device

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101106271A (en) * 2007-08-03 2008-01-16 西安交通大学 Integrated failure positioning protection system for transfer line
CN102103198A (en) * 2010-11-19 2011-06-22 深圳市科陆电子科技股份有限公司 System and method for automatically checking failure of metering equipment

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101106271A (en) * 2007-08-03 2008-01-16 西安交通大学 Integrated failure positioning protection system for transfer line
CN102103198A (en) * 2010-11-19 2011-06-22 深圳市科陆电子科技股份有限公司 System and method for automatically checking failure of metering equipment

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
邢蕊: "首都电网输电线路监测平台建设与应用", 《中国优秀硕士学位论文全文数据库 工程科技Ⅱ辑》, no. 4, 15 April 2012 (2012-04-15), pages 5 - 22 *

Cited By (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104036374A (en) * 2014-07-08 2014-09-10 国网辽宁省电力有限公司 Method for assisting in disposing operating accidents of power grid
CN105894199A (en) * 2016-03-31 2016-08-24 国网北京市电力公司 Work order processing method and device
CN105894250A (en) * 2016-03-31 2016-08-24 国网北京市电力公司 Work order processing method and work order processing device
CN105894247A (en) * 2016-03-31 2016-08-24 国网北京市电力公司 Work order processing method and device
CN105913169A (en) * 2016-03-31 2016-08-31 国网北京市电力公司 Work order processing method and device
CN106846168A (en) * 2016-12-09 2017-06-13 国网北京市电力公司 The processing unit and system of transmission line of electricity scissors crossing
CN108512223A (en) * 2018-04-11 2018-09-07 江苏电力信息技术有限公司 Transformer substation switch tripping intelligence auxiliary analysis method in power transmission and transformation fortune inspection control platform
CN108512223B (en) * 2018-04-11 2020-07-03 江苏电力信息技术有限公司 Intelligent auxiliary studying and judging method for switching tripping of substation in power transmission and transformation operation and detection control platform
CN110445107A (en) * 2019-07-25 2019-11-12 国网河北省电力有限公司衡水供电分公司 Processing method for 110kV line fault tripping
CN110445107B (en) * 2019-07-25 2021-09-07 国网河北省电力有限公司衡水供电分公司 Processing method for 110kV line fault tripping
CN110543954A (en) * 2019-09-06 2019-12-06 云南电网有限责任公司电力科学研究院 Power distribution network fault solving method and power distribution network fault solving device
CN110543954B (en) * 2019-09-06 2023-06-30 云南电网有限责任公司电力科学研究院 Power distribution network fault solving method and power distribution network fault solving device

Similar Documents

Publication Publication Date Title
CN103869219A (en) Fault handling method and device for power transmission network
CN107067676B (en) Intelligent pushing processing method and device for alarm event
CA2974401A1 (en) A self-customizing, multi-tenanted mobile system and method for digitally gathering and disseminating real-time visual intelligence on utility asset damage enabling automated priority analysis and enhanced utility outage response
CN106355357B (en) Power distribution network fault processing method and information processing system
CN103771211A (en) Elevator monitoring system based on Internet of Things
CN103729904A (en) Electric intelligent inspection system
CN104821900B (en) Power telecom network emergency first-aid repair whole process managing and control system based on mobile platform application
CN106846700B (en) Method and system for monitoring forest fire of power transmission line
CN109473970A (en) Protect power supply trouble monitoring removal system and method
CN104836837A (en) Chemical industrial park environmental pollution prevention and emergency system
CN113674123B (en) Urban emergency command system and method based on big data service
CN103150598A (en) Processing system and method for sudden failure of power transmission network
CN108574696A (en) A kind of command dispatching system and working method based on GIS map
EP2643802A1 (en) System for monitoring and deploying engineers
CN105242626A (en) Line safety intelligent auxiliary monitoring system
JP2019507893A (en) On-site exploration training method of virtual accident base radiation emergency
CN104320761A (en) Personal safety early-warning system based on smart phone
CN109168173B (en) Base station operation and maintenance management method and device and electronic equipment
CN102523597A (en) Method for monitoring power generation of oil engine at location of communication base station
CN103871185B (en) The anti-external force processing method of transmission line of electricity, Apparatus and system
CN114092279A (en) Full-service ubiquitous visual intelligent power operation and maintenance system
CN205583840U (en) Power equipment monitoring device
CN202512722U (en) Movable type electric transmission and transformation equipment condition monitoring system
JP5197639B2 (en) Construction and construction management device, construction and construction management system, and construction and construction management method
RU2675655C1 (en) Method of carrying out meteomonitoring for predicting probability of damage to electric grid equipment

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20140618