CN109473970A - Protect power supply trouble monitoring removal system and method - Google Patents
Protect power supply trouble monitoring removal system and method Download PDFInfo
- Publication number
- CN109473970A CN109473970A CN201711471232.5A CN201711471232A CN109473970A CN 109473970 A CN109473970 A CN 109473970A CN 201711471232 A CN201711471232 A CN 201711471232A CN 109473970 A CN109473970 A CN 109473970A
- Authority
- CN
- China
- Prior art keywords
- electric
- unit
- module
- guarantor
- electricity
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000012544 monitoring process Methods 0.000 title claims abstract description 78
- 238000000034 method Methods 0.000 title claims description 19
- 230000005611 electricity Effects 0.000 claims abstract description 88
- 238000012423 maintenance Methods 0.000 claims abstract description 70
- 238000007726 management method Methods 0.000 claims description 64
- 238000007689 inspection Methods 0.000 claims description 18
- 238000013468 resource allocation Methods 0.000 claims description 18
- 230000005484 gravity Effects 0.000 claims description 14
- 239000000463 material Substances 0.000 claims description 14
- 230000002159 abnormal effect Effects 0.000 claims description 12
- 238000012546 transfer Methods 0.000 claims description 12
- 238000004458 analytical method Methods 0.000 claims description 10
- 238000012545 processing Methods 0.000 claims description 7
- 230000008859 change Effects 0.000 claims description 4
- 230000008439 repair process Effects 0.000 claims description 4
- XEEYBQQBJWHFJM-UHFFFAOYSA-N Iron Chemical group [Fe] XEEYBQQBJWHFJM-UHFFFAOYSA-N 0.000 claims description 3
- 230000005540 biological transmission Effects 0.000 claims description 3
- 239000003990 capacitor Substances 0.000 claims description 3
- 238000004587 chromatography analysis Methods 0.000 claims description 3
- 230000008030 elimination Effects 0.000 claims description 3
- 238000003379 elimination reaction Methods 0.000 claims description 3
- 230000010354 integration Effects 0.000 abstract description 6
- 230000003068 static effect Effects 0.000 abstract description 4
- 241001269238 Data Species 0.000 abstract description 3
- 238000012800 visualization Methods 0.000 description 4
- 230000008569 process Effects 0.000 description 3
- 230000004044 response Effects 0.000 description 3
- 230000004888 barrier function Effects 0.000 description 2
- 230000006854 communication Effects 0.000 description 2
- 230000000694 effects Effects 0.000 description 2
- 238000005516 engineering process Methods 0.000 description 2
- 230000033001 locomotion Effects 0.000 description 2
- 238000010248 power generation Methods 0.000 description 2
- 230000009467 reduction Effects 0.000 description 2
- 230000000007 visual effect Effects 0.000 description 2
- 241000208340 Araliaceae Species 0.000 description 1
- 241000196324 Embryophyta Species 0.000 description 1
- 235000005035 Panax pseudoginseng ssp. pseudoginseng Nutrition 0.000 description 1
- 235000003140 Panax quinquefolius Nutrition 0.000 description 1
- 238000013459 approach Methods 0.000 description 1
- 230000015556 catabolic process Effects 0.000 description 1
- 238000004891 communication Methods 0.000 description 1
- 238000007596 consolidation process Methods 0.000 description 1
- 238000010276 construction Methods 0.000 description 1
- 238000007405 data analysis Methods 0.000 description 1
- 238000011161 development Methods 0.000 description 1
- 239000004744 fabric Substances 0.000 description 1
- 230000004927 fusion Effects 0.000 description 1
- 235000008434 ginseng Nutrition 0.000 description 1
- 238000004519 manufacturing process Methods 0.000 description 1
- 238000004321 preservation Methods 0.000 description 1
- 238000007634 remodeling Methods 0.000 description 1
Classifications
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02J—CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- H02J3/00—Circuit arrangements for ac mains or ac distribution networks
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
- G06Q10/063—Operations research, analysis or management
- G06Q10/0631—Resource planning, allocation, distributing or scheduling for enterprises or organisations
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q50/00—Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
- G06Q50/06—Energy or water supply
-
- H02J13/0006—
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y04—INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
- Y04S—SYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
- Y04S10/00—Systems supporting electrical power generation, transmission or distribution
- Y04S10/50—Systems or methods supporting the power network operation or management, involving a certain degree of interaction with the load-side end user applications
Landscapes
- Business, Economics & Management (AREA)
- Engineering & Computer Science (AREA)
- Human Resources & Organizations (AREA)
- Economics (AREA)
- Strategic Management (AREA)
- Tourism & Hospitality (AREA)
- Health & Medical Sciences (AREA)
- Entrepreneurship & Innovation (AREA)
- Theoretical Computer Science (AREA)
- Marketing (AREA)
- General Physics & Mathematics (AREA)
- General Business, Economics & Management (AREA)
- Physics & Mathematics (AREA)
- Development Economics (AREA)
- Quality & Reliability (AREA)
- Operations Research (AREA)
- Educational Administration (AREA)
- Power Engineering (AREA)
- Game Theory and Decision Science (AREA)
- Public Health (AREA)
- Water Supply & Treatment (AREA)
- General Health & Medical Sciences (AREA)
- Primary Health Care (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
- Remote Monitoring And Control Of Power-Distribution Networks (AREA)
Abstract
It protects power supply trouble and monitors removal system, comprising: panorama display module protects electricity commander module, power network monitoring module, protects electric resources module, protects electric management module and basic data maintenance module;Guarantor's electricity commander module, power network monitoring module, guarantor's electric resources module and the electric management module of guarantor are connect with panorama display module;The power network monitoring module, guarantor's electric resources module and the electric management module of guarantor command module to connect with guarantor's electricity;The power network monitoring module, guarantor's electric resources module, the electric management module of guarantor and panorama display module are connect with basic data maintenance module.The present invention protects power supply trouble monitoring around reply in time and excludes this target, by integration equipment machine account information, power grid topological graph, the basic datas such as electric resources, Real-time Monitoring Data are protected as bottom data support, it realizes that information merges with dynamic data by integrating static data, construct integrated guarantor's fulgurite reason, aid decision and protects electric command system.
Description
Technical field
The present invention relates to power industry safety management technology fields, in particular to guarantor's power supply trouble monitoring removal system and side
Method.
Background technique
With the rapid development of economic life various aspects, face more and more some momentous conferences, high standard activity and
Heavyweight receives task, and protecting power supply capacity to power supply companies at different levels also proposed more higher requirements.Electric system guarantees to supply
Electricity demanding, processing burst accident, ensure electric power netting safe running platform, the key problem to be solved be emergency event occur after,
How comprehensive response is made within the shortest time, this just need a kind of convenience, it is reliable, fast establish each related link be
System support, to realize the purpose of obtaining information, coordinative command, instruction issuing, to be damaged caused by reduction accident to greatest extent
It loses.Management mode single at present, is limited by region, mode etc., cannot all cover the links of power generation and maintenance,
Its timeliness and reliability are not able to satisfy the needs for protecting electric task.It is difficult to obtain to solve to protect power supply profession data at present, electricity
Net Operational Data Analysis and monitoring function shortcoming, management aid decision float on surface, the electric personnel/vehicle visionization of guarantor shows and lacks
The problems such as, guarantee the power supply in the special period of the protection of electricity, reinforces protecting power supply personal scheduling and important equipment monitoring, carry out repairing
Personnel's vehicle scheduling promotes electric service level and power supply supportability, can be most after solving electric system emergency event generation
Comprehensive response is made in the short time, need it is logical establish a kind of convenience, the support of the system of reliable, fast each related link, with
The purpose of obtaining information, coordinative command, instruction issuing is realized, to lose caused by reduction accident to greatest extent.
China Patent Publication No. CN10252170B, grant date on 2 18th, 2015, the entitled power train of innovation and creation
System early warning command system, this application discloses a kind of electric system early warning command system and its methods, including early warning commander's clothes
Be engaged in platform, Communications service equipment and subscriber terminal equipment, the early warning commander service platform by graphical user interface, using center
Module and bottom data interface are constituted, and by processing result information sender graphical user interface or bottom data interface, this is
The reliability and operational efficiency of electric system early warning system can be improved in system and its method, is used for power system power supply management.Its
It is disadvantageous in that the description laid particular emphasis on to communication process, what the composition of entire Control management system was introduced is not very complete
Face.
Summary of the invention
It is single it is an object of the invention to solve above-mentioned management mode of the existing technology, by the limit of region, mode etc.
System cannot cover the links of power generation and maintenance, and timeliness and reliability, which are not able to satisfy, protects needing for electric task
Problem provides a kind of guarantor's power supply trouble monitoring removal system and method.
The technical solution adopted by the present invention to solve the technical problems is: protecting power supply trouble and monitors removal system, comprising: is complete
Scape display module protects electricity commander module, power network monitoring module, protects electric resources module, protecting electric management module and basic data dimension
Protect module;Guarantor's electricity commander module, power network monitoring module, guarantor's electric resources module and the electric management module of guarantor are shown with panorama
Module connection;The power network monitoring module, guarantor's electric resources module and the electric management module of guarantor command module to connect with guarantor's electricity;Institute
State power network monitoring module, protect electric resources module, protect electric management module and panorama display module with basic data maintenance module
Connection.
In the present invention, around in time reply protect power supply trouble monitoring exclude this target, by integration equipment machine account information,
Power grid topological graph, protect electric resources, the basic datas such as Real-time Monitoring Data are supported as bottom data, by integrate static data and
Dynamic data realizes information fusion, constructs integrated guarantor's fulgurite reason, aid decision, protects electric command system, finally with visualization
Carrier realizes power network monitoring, protects the Panoptic visualization displaying that fulgurite is managed, protects electric resources deployment, protecting electric command and management.
Preferably, guarantor electricity commander's module, comprising: maneuvering platform unit, repairing work order, failure study and judge unit and
Live line unit, the repairing work order, failure are studied and judged unit and are connect with maneuvering platform unit, and failure studies and judges unit and scene
The connection of line unit, live line unit are connect with maneuvering platform unit, guarantor's electric resources module;The repairing work order also with
95598 work orders, internal work order connection;The power network monitoring module, comprising: abnormal alarm platform, power system monitor control unit with
And several power network lines, every power network line correspond to several grid equipments, every grid equipment includes that real time information monitoring is single
Member and video information storage unit;The real time information monitoring unit is used to monitor and show the operation ginseng of corresponding grid equipment
Number;The video information storage unit stores the operation and maintenance situation of corresponding grid equipment;The power network line and abnormal alarm
Platform connection, abnormal alarm platform are connect with repairing work order;The power network line is connect with power system monitor control unit;The guarantor
Electric resources module, comprising: protect electric resources platform, the region of war Bao electricity troop, protect electric personnel, protect electric car, protect electric goods and materials and protect electricity
Logistics, the region of war the Bao electricity troop, protect electric personnel, protect electric car, protect electric goods and materials and protect electric logistics with protect electric resources platform
Connection is protected electric resources platform and is connect with live line unit;The electric management module of the guarantor, comprising: protect electric management control unit, report
Table counts platform, protects electricity user, protect electric task, protect electricity tour unit and weather monitoring unit;The guarantor electric user, Bao electricity Ren
Business, guarantor's electricity makes an inspection tour unit and weather monitoring unit is connect with report form statistics platform, and report form statistics platform and failure study and judge list
Member connection;The electric user of the guarantor, protect electric task, protect electricity make an inspection tour unit and weather monitoring unit with protect electric management control unit
Connection;The basic data maintenance module, comprising: system configuration unit, power network monitoring maintenance unit protect electric management service list
Member protects electric resources maintenance unit and panorama displaying maintenance unit;The system configuration unit and power network monitoring maintenance unit are protected
Fulgurite manages maintenance unit, protects electric resources maintenance unit and panorama displaying maintenance unit connection;The power network monitoring maintenance unit
It is connect with power system monitor control unit, guarantor's fulgurite reason maintenance unit is connect with electric management control unit is protected, guarantor's electricity money
Source maintenance unit is connect with electric resources platform is protected, and the panorama shows that maintenance unit is connect with panorama display module;The system
Configuration unit, comprising: rights management unit and operating unit;The rights management unit is for being arranged each organizations and individuals couple
Protect the administration authority of electric system;The operating unit is used to that the mode of operation for protecting electric system to be arranged, and is divided into programming management and parameter
Setting.
Preferably, the failure studies and judges unit, comprising: failure essential information transfers unit, the analysis of failure influence area
Unit and repairing resource allocation unit;The failure essential information is transferred unit, failure influence area analytical unit and is robbed
Resource allocation unit is repaired to be sequentially connected;The failure essential information transfers unit and maneuvering platform, the report form statistics platform connect
It connects, the repairing resource allocation unit is connect with the live line unit.
Preferably, the data for the grid equipment that the real time information monitoring unit is monitored include: substation temperature,
Humidity, the temperature of transformer, humidity, partial discharge, oil chromatography, iron core, SF6 gas-monitoring, current transformer, combined electrical apparatus, bus
Temperature, the humidity of PT, coupled capacitor, breaker, reactor, combined electrical apparatus, switchgear, disconnecting link and battery.
Preferably, protecting power supply trouble monitors method for removing, removal system, institute are monitored suitable for guarantor's power supply trouble
It states repairing work order and receives the warning message that abnormal alarm platform, internal work order and the transmission of 95598 work orders come, warning message is passed
Maneuvering platform unit is transported to, maneuvering platform unit carries out failure and studies and judges, and transfers unit by failure essential information and transfers report system
The integral data of platform is counted, the analysis of failure influence area is carried out, laggard rob of locking involved area is repaired resource allocation layout, led to
It crosses live line unit to connect with electric resources platform is protected, obtains the region of war Bao electricity troop, protect electric personnel, protect electric car, protect electric goods and materials
And electric logistical information is protected, after arranging the corresponding region of war Bao electricity troop, protecting electric personnel, protect electric car, protecting electric goods and materials and protect electricity
It is diligent to carry out Failure elimination, and pass processing progress back maneuvering platform;Guarantor's electricity the commander module, power network monitoring module, Bao electricity Zi
Source module and the data for protecting electric management module are presented on panorama display module, and maneuvering platform is looked by panorama display module
See each module multidate information;Basic data maintenance module to protect electric management module, power network monitoring module, protect electric resources module and
Panorama display module carries out data maintenance;Operator is divided into programming management and parameter setting, system configuration list to the maintenance of data
Member distributes corresponding operation permission according to operator's institutional affiliation and responsibility, for operator, realizes to power network monitoring module, protects electricity
Resource module, the difference management for protecting electric management module and panorama display module.
Preferably, carry out power network line to protect electric priority division according to electric weight is protected, it is every on same power network line
Platform grid equipment corresponds to corresponding equipment preferred number, when carrying out the analysis of failure influence area, first determines hair according to the electric weight of guarantor
The maintenance sequence of the power network line of raw failure, the power grid to break down on same power network line is determined further according to equipment preferred number
The maintenance sequence of equipment, to carry out repairing resource allocation.
Preferably, the electric weight=user gradation * task grade * of the guarantor makes an inspection tour specific gravity;The size of electric weight is protected by this
The electric task of guarantor's electricity user, guarantor and tour situation meteorologic factor on route determine, if on every power network line including Ganlei guarantor
Electric user and several Xiang Bao electricity tasks, every class protect electric user and correspond to corresponding user gradation, and it is corresponding corresponding that each protects electric task
Task grade, the task grade can be changed according to the change of period, maked an inspection tour situation and measured with making an inspection tour specific gravity.
Preferably, the equipment preferred number is by the loadtype, load number, load utilization rate and load that connect
Failure rate decision, the equipment preferred number=∑ failure rate/(load number * utilization rate * specific gravity factor), equipment preferred number
Smaller, equipment priority is higher, and specific gravity factor is corresponding with loadtype.
Substantial effect of the invention: power supply trouble monitoring is protected around reply in time and excludes this target, is set by integration
Standby machine account information, power grid topological graph protect the basic datas such as electric resources, Real-time Monitoring Data as bottom data support, by whole
It closes static data and realizes that information merges with dynamic data, construct integrated guarantor's fulgurite reason, aid decision and protect electricity commander system
System, finally to visualize the panorama visible that carrier realizes power network monitoring, protects fulgurite reason, protects electric resources deployment, protects electric command and management
Change displaying, realizes that supply network monitoring integration, failure study and judge analysis intelligence, protect electric resources deployment visualization, General Promotion
Protect electric command comprehensive decision-making capability, emergency disposal specific aim and coordinative command efficiency.Realize special guarantor's electric industry business and data information
Change, visualize, interactivity and intelligentized functional characteristics new model, building are based on guarantor's electricity commander that big data information merges
System, realization is special to be protected the resource consolidation of Electricity Functional related data, updates and share.
Detailed description of the invention
Fig. 1 is system construction drawing of the invention;
Fig. 2 is basic data maintenance modular structure connection figure of the invention.
Specific embodiment
Below by specific embodiment, and in conjunction with attached drawing, technical scheme of the present invention will be further explained in detail.
As shown in Figure 1, protecting power supply trouble monitors removal system, comprising: panorama display module protects electricity commander module, power grid
Monitoring modular protects electric resources module, protects electric management module and basic data maintenance module;Guarantor's electricity the commander module, power grid
Monitoring modular, guarantor's electric resources module and the electric management module of guarantor are connect with panorama display module;The power network monitoring module is protected
Electric resources module and the electric management module of guarantor are connect with guarantor's electricity commander's module;The power network monitoring module, protect electric resources module,
It protects electric management module and panorama display module is connect with basic data maintenance module.Basic data maintenance module is to guarantor's fulgurite
It manages module, guarantor's electric resources module and power network resources module and carries out the operation such as permission, parameter setting.
Panorama display module, it is main to realize to guarantor electric user, troop, personnel, the quick of the visualized elements such as institute, route of standing
It operates, realizes that protecting fulgurite manages, guarantor's electric resources, protects the functional requirements such as electricity commander comprehensively, shown by single screen, combine aobvious, whole screen display etc.
Function shows the operation of power networks state of grid equipment, check primary connection figure in the electric prediction scheme of guarantor, line chart/stand, on-line monitoring,
The details such as Unit account of plant and resume information, one, one/mono- station of a line, video monitoring, realize the real-time prison of operation of power networks
It surveys, the abstraction process for protecting electricity commander is allowed to realize visualization, quantifying.
Protect electric management module, comprising: protect electric management control unit, report form statistics platform, the region of war Bao electricity troop, Bao electricity Yong
Family protects electric task, protects electricity tour unit and weather monitoring unit;The region of war the Bao electricity troop, protect electric user, protect electric task,
It protects electricity tour unit and weather monitoring unit is connect with report form statistics platform, report form statistics platform and guarantor's electricity commander's module company
It connects;The region of war the Bao electricity troop, protect electric user, protect electric task, protect electricity make an inspection tour unit and weather monitoring unit with protect fulgurite
Reason control unit connects, by protecting electricity management control unit to the region of war Bao electricity troop, guarantor's electricity user, the electric task of guarantor, the electric tour of guarantor
Unit and weather monitoring unit are controlled.It protects electric management module and centralized management is carried out to the management work protected in electric process,
Electric user and Bao electricity task are protected by showing, holds the main node for protecting electricity;The tour of unit control personnel is maked an inspection tour by protecting electricity
Situation and tour quality;It obtains current weather information in time by weather monitoring unit, the electric scheme of guarantor and resource allocation is mentioned
For reference.Report form statistics platform timing, which updates, to be protected electric user, protects electric task, protects the letter that electricity makes an inspection tour unit and weather monitoring unit
Breath, all information are presented in the form of statements, are facilitated guarantor's electricity commander's module calls, are completed at the same time the important record for protecting power information
And preservation.
Protect electricity commander's module, comprising: maneuvering platform unit, repairing work order, failure study and judge unit and live line unit,
The repairing work order, failure are studied and judged unit and are connect with maneuvering platform unit, and failure is studied and judged unit and connect with live line unit,
Live line unit is connect with maneuvering platform unit, guarantor's electric resources module.Work order is overhauled also to connect with 95598 work orders, internal work order
It connects.There are three approach in the warning message source of maintenance work order: the warning message of the first power network monitoring module, second is 95598 states
The alarm call that family's power grid hotline is squeezed into, the i.e. internal work of the alarm call that third is found the problem when being power grid internal maintenance
Single, check man's unirecord alarm circuit number and alarm overview are simultaneously sent to failure by maneuvering platform and study and judge unit.Failure is ground
Sentence unit, comprising: failure essential information transfers unit, failure influence area analytical unit and repairing resource allocation unit.Therefore
Barrier studies and judges unit, comprising: failure essential information transfers unit, failure influence area analytical unit and repairing resource allocation list
Member;The failure essential information is transferred unit, failure influence area analytical unit and repairing resource allocation unit and is sequentially connected;
The failure essential information is transferred unit and is connect with maneuvering platform, the report form statistics platform, the repairing resource allocation unit
It is connect with the live line unit.Failure essential information transfers the number of unit resolves failure power supply line, and transfers accordingly
The corresponding data of electric management module report form statistics platform is protected belonging to the route.Repairing money needed for repairing the analysis of resource allocation unit
Source is connect with live line unit, is assembled from corresponding resource progress failure by live line unit from electric resources module is protected
Reason, and processing progress is fed back into maneuvering platform.Electricity commander's module is protected by panorama display module with visual means realization pair
The real-time tracking of 5 working condition of equipment obstacle management situation and breakdown gang holds global situation for Bao electricity command centre and provides branch
It holds.Using the handheld device of repair personnel, for emergency event and the trend analysis of major issue field conditions, process assessment and
Decision commanding etc. is reported and is transmitted, and the capability of fast response to control ability and the failure emergency of production scene is promoted.
Power network monitoring module, comprising: abnormal alarm platform, power system monitor control unit and several power network lines, often
Power network line corresponds to several grid equipments, and every grid equipment includes that real time information monitoring unit and video information storage are single
Member;The real time information monitoring unit is used to monitor and show the operating parameter of corresponding grid equipment;The video information storage
Unit stores the operation and maintenance situation of corresponding grid equipment;The power network line is connect with abnormal alarm platform, and abnormal alarm is flat
Platform is connect with repairing work order;The power network line is connect with power system monitor control unit.Real time information monitoring unit is monitored
The data of grid equipment include but is not limited to: temperature, the humidity of substation, the temperature of transformer, humidity, partial discharge, oil chromatography, iron
Core, SF6 gas-monitoring, current transformer, combined electrical apparatus, bus PT, coupled capacitor, breaker, reactor, combined electrical apparatus are opened
Close cabinet, temperature, the humidity of disconnecting link and battery, real time information monitoring unit by the monitoring to these parameters to determine whether
There is equipment fault.
Protect electric resources module, comprising: protect electric resources platform, the region of war Bao electricity troop, protect electric personnel, protect electric car, protect electric object
Money and protect electric logistics, the region of war the Bao electricity troop, protect electric personnel, protect electric car, protect electric goods and materials and protect electric logistics with guarantor
The connection of electric resources platform is protected electric resources platform and is connect with live line unit.Electric resources module is protected to protect electric region of war, troop, people
The static management of all kinds of guarantor's electric resources such as member, vehicle, logistics is core, realizes the maintenance for protecting electric resources and visual presentation.It protects
Electric region of war troop shows essential information: region of war title, headquarter address protect electric region, responsible person, contact method, protect electric user
Quantity, Bao electricity troop information, correlation protect electric personnel etc..Protect electric personnel: including essential information, historical track and line scene.Base
This information, show staff's information list protect electric personnel's name, affiliated unit, personnel specialty, affiliated troop, contact method (movement
Mobile phone, day wing intercom, base etc.), identity card, photo etc..Historical track, display is currently when hand-held PDA a little arrive, personnel
The functions such as historical track inquiry.Line scene, can check text transmitted by the personnel, picture upload message.Protect electric car packet
Include vehicle essential information and historical track.Vehicle essential information includes the license number of the vehicle, model, classification, driver, correspondent party
The information such as formula;Historical track refers to shows the recent motion track of the vehicle on geographical map, and time section can be realized customized.It protects
Electric goods and materials include warehouse overview and standby redundancy.Warehouse overview, that is, warehouse essential information, as warehouse title, address, responsible person,
Telephone number etc.;Standby redundancy, including the classification of the repair piece statistical conditions, standby redundancy list information.Protecting electric logistics includes object
Money receives the letter such as a title, address, responsible person, contact method, service time, main material information and logistical materials quantity
Breath.These information of electric resources Platform integration are protected, and these information are supplied to live line unit.
As shown in Fig. 2, the basic data maintenance module, comprising: system configuration unit, is protected power network monitoring maintenance unit
Fulgurite manages maintenance unit, protects electric resources maintenance unit and panorama displaying maintenance unit;The system configuration unit and power grid are supervised
Maintenance unit is surveyed, fulgurite reason maintenance unit is protected, protects electric resources maintenance unit and panorama displaying maintenance unit connection;The power grid
Monitoring and maintenance unit is connect with power system monitor control unit, and guarantor's fulgurite reason maintenance unit and the electric management control unit of guarantor connect
It connects, guarantor's electric resources maintenance unit is connect with electric resources platform is protected, and the panorama shows maintenance unit and panorama display module
Connection;The system configuration unit, comprising: rights management unit and operating unit;The rights management unit is each for being arranged
A organizations and individuals are to the administration authority for protecting electric system;The operating unit is used to that the mode of operation for protecting electric system to be arranged, and is divided into
Programming management and parameter setting.
It protects power supply trouble and monitors method for removing, monitor removal system suitable for guarantor's power supply trouble, repairing work order connects
The warning message that abnormal alarm platform, internal work order and the transmission of 95598 work orders come is received, warning message is transmitted to maneuvering platform
Unit, maneuvering platform unit carry out failure and study and judge, and transfer the integration that unit transfers report form statistics platform by failure essential information
Data, carry out the analysis of failure influence area, and laggard rob of locking involved area repairs resource allocation layout, pass through live netlist
Member is connect with electric resources platform is protected, and is obtained and is protected electric personnel, protects electric car, protects electric goods and materials and protect electric logistical information, arranges corresponding
Guarantor's electricity personnel, protect electric car, protect electric goods and materials and protect electric logistics and carry out Failure elimination, and it is flat to pass processing progress back commander
Platform;The data for protecting electricity commander module, power network monitoring module, guarantor's electric resources module and the electric management module of guarantor are presented on entirely
Scape display module, maneuvering platform check each module multidate information by panorama display module;Basic data maintenance module is electric to protecting
Management module, power network monitoring module protect electric resources module and the progress data maintenance of panorama display module;Operator is to data
Maintenance is divided into programming management and parameter setting, and system configuration unit is distributed according to operator's institutional affiliation and responsibility for operator
Corresponding operation permission is realized to power network monitoring module, protects electric resources module, the electric management module of guarantor and panorama display module
Difference management.
When carrying out repairing resource allocation, power network line is carried out to protect electric priority division, same electricity according to electric weight is protected
Every grid equipment of cable road corresponds to corresponding equipment preferred number, when carrying out the analysis of failure influence area, first according to guarantor
Electric weight determines the maintenance sequence of the power network line to break down, determines to send out on same power network line further according to equipment preferred number
The maintenance sequence of the equipment of raw failure, to carry out repairing resource allocation.It protects electric weight and is used for every power network line of overall merit
Importance, protect electric weight=user gradation * task grade * and make an inspection tour specific gravity.The importance of power network line is by the power network line
Guarantor's electricity user, protect electric task and make an inspection tour situation.To protect the electric period is divided into several periods, protect electric user be divided into it is different etc.
Grade, such as general meeting, momentous conference, high-level meeting etc., user gradation are the equivalent coefficient of the guarantor electricity user, user gradation
Higher, coefficient is smaller;According to the electricity consumption scene of different periods, electric task will be protected and be divided into meeting, have dinner, lie fallow, going to bed, connecing
To ... several junior's tasks are waited, the importance of different periods, each junior's task is not quite similar, such as night is preferential
Guarantee is gone to bed electricity consumption, mealtime preferentially guarantees to have dinner electricity consumption ... needs according to the period to the important of these junior's tasks
Property is divided, and the significance level of junior's task is represented with task grade, significance level is higher, and task equivalent coefficient is smaller;
Tour resource provisioned in the electric region of each guarantor is not quite similar, and making an inspection tour resource, to be equipped with high regional processing efficiency relatively high, patrols
Apparent gravity coefficient is smaller, and it is more sufficient to represent tour resource.Therefore the electric weight of guarantor is smaller, then the maintenance priority of the power network line is got over
It is high.
Equipment preferred number=∑ failure rate/(load number * utilization rate * specific gravity factor);The electricity consumption of every grid equipment
Situation is related with loadtype, load number, utilization rate, failure rate, and specific gravity system is arranged for each loadtype in each period
Number, each loadtype have quantity and frequency of use, the difference of failure rate.Such as a lighting apparatus, loadtype may wrap
Include: ceiling lamp, desk lamp, socket etc., when daytime is bright and clear, ceiling lamp, the specific gravity factor of desk lamp are relatively low, it is corresponding this when
The utilization rate and failure rate of section are also just lower;To night, ceiling lamp, desk lamp specific gravity factor will become larger, utilization rate and therefore
Barrier rate also just improves.The electricity consumption situation of every equipment of overall merit helps accurately to estimate overall electricity consumption, so which judge
The stand-by equipment that a little equipment can be used as other equipment guarantees overall power supply cloth under the premise of meeting power itself demand
Office.To sum up, protecting electric priority is to carry out dynamic update according to different periods, in order to according to specific service condition,
When an error occurs, the higher power demand protected electric task or protect electricity object of preferential guarantee priority, motor-driven carries out guarantor's electricity
The allotment of goods and materials.
Embodiment described above is a kind of preferable scheme of the invention, not makees limit in any form to the present invention
System, there are also other variants and remodeling on the premise of not exceeding the technical scheme recorded in the claims.
Claims (8)
1. protecting power supply trouble monitors removal system characterized by comprising panorama display module protects electricity commander module, power grid prison
Module is surveyed, electric resources module is protected, protects electric management module and basic data maintenance module;
Guarantor's electricity commander module, power network monitoring module, guarantor's electric resources module and the electric management module of guarantor show mould with panorama
Block connection;
The power network monitoring module, guarantor's electric resources module and the electric management module of guarantor command module to connect with guarantor's electricity;The electricity
Net monitoring modular, guarantor's electric resources module, the electric management module of guarantor and panorama display module are connect with basic data maintenance module.
2. guarantor's power supply trouble according to claim 1 monitors removal system, which is characterized in that guarantor's electricity commander's module,
It include: that maneuvering platform unit, repairing work order, failure study and judge unit and live line unit, the repairing work order, failure are studied and judged
Unit is connect with maneuvering platform unit, and failure is studied and judged unit and connect with live line unit, and live line unit and commander are flat
Platform unit protects the connection of electric resources module;The repairing work order is also connect with 95598 work orders, internal work order;The power network monitoring mould
Block, comprising: abnormal alarm platform, power system monitor control unit and several power network lines, every power network line connection are several
Grid equipment, every grid equipment include real time information monitoring unit and video information storage unit;The real time information monitoring
Unit is used to monitor and show the operating parameter of corresponding grid equipment;The video information storage unit stores corresponding grid equipment
Operation and maintenance situation;The power network line is connect with abnormal alarm platform, and abnormal alarm platform is connect with repairing work order;It is described
Power network line is connect with power system monitor control unit;
Guarantor's electric resources module, comprising: protect electric resources platform, the region of war Bao electricity troop, protect electric personnel, protect electric car, protect electric object
Money and protect electric logistics, the region of war the Bao electricity troop, protect electric personnel, protect electric car, protect electric goods and materials and protect electric logistics with guarantor
The connection of electric resources platform is protected electric resources platform and is connect with live line unit;
The electric management module of the guarantor, comprising: protect electric management control unit, report form statistics platform, protect electric user, protect electric task, protect
Electricity makes an inspection tour unit and weather monitoring unit;The electric user of the guarantor, the electric task of guarantor, guarantor's electricity make an inspection tour unit and weather monitoring unit
It is connect with report form statistics platform, report form statistics platform is studied and judged unit with failure and connect;The electric user of the guarantor protects electric task, protects
Electricity is maked an inspection tour unit and weather monitoring unit and is connect with the electric management control unit of guarantor;
The basic data maintenance module, comprising: system configuration unit, power network monitoring maintenance unit, protect fulgurite reason maintenance unit,
It protects electric resources maintenance unit and panorama shows maintenance unit;The system configuration unit and power network monitoring maintenance unit protect electricity
Management service unit protects electric resources maintenance unit and panorama displaying maintenance unit connection;The power network monitoring maintenance unit with
The connection of power system monitor control unit, guarantor's fulgurite reason maintenance unit are connect with electric management control unit is protected, guarantor's electric resources
Maintenance unit is connect with electric resources platform is protected, and the panorama shows that maintenance unit is connect with panorama display module;
The system configuration unit, comprising: rights management unit and operating unit;The rights management unit is each for being arranged
Organizations and individuals are to the administration authority for protecting electric system;The operating unit is used to that the mode of operation for protecting electric system to be arranged, and is divided into volume
Thread management and parameter setting.
3. guarantor's power supply trouble according to claim 2 monitors removal system, which is characterized in that the failure studies and judges unit,
It include: that failure essential information transfers unit, failure influence area analytical unit and repairing resource allocation unit;The failure base
This information is transferred unit, failure influence area analytical unit and repairing resource allocation unit and is sequentially connected;The failure is basic
Information is transferred unit and is connect with maneuvering platform, the report form statistics platform, and the repairing resource allocation unit and the scene are even
The connection of line unit.
4. guarantor's power supply trouble according to claim 2 monitors removal system, which is characterized in that the real time information monitoring is single
The data of grid equipment that member is monitored include: the temperature of substation, humidity, the temperature of transformer, humidity, partial discharge, oil chromatography,
Iron core, SF6 gas-monitoring, current transformer, combined electrical apparatus, bus PT, coupled capacitor, breaker, reactor, combined electrical apparatus,
Temperature, the humidity of switchgear, disconnecting link and battery.
5. protecting power supply trouble monitors method for removing, it is suitable for guarantor's power supply trouble described in claim 1 and monitors removal system, it is special
Sign is that the repairing work order receives the warning message that abnormal alarm platform, internal work order and the transmission of 95598 work orders come, will
Warning message is transmitted to maneuvering platform unit, and maneuvering platform unit carries out failure and studies and judges, and transfers unit by failure essential information
The integral data of report form statistics platform is transferred, the analysis of failure influence area is carried out, locking laggard rob of involved area repairs resource
Allotment layout is connect by live line unit with electric resources platform is protected, and is obtained the region of war Bao electricity troop, is protected electric personnel, protects electric car
, protect electric goods and materials and protect electric logistical information, arrange the corresponding region of war Bao electricity troop, protect electric personnel, protect electric car, protect electric goods and materials
And it protects electric logistics and carries out Failure elimination, and pass processing progress back maneuvering platform;Guarantor's electricity the commander module, power network monitoring mould
Block, the data protected electric resources module and protect electricity management module are presented on panorama display module, and maneuvering platform passes through panorama exhibition
Show module, checks each module multidate information;Basic data maintenance module is to guarantor electric management module, power network monitoring module, Bao electricity Zi
Source module and panorama display module carry out data maintenance;Operator is divided into programming management and parameter setting to the maintenance of data,
System configuration unit distributes corresponding operation permission according to operator's institutional affiliation and responsibility, for operator, realizes and supervises to power grid
The difference management for surveying module, protecting electric resources module, protecting electric management module and panorama display module.
6. guarantor's power supply trouble according to claim 5 monitors method for removing, which is characterized in that according to protecting electric weight for power grid
Route carries out protecting electric priority division, and every grid equipment corresponds to corresponding equipment preferred number, carries out failure influence area point
When analysis, first according to the maintenance sequence for protecting the power network line that electric weight decision is broken down, determined further according to equipment preferred number same
The maintenance sequence of the grid equipment to break down on one power network line, to carry out repairing resource allocation.
7. guarantor's power supply trouble according to claim 6 monitors method for removing, which is characterized in that the electric weight=user of the guarantor
Grade * task grade * makes an inspection tour specific gravity;The size of electric weight is protected by the electric task of guarantor's electricity user, guarantor on the route and makes an inspection tour feelings
Condition meteorologic factor determines that, if including that Ganlei protects electric user and several Xiang Bao electricity tasks on every power network line, every class protects electric user
Corresponding corresponding user gradation, each is protected electric task and corresponds to corresponding task grade, which can be according to the change of period
It changes, makes an inspection tour situation and measured with making an inspection tour specific gravity.
8. guarantor's power supply trouble according to claim 6 monitors method for removing, which is characterized in that the equipment preferred number by
Loadtype, load number, load utilization rate and the decision of load faulty rate of connection, the equipment preferred number=∑ failure
Rate/(load number * utilization rate * specific gravity factor), equipment preferred number is smaller, and equipment priority is higher, specific gravity factor and load
Type is corresponding.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201711471232.5A CN109473970A (en) | 2017-12-28 | 2017-12-28 | Protect power supply trouble monitoring removal system and method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201711471232.5A CN109473970A (en) | 2017-12-28 | 2017-12-28 | Protect power supply trouble monitoring removal system and method |
Publications (1)
Publication Number | Publication Date |
---|---|
CN109473970A true CN109473970A (en) | 2019-03-15 |
Family
ID=65658446
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201711471232.5A Pending CN109473970A (en) | 2017-12-28 | 2017-12-28 | Protect power supply trouble monitoring removal system and method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN109473970A (en) |
Cited By (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110045207A (en) * | 2019-04-26 | 2019-07-23 | 国网上海市电力公司 | A kind of complex fault diagnostic method based on power grid architecture and multisource data fusion |
CN110298764A (en) * | 2019-05-15 | 2019-10-01 | 广西电网有限责任公司南宁供电局 | A kind of guarantor powers visualization system and method |
CN110321509A (en) * | 2019-04-16 | 2019-10-11 | 国网新疆电力有限公司昌吉供电公司 | A kind of guarantor's power supply management system |
CN111047195A (en) * | 2019-12-13 | 2020-04-21 | 北京科东电力控制系统有限责任公司 | Power supply protecting system based on multi-source data |
CN111159267A (en) * | 2019-12-19 | 2020-05-15 | 国网北京市电力公司 | Power supply guarantee system |
CN111582549A (en) * | 2020-04-14 | 2020-08-25 | 广东卓维网络有限公司 | Power station monitoring and rush-repair system based on GIS |
CN112016705A (en) * | 2020-07-08 | 2020-12-01 | 国网浙江杭州市富阳区供电有限公司 | Active first-aid repair method based on power Internet of things |
CN114089114A (en) * | 2021-11-19 | 2022-02-25 | 重庆玖奇科技有限公司 | Low-voltage distribution network fault prediction method based on terminal sensing technology |
WO2022123628A1 (en) * | 2020-12-07 | 2022-06-16 | 日本電気株式会社 | Facility inspection assistance system, facility inspection assistance method, and recording medium having facility inspection assistance program stored thereon |
Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106203830A (en) * | 2016-07-12 | 2016-12-07 | 国网江西省电力公司南昌供电分公司 | Promote Distribution Network Failure response and the electric service system of repairing ability |
CN106685074A (en) * | 2016-10-26 | 2017-05-17 | 珠海许继芝电网自动化有限公司 | System and method of commanding power supply guarantee |
-
2017
- 2017-12-28 CN CN201711471232.5A patent/CN109473970A/en active Pending
Patent Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106203830A (en) * | 2016-07-12 | 2016-12-07 | 国网江西省电力公司南昌供电分公司 | Promote Distribution Network Failure response and the electric service system of repairing ability |
CN106685074A (en) * | 2016-10-26 | 2017-05-17 | 珠海许继芝电网自动化有限公司 | System and method of commanding power supply guarantee |
Cited By (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110321509A (en) * | 2019-04-16 | 2019-10-11 | 国网新疆电力有限公司昌吉供电公司 | A kind of guarantor's power supply management system |
CN110045207A (en) * | 2019-04-26 | 2019-07-23 | 国网上海市电力公司 | A kind of complex fault diagnostic method based on power grid architecture and multisource data fusion |
CN110298764A (en) * | 2019-05-15 | 2019-10-01 | 广西电网有限责任公司南宁供电局 | A kind of guarantor powers visualization system and method |
CN111047195A (en) * | 2019-12-13 | 2020-04-21 | 北京科东电力控制系统有限责任公司 | Power supply protecting system based on multi-source data |
WO2021114856A1 (en) * | 2019-12-13 | 2021-06-17 | 北京科东电力控制系统有限责任公司 | Multisource data-based uninterruptible power supply system |
CN111159267A (en) * | 2019-12-19 | 2020-05-15 | 国网北京市电力公司 | Power supply guarantee system |
CN111582549A (en) * | 2020-04-14 | 2020-08-25 | 广东卓维网络有限公司 | Power station monitoring and rush-repair system based on GIS |
CN112016705A (en) * | 2020-07-08 | 2020-12-01 | 国网浙江杭州市富阳区供电有限公司 | Active first-aid repair method based on power Internet of things |
WO2022123628A1 (en) * | 2020-12-07 | 2022-06-16 | 日本電気株式会社 | Facility inspection assistance system, facility inspection assistance method, and recording medium having facility inspection assistance program stored thereon |
CN114089114A (en) * | 2021-11-19 | 2022-02-25 | 重庆玖奇科技有限公司 | Low-voltage distribution network fault prediction method based on terminal sensing technology |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN109473970A (en) | Protect power supply trouble monitoring removal system and method | |
CN206962989U (en) | A kind of power emergency command center system structure | |
CN105564465B (en) | A kind of railway electric signal plant maintenance operation control system and method | |
CN110071579A (en) | Power grid power supply based on ubiquitous electric power Internet of Things ensures and intelligent managing and control system | |
CN108830462A (en) | A kind of pipe gallery wisdom operation management platform and method | |
CN102931724A (en) | Intelligent video monitoring system for electric power transmission and transformation | |
CN104091231A (en) | Distribution network fault repairing commanding and processing system and method | |
CN104401820B (en) | Elevator management system | |
CN103578228A (en) | Rainstorm flood disaster monitoring pre-warning and emergency response system and method | |
CN104077641A (en) | Power grid operation and emergency command method and power commanding system | |
WO2021114856A1 (en) | Multisource data-based uninterruptible power supply system | |
KR100867864B1 (en) | Ubiquitous sensor network unity control system and method thereof | |
CN106597966A (en) | Security and protection system based on chemical industrial park | |
CN107991976A (en) | A kind of cloud safeguards fusion linkage platform and the intelligent linkage system based on the platform | |
CN204965565U (en) | Access control system of transformer substation | |
CN102120070A (en) | Self-extinguishing rescuing intelligent system based on fire-fighting early warning | |
CN111792487A (en) | Elevator intelligent management system and management method based on big data platform | |
CN108267670A (en) | A kind of Distribution Network Failure studies and judges early warning system and its implementation | |
CN203104105U (en) | Intelligent video monitoring system for power transmission and transformation | |
CN203192178U (en) | Rainstorm and flood disaster monitoring/early warning and emergency command system | |
CN103869219A (en) | Fault handling method and device for power transmission network | |
CN110298764A (en) | A kind of guarantor powers visualization system and method | |
CN114157687B (en) | Concentrated transformer information display system and method based on cloud platform deployment | |
CN112348729A (en) | Intelligent security-eliminating integrated big data cloud platform system | |
CN108256770A (en) | Photo-voltaic power generation station O&M managing and control system based on mobile application |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20190315 |