CN110445107A - Processing method for 110kV line fault tripping - Google Patents

Processing method for 110kV line fault tripping Download PDF

Info

Publication number
CN110445107A
CN110445107A CN201910676382.2A CN201910676382A CN110445107A CN 110445107 A CN110445107 A CN 110445107A CN 201910676382 A CN201910676382 A CN 201910676382A CN 110445107 A CN110445107 A CN 110445107A
Authority
CN
China
Prior art keywords
accident
line
situation
inspection result
processing method
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201910676382.2A
Other languages
Chinese (zh)
Other versions
CN110445107B (en
Inventor
武志伟
余林
马召鼎
黄伟
秦义伟
张培玉
李建文
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hengshui Power Design Co ltd
State Grid Corp of China SGCC
State Grid Hebei Electric Power Co Ltd
Hengshui Power Supply Co of State Grid Hebei Electric Power Co Ltd
Original Assignee
State Grid Corp of China SGCC
State Grid Hebei Electric Power Co Ltd
Hengshui Power Supply Co of State Grid Hebei Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Corp of China SGCC, State Grid Hebei Electric Power Co Ltd, Hengshui Power Supply Co of State Grid Hebei Electric Power Co Ltd filed Critical State Grid Corp of China SGCC
Priority to CN201910676382.2A priority Critical patent/CN110445107B/en
Publication of CN110445107A publication Critical patent/CN110445107A/en
Application granted granted Critical
Publication of CN110445107B publication Critical patent/CN110445107B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • GPHYSICS
    • G01MEASURING; TESTING
    • G01RMEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
    • G01R31/00Arrangements for testing electric properties; Arrangements for locating electric faults; Arrangements for electrical testing characterised by what is being tested not provided for elsewhere
    • G01R31/08Locating faults in cables, transmission lines, or networks
    • G01R31/081Locating faults in cables, transmission lines, or networks according to type of conductors
    • G01R31/085Locating faults in cables, transmission lines, or networks according to type of conductors in power transmission or distribution lines, e.g. overhead
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01RMEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
    • G01R31/00Arrangements for testing electric properties; Arrangements for locating electric faults; Arrangements for electrical testing characterised by what is being tested not provided for elsewhere
    • G01R31/08Locating faults in cables, transmission lines, or networks
    • G01R31/081Locating faults in cables, transmission lines, or networks according to type of conductors
    • G01R31/086Locating faults in cables, transmission lines, or networks according to type of conductors in power transmission or distribution networks, i.e. with interconnected conductors
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02HEMERGENCY PROTECTIVE CIRCUIT ARRANGEMENTS
    • H02H1/00Details of emergency protective circuit arrangements
    • H02H1/0061Details of emergency protective circuit arrangements concerning transmission of signals
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02HEMERGENCY PROTECTIVE CIRCUIT ARRANGEMENTS
    • H02H7/00Emergency protective circuit arrangements specially adapted for specific types of electric machines or apparatus or for sectionalised protection of cable or line systems, and effecting automatic switching in the event of an undesired change from normal working conditions
    • H02H7/26Sectionalised protection of cable or line systems, e.g. for disconnecting a section on which a short-circuit, earth fault, or arc discharge has occured
    • H02H7/28Sectionalised protection of cable or line systems, e.g. for disconnecting a section on which a short-circuit, earth fault, or arc discharge has occured for meshed systems

Abstract

The invention relates to a processing method for 110kV line fault tripping, which comprises the following steps: 1. accident information is collected and preliminarily analyzed; 2. judging whether the accident is a major event or not, and simultaneously transmitting a primary analysis result to an operation and maintenance site; 3. uploading and summarizing the operation and maintenance site inspection results to the next flow for accident handling; 4. judging whether the line is a live working line or not according to the accident information; 5. judging whether the line inspection result has obvious faults or not, and when the line inspection result has obvious faults, finding out reasons and eliminating the faults, and trying to send the line inspection result once; when the line inspection result has no obvious fault, trying to send the line inspection result once; 6. judging whether the trial delivery is successful, and transmitting the accident handling condition to the short message platform system when the trial delivery is successful; when the trial delivery is unsuccessful, the accident handling condition is transmitted to a link for finding out reasons and eliminating faults for analysis; the invention shortens the processing time of line fault tripping, optimizes the power grid fault recovery and improves the first-aid repair efficiency and the service level.

Description

A kind of processing method of 110kV line fault tripping
Technical field
The present invention relates to a kind of processing methods of 110kV line fault tripping, belong to troubleshooting field.
Background technique
With the development of electric power network technique, rule-of-thumb approach scheduling method has been not suitable with the requirement of nowadays power network development.State " the Hebei South Power Network scheduling controlling rule of management " for netting the publication of Hebei Utilities Electric Co., wherein " troubleshooting regulation " has larger change Change.Organ of the regulation center as electric network accident management, when accident occurs for power grid, dispatcher should work as according to power grid immediately The preceding method of operation, abnormal signal and phenomenon etc. are judged and are handled to accident rapidly, are striven within the shortest time to user It restores electricity, to be influenced caused by reduction accident.
Important public infrastructure of the power distribution network as national economy and social development, has that scale is big, distribution is wide, network The features such as connection is various with the method for operation.And with the continuous expansion of distribution scale, the composition of electric load also has occurred Significant changes, wherein business and electricity consumption of resident have and are obviously improved, this will so that distribution line and transformer load increase, Lead to line tripping event increases.
In the prior art, it after 110kV line fault trips, is mainly uploaded using artificial warning message or station website Information carry out the judgement of failure the scheme for restoring normal mode be discussed out then using the artificial analysis processing for carrying out failure, Efficiency is lower, and fault location accuracy rate is lower, causes the line fault tripping processing time longer.
In the actual process, it is found that there are at many failures for 110kV line fault tripping processing method in the prior art It is lower to manage efficiency, handles time longer drawback.
Summary of the invention
Technical problem to be solved by the invention is to provide a kind of processing of efficient and convenient 110kV line fault tripping Method.
In order to solve the above technical problems, the present invention adopts the following technical scheme:
A kind of processing method of 110kV line fault tripping comprising:
Step 1, accident information is collected and preliminary analysis;
Whether step 2, judgement accident are major event, simultaneous transmission Preliminary Analysis Results to O&M scene;
When accident is determined as major event, then a hierarchical system is uploaded to;When accident is determined as insignificant event, then will Accident situation is transmitted to SMS platform system;
Step 3 summarizes the upload of O&M site inspection result to downstream progress accident treatment;
Step 4 is made to determine whether according to accident information as livewire work route;
Step 5 determines that line inspection result whether there is obvious fault, when there are the eliminations that when obvious fault, ascertains the reason for line inspection result After failure, carries out examination and send once;When line inspection result is without obvious fault, carries out examination and send once;
Whether step 6 determines to try to send to succeed, and when examination is sent successfully, accident treatment situation should be transmitted to SMS platform system;When Examination is when sending failed, should be transmitted to ascertain the reason accident treatment situation and eliminate failsafe link and analyze.
Further, step 1 accident information collects simultaneously preliminary analysis, i.e., carries out according to basic parameter and accident situation Classification.
Further, the basic parameter includes line length, wire type, relay protection scheme and protection scope.
Further, the accident situation include accident occur time, monitoring-controlling system signal, relay protection and safety from Dynamic device action situation and switch changed position, equipment state, loss load and dispatching terminal failure wave-recording situation.
Further, O&M site inspection result includes the time of accident generation, separate and relay protection in the step 3 Automatic safety device action situation, protection ranging situation and failure wave-recording ranging situation.
Further, the step 4 is made to determine whether that for livewire work route, judgment basis is such as according to accident information Under:
When faulty line is livewire work route, then principle is disposed according to livewire work line fault, information is transmitted to transmission of electricity Fortune inspection room carries out the electrification line inspection;
When faulty line is not livewire work route, then carry out accident treatment, summarize O&M site inspection result be transmitted to it is defeated Electricity fortune inspection room carries out the electrification line inspection.
Further, the livewire work line fault disposition principle is live feelings after the tripping of livewire work line fault Condition summarizes to system platform, and still regards equipment live.
Further, obvious fault includes strand breakage of circuit, damage and/or flashover burn in the step 5.
Beneficial effects of the present invention are as follows:
The present invention uses the processing method of 110kV line fault tripping, solves 110kV line fault tripping in the prior art Afterwards, existing recovery normal efficiency is low, and fault location accuracy rate is low, leads to line fault tripping processing time longer problem, The processing time for shortening line fault tripping optimizes electric network fault recovery, realizes and close to 110kV line tripping repairing Endless tube control improves first-aid repair efficiency and service level, strengthens the control ability to the repairing of 110kV line tripping, improves The stability of power distribution network operation level fundamentally improves the electricity consumption reliability level of 110kV route.
Detailed description of the invention
It, below will be to specific in order to illustrate more clearly of the specific embodiment of the invention or technical solution in the prior art Embodiment or attached drawing needed to be used in the description of the prior art be briefly described, it should be apparent that, it is described below Attached drawing is some embodiments of the present invention, for those of ordinary skill in the art, before not making the creative labor It puts, can also be obtained according to these attached drawings other attached drawings.
Fig. 1 is the flow chart of processing method of the present invention.
Specific embodiment
To make the object, technical solutions and advantages of the present invention clearer, with reference to the accompanying drawing 1 and specific embodiment to hair It is bright to carry out clear, complete description.
As shown in Figure 1, the present embodiment 1 is related to a kind of processing method of 110kV line fault tripping comprising:
Step 1, accident information is collected and preliminary analysis;
Whether step 2, judgement accident are major event, simultaneous transmission Preliminary Analysis Results to O&M scene;
When accident is determined as major event, then a hierarchical system is uploaded to;When accident is determined as insignificant event, then will Accident situation is transmitted to SMS platform system;
Step 3 summarizes the upload of O&M site inspection result to downstream progress accident treatment;
Step 4 is made to determine whether according to accident information as livewire work route;
Step 5 determines that line inspection result whether there is obvious fault, when there are the eliminations that when obvious fault, ascertains the reason for line inspection result After failure, carries out examination and send once;When line inspection result is without obvious fault, carries out examination and send once;
Whether step 6 determines to try to send to succeed, and when examination is sent successfully, accident treatment situation should be transmitted to SMS platform system;When Examination is when sending failed, should be transmitted to ascertain the reason accident treatment situation and eliminate failsafe link and analyze.
The present embodiment 2 is related to a kind of processing method of 110kV line fault tripping comprising:
Step 1, accident information is collected and preliminary analysis, i.e., classifies according to basic parameter and accident situation;
Whether step 2, judgement accident are major event, simultaneous transmission Preliminary Analysis Results to O&M scene;
When accident is determined as major event, then a hierarchical system is uploaded to;When accident is determined as insignificant event, then will Accident situation is transmitted to SMS platform system;
Step 3 summarizes the upload of O&M site inspection result to downstream progress accident treatment;
Step 4 is made to determine whether according to accident information as livewire work route;
Step 5 determines that line inspection result whether there is obvious fault, when there are the eliminations that when obvious fault, ascertains the reason for line inspection result After failure, carries out examination and send once;When line inspection result is without obvious fault, carries out examination and send once;
Whether step 6 determines to try to send to succeed, and when examination is sent successfully, accident treatment situation should be transmitted to SMS platform system;When Examination is when sending failed, should be transmitted to ascertain the reason accident treatment situation and eliminate failsafe link and analyze.
The present embodiment 3 is related to a kind of processing method of 110kV line fault tripping comprising:
Step 1, accident information is collected and preliminary analysis, i.e., classifies according to basic parameter and accident situation;
The basic parameter includes line length, wire type, relay protection scheme and protection scope;
Whether step 2, judgement accident are major event, simultaneous transmission Preliminary Analysis Results to O&M scene;
When accident is determined as major event, then a hierarchical system is uploaded to;When accident is determined as insignificant event, then will Accident situation is transmitted to SMS platform system;
Step 3 summarizes the upload of O&M site inspection result to downstream progress accident treatment;
Step 4 is made to determine whether according to accident information as livewire work route;
Step 5 determines that line inspection result whether there is obvious fault, when there are the eliminations that when obvious fault, ascertains the reason for line inspection result After failure, carries out examination and send once;When line inspection result is without obvious fault, carries out examination and send once;
Whether step 6 determines to try to send to succeed, and when examination is sent successfully, accident treatment situation should be transmitted to SMS platform system;When Examination is when sending failed, should be transmitted to ascertain the reason accident treatment situation and eliminate failsafe link and analyze.
The present embodiment 4 is related to a kind of processing method of 110kV line fault tripping comprising:
Step 1, accident information is collected and preliminary analysis, i.e., classifies according to basic parameter and accident situation;
The basic parameter includes line length, wire type, relay protection scheme and protection scope;
The accident situation includes time, monitoring-controlling system signal, relay protection and the automatic safety device movement feelings that accident occurs Condition and switch changed position, equipment state, loss load and dispatching terminal failure wave-recording situation;
Whether step 2, judgement accident are major event, simultaneous transmission Preliminary Analysis Results to O&M scene;
When accident is determined as major event, then a hierarchical system is uploaded to;When accident is determined as insignificant event, then will Accident situation is transmitted to SMS platform system;
Step 3 summarizes the upload of O&M site inspection result to downstream progress accident treatment;
Step 4 is made to determine whether according to accident information as livewire work route;
Step 5 determines that line inspection result whether there is obvious fault, when there are the eliminations that when obvious fault, ascertains the reason for line inspection result After failure, carries out examination and send once;When line inspection result is without obvious fault, carries out examination and send once;
Whether step 6 determines to try to send to succeed, and when examination is sent successfully, accident treatment situation should be transmitted to SMS platform system;When Examination is when sending failed, should be transmitted to ascertain the reason accident treatment situation and eliminate failsafe link and analyze.
The present embodiment 5 is related to a kind of processing method of 110kV line fault tripping comprising:
Step 1, accident information is collected and preliminary analysis, i.e., classifies according to basic parameter and accident situation;
The basic parameter includes line length, wire type, relay protection scheme and protection scope;
The accident situation includes time, monitoring-controlling system signal, relay protection and the automatic safety device movement feelings that accident occurs Condition and switch changed position, equipment state, loss load and dispatching terminal failure wave-recording situation;
Whether step 2, judgement accident are major event, simultaneous transmission Preliminary Analysis Results to O&M scene;
When accident is determined as major event, then a hierarchical system is uploaded to;When accident is determined as insignificant event, then will Accident situation is transmitted to SMS platform system;
Step 3 summarizes the upload of O&M site inspection result to downstream progress accident treatment;The O&M site inspection knot Fruit includes time, separate and automatic equipment of relay protection action situation, protection ranging situation and the failure that accident occurs Recording ranging situation;
Step 4 is made to determine whether according to accident information as livewire work route;
Step 5 determines that line inspection result whether there is obvious fault, when there are the eliminations that when obvious fault, ascertains the reason for line inspection result After failure, carries out examination and send once;When line inspection result is without obvious fault, carries out examination and send once;
Whether step 6 determines to try to send to succeed, and when examination is sent successfully, accident treatment situation should be transmitted to SMS platform system;When Examination is when sending failed, should be transmitted to ascertain the reason accident treatment situation and eliminate failsafe link and analyze.
The present embodiment 6 is related to a kind of processing method of 110kV line fault tripping comprising:
Step 1, accident information is collected and preliminary analysis, i.e., classifies according to basic parameter and accident situation;
The basic parameter includes line length, wire type, relay protection scheme and protection scope;
The accident situation includes time, monitoring-controlling system signal, relay protection and the automatic safety device movement feelings that accident occurs Condition and switch changed position, equipment state, loss load and dispatching terminal failure wave-recording situation;
Whether step 2, judgement accident are major event, simultaneous transmission Preliminary Analysis Results to O&M scene;
When accident is determined as major event, then a hierarchical system is uploaded to;When accident is determined as insignificant event, then will Accident situation is transmitted to SMS platform system;
Step 3 summarizes the upload of O&M site inspection result to downstream progress accident treatment;The O&M site inspection knot Fruit includes time, separate and automatic equipment of relay protection action situation, protection ranging situation and the failure that accident occurs Recording ranging situation;
Step 4 is made to determine whether as livewire work route that judgment basis is as follows according to accident information:
When faulty line is livewire work route, then principle is disposed according to livewire work line fault, information is transmitted to transmission of electricity Fortune inspection room carries out the electrification line inspection;
When faulty line is not livewire work route, then carry out accident treatment, summarize O&M site inspection result be transmitted to it is defeated Electricity fortune inspection room carries out the electrification line inspection;
Step 5 determines that line inspection result whether there is obvious fault, when there are the eliminations that when obvious fault, ascertains the reason for line inspection result After failure, carries out examination and send once;When line inspection result is without obvious fault, carries out examination and send once;
Whether step 6 determines to try to send to succeed, and when examination is sent successfully, accident treatment situation should be transmitted to SMS platform system;When Examination is when sending failed, should be transmitted to ascertain the reason accident treatment situation and eliminate failsafe link and analyze.
The present embodiment 7 is related to a kind of processing method of 110kV line fault tripping comprising:
Step 1, accident information is collected and preliminary analysis, i.e., classifies according to basic parameter and accident situation;
The basic parameter includes line length, wire type, relay protection scheme and protection scope;
The accident situation includes time, monitoring-controlling system signal, relay protection and the automatic safety device movement feelings that accident occurs Condition and switch changed position, equipment state, loss load and dispatching terminal failure wave-recording situation;
Whether step 2, judgement accident are major event, simultaneous transmission Preliminary Analysis Results to O&M scene;
When accident is determined as major event, then a hierarchical system is uploaded to;When accident is determined as insignificant event, then will Accident situation is transmitted to SMS platform system;
Step 3 summarizes the upload of O&M site inspection result to downstream progress accident treatment;The O&M site inspection knot Fruit includes time, separate and automatic equipment of relay protection action situation, protection ranging situation and the failure that accident occurs Recording ranging situation;
Step 4 is made to determine whether as livewire work route that judgment basis is as follows according to accident information:
When faulty line is livewire work route, then principle is disposed according to livewire work line fault, information is transmitted to transmission of electricity Fortune inspection room carries out the electrification line inspection;The livewire work line fault disposition principle is scene after the tripping of livewire work line fault Situation summarizes to system platform, and still regards equipment live;
When faulty line is not livewire work route, then carry out accident treatment, summarize O&M site inspection result be transmitted to it is defeated Electricity fortune inspection room carries out the electrification line inspection;
Step 5 determines that line inspection result whether there is obvious fault, when there are the eliminations that when obvious fault, ascertains the reason for line inspection result After failure, carries out examination and send once;When line inspection result is without obvious fault, carries out examination and send once;
Whether step 6 determines to try to send to succeed, and when examination is sent successfully, accident treatment situation should be transmitted to SMS platform system;When Examination is when sending failed, should be transmitted to ascertain the reason accident treatment situation and eliminate failsafe link and analyze.
The present embodiment 8 is related to a kind of processing method of 110kV line fault tripping comprising:
Step 1, accident information is collected and preliminary analysis, i.e., classifies according to basic parameter and accident situation;
The basic parameter includes line length, wire type, relay protection scheme and protection scope;
The accident situation includes time, monitoring-controlling system signal, relay protection and the automatic safety device movement feelings that accident occurs Condition and switch changed position, equipment state, loss load and dispatching terminal failure wave-recording situation;
Whether step 2, judgement accident are major event, simultaneous transmission Preliminary Analysis Results to O&M scene;
When accident is determined as major event, then a hierarchical system is uploaded to;When accident is determined as insignificant event, then will Accident situation is transmitted to SMS platform system;
Step 3 summarizes the upload of O&M site inspection result to downstream progress accident treatment;The O&M site inspection knot Fruit includes time, separate and automatic equipment of relay protection action situation, protection ranging situation and the failure that accident occurs Recording ranging situation;
Step 4 is made to determine whether as livewire work route that judgment basis is as follows according to accident information:
When faulty line is livewire work route, then principle is disposed according to livewire work line fault, information is transmitted to transmission of electricity Fortune inspection room carries out the electrification line inspection;The livewire work line fault disposition principle is scene after the tripping of livewire work line fault Situation summarizes to system platform, and still regards equipment live;
When faulty line is not livewire work route, then carry out accident treatment, summarize O&M site inspection result be transmitted to it is defeated Electricity fortune inspection room carries out the electrification line inspection;
Step 5 determines that line inspection result whether there is obvious fault, hence it is evident that failure includes that strand breakage of circuit, damage and/or flashover are burnt Wound;When line inspection result is there are when obvious fault, ascertaining the reason after eliminating the fault, carry out examination send it is primary;When line inspection result is without obvious When failure, carries out examination and send once;
Whether step 6 determines to try to send to succeed, and when examination is sent successfully, accident treatment situation should be transmitted to SMS platform system;When Examination is when sending failed, should be transmitted to ascertain the reason accident treatment situation and eliminate failsafe link and analyze.
After above-described embodiment solves 110kV line fault tripping in the prior art, existing recovery normal efficiency is low, therefore It is low to hinder locating accuracy, leads to line fault tripping processing time longer problem, when shortening the processing of line fault tripping Between, optimize electric network fault recovery, realize to 110kV line tripping repairing closed loop control, improve first-aid repair efficiency and Service level strengthens the control ability to the repairing of 110kV line tripping, improves the stability of power distribution network operation level, from Fundamentally improve the electricity consumption reliability level of 110kV route.
It should be noted that term used herein above is merely to describe specific embodiment, and be not intended to restricted root According to the illustrative embodiments of the application.As used herein, unless the context clearly indicates otherwise, otherwise singular Also it is intended to include plural form, additionally, it should be understood that, when in the present specification using term "comprising" and/or " packet Include " when, indicate existing characteristics, step, operation, device, component and/or their combination.
Finally, it should be noted that the above embodiments are merely illustrative of the technical solutions of the present invention, rather than its limitations;Although Present invention has been described in detail with reference to the aforementioned embodiments, those skilled in the art should understand that: it still may be used To modify to technical solution documented by previous embodiment or equivalent replacement of some of the technical features;And These are modified or replaceed, the spirit and model of technical solution of the embodiment of the present invention that it does not separate the essence of the corresponding technical solution It encloses.

Claims (10)

1. a kind of processing method of 110kV line fault tripping, which is characterized in that it includes the following steps:
Step 1, accident information is collected and preliminary analysis;Whether step 2, judgement accident are major event, and simultaneous transmission is tentatively divided Result is analysed to O&M scene;When accident is determined as major event, then a hierarchical system is uploaded to;When accident be determined as it is non-heavy When major issue, then accident situation is transmitted to SMS platform system;Step 3 summarizes the upload of O&M site inspection result under One process carries out accident treatment;Step 4 is made to determine whether according to accident information as livewire work route;Step 5, judgement are looked into Knot fruit whether there is obvious fault, when line inspection result is there are when obvious fault, ascertaining the reason after eliminating the fault, carries out examination and send one It is secondary;When line inspection result is without obvious fault, carries out examination and send once;Whether step 6 determines to try to send to succeed, and when examination is sent successfully, answers Accident treatment situation is transmitted to SMS platform system;When examination is sent it is failed when, accident treatment situation should be transmitted to and find out original It is analyzed because eliminating failsafe link.
2. a kind of processing method of 110kV line fault tripping according to claim 1, which is characterized in that the step 1 Accident information is collected and preliminary analysis, i.e., classifies according to basic parameter and accident situation.
3. a kind of processing method of 110kV line fault tripping according to claim 2, which is characterized in that described basic Parameter includes line length, wire type, relay protection scheme and protection scope.
4. a kind of processing method of 110kV line fault tripping according to claim 2 or 3, which is characterized in that the thing Therefore situation includes time, monitoring-controlling system signal, relay protection and the automatic safety device action situation and switch change that accident occurs Position.
5. a kind of processing method of 110kV line fault tripping according to claim 4, which is characterized in that the accident Situation further includes equipment state, loss load and dispatching terminal failure wave-recording situation.
6. a kind of processing method of 110kV line fault tripping according to claim 1, which is characterized in that the step 3 Middle O&M site inspection result includes time, the separate and automatic equipment of relay protection action situation that accident occurs.
7. a kind of processing method of 110kV line fault tripping according to claim 6, which is characterized in that the step 3 Middle O&M site inspection result further includes protection ranging situation and failure wave-recording ranging situation.
8. a kind of processing method of 110kV line fault tripping according to claim 1, which is characterized in that
The step 4 is made to determine whether as livewire work route that judgment basis is as follows according to accident information:
When faulty line is livewire work route, then principle is disposed according to livewire work line fault, information is transmitted to transmission of electricity Fortune inspection room carries out the electrification line inspection;
When faulty line is not livewire work route, then carry out accident treatment, summarize O&M site inspection result be transmitted to it is defeated Electricity fortune inspection room carries out the electrification line inspection.
9. a kind of processing method of 110kV line fault tripping according to claim 8, which is characterized in that
The livewire work line fault disposition principle is after livewire work line fault trips, and field condition summarizes flat to system Platform, and still regard equipment live.
10. a kind of processing method of 110kV line fault tripping according to claim 1, which is characterized in that the step Obvious fault includes strand breakage of circuit, damage and/or flashover burn in 5.
CN201910676382.2A 2019-07-25 2019-07-25 Processing method for 110kV line fault tripping Active CN110445107B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910676382.2A CN110445107B (en) 2019-07-25 2019-07-25 Processing method for 110kV line fault tripping

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910676382.2A CN110445107B (en) 2019-07-25 2019-07-25 Processing method for 110kV line fault tripping

Publications (2)

Publication Number Publication Date
CN110445107A true CN110445107A (en) 2019-11-12
CN110445107B CN110445107B (en) 2021-09-07

Family

ID=68431507

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910676382.2A Active CN110445107B (en) 2019-07-25 2019-07-25 Processing method for 110kV line fault tripping

Country Status (1)

Country Link
CN (1) CN110445107B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113837652A (en) * 2021-10-13 2021-12-24 广东电网有限责任公司东莞供电局 Power grid accident information analysis and release method and system

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101299532A (en) * 2007-11-08 2008-11-05 江苏省电力公司 Closed-loop self-adaption emergency control method for large electric network ''('centralized coordination, demixing control') ''
US20090013233A1 (en) * 2007-07-06 2009-01-08 Micron Technology, Inc. Error recovery storage along a nand-flash string
CN202487515U (en) * 2012-03-12 2012-10-10 辽宁省电力有限公司抚顺供电公司 Pollution flashover discharging resisting adapter for10-KV drop-out fuse
CN103279830A (en) * 2013-05-28 2013-09-04 中国南方电网有限责任公司超高压输电公司广州局 Transformer substation or converter station accident handling cloud terminal remote support decision-making method and system
CN103869219A (en) * 2012-12-14 2014-06-18 国家电网公司 Fault handling method and device for power transmission network
CN106505740A (en) * 2016-12-06 2017-03-15 国网山东省电力公司鄄城县供电公司 The intelligent monitoring device of power equipment, system and intelligent control system
CN106779171A (en) * 2016-11-25 2017-05-31 国网山东省电力公司济南供电公司 A kind of strong power transmission Intelligent Decision-making Method of transmission line malfunction

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20090013233A1 (en) * 2007-07-06 2009-01-08 Micron Technology, Inc. Error recovery storage along a nand-flash string
CN101299532A (en) * 2007-11-08 2008-11-05 江苏省电力公司 Closed-loop self-adaption emergency control method for large electric network ''('centralized coordination, demixing control') ''
CN202487515U (en) * 2012-03-12 2012-10-10 辽宁省电力有限公司抚顺供电公司 Pollution flashover discharging resisting adapter for10-KV drop-out fuse
CN103869219A (en) * 2012-12-14 2014-06-18 国家电网公司 Fault handling method and device for power transmission network
CN103279830A (en) * 2013-05-28 2013-09-04 中国南方电网有限责任公司超高压输电公司广州局 Transformer substation or converter station accident handling cloud terminal remote support decision-making method and system
CN106779171A (en) * 2016-11-25 2017-05-31 国网山东省电力公司济南供电公司 A kind of strong power transmission Intelligent Decision-making Method of transmission line malfunction
CN106505740A (en) * 2016-12-06 2017-03-15 国网山东省电力公司鄄城县供电公司 The intelligent monitoring device of power equipment, system and intelligent control system

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
陈家斌: "《变配电设备现场操作及事故处理典型实例》", 31 May 2011 *

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113837652A (en) * 2021-10-13 2021-12-24 广东电网有限责任公司东莞供电局 Power grid accident information analysis and release method and system

Also Published As

Publication number Publication date
CN110445107B (en) 2021-09-07

Similar Documents

Publication Publication Date Title
CN104753038B (en) A kind of intelligent substation centralization relay protection system and guard method
CN102306929B (en) Method and system for realizing fault self-healing
CN104601383B (en) A kind of power telecom network fault piecewise analysis method
CN109472476B (en) Power failure identification analysis method and system
CN104113141A (en) Intelligent lengthways interconnected feeder line automatic control method
CN103227662A (en) Safety detection method and system of electric power communication equipment based on state control
CN106651128A (en) Power transmission and transformation system risk early warning method
CN105527541A (en) Method for judging power distribution line fault tripping
CN110097196A (en) A kind of intelligence operation management method and system
CN105932777A (en) Intelligent processing method for transmission line fault and apparatus thereof
CN111327477A (en) Substation area control protection method and system based on edge calculation
CN104967216B (en) A kind of substation and its monitoring system and its monitoring method
CN107069964B (en) A kind of intelligent distributed FA and master station-centralized FA Synergistic method
CN110445107A (en) Processing method for 110kV line fault tripping
CN115800216A (en) Digital distribution network fault processing system
CN110031699B (en) Method and system for testing remote operation function of relay protection device
CN111142047A (en) Automatic studying and judging method based on power distribution internet of things power failure
CN104636990A (en) Method of real-time troubleshooting and early warning for shutdown reasons of power grid equipment based on N-1 principle
CN110265998A (en) A kind of method and device that stabilized control system strategy definite value is checked
CN102508053B (en) Area backup automatic switch testing system based on digital simulation technology
CN106655128B (en) A kind of power distribution network part power-off control system and distribution network system
CN104135079A (en) Failure processing method for intelligent power distribution network comprising distributed power supply
CN112162174A (en) Distribution room fault positioning method and system based on marketing and distribution integration
CN203967837U (en) The longitudinal interconnected feeder automation control device of a kind of intelligence
CN113643596B (en) Power distribution demonstration method and device, electronic equipment and computer readable storage medium

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20220516

Address after: No. 185, Renmin East Road, Taocheng District, Hengshui City, Hebei Province

Patentee after: HENGSHUI POWER SUPPLY BRANCH OF STATE GRID HEBEI ELECTRIC POWER Co.,Ltd.

Patentee after: STATE GRID HEBEI ELECTRIC POWER Co.,Ltd.

Patentee after: STATE GRID CORPORATION OF CHINA

Patentee after: Hengshui Power Design Co.,Ltd.

Address before: 053000 No.185, Renmin East Road, Taocheng District, Hengshui City, Hebei Province

Patentee before: HENGSHUI POWER SUPPLY BRANCH OF STATE GRID HEBEI ELECTRIC POWER Co.,Ltd.

Patentee before: STATE GRID HEBEI ELECTRIC POWER Co.,Ltd.

Patentee before: STATE GRID CORPORATION OF CHINA

TR01 Transfer of patent right