CN103821229A - Rapid assembly type integrated house and installation method - Google Patents

Rapid assembly type integrated house and installation method Download PDF

Info

Publication number
CN103821229A
CN103821229A CN201410066325.XA CN201410066325A CN103821229A CN 103821229 A CN103821229 A CN 103821229A CN 201410066325 A CN201410066325 A CN 201410066325A CN 103821229 A CN103821229 A CN 103821229A
Authority
CN
China
Prior art keywords
wallboard
house
floor
roof panel
basis
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201410066325.XA
Other languages
Chinese (zh)
Other versions
CN103821229B (en
Inventor
侯和涛
周健
孙燕飞
吕忠珑
刘海宁
李晶晶
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shandong Baiku Education Technology Co ltd
Original Assignee
Shandong University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shandong University filed Critical Shandong University
Priority to CN201410066325.XA priority Critical patent/CN103821229B/en
Publication of CN103821229A publication Critical patent/CN103821229A/en
Application granted granted Critical
Publication of CN103821229B publication Critical patent/CN103821229B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Steps, Ramps, And Handrails (AREA)
  • Working Measures On Existing Buildindgs (AREA)

Abstract

The invention relates to a rapid assembly type integrated house and an installation method. The house is integrally formed by assembling standardized foundations, wallboards, floor slabs, roof panels, doors, windows and stairs. The foundations, the wallboards, the floor slabs and the roof panels are consistent in size in the direction of the standard width of rooms in the house, the sizes of the foundations, the wallboards, the floor slabs and the roof panels adopt 300 mm as a basic module, and adopt 0.6-6 m and other sizes or are set according to room sizes. Pre-buried connecting pieces are arranged on the foundations, the wallboards, the floor slabs and the roof panels, the foundations, the wallboards, the floor slabs and the roof panels are connected through L-shaped steel connecting piece-bolt pin joints, board joints of the wallboards are connected through flat connecting plate-bolt pin joints, and the structural system of the house is a semi-rigid joint concrete plate type structural system. The rapid assembly type integrated house and the installation method replace tiles in a traditional brick-concrete structure and a cast-in-place concrete structure, reduce the use number of formworks on a construction site, and largely reduce the workload of a scaffold. Joint installation is convenient and rapid, production efficiency is largely improved, and construction cost is lowered. The assembled house is good in stability, safe, reliable and high in comfort level.

Description

A kind of integrated house of quick assembled type and mounting method
Technical field
The present invention relates to the integrated house of a kind of quick assembled type and mounting method, be specifically related to a kind of board-like structural building of standardization semi-rigid joint concrete that adopts factory-made component, site assembly to form.
Background technology
At present, construction board house is a kind of take light steel as skeleton, take chromatic steel sandwich plate as cladding, carry out Spatial Coupling with standard module, member with bolts and form movable plank house, can carry out quickly and easily assembly and disassembly, but its thermal insulation, sound insulation, fire resistance are poor, comfort level is low, easily produces building waste after dismounting.
Container trailer room is a kind of novel temporary building, and convenient disassembly is quick, and need not build that ground, environment protecting are good, long service life, recoverable, but its cost of transportation is high, usage space is limited.
Lightgage steel joist assembling house is all skeletons and the support that forms house with lightweight steel, as light gauge cold-formed steel shape house and web steel structural building, and can site assembly, easy for installation, but operation is more, and its cost is higher, is applicable to low layer villa or high-grade house.
I.e. " the prefabricated assembled concrete structure " of the PC of Wanke, is take precast unit as main member, through assembling, connect, and the cast-in-place and concrete structure that forms of bound fraction.But ordinary concrete construction weight is large, transportation and installation process are more difficult, the processing complexity of bean column node, and high expensive, and its prefabrication and assembly construction rate is not generally higher than 65%.
Long-range house Industrial Co., Ltd the 5th generation integrated house in structural system, adopt superposed floor cast-in-place shear wall structure system, space enclosing structure adopts exterior wall cladding, prefabrication and assembly construction rate reaches 85%, and thermal insulation, sound insulation, fire resistance are good, but the turnover that can not repeatedly circulate.
Summary of the invention
The invention provides the integrated house of a kind of quick assembled type and mounting method, adopt prefabricate the standardized house member, the turnover that can repeatedly circulate, thermal insulation, sound insulation, fire resistance are good, and comfort level is high, easy accessibility, cost performance is high.
The technical solution adopted for the present invention to solve the technical problems is:
The integrated house of a kind of quick assembled type, comprises prefabricate the standardized house member: basis, wallboard, floor, roof panel, door, window, stair etc., described house is assembled into entirety by described the standardized house member.The structural system in described house is the board-like structural system of semi-rigid joint concrete; The consistent size in standard width of a room in an old-style house direction such as described basis, wallboard, floor, roof panel, guarantees clear and definite force transferring structure; The size of described basis, wallboard, floor and roof panel can, with 300mm basic module, adopt 0.6m~6m equidimension, also can customize according to room-sized; On described basis, wallboard, floor and roof panel, built-in connection is set, connects by L-type steel fastener-pin joint, wall panels seam position connects by plate shaped junction plate-pin joint; Described wallboard adopts steel wire truss concrete composite wallboard, and floor, roof panel adopt steel wire truss concrete slab or profiling steel plate-bamboo offset plate compoboard; Described floor is chosen as corridor, and roof panel is chosen as cornicing, at the bottom of the floor chosen, roof panel and oblique steel supporting member is set between wallboard; Described stair are outdoor attached steel stair or precast concrete stair.
Another preferred embodiment of the present invention is: described wallboard, roof panel all adopt groove and tognue type seam in level and vertically, and adopt caulking material and packing material to carry out anti-drain process.
Another preferred embodiment of the present invention is: wallboard comprises inner wall panel and side fascia, is with turning, with the band turning, basis of side fascia corresponding position when described side fascia is used for room corner.
Another preferred embodiment of the present invention is: wallboard comprises inner wall panel and side fascia, and described side fascia is reserved with window hole, the door opening of design size.
Another preferred embodiment of the present invention is: described wall panels seam position arranges built-in connection, by dull and stereotyped junction plate, bolt with built-in connection to be connected two blocks of wallboards.
Another preferred embodiment of the present invention is: described wallboard arranges pre-buried hanging piece device on vertical top, the node apparatus of pre-buried lateral support outside wallboard, and basis, floor, roof panel, at its end face built-in hanger device, are convenient to site operation.
The present invention also provides the mounting method in the integrated house of a kind of quick assembled type: the erection sequence of described house component is basic for placing, basis is connected with wallboard, wallboard is connected with roof panel with floor, wallboard, disposable plates seam.First according to actual place size and instructions for use, carry out the design in house, and further described house component is carried out to Deepen Design, be convenient to the standardized production of factory.When plant produced, need carry out according to designed drawing prefabricatedly, the node apparatus of built-in connection, hanging piece device, wallboard lateral support etc. is set on described house component according to designing requirement.When on-the-spot installation, first lift basis, location, then according to the board-like frame structure system in this house, wallboard, the floor (roof panel) of each Pin is installed respectively, form stable structure system, be also convenient to recycling of wallboard lateral support.When installation, first lift wallboard, wallboard bottom is connected with basis, and the fixing wallboard of lateral support is set, then lift the floor (roof panel) that wallboard is corresponding therewith, be connected with wallboard.After integral installation completes, need carry out the correction of size and direction, reaching after requirement can disposable plates seam, lay roof waterproof coiled material, and mounting door-window, outdoor staircase, corridor railing, carry out the simple and easy finishing work in later stage.Specifically comprise:
One, the installation on basis:
Unwrapping wire location, place, carries out leveling and the ground processing of substrate, to meet bearing capacity of foundation soil and settlement request, then carries out basic lifting according to the foundation arrangement drawing of design drawing and places.Basis deploys, and can pre-connection be carried out in basis and L-type steel fastener and the basis of the node of wallboard by pin, is convenient to the installation of wallboard.
Two, the installation of wallboard:
According to the numbering of wallboard, lifted to upper location, corresponding basis, be connected with the L-type steel fastener of basic pre-connection by pin, the lateral support of wallboard is set simultaneously, guarantee the stability of member.After wallboard and basis are connected firmly, by pin, L-type steel fastener and the wallboard of wallboard and floor (roof panel) node are carried out to pre-connection.L-type steel fastener can be floor (roof panel) vertical supporting is provided, and is convenient to next step location is installed.
Three, the installation of floor (roof panel):
According to the numbering of floor (roof panel), lifted to corresponding wallboard and located, be connected with the L-type steel fastener of wallboard pre-connection by pin.Oblique steel supporting member between floor (roof panel) end and the wallboard of choosing is installed simultaneously.
Four, laterally connect:
After the each member in house installs, carry out the node installation between wallboard, integral house structure is installed to correction simultaneously.
Five, plate seam is processed and waterproof:
In plate seam, fill out waterproofing materials, the middle flexible materials such as PE rubber bar of filling, outermost selects the good one-component silicone sealant of weatherability to carry out shutoff.After roof panel seam is disposed, can lay waterproof roll by related request.
Six, later stage work:
Mounting door-window, outdoor staircase, corridor railing, carry out the simple and easy finishing work in later stage.
The invention has the beneficial effects as follows:
1, because building systems provided by the invention adopts the board-like member of precast concrete, replace brick and tile material and the cast-in-place concrete structure of brick masonry structure building, reduced building site template consumption, greatly reduced scaffold work amount; Connect by pin joint, node installation is convenient and swift, and production efficiency significantly improves; Convenient disassembly is quick, and turnover capable of circulation and cost of transportation are low.
2, the plate-type component adopting due to the present invention is steel wire truss concrete slab or profiling steel plate-bamboo offset plate compoboard, and its deadweight is little, thermal and insulating performance good; Steel wire truss concrete slab is done or profiling steel plate-bamboo offset plate compoboard both can be used as space enclosing structure, can be used as again load-carrying members, has reduced on-the-spot rolled steel dosage; And can be according to larger size panel prefabricated or according to the customization of standard width of a room in an old-style house size, plate seam is few compared with traditional ALC prefabricated panel and other wallboards, and hidden leakage defect is few.
3, prefabricated building good stability of the present invention, safe and reliable, comfort level is high, is particularly useful for temporary building, as between the field work in emergent earthquake relief work room, building site office occupancy, oil field etc. etc.
Accompanying drawing explanation
Fig. 1 is building structure schematic diagram of the present invention;
Fig. 2-1 is one side stepped ramp type of the present invention basis sectional view;
Fig. 2-2 are two-sided stepped ramp type of the present invention basis sectional view;
Fig. 3-1 is the not plate shaped wallboard schematic diagram with turning of the present invention;
Fig. 3-2 are the wallboard schematic diagram with turning of the present invention;
Fig. 4 is floor schematic diagram of the present invention;
Fig. 5 is roof panel schematic diagram of the present invention;
Fig. 6-1 is the facade position view of one side stepped ramp type of the present invention basis and wallboard;
Fig. 6-2 are the facade position view of two-sided stepped ramp type basis of the present invention and wallboard;
Fig. 6-3 are wallboard of the present invention and the facade position view of the floor of not encorbelmenting;
Fig. 6-4 are wallboard of the present invention and the facade position view of the floor of encorbelmenting;
Fig. 6-5 are the facade position view of wallboard of the present invention and roof panel.
In figure: 3-wallboard, 4-floor, the 5-roof panel of 1-quick assembled type integrated house 2-basis.
The specific embodiment
The integrated house 1 of quick assembled type as shown in Fig. 1 to Fig. 6-5, by the prefabricated the standardized house member of industry: basis, wallboard 3, floor 4, roof panel 5, door, window, stair etc. are assembled.
Fig. 2-1,2-2 are two kinds of basic section forms that the present invention adopts, and wherein Fig. 2-1 is cross section, one side stepped ramp type basis, and near an indoor lateral process, an outdoor side adopts constructional waterproofing, beveling, Fig. 2-2nd, cross section, two-sided stepped ramp type basis.Fig. 3-1,3-2 are two kinds of forms of wallboard 3 of the present invention, wherein Fig. 3-1st, and the not plate shaped wallboard with turning, Fig. 3-2nd, is positioned at the wallboard of room corner.Fig. 4, Fig. 5 are plate shaped floor and the roof panel 5 that the present invention adopts.Fig. 6-1,6-2 are the facade position signal of basis of the present invention and wallboard 3.Fig. 6-3,6-4 are two kinds of facade forms of wallboard 3 and floor 4, wherein Fig. 6-3rd, and wallboard 3 of the present invention is illustrated with the facade position of the floor of not encorbelmenting, Fig. 6-4th, wallboard 3 of the present invention is illustrated with the facade position of the floor of encorbelmenting.Fig. 6-5 are that wallboard 3 of the present invention is illustrated with the facade position of roof panel 5, and the overhanging conduct of roof panel is corniced.
Concrete fabrication and installation method:
First according to actual place size and instructions for use, carry out the design in house, and further described house component is carried out to Deepen Design, be convenient to the standardized production of factory.When plant produced, need carry out according to designed drawing prefabricatedly, the node apparatus of built-in connection, hanging piece device, wallboard lateral support etc. is set on described house component according to designing requirement.When on-the-spot installation, first lift basis, location, then according to the board-like frame structure system in this house, wallboard 3, the floor 4(roof panel 5 of each Pin be installed respectively), form stable structure system, be also convenient to recycling of wallboard lateral support.When installation, first lift wallboard 3, wallboard bottom be connected with basis, and the fixing wallboard of lateral support is set, then lift the floor 4(roof panel 5 that wallboard is corresponding therewith), be connected with wallboard 3.After integral installation completes, need carry out the correction of size and direction, reaching after requirement can disposable plates seam, lay roof waterproof coiled material, and mounting door-window, outdoor staircase, corridor railing, carry out the simple and easy finishing work in later stage.
One, the installation on basis:
Unwrapping wire location, place, carries out leveling and the ground processing of substrate, to meet bearing capacity of foundation soil and settlement request, then carries out basic lifting according to the foundation arrangement drawing of design drawing and places.Basis deploys, and can pre-connection be carried out in basis and L-type steel fastener and the basis of the node of wallboard 3 by pin, is convenient to the installation of wallboard 3.
Two, the installation of wallboard:
According to the numbering of wallboard 3, lifted to upper location, corresponding basis, be connected with the L-type steel fastener of basic pre-connection by pin, the lateral support of wallboard 3 is set simultaneously, guarantee the stability of member.After wallboard 3 is connected firmly with basis, by pin by wallboard 3 and floor 4(roof panel 5) L-type steel fastener and the wallboard 3 of node carry out pre-connection.L-type steel fastener can be floor 4(roof panel 5) vertical supporting is provided, be convenient to next step location is installed.
Three, floor 4(roof panel 5) installation:
According to floor 4(roof panel 5) numbering, lifted to location on corresponding wallboard 3, be connected with the L-type steel fastener of wallboard 3 pre-connections by pin.The floor 4(roof panel 5 chosen is installed simultaneously) oblique steel supporting member between the end and wallboard 3.
Four, laterally connect:
After the each member in house installs, carry out the node installation of 3 of wallboards, integral house structure is installed to correction simultaneously.
Five, plate seam is processed and waterproof:
In plate seam, fill out waterproofing materials, the middle flexible materials such as PE rubber bar of filling, outermost selects the good one-component silicone sealant of weatherability to carry out shutoff.After roof panel 4 seams are disposed, can lay waterproof roll by related request.
Six, later stage work:
Mounting door-window, outdoor staircase, corridor railing, carry out the simple and easy finishing work in later stage.
The integrated house of assembling of the present invention adopts the board-like structural system of semi-rigid joint concrete, connects by pin joint, and node installation is convenient and swift, and production efficiency significantly improves; Convenient disassembly is quick, and turnover capable of circulation and cost of transportation are low.
The standardized production that described the standardized house member of the present invention all can carry out batch production in factory, the sheet material adopting is that composite board and its supporting capacity, thermal and insulating performance etc. have all been applied approval by engineering, and described integrated building safety is reliable.

Claims (6)

1. the integrated house of quick assembled type, comprises prefabricated the standardized house member: basis, wallboard, floor, roof panel, door, window, stair, and described house is assembled into entirety by described the standardized house member; It is characterized in that: the structural system in described house is the board-like structural system of semi-rigid joint concrete; Described basis, wallboard, floor, roof panel consistent size in standard width of a room in an old-style house direction, guarantee clear and definite force transferring structure; The size of described basis, wallboard, floor and roof panel, with 300mm basic module, adopts 0.6m~6m equidimension, or customizes according to room-sized; On described basis, wallboard, floor and roof panel, built-in connection is set, connects by L-type steel fastener-pin joint, wall panels seam position connects by plate shaped junction plate-pin joint; Described wallboard adopts steel wire truss concrete composite wallboard, and floor, roof panel adopt steel wire truss concrete slab or profiling steel plate-bamboo offset plate compoboard; Described floor is chosen as corridor, and roof panel is chosen as cornicing, at the bottom of the floor chosen, roof panel and oblique steel supporting member is set between wallboard; Described stair are outdoor attached steel stair or precast concrete stair.
2. the integrated house of quick assembled type according to claim 1, is characterized in that, described wallboard, roof panel all adopt groove and tognue type seam in level and vertically, and adopt caulking material and packing material to carry out anti-drain process.
3. the integrated house of quick assembled type according to claim 1, is characterized in that, described wallboard comprises inner wall panel and side fascia, and turning is also with the basis of side fascia corresponding position in exterior wall strip turning.
4. the integrated house of quick assembled type according to claim 1, is characterized in that, described wallboard comprises inner wall panel and side fascia, and side fascia is reserved with window hole, door opening.
5. the integrated house of quick assembled type according to claim 1, it is characterized in that, described wallboard arranges pre-buried hanging piece device on vertical top, the node apparatus of pre-buried lateral support outside wallboard, basis, floor, roof panel, at its end face built-in hanger device, are convenient to site operation.
6. the mounting method in the integrated house of quick assembled type as described in above-mentioned any one claim, is characterized in that, specifically comprises the steps:
(1) installation on basis:
Unwrapping wire location, place, carries out leveling and the ground processing of substrate, to meet bearing capacity of foundation soil and settlement request, then carries out basic lifting according to the foundation arrangement drawing of design drawing and places; Basis deploys, and can pre-connection be carried out in basis and L-type steel fastener and the basis of the node of wallboard by pin, is convenient to the installation of wallboard;
(2) installation of wallboard:
According to the numbering of wallboard, lifted to upper location, corresponding basis, be connected with the L-type steel fastener of basic pre-connection by pin, the lateral support of wallboard is set simultaneously, guarantee the stability of member; After wallboard and basis are connected firmly, by pin, L-type steel fastener and the wallboard of wallboard and floor, roof panel node are carried out to pre-connection; L-type steel fastener can be floor, roof panel provides vertical supporting, is convenient to next step location is installed;
(3) installation of floor and roof panel:
According to the numbering of floor and roof panel, lifted to corresponding wallboard and located, be connected with the L-type steel fastener of wallboard pre-connection by pin; Oblique steel supporting member at the bottom of the floor that installation is chosen simultaneously and roof panel and between wallboard;
(4) laterally connect:
After the each member in house installs, carry out the node installation between wallboard, integral house structure is installed to correction simultaneously;
(5) plate seam is processed and waterproof:
In plate seam, fill out waterproofing materials, the middle flexible materials such as PE rubber bar of filling, outermost selects the good one-component silicone sealant of weatherability to carry out shutoff; After roof panel seam is disposed, can lay waterproof roll by related request;
(6) later stage work:
Mounting door-window, outdoor staircase, corridor railing, carry out the simple and easy finishing work in later stage.
CN201410066325.XA 2014-02-26 2014-02-26 Rapid assembly type integrated house and installation method Active CN103821229B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410066325.XA CN103821229B (en) 2014-02-26 2014-02-26 Rapid assembly type integrated house and installation method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410066325.XA CN103821229B (en) 2014-02-26 2014-02-26 Rapid assembly type integrated house and installation method

Publications (2)

Publication Number Publication Date
CN103821229A true CN103821229A (en) 2014-05-28
CN103821229B CN103821229B (en) 2017-02-15

Family

ID=50756494

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410066325.XA Active CN103821229B (en) 2014-02-26 2014-02-26 Rapid assembly type integrated house and installation method

Country Status (1)

Country Link
CN (1) CN103821229B (en)

Cited By (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104018583A (en) * 2014-06-06 2014-09-03 四川华铁钢结构有限公司 Combined type integrated box room
CN104372905A (en) * 2014-11-19 2015-02-25 江苏立德节能建筑股份有限公司 Balcony breast board structure for light steel joist building and installation method thereof
CN104963538A (en) * 2015-05-13 2015-10-07 韩凯 Modular mobile house production method
CN105986632A (en) * 2015-01-29 2016-10-05 当代节能置业股份有限公司 Prefabricated radiation floor and manufacturing method and construction method thereof
CN106245777A (en) * 2016-09-30 2016-12-21 江苏旭华圣洛迪建材有限公司 The installation method of a kind of assembled house and assembled house
CN107237399A (en) * 2017-07-21 2017-10-10 宝钢建筑系统集成有限公司 A kind of light lath building systems quickly assembled and its construction method
CN109281478A (en) * 2018-08-20 2019-01-29 中民筑友有限公司 A kind of assembly method of shear wall-concrete truss overhanging construction
CN110284588A (en) * 2019-06-24 2019-09-27 广东锦然之格科技有限公司 A kind of construction method in assembled combined wall house
CN111502336A (en) * 2020-05-06 2020-08-07 黑龙江省建筑安装集团有限公司 Energy-saving environment-friendly building house
CN111997200A (en) * 2020-07-15 2020-11-27 中建三局第一建设工程有限责任公司 Recyclable full-assembly concrete temporary building board house and manufacturing method thereof
CN112487540A (en) * 2020-12-09 2021-03-12 南京长江都市建筑设计股份有限公司 Method for generating prefabricated assembly information
CN117758863A (en) * 2024-01-05 2024-03-26 深圳市鹏翔建筑科技有限公司 Prefabricated steel frame plate structure fast-assembling house

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO1997012099A1 (en) * 1995-09-26 1997-04-03 Gary Thomas Ballinger Joint connector device and method for assembling prefabricated building panels
CN203769069U (en) * 2014-02-26 2014-08-13 山东大学 Rapidly-assembled integrated house

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO1997012099A1 (en) * 1995-09-26 1997-04-03 Gary Thomas Ballinger Joint connector device and method for assembling prefabricated building panels
CN203769069U (en) * 2014-02-26 2014-08-13 山东大学 Rapidly-assembled integrated house

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
刘玮龙: "轻钢装配式住宅的设计与应用研究", 《中国优秀硕士学位论文全文数据库》 *

Cited By (15)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104018583B (en) * 2014-06-06 2016-08-10 四川华铁钢结构有限公司 A kind of combination type integral box house
CN104018583A (en) * 2014-06-06 2014-09-03 四川华铁钢结构有限公司 Combined type integrated box room
CN104372905A (en) * 2014-11-19 2015-02-25 江苏立德节能建筑股份有限公司 Balcony breast board structure for light steel joist building and installation method thereof
CN105986632A (en) * 2015-01-29 2016-10-05 当代节能置业股份有限公司 Prefabricated radiation floor and manufacturing method and construction method thereof
CN104963538A (en) * 2015-05-13 2015-10-07 韩凯 Modular mobile house production method
CN106245777B (en) * 2016-09-30 2018-12-04 南京旭华圣洛迪新型建材有限公司 A kind of installation method and assembled house of assembled house
CN106245777A (en) * 2016-09-30 2016-12-21 江苏旭华圣洛迪建材有限公司 The installation method of a kind of assembled house and assembled house
CN107237399A (en) * 2017-07-21 2017-10-10 宝钢建筑系统集成有限公司 A kind of light lath building systems quickly assembled and its construction method
CN109281478A (en) * 2018-08-20 2019-01-29 中民筑友有限公司 A kind of assembly method of shear wall-concrete truss overhanging construction
CN109281478B (en) * 2018-08-20 2021-04-09 中民筑友有限公司 Assembly method of shear wall-concrete truss cantilever type building
CN110284588A (en) * 2019-06-24 2019-09-27 广东锦然之格科技有限公司 A kind of construction method in assembled combined wall house
CN111502336A (en) * 2020-05-06 2020-08-07 黑龙江省建筑安装集团有限公司 Energy-saving environment-friendly building house
CN111997200A (en) * 2020-07-15 2020-11-27 中建三局第一建设工程有限责任公司 Recyclable full-assembly concrete temporary building board house and manufacturing method thereof
CN112487540A (en) * 2020-12-09 2021-03-12 南京长江都市建筑设计股份有限公司 Method for generating prefabricated assembly information
CN117758863A (en) * 2024-01-05 2024-03-26 深圳市鹏翔建筑科技有限公司 Prefabricated steel frame plate structure fast-assembling house

Also Published As

Publication number Publication date
CN103821229B (en) 2017-02-15

Similar Documents

Publication Publication Date Title
CN103821229B (en) Rapid assembly type integrated house and installation method
US10156073B2 (en) Modular building system
JP5643205B2 (en) Unit building system
EP1971727B1 (en) Construction of buildings
CN203769069U (en) Rapidly-assembled integrated house
EP1992750A1 (en) Prefabricated reinforced-concrete single-family dwelling and method for erecting said dwelling
US20100140447A1 (en) Multi-purpose part
WO2017041517A1 (en) Movable aluminum alloy house
EP2175088B1 (en) Method of installation on site of a prefabricated semi-resistant module for construction
CN103982041A (en) Method for constructing reinforced-concrete prefabricated element fabricated building with frame structure system
CN105421818A (en) Embedded steel structure assembling residence
CN116145857A (en) Modular unit of steel-concrete combined shear wall structure, building and construction method
CN110612373A (en) Prefabricated pre-decorated volume construction of buildings
CN205296893U (en) Embedded steel construction assembly house
CN110593397A (en) Multilayer assembled plate type building
CN111927249B (en) Integral prefabricated embedded bay window, connecting node and manufacturing method
CN103362235A (en) Integrally-poured building house with wallboards integrating thermal insulating and templates
US11098475B2 (en) Building system with a diaphragm provided by pre-fabricated floor panels
US20230374781A1 (en) Pre-manufactured floor-ceiling panel for a multi-story building having load bearing walls
CN211200692U (en) Multilayer assembled plate type building
WO2002064900A1 (en) Modular structure
RU69547U1 (en) BUILDING FROM PANEL ELEMENTS
JP3216523U (en) A frame structure of a residence without pillars.
WO2023222853A2 (en) Hybrid building system, building and method
AU2024204820A1 (en) A prefabricated wall structure

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20200708

Address after: Room 212, second floor, Longda business complex building, 23 Wenhua East Road, dianliuxin village, Lixia District, Jinan City, Shandong Province

Patentee after: SHANDONG BAIKU EDUCATION TECHNOLOGY Co.,Ltd.

Address before: 250061, No. ten, No. 17923, Lixia District, Ji'nan City, Shandong Province

Patentee before: SHANDONG University

TR01 Transfer of patent right
PE01 Entry into force of the registration of the contract for pledge of patent right

Denomination of invention: A fast assembling integrated house and its installation method

Effective date of registration: 20210517

Granted publication date: 20170215

Pledgee: Branches of Jinan Rural Commercial Bank Co.,Ltd.

Pledgor: SHANDONG BAIKU EDUCATION TECHNOLOGY Co.,Ltd.

Registration number: Y2021980003719

PE01 Entry into force of the registration of the contract for pledge of patent right
PC01 Cancellation of the registration of the contract for pledge of patent right

Date of cancellation: 20220330

Granted publication date: 20170215

Pledgee: Branches of Jinan Rural Commercial Bank Co.,Ltd.

Pledgor: SHANDONG BAIKU EDUCATION TECHNOLOGY CO.,LTD.

Registration number: Y2021980003719

PC01 Cancellation of the registration of the contract for pledge of patent right
PE01 Entry into force of the registration of the contract for pledge of patent right

Denomination of invention: A fast assembling integrated house and its installation method

Effective date of registration: 20220330

Granted publication date: 20170215

Pledgee: Branches of Jinan Rural Commercial Bank Co.,Ltd.

Pledgor: SHANDONG BAIKU EDUCATION TECHNOLOGY CO.,LTD.

Registration number: Y2022980003692

PE01 Entry into force of the registration of the contract for pledge of patent right
PC01 Cancellation of the registration of the contract for pledge of patent right

Date of cancellation: 20230117

Granted publication date: 20170215

Pledgee: Branches of Jinan Rural Commercial Bank Co.,Ltd.

Pledgor: SHANDONG BAIKU EDUCATION TECHNOLOGY CO.,LTD.

Registration number: Y2022980003692

PC01 Cancellation of the registration of the contract for pledge of patent right
PE01 Entry into force of the registration of the contract for pledge of patent right

Denomination of invention: A fast assembling integrated house and its installation method

Effective date of registration: 20230322

Granted publication date: 20170215

Pledgee: Branches of Jinan Rural Commercial Bank Co.,Ltd.

Pledgor: SHANDONG BAIKU EDUCATION TECHNOLOGY CO.,LTD.

Registration number: Y2023980035514

PE01 Entry into force of the registration of the contract for pledge of patent right
PC01 Cancellation of the registration of the contract for pledge of patent right

Granted publication date: 20170215

Pledgee: Branches of Jinan Rural Commercial Bank Co.,Ltd.

Pledgor: SHANDONG BAIKU EDUCATION TECHNOLOGY CO.,LTD.

Registration number: Y2023980035514

PC01 Cancellation of the registration of the contract for pledge of patent right