CN109281478A - A kind of assembly method of shear wall-concrete truss overhanging construction - Google Patents

A kind of assembly method of shear wall-concrete truss overhanging construction Download PDF

Info

Publication number
CN109281478A
CN109281478A CN201810950032.6A CN201810950032A CN109281478A CN 109281478 A CN109281478 A CN 109281478A CN 201810950032 A CN201810950032 A CN 201810950032A CN 109281478 A CN109281478 A CN 109281478A
Authority
CN
China
Prior art keywords
concrete
concrete truss
truss
shear wall
overhanging
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201810950032.6A
Other languages
Chinese (zh)
Other versions
CN109281478B (en
Inventor
尹犟
李昌州
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Minsheng Zhuyou Co Ltd
Original Assignee
China Minsheng Zhuyou Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Minsheng Zhuyou Co Ltd filed Critical China Minsheng Zhuyou Co Ltd
Priority to CN201810950032.6A priority Critical patent/CN109281478B/en
Publication of CN109281478A publication Critical patent/CN109281478A/en
Application granted granted Critical
Publication of CN109281478B publication Critical patent/CN109281478B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • E04G21/14Conveying or assembling building elements
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/34Extraordinary structures, e.g. with suspended or cantilever parts supported by masts or tower-like structures enclosing elevators or stairs; Features relating to the elastic stability

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Mechanical Engineering (AREA)
  • Physics & Mathematics (AREA)
  • Electromagnetism (AREA)
  • Conveying And Assembling Of Building Elements In Situ (AREA)
  • Joining Of Building Structures In Genera (AREA)

Abstract

The present invention relates to a kind of shear wall-concrete truss overhanging construction assembly methods, include the following steps: (1) basis arrangement;(2) concrete truss and shear wall for lifting first layer, concrete truss, shear wall are connected with basis, the top boom of concrete truss laterally outward overhangs with respect to lower boom one end, and one end is laterally inwardly taken in;Concrete truss is arranged multiple rows of, shear wall is fixedly connected and is surrounded by least one Core Walls Structure, Core Walls Structure is arranged within the scope of the vertical load-bearing main body, building is assembled obliquely up with above-mentioned steps assembly predetermined number of layers and constitutes an overhanging unit, the overhanging of the concrete truss of two neighbouring overhanging units is contrary and constitutes firm cellular construction, and the Core Walls Structure is integrally continuously arranged from bottom to top and connected integral along shear wall-concrete truss overhanging construction;(3) step (2) continues up construction along building central axes mirror image afterwards, completes the assembly of multiple firm cellular constructions.

Description

A kind of assembly method of shear wall-concrete truss overhanging construction
Technical field
The invention belongs to building engineering field more particularly to a kind of assembly of shear wall-concrete truss overhanging construction Method.
Background technique
In the major premise that land resource that China can be used in urban construction is limited, population constantly increases, urbanization accelerates Under, the soil that downtown area can be sent out is fewer and fewer, and the rare degree in the especially superior location in big city is particularly evident, on the contrary , city is but rising steadily to housing demand, therefore low-density residential buildings form has been not suitable for surviving in China city, and High-rise agglomerated residence has obtained broad development with the advantage of its higher plot ratio.At home in most of more developed city, The villa house of low-density often build Outskirts of City or outer suburbs location in, and people gradually have found Suburban Life during house Mode facing the Space Quality of inhabitation and travel to and fro between residence time cost and lack improve life it is mating between lance Shield.Therefore, in order to solve the contradiction of comfort and convenience, the agglomerated residence of villadom be increasingly becoming for real estate market it is high-end The new lover of product.This kind of house is located at downtown prime location mostly, and the function cloth of villa house is imitated on Size Dwelling Design Office, and have " hanging garden ", occupant, which stays indoors, can get close to nature;Plane figure design can also be optimized, as villa one Sample possesses the inhabitation atmosphere of individual character secret;Along with the full landscape balcony etc. towards Urban Parks or waters, therefore opened by real estate Hair quotient are described as " aerial villa " in city.To a certain extent, it is equivalent to villa house ensemble, extends to sky In, it is incomparable that the imposing manner of " it is small to have a guide look of all mountains " is sometimes villa.
Villa embodies a kind of natural life style as a kind of high-quality house, more representative of inhabitation culture and Spirit becomes the best inhabitation selection of people's good life needs, and price is high, remote, mating uneven congruence of living all is general The logical people are difficult to the major reason received to it.And the soil and construction cost of aerial villa and common high residential building are suitable, enjoy By villa quality and occupy downtown prime location, be the house of new generation that people go after like a flock of ducks, demand crowd will not It is only limitted to the elite crowd of booming income again, but ruck and middle class, the scale of construction of the market demand is than present high level House is bigger, not only contains the demand crowd of existing high residential building, will also include a part of existing villa demand crowd.Cause As the high-end house in down town, demand is very wide in this central U.S. villa.
Summary of the invention
The object of the present invention is to provide a kind of structure novels, assembly efficiency height, and villa house ensemble simultaneously extends to aerial Shear wall-concrete truss overhanging construction assembly method.
Above-mentioned purpose is to be achieved through the following technical solutions: a kind of assembly of shear wall-concrete truss overhanging construction Method, the shear wall-concrete truss overhanging construction include vertical load-bearing main body and overhanging in the vertical load-bearing master Cantilever part outside body, the shear wall-concrete truss overhanging construction assembly method include the following steps:
(1) basis arrangement;
(2) concrete truss and shearing of first layer the assembly of the construction of Core Walls Structure and firm cellular construction: are lifted Concrete truss, shear wall are connected by wall with basis, and the top boom of concrete truss is laterally outward hanged with respect to lower boom one end It chooses, one end is laterally inwardly taken in;Concrete truss is longitudinally arranged multiple rows of, and shear wall is fixedly connected and is surrounded by least one A Core Walls Structure, Core Walls Structure are arranged within the scope of the vertical load-bearing main body, the concrete truss that shear wall intersects with it are fixed Connection, connects between multiple rows of concrete truss integral by precast beam, then sets up temporary support in first layer, lifting is in advance It is fixedly connected by floor processed with the concrete truss and/or shear wall;Make to build with above-mentioned steps assembly predetermined number of layers An overhanging unit is obliquely up assembled and constitutes, the one end on the upper layer of the overhanging unit is with respect to its adjacent lower Laterally overhanging preset distance, the other end laterally take in preset distance, the concrete truss on the upper layer of same row and mixing for lower layer Solidifying soil truss is fixedly connected integral;Continue assembly overhanging unit, top according to above-mentioned steps on the top of above-mentioned overhanging unit The concrete truss for the overhanging unit top layer that the concrete truss of overhanging unit bottom is disposed adjacent with its underpart is fixedly connected, The overhanging of the concrete truss of two neighbouring overhanging units is contrary and constitutes firm cellular construction, the core Cylinder is integrally continuously arranged from bottom to top and is connected integral along shear wall-concrete truss overhanging construction;
(3) step (2) continues up construction along building central axes mirror image afterwards, completes multiple firm cellular constructions Assembly.
Cantilever part described herein refers to the part overhang outside vertical load-bearing main body, and vertical load-bearing main body is specific Refer to and bears building structure self weight and vertical additional load, mobile load and the structure position that it is successively transferred to basis.
Adjacent two overhanging units constitute a firm cellular construction in this building structure, and consolidating cellular construction is three Angular rock-steady structure, this building structure can be made of multiple firm cellular constructions, and whole building is in broken line type, concrete purlin The every overhanging unit increments overhanging of frame, the number of plies of each overhanging unit can be set according to specific actual conditions, if every layer of overhanging 2.1 Rice, then 4 layers overhang 8.4m altogether, cantilever part, which is formed on one, day, under have the balcony space on ground, reach the function of villa, Trees etc. can be planted above, and villa house ensemble is extended to sky by the function distribution that villa house is imitated on Size Dwelling Design In, occupant stays indoors to get close to naturally, can also optimize plane figure and design, and individual character secret is possessed as villa Inhabitation atmosphere, form aerial villa;Experiment proves that this cantilevered structure can satisfy structure safety and requirement.
Specifically, for this method assembly building in the floor direction taken in upwards, every layer of upper space is open, formation On have day, be incremented by the direction of overhanging upwards, every layer of lower space be it is unobstructed, be down ground, one side house type of every floor is equal There is day in one direction on being, can be planted, and forms garden, and the aerial villa of the general top grade is 2 layer of one family, then The trees plant of first layer can be more than that layer is high, reach the second layer, make 2 layers of function of enjoying garden villa.
The building of this method construction is made of assembling truss+assembly or cast-in-place Core Walls Structure, vertical load by truss and Core Walls Structure shared can greatly improve the ability for resisting horizontal earthquake load due to the addition of Core Walls Structure.The number of plies it is high, When seismic force is larger, it can satisfy shockproof requirements.Main load-carrying member of the concrete truss as constructure body structure, can Used instead of prefabricated post and wallboard, the pure solid concrete of truss weight ratio of use it is light, economy to structure entirety and resist Shake is advantageous, and can save a large amount of concrete and bar material, and truss can be conducive to the connection between room, in forming chamber Variable large space, reaches the large space function of villa.
Further technical solution is, first that shear wall-concrete truss overhanging construction is whole in the step (2) A Core Walls Structure assembly is completed, and the assembly of concrete truss and precast floor slab is then successively completed.
Further technical solution is that the Core Walls Structure is perpendicular as the shear wall-concrete truss overhanging construction To traffic core, in the step (2) by stair or elevator setting in the Core Walls Structure.
Stability after forming Core Walls Structure due to shear wall is stronger, and the stress of Core Walls Structure is better than the perpend wall being separately provided, The escape route that Core Walls Structure is built as vertical traffic nuclear protection makes building when an earthquake occurs, guarantees the safety of staircase.
Further technical solution is that the concrete truss includes the concrete truss unit of multiple horizontal splicings, institute It states in step (2), again by the concrete of level splicing after concrete truss unit is fixedly connected with the concrete truss of lower layer Truss element connection is integral.In this way, concrete truss unit member is smaller relatively light, it is readily transported and lifts, in assembling process By being assembled into monolithic concrete truss, globality is relatively preferable, and installation effectiveness is high.
Further technical solution is that the vacancy position in the step (2) in the concrete truss is filled with hair It steeps concrete or sound insulationg board forms internal partition wall.In this way, internal partition wall is then formed by filling-foam concrete or sound insulation plate girder, The prefabricated rear mode installed can be used in foamed concrete in specific assembling process, and the mode poured can also be used and fill, triangle Sound insulationg board then can be used self threading pin or nailing and connect with concrete truss unit.
Further technical solution is that the concrete truss unit includes concrete frame and is arranged in the coagulation Concrete support in native frame, the concrete frame include vertical web member, and the vertical web member separates concrete frame At multiple polygon frames, the both ends of the concrete support are connected to the angle steel joint of the polygon frame.
It should be noted that concrete frame is separated by vertical web member when the frame of concrete frame is non-bevelled The both ends of multiple quadrilateral frames, the concrete branch are connected to the angle steel joint of the quadrilateral frame, when concrete frame When a certain frame is bevel edge, then one of them polygon frame being separated to form is triangle frame, triangle frame is interior, and no setting is required Concrete support.
Further technical solution is that the upper and lower part of the inner wall of the concrete frame is equipped with the first built-in fitting, institute Stating concrete support includes diagonal brace, and the both ends of the diagonal brace are equipped with the second built-in fitting, first built-in fitting and second pre-buried Part is detachably connected.In this way, can then remove in the place that building does not need setting, mode changes relatively flexibly, and later period family If desired type is changed, want to get through in certain several room, under the premise of meeting structure stress, can be supported with dismantling concrete, directly It connects to form large space.
Further technical solution is that first built-in fitting and the second built-in fitting include at least connecting plate, the company Fishplate bar is equipped with threaded connection hole, and first built-in fitting and the second built-in fitting are bolted.In this way, assembly and disassembly is simple Just, and connection is reliable.
Further technical solution is that concrete truss unit spliced side is equipped with notch and vertical jack hole, described In step (2), the concrete truss unit spliced side mutually spliced forms accommodation groove, is equipped with link block, institute in the accommodation groove It states link block and also is provided with vertical jack hole, the vertical jack hole of the link block is vertically worn with the concrete truss unit Hole is connect to be connected, wear connect muscle wear connect the vertical jack hole link block is connected with concrete truss unit it is integral.
Further technical solution is that the concrete truss unit is triangular structure, two concrete truss units Bevel edge be spliced to form truss module, multiple horizontally-spliced composition concrete truss of truss module.In this way, the triangular member Standard module can be formed, can largely be produced without make-to-order, directly assembly when having demand has welding, bolt Connection two ways forms entirety, this concrete truss cellular manufacture mould standard, modularization are high-efficient.
Further technical solution is that concrete truss unit is equipped with built-in connection, and the built-in connection is exposed extremely The splicing side of the concrete truss unit, the built-in connection welding mutually spliced are integral.
Further technical solution is, in the step (2), the concrete truss on the upper layer of same row and mixing for lower layer Solidifying soil truss is fixedly connected integral, is respectively equipped at the top and bottom of the concrete truss and stretches out muscle and injected hole, lower part Concrete truss the stretching muscle concrete truss that stretches to top injected hole in, be perfused with mortar in the injected hole. In this way, the concrete truss of lower layer and the concrete truss connection on upper layer are integral, multi-layer concrete truss structure is formed, it can Applied to multi-story structure, above-mentioned connection is reliable, and levels concrete truss forms effective dry type connection, can reduce wet work Industry, is conducive to the conduction of power between levels concrete truss, while greatly improving field erected efficiency, improves construction Speed.
Further technical solution is that in the step (2), the concrete on the upper layer is arranged in the precast floor slab Between truss and the concrete truss of lower layer, the precast floor slab and concrete truss are equipped with jack hole, neighbouring setting Concrete truss unit and precast floor slab are bolted, and the concrete truss unit is equipped with jack hole, and the bolt is worn It connects the concrete truss of layer, the jack hole of precast floor slab and the concrete truss on upper layer and is fastened by nut.
Further technical solution is, the precast floor slab be overlapped on the concrete truss and with the concrete Truss is fixedly connected, and the splicing side of the precast floor slab is equipped with notch and convex block, and the convex block is overlapped on the concrete frame On.In this way, making full use of the design feature of concrete truss, and notch and convex block, assembly are equipped in the splicing side of precast floor slab The two is fixedly connected while precast floor slab is overlapped on concrete truss in the process, vertical web member, concrete support The part that bottom is connected with concrete frame can be then accommodated in the notch, and precast floor slab delivers load to concrete purlin Frame.And the pure solid concrete of truss weight ratio that uses of the present invention is light, is conducive to antidetonation, and can save a large amount of concrete And bar material, production mould of the present invention standardization, modularization, high-efficient, truss can be conducive to the connection between room, shape At different functions.
Further technical solution is that the concrete frame is provided with stretching muscle, and the convex block of the precast floor slab, which is equipped with, to be worn Hole is connect, the stretching muscle, which is worn, connects the jack hole, is perfused with grouting material in the jack hole.In this way, above structure be conducive to it is pre- The conduction of power between floor and concrete truss processed, while field erected efficiency is greatly improved, construction speed is improved, is led to Crossing grouting material can connect precast floor slab with concrete truss globality that is integral, and then increasing structure, and connection more may be used Lean on, can operative constraint precast floor slab end, it is ensured that this connecting node is destroyed smaller under geological process or even is not destroyed.Institute Stating grouting material is preferably mortar.
Further technical solution is that the shear wall and concrete truss splice, the shear wall and concrete truss Splicing side be equipped with stretching muscle, in the step (2), the stretching muscle of shear wall and concrete truss is mutually overlapped, by pouring It builds concrete sleeper and connect shear wall with concrete truss, the stretching muscle is anchored in the sleeper.
Further technical solution is notch to be equipped at the top of the concrete truss, the both ends of the precast beam are taken respectively It connects in the notch at the top of the two rows of concrete truss being disposed adjacent, the concrete truss is equipped with connector, described pre- Beam processed is equipped with jack hole, and the top of the precast beam is equipped with recess, and the jack hole is connected to the recess, the connector It is protruded into the recess across the jack hole, fastener, the fastener and the connector phase is equipped in the recess Even.
The present invention passes through the connector being inserted into the jack hole of precast beam and fastener for concrete truss and precast beam Effective dry type connection is formed, in assembling process, after concrete truss is vertical good, it is only necessary in the hoisting process of precast beam By the lapping ends of precast beam in the notch that concrete truss is set, while connector is inserted into the precast beam Jack hole and recess in, then fastened by fastener, above structure be conducive to concrete truss and precast beam it Between power conduction, while greatly improving field erected efficiency, improve construction speed.
Further technical solution is that the connector is screw rod, and the fastener is nut, one end of the screw rod It is anchored in the concrete truss, the other end, which is worn, connects the nut.
Further technical solution is to be perfused with grouting material in the jack hole and recess.
Detailed description of the invention
The attached drawing for constituting a part of the invention is used to provide further understanding of the present invention, and of the invention is schematic Examples and descriptions thereof are used to explain the present invention, does not constitute improper limitations of the present invention.
The structural schematic diagram of the building of assembly concrete truss involved in Fig. 1 one embodiment of the present invention;
Fig. 2 is to build first layer concrete truss cloth with formula concrete truss involved in one embodiment of the present invention Set structural schematic diagram;
Fig. 3 is to match formula concrete truss building concrete truss and precast beam involved in one embodiment of the present invention Arragement construction schematic diagram;
Fig. 4 is the arragement construction schematic diagram of precast floor slab involved in one embodiment of the present invention;
Fig. 5 is the structural schematic diagram after the assembly is completed of an overhanging unit involved in one embodiment of the present invention;
Fig. 6 is the structural schematic diagram of a firm unit after the assembly is completed involved in one embodiment of the present invention;Meaning Figure;
Fig. 7 and Fig. 8 is respectively the structural representation that unit assembling process is consolidated involved in one embodiment of the present invention Figure;
Fig. 9 and Figure 10 is respectively that the structure of concrete truss unit involved in one embodiment of the present invention is shown;
Figure 11~Figure 14 is respectively the structural schematic diagram of concrete truss involved in one embodiment of the present invention;Figure 15 and Figure 16 is the structural schematic diagram of the connecting node of concrete truss involved in one embodiment of the present invention and floor;
Figure 17 is the cross-sectional view in the face connecting node A-A of concrete truss involved in Figure 16 and precast floor slab;
Figure 18 is the cross-sectional view in the face connecting node B-B of concrete truss involved in Figure 17 and precast floor slab;
Figure 19 is the attachment structure schematic diagram for inventing concrete truss and shear wall involved in a kind of embodiment;Figure 20 and Figure 21 is respectively the Finite element analysis results figure under a kind of embodiment.
In figure:
1 concrete truss, 2 precast beam, 3 precast floor slab, 4 concrete truss unit
5 built-in connection, 6 shear wall 7 overhangs 8 link block of unit
9 wear and connect 10 Core Walls Structure of muscle, 11 concrete frame, 12 first built-in fitting
Vertical 15 concrete support of web member, 16 notch of 13 second built-in fitting 14
17 convex block, 18 injected hole, 20 foamed concrete
21 bolts 22 stretch out the vertical load-bearing main body of 23 concrete sleeper of muscle 25
26 cantilever part, 27 basis
Specific embodiment
Present invention will now be described in detail with reference to the accompanying drawings., the description of this part be only it is exemplary and explanatory, do not answer There is any restriction effect to protection scope of the present invention.It, can be in addition, description of the those skilled in the art according to this document The corresponding combination is carried out to the feature in embodiment in this document and in different embodiments.
The embodiment of the present invention is as follows, referring to Fig.1~6, a kind of assembly side of shear wall-concrete truss overhanging construction Method, the shear wall-concrete truss overhanging construction include vertical load-bearing main body 25 and overhanging in the vertical load-bearing master Cantilever part 26 outside body 25, the shear wall-concrete truss overhanging construction assembly method include the following steps:
(1) basis 27 is arranged;
(2) it the assembly of the construction of Core Walls Structure 10 and firm cellular construction: lifts the concrete truss 1 of first layer and cuts Concrete truss 1, shear wall 6 are connected by power wall 6 with basis 27, and the top boom of concrete truss 1 is with respect to lower boom one end cross To outside overhanging, one end is laterally inwardly taken in;Concrete truss 1 is longitudinally arranged multiple rows of, and shear wall 6 is fixedly connected and encloses It is coiled at least one Core Walls Structure 10, Core Walls Structure 10 is arranged in vertical 25 range of load-bearing main body, by shear wall 6 and its phase The concrete truss 1 of friendship is fixedly connected, between multiple rows of concrete truss 1 by precast beam 2 connect it is integral, then first Layer sets up temporary support, it is fixedly connected by hoisting prefabricated floor 3 with the concrete truss 1 and/or shear wall 6;Ibid Stating step assembly predetermined number of layers makes building obliquely up assemble and constitute an overhanging unit 7, the overhanging unit 7 With respect to its adjacent lower, laterally overhanging preset distance, the other end laterally take in preset distance for the one end on upper layer, same row's The concrete truss 1 on upper layer is fixedly connected integral with the concrete truss 1 of lower layer;The top of above-mentioned overhanging unit 7 according to Above-mentioned steps continue assembly overhanging unit 7, and the concrete truss 1 of top overhanging 7 bottom of unit is disposed adjacent outstanding with its underpart The concrete truss 1 for choosing 7 top layer of unit is fixedly connected, the overhanging of the concrete truss 1 of two neighbouring overhanging units 7 The firm cellular construction of contrary and composition, the Core Walls Structure 10 are whole under along shear wall-concrete truss overhanging construction To upper continuous arrangement and connect integral;
(3) step (2) continues up construction along building central axes mirror image afterwards, completes multiple firm cellular constructions Assembly.
Cantilever part 26 described herein, which refers to, overhangs part outside vertical load-bearing main body 25, and vertical load-bearing main body 25 specifically refer to bear building structure self weight and vertical additional load, mobile load and the structural portion that it is successively transferred to basis 27 Position.
Adjacent two overhanging units 7 constitute a firm cellular construction in this building structure, and consolidating cellular construction is three Angular rock-steady structure, this building structure can be made of multiple firm cellular constructions, and whole building is in broken line type, concrete purlin The every overhanging unit 7 of frame 1 is incremented by overhanging, and the number of plies of each overhanging unit 7 can be set according to specific actual conditions, if every layer of overhanging 2.1 meters, then 4 layers overhang 8.4m altogether, cantilever part 26, which is formed on one, day, under have the balcony space on ground, reach villa Function can plant trees etc. above, and the function distribution of villa house is imitated on Size Dwelling Design, and villa house ensemble extends To aerial, occupant, which stays indoors, can be got close to naturally, can also optimize plane figure design, and individual character is possessed as villa The inhabitation atmosphere of secret, forms aerial villa;Experiment proves that this cantilevered structure can satisfy structure safety and use is wanted It asks.
Specifically, for this method assembly building in the floor direction taken in upwards, every layer of upper space is open, formation On have day, be incremented by the direction of overhanging upwards, every layer of lower space be it is unobstructed, be down ground, one side house type of every floor is equal There is day in one direction on being, can be planted, and forms garden, and the aerial villa of the general top grade is 2 layer of one family, then The trees plant of first layer can be more than that layer is high, reach the second layer, make 2 layers of function of enjoying garden villa.
The building of this method construction is made of assembling truss+assembly or cast-in-place Core Walls Structure 10, and vertical load is by truss And 10 shared of Core Walls Structure can greatly improve the ability for resisting horizontal earthquake load due to the addition of Core Walls Structure 10.? When the number of plies is high, seismic force is larger, it can satisfy shockproof requirements.Main load of the concrete truss 1 as constructure body structure Component can replace prefabricated post and wallboard to use, the pure solid concrete of truss weight ratio of use it is light, to the warp of structure entirety Ji property and antidetonation are advantageous, and can save a large amount of concrete and bar material, and truss can be conducive to the connection between room, with It can be changed large space in forming chamber, reach the large space function of villa.
On the basis of above-described embodiment, in another embodiment of the present invention, such as Fig. 7 and Fig. 8, will first it be cut in the step (2) Power wall-concrete truss overhanging construction entire Core Walls Structure 10 assembly complete, then successively complete concrete truss 1 and The assembly of precast floor slab 3.
On the basis of above-described embodiment, in another embodiment of the present invention, such as Fig. 1~8, described in the Core Walls Structure 10 is used as Shear wall-concrete truss overhanging construction vertical traffic core, by stair or elevator setting described in the step (2) In Core Walls Structure 10.
Stability after forming Core Walls Structure 10 due to shear wall 6 is stronger, and the stress of Core Walls Structure 10 is better than the list being separately provided Face wall, the escape route that Core Walls Structure 10 is built as vertical traffic nuclear protection make building when an earthquake occurs, guarantee staircase Safety.
On the basis of above-described embodiment, in another embodiment of the present invention, such as Figure 11~13, the concrete truss 1 includes The concrete truss units 4 of multiple horizontal splicings, in the step (2), by the concrete of concrete truss unit 4 and lower layer Truss 1 again connects the concrete truss unit 4 of level splicing integral after being fixedly connected.In this way, concrete truss unit 4 Component is smaller relatively light, is readily transported and lifts, by being assembled into monolithic concrete truss 1, globality phase in assembling process To preferable, installation effectiveness height.
On the basis of above-described embodiment, in another embodiment of the present invention, such as Figure 10, in the coagulation in the step (2) Vacancy position in native truss 1 forms internal partition wall filled with foamed concrete 20 or sound insulationg board.In this way, mixed by filling-foam Solidifying soil 20 or sound insulation plate girder then form internal partition wall, and prefabricated rear installation can be used in foamed concrete 20 in specific assembling process Mode can also be used the mode poured and fill, and self threading pin or nailing and concrete truss unit then can be used in triangle sound insulationg board 4 connections.
On the basis of above-described embodiment, in another embodiment of the present invention, such as Fig. 9, the concrete truss unit 4 includes Concrete frame 11 and the concrete support 15 being arranged in the concrete frame 11, the concrete frame 11 include perpendicular To web member 14, concrete frame 11 is separated into multiple polygon frames by the vertical web member 14, and the two of the concrete support 15 End is connected to the angle steel joint of the polygon frame.
It should be noted that vertical web member 14 is by concrete frame 11 when the frame of concrete frame 11 is non-bevelled Multiple quadrilateral frames are separated into, the both ends of the concrete branch are connected to the angle steel joint of the quadrilateral frame, work as concrete When a certain frame of frame 11 is bevel edge, then one of them polygon frame for being separated to form is triangle frame, in triangle frame No setting is required concrete support 15.
On the basis of above-described embodiment, in another embodiment of the present invention, such as Fig. 9, the top of the inner wall of the concrete frame It is equipped with the first built-in fitting 12 with lower part, the concrete support 15 includes diagonal brace, and it is pre- that the both ends of the diagonal brace are equipped with second Embedded part 13, first built-in fitting 12 and the second built-in fitting 13 are detachably connected.In this way, not needing the ground of setting in building Square then can remove, mode changes relatively flexibly, and if desired later period house type is changed, want to get through in certain several room, ties meeting Under the premise of structure stress, 15, directly formation large space can be supported with dismantling concrete.
On the basis of above-described embodiment, in another embodiment of the present invention, such as Fig. 9, first built-in fitting 12 and second is pre- Embedded part 13 includes at least connecting plate, and the connecting plate is equipped with threaded connection hole, and first built-in fitting 12 and second is pre-buried Part 13 is connected by bolt 21.In this way, assembly and disassembly is easy, and connect reliable.
On the basis of above-described embodiment, in another embodiment of the present invention, such as Figure 11, the concrete truss unit 4 splices Side is equipped with notch 16 and vertical jack hole, and in the step (2), the concrete truss unit 4 mutually spliced, which splices side and formed, to be held Slot is set, link block 8 is equipped in the accommodation groove, the link block 8 also is provided with vertical jack hole, and the link block 8 is vertically worn Hole is connect to be connected with the vertical jack hole of the concrete truss unit 4, wear connect muscle 9 wear connect the vertical jack hole will be described Link block 8 and concrete truss unit 4 connect integral.
On the basis of above-described embodiment, in another embodiment of the present invention, such as Figure 12, the concrete truss unit 4 is three Angular structure, the bevel edge of two concrete truss units 4 are spliced to form truss module, multiple horizontally-spliced compositions of truss module Concrete truss 1.In this way, the triangular member can form standard module, it can largely be produced without make-to-order, there is demand When it is directly assembled, there is welding, bolt 21 to connect two ways and form entirety, this concrete truss unit 4 produces mould Tool standardization, modularization, it is high-efficient.
On the basis of above-described embodiment, in another embodiment of the present invention, such as Figure 13, concrete truss unit 4 is equipped with pre-buried Connector 5, the splicing side of the built-in connection 5 concrete truss unit 4, the pre-buried connection mutually spliced Part 5 welds integral.
On the basis of above-described embodiment, in another embodiment of the present invention, such as Figure 14, in the step (2), same row's The concrete truss 1 on upper layer is fixedly connected with integral, the top and bottom of the concrete truss 1 with the concrete truss 1 of lower layer Portion is respectively equipped with stretching muscle 22 and injected hole 18, the stretching muscle 22 of the concrete truss 1 of lower part stretch to the concrete purlin on top In the injected hole 18 of frame 1, mortar is perfused in the injected hole 18.In this way, the coagulation of the concrete truss 1 of lower layer and upper layer Native truss 1 connect it is integral, formed 1 structure of multi-layer concrete truss, can be applied to multi-story structure, above-mentioned connection is reliable, on Lower-layer concrete truss 1 forms effective dry type connection, can reduce wet construction, be conducive between levels concrete truss 1 The conduction of power, while field erected efficiency is greatly improved, improve construction speed.
It is described prefabricated in the step (2) such as Figure 15 in another embodiment of the present invention on the basis of above-described embodiment Floor 3 is arranged between the concrete truss 1 on the upper layer and the concrete truss 1 of lower layer, the precast floor slab 3 and coagulation Native truss 1 is equipped with jack hole, and the concrete truss unit 4 and precast floor slab 3 of neighbouring setting are connected by bolt 21, institute Concrete truss unit 4 is stated equipped with jack hole, the bolt 21 wear the concrete truss 1 for connecting layer, precast floor slab 3 and on The jack hole of the concrete truss 1 of layer is simultaneously fastened by nut.
On the basis of above-described embodiment, in another embodiment of the present invention, such as Figure 16~18, the precast floor slab 3 is overlapped on It is fixedly connected on the concrete truss 1 and with the concrete truss 1, the splicing side of the precast floor slab 3 is equipped with notch 16 With convex block 17, the convex block 17 is overlapped on the concrete frame 11.In this way, making full use of the structure of concrete truss 1 special Point, and it is equipped with notch 16 and convex block 17 in the splicing side of precast floor slab 3, precast floor slab 3 is overlapped on concrete in assembling process The two is fixedly connected while on truss 1, vertical web member 14, concrete support 15 bottom be connected with concrete frame 11 Part can then be accommodated in the notch 16, precast floor slab 3 delivers load to concrete truss 1.And the present invention uses The pure solid concrete of truss weight ratio it is light, be conducive to antidetonation, and a large amount of concrete and bar material, this hair can be saved Open-birth produces mould standard, modularization, and high-efficient, truss can be conducive to the connection between room, form different functions.
On the basis of above-described embodiment, in another embodiment of the present invention, such as Figure 17 and Figure 18, the concrete frame 11 Equipped with muscle 22 is stretched out, the convex block 17 of the precast floor slab 3 is equipped with jack hole, and the stretching muscle 22, which is worn, connects the jack hole, described Grouting material is perfused in jack hole.In this way, above structure is conducive to the conduction of power between precast floor slab 3 and concrete truss 1, Field erected efficiency is greatly improved simultaneously, improves construction speed, it can be by precast floor slab 3 and concrete purlin by grouting material Frame 1 connect it is integral, and then increase structure globality, connect it is more reliable, can operative constraint precast floor slab 3 end, really The connecting node that breaks even is destroyed smaller under geological process or even is not destroyed.The grouting material is preferably mortar.
On the basis of above-described embodiment, in another embodiment of the present invention, such as Figure 19, the shear wall 6 and concrete truss The splicing side of 1 splicing, the shear wall 6 and concrete truss 1, which is equipped with, stretches out muscle 22, in the step (2), shear wall 6 with The stretching muscle 22 of concrete truss 1 mutually overlaps, and is connected shear wall 6 and concrete truss 1 by casting concrete sleeper 23 It connects, the stretching muscle 22 is anchored in the sleeper.
On the basis of above-described embodiment, in another embodiment of the present invention, notch, institute are equipped at the top of the concrete truss 1 The both ends for stating precast beam 2 are overlapped on respectively in the notch at 1 top of two rows of concrete truss being disposed adjacent, the coagulation Native truss 1 is equipped with connector, and the precast beam 2 is equipped with jack hole, and the top of the precast beam 2 is equipped with recess, the jack hole It being connected to the recess, the connector passes through the jack hole and protrudes into the recess, fastener is equipped in the recess, The fastener is connected with the connector.
The present invention by insertion precast beam 2 jack hole in connector and fastener by concrete truss 1 with it is prefabricated Beam 2 forms effective dry type connection, in assembling process, after concrete truss 1 is vertical good, it is only necessary in the lifting of precast beam 2 In journey by the lapping ends of precast beam 2 in the notch that concrete truss 1 is set, while making connector insertion described pre- In jack hole and recess in beam 2 processed, then by fastener fasten, above structure be conducive to concrete truss 1 with The conduction of power between precast beam 2, while field erected efficiency is greatly improved, improve construction speed.
On the basis of above-described embodiment, in another embodiment of the present invention, the connector is screw rod, and the fastener is Nut, one end of the screw rod are anchored in the concrete truss 1, and the other end, which is worn, connects the nut.
On the basis of above-described embodiment, in another embodiment of the present invention, grouting is perfused in the jack hole and recess Material.
A kind of calculating verification result under embodiment is as follows, as follows through finite element analysis computation verification result, such as Figure 20 institute Show, as seen from the figure, depth of building is 32 layers (total 96m high), the accumulative water of (seismic force is larger) under 8 degree of area's geological processes It is 74.6mm that prosposition, which moves, and every layer of horizontal displacement is about 2.33mm (74.6/32=2.33), story drift 1/1288 (2.33/3000, wherein 3000mm is that layer is high), less than the limit value of 1/1200 angle of displacement most stringent of in assembled high-level structure, Meet shockproof requirements.Therefore the structure is suitable for the situation that the number of plies is high, seismic force is larger.
As shown in figure 21, depth of building is 32 layers (total 96m high), and under 8 degree of area's geological processes, overhanging part is perpendicular It is up to 62mm to the vertical displacement under load and earthquake load, overhanging total distance is 16m, and the deflection limit value of cantilever member is 2*16000/400=80mm, vertical maximum displacement be less than deflection limit value, therefore the cantilevered structure can satisfy structure safety and Requirement.
The above is only a preferred embodiment of the present invention, it is noted that for the ordinary skill people of the art For member, various improvements and modifications may be made without departing from the principle of the present invention, these improvements and modifications It should be regarded as protection scope of the present invention.

Claims (10)

1. a kind of shear wall-concrete truss overhanging construction assembly method, which is characterized in that the shear wall-concrete Truss overhanging construction includes the cantilever part of vertical load-bearing main body and overhanging outside the vertical load-bearing main body, described to cut Power wall-concrete truss overhanging construction assembly method includes the following steps:
(1) basis arrangement;
(2) assembly of the construction of Core Walls Structure and firm cellular construction: the concrete truss and shear wall of first layer are lifted, will be mixed Solidifying soil truss, shear wall are connected with basis, and the top boom of concrete truss laterally outward overhangs with respect to lower boom one end, and one end is horizontal To inwardly takeing in;Concrete truss is longitudinally arranged multiple rows of, and shear wall is fixedly connected and is surrounded by least one Core Walls Structure, core Heart cylinder is arranged within the scope of the vertical load-bearing main body, and the concrete truss that shear wall intersects with it is fixedly connected, multiple rows of mixed Connected by precast beam integral between solidifying soil truss, then set up temporary support in first layer, hoisting prefabricated floor, by its with The concrete truss and/or shear wall are fixedly connected;Building is filled obliquely up with above-mentioned steps assembly predetermined number of layers Match and constitute an overhanging unit, the one end on the upper layer of the overhanging unit laterally overhangs pre- spacing with respect to its adjacent lower From the other end laterally takes in preset distance, the concrete truss on the upper layer of same row and the fixed company of the concrete truss of lower layer It is connected into entirety;Continue assembly overhanging unit according to above-mentioned steps on the top of above-mentioned overhanging unit, top overhangs unit bottom The concrete truss for the overhanging unit top layer that concrete truss is disposed adjacent with its underpart is fixedly connected, and neighbouring two outstanding The overhanging for choosing the concrete truss of unit is contrary and constitute firm cellular construction, and the Core Walls Structure is along shear wall-concrete Truss overhanging construction is integrally continuously arranged from bottom to top and is connected integral;
(3) step (2) continues up construction along building central axes mirror image afterwards, completes the assembly of multiple firm cellular constructions.
2. shear wall according to claim 1-concrete truss overhanging construction assembly method, which is characterized in that institute It states first to assemble the entire Core Walls Structure of shear wall-concrete truss overhanging construction in step (2) and complete, then successively complete mixed The assembly of solidifying soil truss and precast floor slab.
3. shear wall according to claim 2-concrete truss overhanging construction assembly method, which is characterized in that institute Core Walls Structure is stated as the shear wall-concrete truss overhanging construction vertical traffic core, in the step (2) by stair or Elevator setting is in the Core Walls Structure.
4. shear wall according to any one of claims 1 to 3-concrete truss overhanging construction assembly method, It is characterized in that, the concrete truss includes the concrete truss unit of multiple horizontal splicings, in the step (2), by coagulation Native truss element is integral by the concrete truss unit connection of level splicing again after being fixedly connected with the concrete truss of lower layer.
5. shear wall according to claim 4-concrete truss overhanging construction assembly method, which is characterized in that institute It states the vacancy position in step (2) in the concrete truss and forms internal partition wall filled with foamed concrete or sound insulationg board.
6. shear wall according to claim 4-concrete truss overhanging construction assembly method, which is characterized in that institute State the concrete support that concrete truss unit includes concrete frame He is arranged in the concrete frame, the concrete Frame includes vertical web member, and concrete frame is separated into multiple polygon frames by the vertical web member, the concrete support Both ends are connected to the angle steel joint of the polygon frame.
7. shear wall according to claim 6-concrete truss overhanging construction assembly method, which is characterized in that institute The upper and lower part for stating the inner wall of concrete frame is equipped with the first built-in fitting, and the concrete support includes diagonal brace, the diagonal brace Both ends be equipped with the second built-in fitting, first built-in fitting and the second built-in fitting are detachably connected.
8. shear wall according to claim 4-concrete truss overhanging construction assembly method, which is characterized in that institute Concrete truss unit spliced side is stated equipped with notch and vertical jack hole, in the step (2), the concrete truss that mutually splices Unit spliced side forms accommodation groove, is equipped with link block in the accommodation groove, the link block also is provided with vertical jack hole, the company The vertical jack hole for connecing block is connected with the vertical jack hole of the concrete truss unit, wears to connect muscle and wear to connect and described vertically wear and connect Hole connects the link block with concrete truss unit integral.
9. shear wall according to claim 4-concrete truss overhanging construction assembly method, which is characterized in that institute It states in step (2), the concrete truss on the upper layer of same row is fixedly connected with integral, the coagulation with the concrete truss of lower layer It is respectively equipped with stretching muscle at the top and bottom of native truss and injected hole, the stretching muscle of the concrete truss of lower part stretch to top In the injected hole of concrete truss, mortar is perfused in the injected hole.
10. shear wall according to claim 9-concrete truss overhanging construction assembly method, which is characterized in that institute It states shear wall and concrete truss splices, the splicing side of the shear wall and concrete truss is equipped with stretching muscle, the step (2) in, the stretching muscle of shear wall and concrete truss is mutually overlapped, by casting concrete sleeper by shear wall and concrete purlin Frame connection, the stretching muscle are anchored in the sleeper.
CN201810950032.6A 2018-08-20 2018-08-20 Assembly method of shear wall-concrete truss cantilever type building Expired - Fee Related CN109281478B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810950032.6A CN109281478B (en) 2018-08-20 2018-08-20 Assembly method of shear wall-concrete truss cantilever type building

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810950032.6A CN109281478B (en) 2018-08-20 2018-08-20 Assembly method of shear wall-concrete truss cantilever type building

Publications (2)

Publication Number Publication Date
CN109281478A true CN109281478A (en) 2019-01-29
CN109281478B CN109281478B (en) 2021-04-09

Family

ID=65183280

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810950032.6A Expired - Fee Related CN109281478B (en) 2018-08-20 2018-08-20 Assembly method of shear wall-concrete truss cantilever type building

Country Status (1)

Country Link
CN (1) CN109281478B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112160594A (en) * 2020-09-23 2021-01-01 成都建工第四建筑工程有限公司 Construction method beneficial to resisting horizontal force of multi-layer special-shaped steel structure building

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1621645A (en) * 2005-01-05 2005-06-01 王治国 Villa type building
CN101200916A (en) * 2007-11-29 2008-06-18 浙江精工钢结构有限公司 Construction method of prestressed suspension type building structure
WO2013149054A1 (en) * 2012-03-28 2013-10-03 Beard Scott Randall Staggered truss system with controlled force slip joints
CN103821229A (en) * 2014-02-26 2014-05-28 山东大学 Rapid assembly type integrated house and installation method
CN106869402A (en) * 2017-04-06 2017-06-20 广州秉正工程检测有限公司 Assembly concrete component and its manufacture method
CN207553612U (en) * 2017-03-31 2018-06-29 中民筑友科技投资有限公司 It is a kind of for the wallboard of low layer assembled architecture and the combined member of frame

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1621645A (en) * 2005-01-05 2005-06-01 王治国 Villa type building
CN101200916A (en) * 2007-11-29 2008-06-18 浙江精工钢结构有限公司 Construction method of prestressed suspension type building structure
WO2013149054A1 (en) * 2012-03-28 2013-10-03 Beard Scott Randall Staggered truss system with controlled force slip joints
CN103821229A (en) * 2014-02-26 2014-05-28 山东大学 Rapid assembly type integrated house and installation method
CN207553612U (en) * 2017-03-31 2018-06-29 中民筑友科技投资有限公司 It is a kind of for the wallboard of low layer assembled architecture and the combined member of frame
CN106869402A (en) * 2017-04-06 2017-06-20 广州秉正工程检测有限公司 Assembly concrete component and its manufacture method

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112160594A (en) * 2020-09-23 2021-01-01 成都建工第四建筑工程有限公司 Construction method beneficial to resisting horizontal force of multi-layer special-shaped steel structure building

Also Published As

Publication number Publication date
CN109281478B (en) 2021-04-09

Similar Documents

Publication Publication Date Title
CN205875394U (en) Antidetonation concrete beam column that dry process is connected
CN209412984U (en) A kind of building
CN106284644B (en) A kind of residential architecture structural system and its method of construction suitable for industrialized production
CN109281390A (en) A kind of assembly concrete truss shear wall building structure
CN209412976U (en) A kind of shear wall-concrete truss overhanging construction
CN209412968U (en) A kind of assembly concrete truss shear wall building structure
CN109281478A (en) A kind of assembly method of shear wall-concrete truss overhanging construction
CN209412983U (en) A kind of assembled interlayer arrangement concrete truss overhanging construction
CN110904992B (en) Elevator foundation member for integrally assembling elevator and construction method thereof
CN209412982U (en) A kind of interlayer cantilevered concrete truss formula building
CN209412967U (en) A kind of assembly concrete truss building structure
CN109372123A (en) A kind of interlayer cantilevered concrete truss formula building
CN109281394A (en) A kind of shear wall-concrete truss overhanging construction
CN109372266A (en) A kind of assembly method of interlayer cantilevered concrete truss formula building
CN109372101A (en) A kind of assembly method of assembled interlayer arrangement concrete truss overhanging construction
CN109372100A (en) A kind of assembly method of assembly concrete truss shear wall building
CN109281395A (en) A kind of assembly method of assembly concrete truss building
CN109281404A (en) A kind of building
CN109281405A (en) A kind of assembled interlayer arrangement concrete truss overhanging construction
CN109372097A (en) A kind of assembly concrete truss building structure
CN209412977U (en) A kind of precast concrete truss element and precast concrete truss
CN209353367U (en) On across active service highway door opening bracket upright post basis
CN217870922U (en) Self-balancing type mortise and tenon stone structure system
CN107143186A (en) The Chinese style local-style dwelling houses of optional energy shock insulation is hinged with prefabricated components quick-assembling flexible rigid
CN104695591B (en) Self-thermal-insulation infilled wall with concrete columns and ring beams wrapped inside and construction method of self-thermal-insulation infilled wall

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20210409