CN209412983U - A kind of assembled interlayer arrangement concrete truss overhanging construction - Google Patents
A kind of assembled interlayer arrangement concrete truss overhanging construction Download PDFInfo
- Publication number
- CN209412983U CN209412983U CN201821342625.6U CN201821342625U CN209412983U CN 209412983 U CN209412983 U CN 209412983U CN 201821342625 U CN201821342625 U CN 201821342625U CN 209412983 U CN209412983 U CN 209412983U
- Authority
- CN
- China
- Prior art keywords
- concrete truss
- truss
- precast
- overhanging
- concrete
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 239000004567 concrete Substances 0.000 title claims abstract description 130
- 238000010276 construction Methods 0.000 title claims abstract description 48
- 239000011229 interlayer Substances 0.000 title claims abstract description 32
- 239000011178 precast concrete Substances 0.000 claims abstract description 66
- 239000010410 layer Substances 0.000 claims abstract description 49
- 210000003205 muscle Anatomy 0.000 claims description 32
- 239000002689 soil Substances 0.000 claims description 12
- 239000011381 foam concrete Substances 0.000 claims description 8
- 230000004308 accommodation Effects 0.000 claims description 6
- 238000003466 welding Methods 0.000 claims description 4
- 239000007787 solid Substances 0.000 abstract description 3
- 238000000034 method Methods 0.000 description 10
- 238000004873 anchoring Methods 0.000 description 9
- 238000010586 diagram Methods 0.000 description 9
- 239000000463 material Substances 0.000 description 9
- 230000008569 process Effects 0.000 description 9
- 238000013461 design Methods 0.000 description 8
- 238000003780 insertion Methods 0.000 description 8
- 230000037431 insertion Effects 0.000 description 8
- 230000001413 cellular effect Effects 0.000 description 7
- 230000015572 biosynthetic process Effects 0.000 description 6
- 239000011440 grout Substances 0.000 description 5
- 238000006073 displacement reaction Methods 0.000 description 4
- 238000009434 installation Methods 0.000 description 4
- 238000009826 distribution Methods 0.000 description 3
- 230000032258 transport Effects 0.000 description 3
- 241000196324 Embryophyta Species 0.000 description 2
- 230000015271 coagulation Effects 0.000 description 2
- 238000005345 coagulation Methods 0.000 description 2
- 238000002474 experimental method Methods 0.000 description 2
- 238000009408 flooring Methods 0.000 description 2
- 238000009413 insulation Methods 0.000 description 2
- 238000004519 manufacturing process Methods 0.000 description 2
- 230000013011 mating Effects 0.000 description 2
- 239000008267 milk Substances 0.000 description 2
- 210000004080 milk Anatomy 0.000 description 2
- 235000013336 milk Nutrition 0.000 description 2
- 239000000203 mixture Substances 0.000 description 2
- 239000004570 mortar (masonry) Substances 0.000 description 2
- 238000005192 partition Methods 0.000 description 2
- 230000003014 reinforcing effect Effects 0.000 description 2
- 238000012795 verification Methods 0.000 description 2
- 241000272517 Anseriformes Species 0.000 description 1
- 240000007594 Oryza sativa Species 0.000 description 1
- 235000007164 Oryza sativa Nutrition 0.000 description 1
- 230000008901 benefit Effects 0.000 description 1
- 239000007795 chemical reaction product Substances 0.000 description 1
- 238000005520 cutting process Methods 0.000 description 1
- 238000011161 development Methods 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 244000144992 flock Species 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 235000009566 rice Nutrition 0.000 description 1
- 230000000630 rising effect Effects 0.000 description 1
- 239000002002 slurry Substances 0.000 description 1
- 239000003643 water by type Substances 0.000 description 1
Landscapes
- Conveying And Assembling Of Building Elements In Situ (AREA)
Abstract
The utility model relates to a kind of assembled interlayers to arrange concrete truss overhanging construction, including multiple vertically arranged overhanging units, the upward lateral inclination setting of overhanging unit, the inclined direction for the overhanging unit being disposed adjacent is opposite, the assembled interlayer arrangement concrete truss overhanging construction is in polyline shaped, shear wall is disposed in the vertical load-bearing main body, the shear wall is integrally continuously arranged from bottom to top along assembled interlayer arrangement concrete truss overhanging construction and is surrounded by least one Core Walls Structure, the overhanging unit two-way is in length and breadth equipped with multiple rows of precast concrete truss at interval of one layer, the Core Walls Structure is fixedly connected in the two-way precast concrete truss intersected with it in length and breadth, it is connected between the multiple rows of precast concrete truss of same layer by precast beam, precast floor slab and the precast concrete truss and/or shear wall are solid Fixed connection.This building cantilever part formed one on have day, under have ground balcony space, reach the function of villa.
Description
Technical field
The utility model belongs to building engineering field more particularly to a kind of assembled interlayer arrangement concrete truss overhanging type
Building.
Background technique
In the major premise that land resource that China can be used in urban construction is limited, population constantly increases, urbanization accelerates
Under, the soil that downtown area can be sent out is fewer and fewer, and the rare degree in the especially superior location in big city is particularly evident, on the contrary
, city is but rising steadily to housing demand, therefore low-density residential buildings form has been not suitable for surviving in China city, and high
Layer agglomerated residence has obtained broad development with the advantage of its higher plot ratio.It is low at home in most of more developed city
The villa house of density often build Outskirts of City or outer suburbs location in, and people gradually have found Suburban Life mode during house
Facing the Space Quality of inhabitation and travel to and fro between residence time cost and lack improve life it is mating between contradiction.Cause
This, in order to solve the contradiction of comfort and convenience, the agglomerated residence of villadom has been increasingly becoming as real estate market high-end product
New lover.This kind of house is located at downtown prime location mostly, and the function distribution of villa house is imitated on Size Dwelling Design, and has
" hanging garden ", occupant, which stays indoors, can get close to nature;Plane figure design can also be optimized, possessed as villa a
The inhabitation atmosphere of property secret;Along with the full landscape balcony etc. towards Urban Parks or waters, therefore praised by real estate developers
For " the aerial villa " in city.To a certain extent, it is equivalent to villa house ensemble, extends to aerial, " guide look crowd
Mountain is small " imposing manner to be sometimes villa incomparable.
Villa embodies a kind of natural life style as a kind of high-quality house, more representative of inhabitation culture and
Spirit becomes the best inhabitation selection of people's good life needs, and price is high, remote, mating uneven congruence of living all is general
The logical people are difficult to the major reason received to it.And the soil and construction cost of aerial villa and common high residential building are suitable, enjoy
By villa quality and occupy downtown prime location, be the house of new generation that people go after like a flock of ducks, demand crowd will not
It is only limitted to the elite crowd of booming income again, but ruck and middle class, the scale of construction of the market demand is than present high level
House is bigger, not only contains the demand crowd of existing high residential building, will also include a part of existing villa demand crowd.Therefore
As the high-end house in down town, demand is very wide in central U.S. villa.
Utility model content
The purpose of the utility model is to provide a kind of structure novel, assembly efficiency height, villa house ensemble is simultaneously extended to
One of sky assembled interlayer arranges concrete truss overhanging construction.
Above-mentioned purpose is to be achieved through the following technical solutions: a kind of assembled interlayer arrangement concrete truss overhanging type is built
It builds, including multiple vertically arranged overhanging units, the overhanging unit includes multilayered structure, and the overhanging unit laterally inclines upwards
Tiltedly setting, the inclined direction for the overhanging unit being disposed adjacent is on the contrary, assembled interlayer arrangement concrete truss overhanging type is built
It builds in polyline shaped, the assembled interlayer arrangement concrete truss overhanging construction includes vertical load-bearing main body and overhanging in institute
The cantilever part outside vertical load-bearing main body is stated, shear wall is disposed in the vertical load-bearing main body, the shear wall is along assembly
At least one Core Walls Structure is continuously arranged from bottom to top and be surrounded by formula interlayer arrangement concrete truss overhanging construction integrally, described
Overhanging unit at interval of one layer it is two-way in length and breadth be equipped with multiple rows of precast concrete truss, the Core Walls Structure is two-way with its phase in length and breadth
The precast concrete truss of friendship is fixedly connected, and is connected between the multiple rows of precast concrete truss of same layer by precast beam, prefabricated building
Plate is fixedly connected with the precast concrete truss and/or shear wall.
Cantilever part described herein refers to the part overhang outside vertical load-bearing main body, and vertical load-bearing main body is specifically
Refer to and bears building structure self weight and vertical additional load, mobile load and the structure position that it is successively transferred to basis;It is two-way in length and breadth
Refer to overhanging direction and the vertical direction of overhanging unit.
Adjacent two overhanging units constitute a firm cellular construction in this building structure, and consolidating cellular construction is triangle
Shape rock-steady structure, this building structure can be made of multiple firm cellular constructions, and whole building is in broken line type, and concrete truss is every
Overhanging unit increments overhanging, the number of plies of each overhanging unit can be set according to specific actual conditions, if every layer overhangs 2.1 meters, that
4 layers overhang 8.4m altogether, and cantilever part, which is formed on one, day, under have the balcony space on ground, reach the function of villa, above may be used
Trees etc. are planted, the function distribution of villa house is imitated on Size Dwelling Design, by villa house ensemble, extend to aerial, inhabitation
Person stays indoors to get close to naturally, can also optimize plane figure and design, and the inhabitation atmosphere of individual character secret is possessed as villa
It encloses, forms aerial villa;Experiment proves that this cantilevered structure can satisfy structure safety and requirement.
Specifically, this building is in the floor direction taken in upwards, every layer of upper space be it is open, have day in formation, to
The upper direction for being incremented by overhanging, every layer of lower space be it is unobstructed, be down ground, one side house type of every floor has a direction
There is day on being, can be planted, garden is formed, and the aerial villa of the general top grade is 2 layer of one family, then the trees of first layer
Plant can be more than that layer is high, reach the second layer, make 2 layers of function of enjoying garden villa.Concrete truss is as building
The main load-carrying member of main structure can replace prefabricated post and wallboard to use, the pure solid concrete of truss weight ratio of use
Gently, advantageous to the economy and antidetonation of structure entirety, and a large amount of concrete and bar material can be saved, truss can be conducive to room
Between between connection, in forming chamber can be changed large space, reach the large space function of villa.
This structure is main vertical load-bearing and horizontal anti-seismic component by assembled Core Walls Structure, every first floor from Core Walls Structure
Overhang one layer of assembling truss structure out, the assembling truss structure of this layer overhanging not only undertakes the load of this floor, also undertakes
The load of next level plate, so that upper one layer of flooring forms a large space without vertical supporting, to form real nothing
The changeable space of any obstruction.
Further technical solution is that bilevel floor is connected with the concrete truss of same layer, and upper layer floor is taken
It connects and is fixed on the top boom of the concrete truss, the lower boom side of the concrete truss is equipped with dowel, described
The splice ends of precast floor slab, which are equipped with, stretches out muscle, and the dowel mutually splices with the stretching muscle, the concrete truss and institute
State precast floor slab connected by post-cast strip it is integral, the dowel and stretch out muscle be anchored in the post-cast strip.
Main load-carrying member of the concrete truss of the utility model as constructure body structure, can replace prefabricated post and
Wallboard uses, this connecting node makes full use of the design feature of concrete truss, throws away company by the side in concrete truss
Muscle is connect, the splice ends of precast floor slab, which are equipped with, stretches out muscle, and dowel is overlapped with stretching muscle and cast-in-place formation post-cast strip will mix here
Solidifying soil truss connect integral with precast floor slab, and precast floor slab delivers load to concrete truss.
Further technical solution is that connection sleeve is embedded in the concrete truss, the opening of the connection sleeve
It is connected outside end and the concrete truss, the dowel is fixedly connected with the connection sleeve.In this way, assembly efficiency is high,
Connection is reliable, does not influence the transport of concrete truss.
Further technical solution is that the dowel is beard muscle, and the beard muscle is embedded in the upper layer truss
Bottom.
Further technical solution is that bracket is equipped with described in the concrete truss, and the precast floor slab is overlapped on described
It is fixedly connected on bracket and with bracket.
Further technical solution is that the precast floor slab is overlapped on one end on the bracket and is equipped with insertion hole, described
Bracket is equipped with anchoring piece, and described anchoring piece one end is anchored in the bracket, inserts in the hole described in other end insertion.The insertion
Grouting material is perfused in hole.In this way, by grouting material anchoring piece can connect with precast beam it is integral, and then increase bracket in advance
The globality of floor processed, connection is more reliable, and the grouting material is preferably mortar.
Further technical solution is that the Core Walls Structure is perpendicular as the shear wall-concrete truss overhanging construction
To traffic core, the shear wall-concrete truss overhanging construction stair or elevator setting are in the Core Walls Structure.Due to cutting
Stability after power wall formation Core Walls Structure is stronger, and the stress of Core Walls Structure is better than the perpend wall being separately provided, and Core Walls Structure is as vertical
The escape route of traffic nuclear protection building, makes building when an earthquake occurs, guarantees the safety of staircase.
Further technical solution is notch to be equipped at the top of the concrete truss, the both ends of the precast beam are taken respectively
It connects in the notch at the top of the two rows of concrete truss being disposed adjacent, the concrete truss is equipped with connector, described pre-
Beam processed is equipped with jack hole, and the top of the precast beam is equipped with recess, and the jack hole is connected to the recess, and the connector is worn
It crosses the jack hole to protrude into the recess, fastener is equipped in the recess, the fastener is connected with the connector.
Further technical solution is that the connector is screw rod, and the fastener is nut, one end anchor of the screw rod
Gu the other end, which is worn, connects the nut in the concrete truss.
Further technical solution is to be perfused with grouting material in the jack hole and recess.The utility model passes through insertion
Concrete truss is formed effective dry type with precast beam and connect by connector and fastener in the jack hole of precast beam, is being filled
With in the process, after concrete truss is vertical good, it is only necessary to the lapping ends of precast beam be arranged in the hoisting process of precast beam
In the notch of concrete truss, while connector is inserted into the jack hole in the precast beam and recess, so
It is fastened afterwards by fastener, above structure is conducive to the conduction of power between concrete truss and precast beam, while greatly improving existing
The efficiency of field installation, improves construction speed.
Further technical solution is that the shear wall and precast concrete truss splice, and the shear wall is mixed with prefabricated
The splicing side of solidifying soil truss is equipped with built-in fitting, is fixedly connected with shear wall with precast concrete truss by welding built-in fitting.
Further technical solution is that the concrete truss includes the precast concrete truss list of multiple horizontal splicings
Member, the precast concrete truss element connection are integral.In this way, precast concrete truss element component is smaller relatively light, it is convenient for
It transports and lifts, by being assembled into monolithic concrete truss in assembling process, globality is relatively preferable, and installation effectiveness is high.
Further technical solution is that the precast concrete truss element is triangular structure, two precast concretes
The bevel edge of truss element is spliced to form truss module, multiple horizontally-spliced composition concrete truss of truss module.In this way, the triangle
Shape component can form standard module, can largely produce without make-to-order, and directly assembly when having demand has weldering
It connecing, is bolted two ways and forms entirety, this concrete truss cellular manufacture mould standard, modularization are high-efficient,
Further technical solution is that the precast concrete truss element being disposed adjacent is bolted, described prefabricated
Concrete truss unit is equipped with jack hole, and the bolt is worn the jack hole for connecing adjacent precast concrete truss splicing side and passed through
Nut fastening.
Further technical solution, which is that precast concrete truss element splicing side is equipped with, stretches out stirrup, mutually splices
The stretching reinforcing bar of precast concrete truss element mutually overlap, the precast concrete truss element mutually spliced passes through the area Hou Jiao
Connect integral, the stretching anchorage of stirrups is in the area Hou Jiao.
Further technical solution is that precast concrete truss element splicing side is equipped with notch and vertical jack hole,
The precast concrete truss element splicing side mutually spliced forms accommodation groove, is equipped with link block, the connection in the accommodation groove
Block also is provided with vertical jack hole, the vertical jack hole of the vertical jack hole of the link block and the precast concrete truss element
Be connected, wear connect muscle wear connect the vertical jack hole link block is connected with precast concrete truss element it is integral.
Further technical solution is that transverse structure muscle, the transverse direction are embedded in the precast concrete truss element
One end of structure muscle is connected with grout sleeve, and the other end is extend out to outside precast concrete truss element, the precast concrete of side
The stretching muscle of truss element stretches in the grout sleeve of precast concrete truss element adjacent thereto and anchoring of being in the milk.
Further technical solution is that the vacancy position in the concrete truss is filled with foamed concrete or sound insulation
Plate.In this way, then forming internal partition wall by filling-foam concrete or sound insulation plate girder, foamed concrete can in specific assembling process
After prefabricated by the way of installation, the mode poured can also be used and fill, self threading pin or nailing then can be used in triangle sound insulationg board
It is connect with concrete truss unit.
Further technical solution is that the top boom and lower boom of the concrete truss are equipped with the first built-in fitting, institute
It states and is equipped with concrete support in concrete truss, the concrete support includes diagonal brace, and the both ends of the diagonal brace are equipped with second
Built-in fitting, first built-in fitting and the second built-in fitting are detachably connected.In this way, then may be used in the place that building does not need setting
To remove, mode changes relatively flexibly, and if desired later period house type is changed, want to get through in certain several room, meeting structure stress
Under the premise of, it can be supported with dismantling concrete, directly formation large space.
Further technical solution is that first built-in fitting and the second built-in fitting include at least connecting plate, the company
Fishplate bar is equipped with threaded connection hole, and first built-in fitting and the second built-in fitting are bolted.In this way, assembly and disassembly is simple
Just, and connection is reliable.
Detailed description of the invention
The attached drawing for constituting a part of the utility model is used to provide a further understanding of the present invention, this is practical new
The illustrative embodiments and their description of type are not constituteed improper limits to the present invention for explaining the utility model.
Fig. 1 is that assembled interlayer involved in a kind of embodiment of the utility model arranges concrete truss overhanging construction
Structural schematic diagram;
Fig. 2 is that assembled interlayer involved in a kind of embodiment of the utility model arranges concrete truss overhanging construction
First layer shear wall Core Walls Structure and second layer precast floor slab arragement construction schematic diagram;
Fig. 3 is that assembled interlayer involved in a kind of embodiment of the utility model arranges concrete truss overhanging construction
Second layer shear wall Core Walls Structure and second layer concrete truss arragement construction schematic diagram;
Fig. 4 is that assembled interlayer involved in a kind of embodiment of the utility model arranges concrete truss overhanging construction
The arragement construction schematic diagram of concrete truss and precast beam;
Fig. 5 is the structural representation after the assembly is completed of an overhanging unit involved in a kind of embodiment of the utility model
Figure;
Fig. 6 is the structural representation of a firm unit after the assembly is completed involved in a kind of embodiment of the utility model
Figure;
It is intended to;
Fig. 7~11 are that assembled interlayer involved in the utility model another embodiment arranges concrete truss overhanging
Formula builds assembling process schematic diagram;
Figure 12 is the connecting node of concrete truss involved in a kind of embodiment of the utility model and precast floor slab
Schematic diagram;
Figure 13 is that schematic diagram is arranged in dowel involved in a kind of embodiment of the utility model;
Figure 14 is the connecting node of concrete truss and precast floor slab involved in the utility model another embodiment
Schematic diagram;
Figure 15 is the cross-sectional view in Figure 14 along the face A-A;
Figure 16 is the connection structure signal of concrete truss involved in a kind of embodiment of the utility model and shear wall
Figure;
Figure 17~23 are the structural schematic diagram of concrete truss involved in a kind of embodiment of the utility model;
Figure 24 and Figure 25 is respectively the Finite element analysis results figure under a kind of embodiment.
In figure:
1 concrete truss, 2 precast beam, 3 precast floor slab, 4 concrete truss unit
5 built-in connection, 6 Core Walls Structure 7 overhangs 8 shear wall of unit
9 top boom, 10 lower boom, 12 first built-in fitting
Vertical 15 concrete support of web member, 16 dowel of 13 second built-in fitting 14
17 connection 18 transverse structure muscle of sleeve, 19 grout sleeve, 20 foamed concretes
The 21 bolts 22 stretching stretching stirrup 24 of muscle 23, which is worn, connects muscle
25 basic 28 brackets of vertical 26 cantilever part of load-bearing main body 27
29 built-in fitting, 30 link block, 33 post-cast strip, 34 anchoring piece
35 areas Hou Jiao
Specific embodiment
The utility model is described in detail with reference to the accompanying drawing, the description of this part be only it is exemplary and explanatory,
There should not be any restriction effect to the protection scope of the utility model.In addition, those skilled in the art's retouching according to this document
It states, the corresponding combination can be carried out to the feature in embodiment in this document and in different embodiments.
The utility model embodiment is as follows, and referring to Fig.1~6 and Fig. 7~11, a kind of assembled interlayer arranges concrete purlin
Frame overhanging construction, including multiple vertically arranged overhanging units 7, the overhanging unit 7 includes multilayered structure, and the overhanging is single
The upward lateral inclination setting of member 7, the inclined direction for the overhanging unit 7 being disposed adjacent is on the contrary, the assembled interlayer arranges coagulation
Native truss overhanging construction is in polyline shaped, and the assembled interlayer arrangement concrete truss overhanging construction includes vertical load-bearing master
Body 25 and overhang cantilever part 26 outside the vertical load-bearing main body 25, is disposed with and cuts in the vertical load-bearing main body 25
Power wall 8, the shear wall 8 are integrally continuously arranged and are enclosed from bottom to top along assembled interlayer arrangement concrete truss overhanging construction
Be coiled at least one Core Walls Structure 6, the overhanging unit 7 at interval of one layer it is two-way in length and breadth be equipped with multiple rows of precast concrete truss 1,
The Core Walls Structure 6 is fixedly connected in the two-way precast concrete truss 1 intersected with it in length and breadth, the multiple rows of precast concrete purlin of same layer
It is connected between frame 1 by precast beam 2, the precast floor slab 3 is fixedly connected with precast concrete truss 1 and/or shear wall 8.
Cantilever part 26 described herein, which refers to, overhangs part outside vertical load-bearing main body 25, and vertical load-bearing main body 25
It specifically refers to bear building structure self weight and vertical additional load, mobile load and the structure position that it is successively transferred to basis 27;
The two-way overhanging direction for referring to overhanging unit 7 and vertical direction in length and breadth.
Adjacent two overhanging units 7 constitute a firm cellular construction in this building structure, and consolidating cellular construction is three
Angular rock-steady structure, this building structure can be made of multiple firm cellular constructions, and whole building is in broken line type, concrete truss
1 every overhanging unit 7 is incremented by overhanging, and the number of plies of each overhanging unit 7 can be set according to specific actual conditions, if every layer of overhanging 2.1
Rice, then 4 layers overhang 8.4m altogether, cantilever part 26, which is formed on one, day, under have the balcony space on ground, reach the function of villa
Can, trees etc. can be planted above, and the function distribution that villa house is imitated on Size Dwelling Design extends to villa house ensemble
In the air, occupant stays indoors to get close to naturally, can also optimize plane figure and design, and individual character secret is possessed as villa
Inhabitation atmosphere, form aerial villa;Experiment proves that this cantilevered structure can satisfy structure safety and requirement.
Specifically, this building is in the floor direction taken in upwards, every layer of upper space be it is open, have day in formation, to
The upper direction for being incremented by overhanging, every layer of lower space be it is unobstructed, be down ground, one side house type of every floor has a direction
There is day on being, can be planted, garden is formed, and the aerial villa of the general top grade is 2 layer of one family, then the trees of first layer
Plant can be more than that layer is high, reach the second layer, make 2 layers of function of enjoying garden villa.Concrete truss 1 is as building
The main load-carrying member of object main structure can replace prefabricated post and wallboard to use, the pure solid concrete of truss weight ratio of use
It is light, advantageous to the economy and antidetonation of structure entirety, and can save a large amount of concrete and bar material, truss can be conducive to
Connection between room reaches the large space function of villa can be changed large space in forming chamber.
This structure is main vertical load-bearing and horizontal anti-seismic component, every alternating floor from Core Walls Structure 6 by assembled Core Walls Structure 6
Building overhangs a floor assembling truss structure out, and the assembling truss structure of this layer overhanging not only undertakes the load of this floor, also holds
The load of next level plate is carried on a shoulder pole, so that upper one layer of flooring forms a large space without vertical supporting, to be formed real
Changeable space without any obstruction.
On the basis of above-described embodiment, in another embodiment of the utility model, such as Figure 12, bilevel floor with it is same
The concrete truss 1 of layer is connected, and upper layer floor is overlapped and is fixed on the top boom 9 of the concrete truss 1, the concrete
10 side of lower boom of truss 1 is equipped with dowel 16, and the splice ends of the precast floor slab 3, which are equipped with, stretches out muscle 22, the dowel
16 are connected into the precast floor slab 3 by post-cast strip 33 whole with the mutually splicing of stretching muscle 22, the concrete truss 1
Body, the dowel 16 and stretching muscle 22 are anchored in the post-cast strip 33.
Main load-carrying member of the concrete truss 1 of the utility model as constructure body structure can replace prefabricated post
It is used with wallboard, this connecting node makes full use of the design feature of concrete truss 1, by getting rid of in the side of concrete truss 1
Dowel 16 out, the splice ends of precast floor slab 3, which are equipped with, stretches out muscle 22, dowel 16 and stretches out the overlap joint of muscle 22 and cast-in-place here
It forms post-cast strip 33 and connect concrete truss 1 with precast floor slab 3 integral, precast floor slab 3 delivers load to concrete purlin
Frame 1.
It is pre- in the concrete truss 1 such as Figure 13 in another embodiment of the utility model on the basis of above-described embodiment
Be embedded with connection sleeve 17, be connected outside the open end of the connection sleeve 17 and the concrete truss 1, the dowel 16 and
The connection sleeve 17 is fixedly connected.In this way, assembly efficiency is high, connection is reliable, does not influence the transport of concrete truss 1.
On the basis of above-described embodiment, in another embodiment of the utility model, the dowel 16 is beard muscle, the Hu
Sub- muscle is embedded in the bottom of the upper layer truss.
On the basis of above-described embodiment, in another embodiment of the utility model, such as Figure 14 and Figure 15, the concrete truss
1 is described equipped with bracket 28, and the precast floor slab 3 is overlapped on the bracket 28 and is fixedly connected with bracket 28.
On the basis of above-described embodiment, in another embodiment of the utility model, such as Figure 15, the precast floor slab 3 is overlapped on
One end on the bracket 28 is equipped with insertion hole, and the bracket 28 is equipped with anchoring piece 34, and described 34 one end of anchoring piece is anchored at institute
It states in bracket 28, inserts in the hole described in other end insertion.Described insert in the hole is perfused with grouting material.In this way, can by grouting material
Anchoring piece 34 is connect to globality that is integral, and then increasing bracket 28 and precast floor slab 3 with precast beam 2, connection is more reliable,
The grouting material is preferably mortar.
On the basis of above-described embodiment, in another embodiment of the utility model, the Core Walls Structure 6 is used as the shear wall 8-
The vertical traffic core of 1 overhanging construction of concrete truss, the stair of 1 overhanging construction of shear wall 8- concrete truss or
Elevator setting is in the Core Walls Structure 6.Stability after forming Core Walls Structure 6 due to shear wall 8 is stronger, and the stress of Core Walls Structure 6 is excellent
In the escape route that the perpend wall being separately provided, Core Walls Structure 6 are built as vertical traffic nuclear protection, make building when an earthquake occurs,
Guarantee the safety of staircase.
On the basis of above-described embodiment, in another embodiment of the utility model, it is equipped with and lacks at the top of the concrete truss 1
Mouthful, the both ends of the precast beam 2 are overlapped on respectively in the notch at 1 top of two rows of concrete truss being disposed adjacent, described
Concrete truss 1 is equipped with connector, and the precast beam 2 is equipped with jack hole, and the top of the precast beam 2 is equipped with recess, described to wear
It connects hole to be connected to the recess, the connector passes through the jack hole and protrudes into the recess, and fastening is equipped in the recess
Part, the fastener are connected with the connector.
On the basis of above-described embodiment, in another embodiment of the utility model, the connector is screw rod, the fastener
For nut, one end of the screw rod is anchored in the concrete truss 1, and the other end, which is worn, connects the nut.
On the basis of above-described embodiment, in another embodiment of the utility model, it is perfused in the jack hole and recess
Slurry.The utility model by insertion precast beam 2 jack hole in connector and fastener by concrete truss 1 with it is prefabricated
Beam 2 forms effective dry type connection, in assembling process, after concrete truss 1 is vertical good, it is only necessary in the lifting of precast beam 2
In journey by the lapping ends of precast beam 2 in the notch that concrete truss 1 is set, while making connector insertion described prefabricated
It in jack hole and recess in beam 2, is then fastened by fastener, above structure is conducive to concrete truss 1 and pre-
The conduction of power between beam 2 processed, while field erected efficiency is greatly improved, improve construction speed.
On the basis of above-described embodiment, in another embodiment of the utility model, such as Figure 16, the shear wall 8 is mixed with prefabricated
Solidifying soil truss 1 splices, and the splicing side of the shear wall 8 and precast concrete truss 1 is equipped with built-in fitting 29, pre-buried by welding
Shear wall 8 is fixedly connected by part 29 with precast concrete truss 1.
On the basis of above-described embodiment, in another embodiment of the utility model, such as Figure 17~23, the concrete truss 1
Precast concrete truss element 4 including multiple horizontal splicings, the precast concrete truss element 4 connects integral.In this way,
4 component of precast concrete truss element is smaller relatively light, is readily transported and lifts, integral mixed by being assembled in assembling process
Solidifying soil truss 1, globality is relatively preferable, and installation effectiveness is high.
On the basis of above-described embodiment, in another embodiment of the utility model, such as Figure 17, the precast concrete truss list
Member 4 is triangular structure, and the bevel edge of two precast concrete truss elements 4 is spliced to form truss module, and multiple truss modules are horizontal
To being spliced to form concrete truss 1.In this way, the triangular member can form standard module, it can be largely raw without make-to-order
It produces, directly assembly when having demand has welding, bolt 21 to connect two ways and forms entirety, this concrete truss list
First 4 production moulds standardization, modularization, it is high-efficient,
On the basis of above-described embodiment, in another embodiment of the utility model, such as Figure 17, precast concrete truss element 4
Equipped with built-in connection 5, the splicing side of the built-in connection 5 precast concrete truss element 4 is mutually spliced
Built-in connection 5 weld it is integral.
On the basis of above-described embodiment, in another embodiment of the utility model, such as Figure 18, the precast concrete being disposed adjacent
Truss element 4 is connected by bolt 21, and the precast concrete truss element 4 is equipped with jack hole, the bolt 21 wear connect it is adjacent
Precast concrete truss 1 splice side jack hole and by nut fastening.
On the basis of above-described embodiment, in another embodiment of the utility model, such as Figure 19, the precast concrete truss list
Member 4 splices side and is equipped with stretching stirrup 23, and the stretching reinforcing bar of the precast concrete truss element 4 mutually spliced mutually overlaps, mutually
The precast concrete truss element 4 of splicing by the area Hou Jiao 35 connect it is integral, the stretching stirrup 23 be anchored at it is described after pour
In area 35.
On the basis of above-described embodiment, in another embodiment of the utility model, such as Figure 20, the precast concrete truss list
Member 4 splices side and is equipped with notch and vertical jack hole, and the precast concrete truss element 4 mutually spliced splices side and forms accommodation groove,
Link block 30 is equipped in the accommodation groove, the link block 30 also is provided with vertical jack hole, and vertically wearing for the link block 30 connects
Hole is connected with the vertical jack hole of the precast concrete truss element 4, wears to connect muscle 24 and wear and connects the vertical jack hole for institute
State link block 30 and precast concrete truss element 4 connect it is integral.
On the basis of above-described embodiment, in another embodiment of the utility model, such as Figure 21, the precast concrete truss list
It is embedded with transverse structure muscle 18 in member 4, one end of the transverse structure muscle 18 is connected with grout sleeve 19, and the other end is extend out to
Outside precast concrete truss element 4, the stretching muscle 22 of the precast concrete truss element 4 of side stretches to adjacent thereto pre-
In the grout sleeve 19 of concrete truss unit 4 processed and anchoring of being in the milk.
On the basis of above-described embodiment, in another embodiment of the utility model, such as Figure 22, in the concrete truss 1
Vacancy position is filled with foamed concrete 20 or sound insulationg board.In this way, passing through filling-foam concrete 20 or the plate girder then shape that insulates against sound
At internal partition wall, the prefabricated rear mode installed is can be used in foamed concrete 20 in specific assembling process, and the mode poured can also be used
Filling, triangle sound insulationg board then can be used self threading pin or nailing and connect with concrete truss unit 4.
On the basis of above-described embodiment, in another embodiment of the utility model, such as Figure 23, the concrete truss 1 it is upper
Chord member 9 and lower boom 10 are equipped with the first built-in fitting 12, are equipped with concrete support 15, the coagulation in the concrete truss 1
Soil support 15 includes diagonal brace, and the both ends of the diagonal brace are equipped with the second built-in fitting 13, and first built-in fitting 12 and second is pre-buried
Part 13 is detachably connected.In this way, can then remove in the place that building does not need setting, mode changes relatively flexibly, and the later period
If desired house type is changed, want to get through in certain several room, under the premise of meeting structure stress, can be supported with dismantling concrete
15, directly formation large space.
Concrete truss includes vertical web member 14, and the vertical web member 14 connects top boom 9 and lower boom 10.
On the basis of above-described embodiment, in another embodiment of the utility model, such as Figure 23, first built-in fitting 12 and
Two built-in fittings 13 include at least connecting plate, and the connecting plate is equipped with threaded connection hole, first built-in fitting 12 and second
Built-in fitting 13 is connected by bolt 21.In this way, assembly and disassembly is easy, and connect reliable.
A kind of calculating verification result under embodiment is as follows, as follows through finite element analysis computation verification result, such as Figure 24 institute
Show, as seen from the figure, depth of building is 16 layers (total 48m high), and (seismic force is smaller) adds up horizontal position under 6 degree of area's geological processes
Moving is 18.8mm, and every layer of horizontal displacement is about 1.175mm (18.8/16=1.175), and story drift is 1/2553 (1.175/
3000, wherein 3000mm is that layer is high), less than the limit value of 1/1200 angle of displacement most stringent of in assembled high-level structure, meet anti-
Shake requires.
As shown in figure 25, vertical displacement of the overhanging part under vertical load and earthquake load is up to 49.5mm, overhangs
Total distance is 24m, and the deflection limit value of cantilever member is 2*24000/400=120mm, and vertical maximum displacement is less than deflection limit value,
Therefore the cantilevered structure can satisfy structure safety and requirement.
The above is only the preferred embodiment of the utility model, it is noted that for the common skill of the art
For art personnel, without departing from the principle of this utility model, several improvements and modifications can also be made, these improve and
Retouching also should be regarded as the protection scope of the utility model.
Claims (10)
1. a kind of assembled interlayer arranges concrete truss overhanging construction, which is characterized in that hanged including multiple vertically arranged
Unit is chosen, the overhanging unit includes multilayered structure, the upward lateral inclination setting of overhanging unit, the overhanging list being disposed adjacent
Member inclined direction on the contrary, the assembled interlayer arrangement concrete truss overhanging construction be in polyline shaped, the assembled every
Layer arrangement concrete truss overhanging construction includes vertical load-bearing main body and overhangs outstanding outside the vertical load-bearing main body
Position is chosen, shear wall is disposed in the vertical load-bearing main body, the shear wall is outstanding along assembled interlayer arrangement concrete truss
Choose that formula building is whole continuously to arrange from bottom to top and be surrounded by least one Core Walls Structure, the overhanging unit at interval of one layer in length and breadth
Two-way to be equipped with multiple rows of precast concrete truss, the Core Walls Structure is fixed in the two-way precast concrete truss intersected with it in length and breadth
It connects, is connected between the multiple rows of precast concrete truss of same layer by precast beam, precast floor slab and the precast concrete truss
And/or shear wall is fixedly connected.
2. assembled interlayer according to claim 1 arranges concrete truss overhanging construction, which is characterized in that upper and lower two
The floor of layer is connected with the concrete truss of same layer, and upper layer floor overlaps and is fixed on the top boom of the concrete truss
On, the lower boom side of the concrete truss is equipped with dowel, and the splice ends of the precast floor slab, which are equipped with, stretches out muscle, the company
It connects muscle mutually to splice with the stretching muscle, the concrete truss connect integral, institute with the precast floor slab by post-cast strip
It states dowel and stretches out muscle and be anchored in the post-cast strip.
3. assembled interlayer according to claim 2 arranges concrete truss overhanging construction, which is characterized in that described mixed
It is embedded with connection sleeve in solidifying soil truss, is connected outside the open end of the connection sleeve and the concrete truss, the company
Muscle is connect to be fixedly connected with the connection sleeve.
4. assembled interlayer according to any one of claims 1 to 3 arranges concrete truss overhanging construction, feature
It is, for the Core Walls Structure as the shear wall-concrete truss overhanging construction vertical traffic core, the shear wall-is mixed
The stair or elevator setting of solidifying soil truss overhanging construction are in the Core Walls Structure.
5. assembled interlayer according to claim 4 arranges concrete truss overhanging construction, which is characterized in that described mixed
Notch is equipped at the top of solidifying soil truss, the both ends of the precast beam are overlapped on the two rows of concrete truss tops being disposed adjacent respectively
In the notch in portion, connector is equipped at the top of the concrete truss, the precast beam is equipped with jack hole, the top of the precast beam
Equipped with recess, the jack hole is connected to the recess, and the connector passes through the jack hole and protrudes into the recess, described
Fastener is equipped in recess, the fastener is connected with the connector.
6. assembled interlayer according to claim 4 arranges concrete truss overhanging construction, which is characterized in that described to cut
Power wall and precast concrete truss splice, and the splicing side of the shear wall and precast concrete truss is equipped with built-in fitting, pass through
Shear wall is fixedly connected by welding built-in fitting with precast concrete truss.
7. assembled interlayer according to claim 4 arranges concrete truss overhanging construction, which is characterized in that described mixed
Solidifying soil truss includes the precast concrete truss element of multiple horizontal splicings, and the precast concrete truss element connects into whole
Body.
8. assembled interlayer according to claim 7 arranges concrete truss overhanging construction, which is characterized in that described pre-
Concrete truss unit spliced processed side is equipped with notch and vertical jack hole, the precast concrete truss element splicing side mutually spliced
Form accommodation groove, be equipped with link block in the accommodation groove, the link block also is provided with vertical jack hole, the link block it is vertical
Jack hole is connected with the vertical jack hole of the precast concrete truss element, wears to connect muscle and wear and connects the vertical jack hole for institute
State link block connected with precast concrete truss element it is integral.
9. assembled interlayer according to claim 7 arranges concrete truss overhanging construction, which is characterized in that described mixed
Vacancy position in solidifying soil truss is filled with foamed concrete or sound insulationg board.
10. assembled interlayer according to claim 9 arranges concrete truss overhanging construction, which is characterized in that described
The top boom and lower boom of concrete truss are equipped with the first built-in fitting, are equipped with concrete support, institute in the concrete truss
Stating concrete support includes diagonal brace, and the both ends of the diagonal brace are equipped with the second built-in fitting, first built-in fitting and second pre-buried
Part is detachably connected.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201821342625.6U CN209412983U (en) | 2018-08-20 | 2018-08-20 | A kind of assembled interlayer arrangement concrete truss overhanging construction |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201821342625.6U CN209412983U (en) | 2018-08-20 | 2018-08-20 | A kind of assembled interlayer arrangement concrete truss overhanging construction |
Publications (1)
Publication Number | Publication Date |
---|---|
CN209412983U true CN209412983U (en) | 2019-09-20 |
Family
ID=67930149
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201821342625.6U Expired - Fee Related CN209412983U (en) | 2018-08-20 | 2018-08-20 | A kind of assembled interlayer arrangement concrete truss overhanging construction |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN209412983U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109281405A (en) * | 2018-08-20 | 2019-01-29 | 中民筑友有限公司 | A kind of assembled interlayer arrangement concrete truss overhanging construction |
-
2018
- 2018-08-20 CN CN201821342625.6U patent/CN209412983U/en not_active Expired - Fee Related
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109281405A (en) * | 2018-08-20 | 2019-01-29 | 中民筑友有限公司 | A kind of assembled interlayer arrangement concrete truss overhanging construction |
CN109281405B (en) * | 2018-08-20 | 2023-10-20 | 筑友智造智能科技有限公司 | Assembled interlayer arrangement concrete truss overhanging type building |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN101215819B (en) | Separated double-layer bridge-floor cable stayed bridge | |
CN205875394U (en) | Antidetonation concrete beam column that dry process is connected | |
CN209412984U (en) | A kind of building | |
CN209412983U (en) | A kind of assembled interlayer arrangement concrete truss overhanging construction | |
CN109281390A (en) | A kind of assembly concrete truss shear wall building structure | |
CN209412976U (en) | A kind of shear wall-concrete truss overhanging construction | |
CN106088328A (en) | A kind of group frame | |
CN209412968U (en) | A kind of assembly concrete truss shear wall building structure | |
CN209412967U (en) | A kind of assembly concrete truss building structure | |
CN209412982U (en) | A kind of interlayer cantilevered concrete truss formula building | |
CN102392417B (en) | Dual-cantilever bearing support structure for large steel pipe and installation method | |
CN109281478A (en) | A kind of assembly method of shear wall-concrete truss overhanging construction | |
CN109372123A (en) | A kind of interlayer cantilevered concrete truss formula building | |
CN109281405A (en) | A kind of assembled interlayer arrangement concrete truss overhanging construction | |
CN109372101A (en) | A kind of assembly method of assembled interlayer arrangement concrete truss overhanging construction | |
CN106013097B (en) | Mountain area abrupt slope great diameter and long pile cages construction sizing mould bases in situ and construction method | |
CN109281394A (en) | A kind of shear wall-concrete truss overhanging construction | |
CN209412977U (en) | A kind of precast concrete truss element and precast concrete truss | |
CN109372097A (en) | A kind of assembly concrete truss building structure | |
CN109281395A (en) | A kind of assembly method of assembly concrete truss building | |
CN109281404A (en) | A kind of building | |
CN209353367U (en) | On across active service highway door opening bracket upright post basis | |
CN109372266A (en) | A kind of assembly method of interlayer cantilevered concrete truss formula building | |
CN206408743U (en) | A kind of assembly concrete node | |
CN109372100A (en) | A kind of assembly method of assembly concrete truss shear wall building |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20190920 |
|
CF01 | Termination of patent right due to non-payment of annual fee |