Utility model content
The purpose of the utility model is to provide a kind of structure novel, assembly efficiency height, villa house ensemble is simultaneously extended to
Aerial building.
Above-mentioned purpose is to be achieved through the following technical solutions: a kind of building, includes at least a firm cellular construction, institute
Stating firm cellular construction includes the first overhanging unit and the second overhanging unit, and the first overhanging unit and the second overhanging unit are equal
Including multilayered structure, the one end on the upper layer of the first overhanging unit overhangs preset distance, the other end with respect to its adjacent lower
Preset distance is taken in, the top of the first overhanging unit, the second overhanging unit is arranged in the second overhanging unit
The one end on upper layer overhang preset distance with respect to its adjacent lower, the other end takes in preset distance, and second overhanging is single
Member overhanging direction with first overhang the overhanging of unit it is contrary, the firm cellular construction include vertical load-bearing main body and
Overhang cantilever part outside the vertical load-bearing main body, at least cantilever part using truss structure and with the vertical load-bearing
Main body is fixedly connected.
Cantilever part described herein refers to the part overhang outside vertical load-bearing main body, and vertical load-bearing main body is specifically
Refer to and bears building structure self weight and vertical additional load, mobile load and the structure position that it is successively transferred to basis.
This building can be made of multiple firm cellular constructions, and consolidating cellular construction is triangle rock-steady structure, entirely be built
It builds in broken line type, the every overhanging unit increments overhanging of concrete truss, the number of plies of each overhanging unit can be according to specific actual conditions
Setting, if every layer overhangs 2.1 meters, then 4 layers overhang 8.4m altogether, cantilever part, which is formed on one, day, under have the balcony on ground empty
Between, reach the function of villa, trees etc. can be planted above, the function distribution of villa house is imitated on Size Dwelling Design, villa is lived
Residence ensemble extends in the air, and occupant, which stays indoors, can get close to naturally, can also optimize plane figure design, as villa
The inhabitation atmosphere for equally possessing individual character secret, forms aerial villa;Experiment proves that this cantilevered structure can satisfy structure safety
And requirement.
Specifically, this building is in the floor direction taken in upwards, every layer of upper space be it is open, have day in formation, to
The upper direction for being incremented by overhanging, every layer of lower space be it is unobstructed, be down ground, one side house type of every floor has a direction
There is day on being, can be planted, garden is formed, and the aerial villa of the general top grade is 2 layer of one family, then the trees of first layer
Plant can be more than that layer is high, reach the second layer, make 2 layers of function of enjoying garden villa.
Further technical solution is that the top layer of the first overhanging unit is the bottom of the second overhanging unit, institute
The top layer and the second overhanging unit for stating the first overhanging unit are symmetrical arranged.In this way, moulding is more in line with aesthetic, build simultaneously
The stress performance of object entirety is more balanced, is conducive to its antidetonation.
Further technical solution is that the vertical load-bearing main body uses frame structure or shear wall structure, the truss
Structure uses steel structure truss or concrete truss.In this way, it is assembling truss structure that this building structure, which only has cantilever part, with
Aerial villa function is formed, which makes full use of the overhanging function of truss, and the height and anti-seismic performance of vertical load-bearing main body take
Certainly in the shear wall disposal situation of non-overhanging part-structure main body.
Further technical solution is that the vertical load-bearing main body and the cantilever part are all made of concrete truss knot
Structure, every layer of the building are mixed including at least multiple rows of along what the first overhanging unit or the second overhanging unit overhanging direction extended
Solidifying soil truss, the concrete truss entirety parallelogram, multiple rows of concrete truss are connected by precast beam, precast floor slab
It is fixedly connected with the concrete truss, the concrete truss on the upper layer of same row and the concrete truss of lower layer are fixedly connected into
It is whole.
In this way, being assemblied in this building by precast truss frame, vertical load is by vertical truss support, horizontal earthquake load
The space structure resistance being made of truss is not high in the number of plies, when seismic force is smaller, can satisfy shockproof requirements.Concrete truss is made
For the main load-carrying member of constructure body structure, prefabricated post and wallboard can be replaced to use, the truss weight ratio of use is pure solid
Concrete it is light, advantageous to the economy and antidetonation of structure entirety, and can save a large amount of concrete and bar material, truss can
Be conducive to the connection between room, can be changed large space in forming chamber, reach the large space function of villa.
Further technical solution is that the concrete truss includes the concrete truss unit of multiple horizontal splicings, institute
It is integral to state the connection of concrete truss unit.In this way, concrete truss unit member is smaller relatively light, it is readily transported and lifts, fills
With by being assembled into monolithic concrete truss, globality is relatively preferable in the process, installation effectiveness is high.
Further technical solution is that the concrete truss unit of level splicing is connected by presstressed reinforcing steel, the coagulation
The top boom and lower boom of native truss element are equipped with horizontally jack hole, and the wearing for concrete truss unit of level splicing connects
Hole is connected, and the presstressed reinforcing steel is fixed through the jack hole and by tension ground tackle.In this way, assembly efficiency is high, concrete
Truss good integrity, conducive to the transmitting of power.
Further technical solution is that the concrete truss unit uses mortise-tenon joint, the concrete purlin mutually spliced
The mortise-tenon joint portion of frame unit is equipped with vertical jack hole, wears to connect muscle and wear and connects the concrete purlin that the vertical jack hole will be disposed adjacent
The connection of frame unit is integral.
Further technical solution is that the concrete truss on the upper layer of same row is fixedly connected with the concrete truss of lower layer
It is integral, it is respectively equipped at the top and bottom of the concrete truss and stretches out muscle and injected hole, the concrete truss of institute lower part
It stretches out in the injected hole for the concrete truss that muscle stretches to top, is perfused with mortar in the injected hole.In this way, the coagulation of lower layer
Native truss and the connection of the concrete truss on upper layer are integral, form multi-layer concrete truss structure, can be applied to multi-story structure,
Above-mentioned connection is reliable, and levels concrete truss forms effective dry type connection, can reduce wet construction, be conducive to upper and lower level coagulation
The conduction of power between native truss, while field erected efficiency is greatly improved, improve construction speed.
Further technical solution is, the precast floor slab be overlapped on the concrete truss and with the concrete purlin
Frame is fixedly connected, and the splicing side of the precast floor slab is equipped with notch and convex block, and the convex block is overlapped on the concrete frame.
In this way, making full use of the design feature of concrete truss, and notch and convex block, assembling process are equipped in the splicing side of precast floor slab
It is middle to be fixedly connected with the two while precast floor slab is overlapped on concrete truss, the bottom of vertical web member, concrete support
The part being connected with concrete frame can be then accommodated in the notch, and precast floor slab delivers load to concrete truss.And
The utility model use the pure solid concrete of truss weight ratio it is light, be conducive to antidetonation, and can save a large amount of concrete and
Bar material, the standardization of the utility model production mould, modularization, high-efficient, truss can be conducive to the connection between room, shape
At different functions.
Further technical solution is notch to be equipped at the top of the concrete truss, the both ends of the precast beam are taken respectively
It connects in the notch at the top of the two rows of concrete truss being disposed adjacent, the concrete truss connector, the precast beam
Equipped with jack hole, the top of the precast beam is equipped with recess, and the jack hole is connected to the recess, and the connector passes through institute
It states jack hole to protrude into the recess, fastener is equipped in the recess, the fastener is connected with the connector.
Further technical solution is that the connector is screw rod, and the fastener is nut, one end anchor of the screw rod
Gu the other end, which is worn, connects the nut in the concrete truss.
Further technical solution is to be perfused with grouting material in the jack hole and recess.The utility model passes through insertion
Concrete truss is formed effective dry type with precast beam and connect by connector and fastener in the jack hole of precast beam, is being filled
With in the process, after concrete truss is vertical good, it is only necessary to the lapping ends of precast beam be arranged in the hoisting process of precast beam
In the notch of concrete truss, while connector is inserted into the jack hole in the precast beam and recess, so
It is fastened afterwards by fastener, above structure is conducive to the conduction of power between concrete truss and precast beam, while greatly improving existing
The efficiency of field installation, improves construction speed.
Further technical solution is that the concrete truss unit includes concrete frame and is arranged in the concrete
Concrete support in frame, the concrete frame include vertical web member, and concrete frame is separated by the vertical web member
Multiple polygon frames, the both ends of the concrete support are connected to the angle steel joint of the polygon frame.
It should be noted that concrete frame is separated by vertical web member when the frame of concrete frame is non-bevelled
The both ends of multiple quadrilateral frames, the concrete branch are connected to the angle steel joint of the quadrilateral frame, when concrete frame
When a certain frame is bevel edge, then one of them polygon frame being separated to form is triangle frame, triangle frame is interior, and no setting is required
Concrete support.
Further technical solution is that the vacancy position in the concrete truss is filled with foamed concrete or sound insulation
Plate.In this way, then forming internal partition wall by filling-foam concrete or sound insulation plate girder, foamed concrete can in specific assembling process
After prefabricated by the way of installation, the mode poured can also be used and fill, self threading pin or nailing then can be used in triangle sound insulationg board
It is connect with concrete truss unit.
Further technical solution is that the upper and lower part of the inner wall of the concrete frame is equipped with the first built-in fitting, institute
Stating concrete support includes diagonal brace, and the both ends of the diagonal brace are equipped with the second built-in fitting, first built-in fitting and second pre-buried
Part is detachably connected.In this way, can then remove in the place that building does not need setting, mode changes relatively flexibly, and later period family
If desired type is changed, want to get through in certain several room, under the premise of meeting structure stress, can be supported with dismantling concrete, directly
It connects to form large space.
Further technical solution is that first built-in fitting and the second built-in fitting include at least connecting plate, the company
Fishplate bar is equipped with threaded connection hole, and first built-in fitting and the second built-in fitting are bolted.In this way, assembly and disassembly is simple
Just, and connection is reliable.
Specific embodiment
The utility model is described in detail with reference to the accompanying drawing, the description of this part be only it is exemplary and explanatory,
There should not be any restriction effect to the protection scope of the utility model.In addition, those skilled in the art's retouching according to this document
It states, the corresponding combination can be carried out to the feature in embodiment in this document and in different embodiments.
The utility model embodiment is as follows, and referring to Fig.1~10, a kind of building includes at least a firm cellular construction,
The firm cellular construction includes the first overhanging unit 6 and the second overhanging unit 7, and the first overhanging unit 6 and second overhang
Unit 7 includes multilayered structure, and the one end on the upper layer of the first overhanging unit 6 overhangs pre- spacing with respect to its adjacent lower
Preset distance is taken in from, the other end, the second overhanging unit 7 is arranged in the top of the first overhanging unit 6, and described the
The one end on the upper layer of two overhanging units 7 overhangs preset distance with respect to its adjacent lower, and the other end takes in preset distance, described
The overhanging direction of second overhanging unit 7 is contrary with the first overhanging overhanging of unit 6, and the firm cellular construction includes perpendicular
To the cantilever part 26 of load-bearing main body 25 and overhanging outside the vertical load-bearing main body 25, at least cantilever part 26 uses purlin
Frame structure is simultaneously fixedly connected with the vertical load-bearing main body 25.
Cantilever part 26 described herein, which refers to, overhangs part outside vertical load-bearing main body 25, and vertical load-bearing main body 25
It specifically refers to bear building structure self weight and vertical additional load, mobile load and the structure position that it is successively transferred to basis 27.
This building can be made of multiple firm cellular constructions, and consolidating cellular construction is triangle rock-steady structure, entirely be built
It builds in broken line type, the overhanging of the every overhanging unit increments of concrete truss 1, the number of plies of each overhanging unit can be according to specific actual conditions
Setting, if every layer overhangs 2.1 meters, then 4 layers overhang 8.4m altogether, cantilever part 26, which is formed on one, day, under have the balcony on ground
Space reaches the function of villa, can plant trees etc. above, the function distribution of villa house is imitated on Size Dwelling Design, by villa
House ensemble extends in the air, and occupant, which stays indoors, can get close to naturally, can also optimize plane figure design, as other
Villa equally possesses the inhabitation atmosphere of individual character secret, forms aerial villa;Experiment proves that this cantilevered structure can satisfy structure peace
Complete and requirement.
Specifically, this building is in the floor direction taken in upwards, every layer of upper space be it is open, have day in formation, to
The upper direction for being incremented by overhanging, every layer of lower space be it is unobstructed, be down ground, one side house type of every floor has a direction
There is day on being, can be planted, garden is formed, and the aerial villa of the general top grade is 2 layer of one family, then the trees of first layer
Plant can be more than that layer is high, reach the second layer, make 2 layers of function of enjoying garden villa.
On the basis of above-described embodiment, in another embodiment of the utility model, such as Fig. 1, the top of the first overhanging unit 6
Layer is the bottom of the second overhanging unit 7, and the top layer of the first overhanging unit 6 and the second overhanging unit 7 are symmetrically set
It sets.In this way, moulding is more in line with aesthetic, while the stress performance of building entirety is more balanced, is conducive to its antidetonation.
On the basis of above-described embodiment, in another embodiment of the utility model, such as Fig. 1, the vertical load-bearing main body 25 is adopted
With 8 structure of frame structure or shear wall, the truss structure uses steel structure truss or concrete truss 1.In this way, this building is tied
It is assembling truss structure that structure, which only has cantilever part 26, and to form aerial villa function, which makes full use of the overhanging of truss
Function, the height and anti-seismic performance of vertical load-bearing main body 25 depend on 8 deployment scenarios of shear wall of non-overhanging part-structure main body.
On the basis of above-described embodiment, in another embodiment of the utility model, such as Fig. 2 and Fig. 6, the vertical load-bearing main body
25 are all made of 1 structure of concrete truss with the cantilever part 26, and every layer of the building includes at least multiple rows of along first
Overhang unit 6 or the second overhanging unit 7 overhangs the concrete truss 1 that direction extends, the whole concrete truss 1 is in parallel four
Side shape, multiple rows of concrete truss 1 are connected by precast beam 2, and precast floor slab 3 is fixedly connected with the concrete truss 1, same
The concrete truss 1 on the upper layer of row is fixedly connected integral with the concrete truss 1 of lower layer.
In this way, this building is assemblied by precast truss frame, vertical load by vertical truss support, horizontal earthquake load by
The space structure resistance of truss composition is not high in the number of plies, when seismic force is smaller, can satisfy shockproof requirements.Concrete truss 1 is made
For the main load-carrying member of constructure body structure, prefabricated post and wallboard can be replaced to use, the truss weight ratio of use is pure solid
Concrete it is light, advantageous to the economy and antidetonation of structure entirety, and can save a large amount of concrete and bar material, truss can
Be conducive to the connection between room, can be changed large space in forming chamber, reach the large space function of villa.
Can preferably to resist horizontal earthquake load, a kind of specific embodiment, such as Fig. 4 introduce in concrete truss 1
Shear wall 8 can satisfy shockproof requirements when the not high seismic force of the number of plies is larger or the high seismic force of the number of plies is smaller.
Specifically, every layer of 1 building structure of assembly concrete truss is equipped with shear wall 8 and concrete truss 1, institute
State that concrete truss 1 is longitudinal to be equipped with multiple rows of, 8 bidirectional arrangements of shear wall are described in vertical 25 range of load-bearing main body
Shear wall 8, multiple rows of concrete truss 1 are connected by precast beam 2, the precast floor slab 3 and the concrete truss 1 and/or are cut
Power wall 8 is fixedly connected, and the shear wall 8 is at least fixedly connected with row's concrete truss 1, the concrete purlin on the upper layer of same row
Frame 1 is fixedly connected with integral, vertically arranged shear wall 8 with the concrete truss 1 of lower layer and builds along assembly concrete truss 1
Structure is integrally continuously arranged from bottom to top and is connected integral.
It is preferred that it is described herein it is two-way refer to it is uniform along overhanging direction and vertical direction in vertical 25 range of load-bearing main body
The four corners that vertical load-bearing main body 25 is arranged in arrangement, preferably shear wall 8.The specific set-up mode of shear wall 8 is to set in length and breadth
The prefabricated panel set undertake respectively X to seismic force and Y-direction seismic force, form two-way Lateral Resistant System, architectural structure system
Anti-seismic performance is more preferable.
Another specific embodiment, such as Fig. 5, every layer of building is equipped with shear wall 8 and concrete truss 1, the coagulation
Native truss 1 is longitudinal to be equipped with multiple rows of, and the shear wall 8 is whole under along 1 overhanging construction of fabricated shear wall 8- concrete truss
To upper continuous arrangement and it is surrounded by least one Core Walls Structure 5, the Core Walls Structure 5 is arranged in vertical 25 range of load-bearing main body
Interior, the shear wall 8, multiple rows of concrete truss 1 are connected by precast beam 2, the precast floor slab 3 and the concrete truss 1
And/or shear wall 8 is fixedly connected, the shear wall 8 is at least fixedly connected with row's concrete truss 1, the upper layer of same row
Concrete truss 1 is fixedly connected integral with the concrete truss 1 of lower layer.
Core Walls Structure 5 is to be preferably placed in vertical traffic core, and stair or elevator are wrapped up, since prefabricated panel forms Core Walls Structure
Stability after 5 is stronger, and the stress of Core Walls Structure 5 is better than the perpend wall being separately provided, and Core Walls Structure 5 can be set in the building of building
Between ladder, the escape route of building is protected, makes building when an earthquake occurs, guarantees the safety of staircase.
On the basis of above-described embodiment, in another embodiment of the utility model, such as Figure 11 and Figure 12, the concrete truss
1 includes the concrete truss unit 4 of multiple horizontal splicings, and the concrete truss unit 4 connects integral.In this way, concrete
4 component of truss element is smaller relatively light, is readily transported and lifts, by being assembled into monolithic concrete truss 1 in assembling process,
Globality is relatively preferable, and installation effectiveness is high.
On the basis of above-described embodiment, in another embodiment of the utility model, such as Figure 11, the concrete truss of level splicing
Unit 4 is connected by presstressed reinforcing steel 18, and the top boom 9 and lower boom 10 of the concrete truss unit 4 are equipped with horizontally
The jack hole 28 of jack hole 28, the concrete truss unit 4 of level splicing is connected, and the presstressed reinforcing steel 18 is worn through described
It connects hole 28 and is fixed by tension ground tackle 19.In this way, assembly efficiency is high, 1 good integrity of concrete truss, conducive to the transmitting of power.
On the basis of above-described embodiment, in another embodiment of the utility model, such as Figure 12, the concrete truss unit 4
Using mortise-tenon joint, the mortise-tenon joint portion of the concrete truss unit 4 mutually spliced is equipped with vertical jack hole 28, wears and connects muscle 24 and wear
Connect the vertical jack hole 28 the concrete truss unit 4 being disposed adjacent is connected it is integral.
On the basis of above-described embodiment, in another embodiment of the utility model, such as Figure 13, the concrete on the upper layer of same row
Truss 1 is fixedly connected integral with the concrete truss 1 of lower layer, and the top and bottom of the concrete truss 1, which are respectively equipped with, stretches
Muscle 22 and injected hole 23 out, the stretching muscle 22 of the concrete truss 1 of institute lower part stretch to the slip casting of the concrete truss 1 on top
In hole 23, mortar is perfused in the injected hole 23.
In this way, the concrete truss 1 of lower layer connect integral, formation multi-layer concrete purlin with the concrete truss 1 on upper layer
1 structure of frame can be applied to multi-story structure, and above-mentioned connection is reliable, and levels concrete truss 1 forms effective dry type connection,
Wet construction can be reduced, the conduction of power between levels concrete truss 1 is conducive to, while greatly improving field erected efficiency,
Improve construction speed.
On the basis of above-described embodiment, in another embodiment of the utility model, such as Figure 14~16, the precast floor slab 3 is taken
It connects on the concrete truss 1 and is fixedly connected with the concrete truss 1, the splicing side of the precast floor slab 3 is equipped with slot
Mouth 16 and convex block 17, the convex block 17 are overlapped on the concrete frame 11.In this way, making full use of the knot of concrete truss 1
Structure feature, and it is equipped with notch 16 and convex block 17 in the splicing side of precast floor slab 3, precast floor slab 3 is overlapped in assembling process mixed
The two is fixedly connected while on solidifying soil truss 1, bottom and 11 phase of concrete frame of vertical web member 14, concrete support 15
Part even can be then accommodated in the notch 16, and precast floor slab 3 delivers load to concrete truss 1.And the utility model
The pure solid concrete of truss weight ratio of use it is light, be conducive to antidetonation, and a large amount of concrete and bar material can be saved, this
The standardization of utility model production mould, modularization, high-efficient, truss can be conducive to the connection between room, form different function
Energy.
On the basis of above-described embodiment, in another embodiment of the utility model, such as Figure 15 and Figure 16, the concrete frame
11 are equipped with stretching muscle 22, and the convex block 17 of the precast floor slab 3 is equipped with jack hole 28, and the stretching muscle 22, which is worn, connects the jack hole
28, grouting material is perfused in the jack hole 28.In this way, above structure is conducive to power between precast floor slab 3 and concrete truss 1
Conduction, while greatly improving field erected efficiency, improve construction speed, can be by precast floor slab 3 and mixed by grouting material
Solidifying soil truss 1 connects globality that is integral, and then increasing structure, connect it is more reliable, can operative constraint precast floor slab 3 end
Portion, it is ensured that this connecting node is destroyed smaller under geological process or even do not destroyed.The grouting material is preferably mortar.
On the basis of above-described embodiment, such as Fig. 1 in another embodiment of the utility model, set at the top of the concrete truss 1
Jagged, the both ends of the precast beam 2 are overlapped on respectively in the notch at 1 top of two rows of concrete truss being disposed adjacent,
Connector is equipped at the top of the concrete truss 1, the precast beam 2 is equipped with jack hole 28, and the top of the precast beam 2 is equipped with recessed
Mouthful, the jack hole 28 is connected to the recess, and the connector passes through the jack hole 28 and protrudes into the recess, described recessed
Fastener is equipped in mouthful, the fastener is connected with the connector.
On the basis of above-described embodiment, in another embodiment of the utility model, the connector is screw rod, the fastener
For nut, one end of the screw rod is anchored in the concrete truss 1, and the other end, which is worn, connects the nut.
On the basis of above-described embodiment, in another embodiment of the utility model, it is perfused in the jack hole 28 and recess
Grouting material.The utility model by insertion precast beam 2 jack hole 28 in connector and fastener by concrete truss 1 with
Precast beam 2 forms effective dry type connection, in assembling process, after concrete truss 1 is vertical good, it is only necessary in hanging for precast beam 2
During dress by the lapping ends of precast beam 2 in the notch that concrete truss 1 is set, while making described in connector insertion
It in jack hole 28 and recess in precast beam 2, is then fastened by fastener, above structure is conducive to concrete truss
The conduction of power between 1 and precast beam 2, while field erected efficiency is greatly improved, improve construction speed.
On the basis of above-described embodiment, in another embodiment of the utility model, such as Figure 17, the concrete truss unit 4
Including concrete frame 11 and the concrete support 15 being arranged in the concrete frame 11, the concrete frame 11 includes
Concrete frame 11 is separated into multiple polygon frames by vertical web member 14, the vertical web member 14, the concrete support 15
Both ends are connected to the angle steel joint of the polygon frame.
It should be noted that vertical web member 14 is by concrete frame 11 when the frame of concrete frame 11 is non-bevelled
Multiple quadrilateral frames are separated into, the both ends of the concrete branch are connected to the angle steel joint of the quadrilateral frame, work as concrete
When a certain frame of frame 11 is bevel edge, then one of them polygon frame for being separated to form is triangle frame, in triangle frame
No setting is required concrete support 15.
On the basis of above-described embodiment, in another embodiment of the utility model, as Figure 18 fills foamed concrete 20 or sound insulation
Plate girder then forms internal partition wall, and the prefabricated rear mode installed can be used in foamed concrete 20 in specific assembling process, can also be used
The mode poured is filled, and triangle sound insulationg board then can be used self threading pin or nailing and connect with concrete truss unit 4.
On the basis of above-described embodiment, in another embodiment of the utility model, such as Figure 17, the inner wall of the concrete frame
Upper and lower part is equipped with the first built-in fitting 12, and the concrete support 15 includes diagonal brace, and the both ends of the diagonal brace are equipped with the
Two built-in fittings 13, first built-in fitting 12 and the second built-in fitting 13 are detachably connected.In this way, not needing setting in building
Local then can remove, mode changes relatively flexibly, and if desired later period house type is changed, want to get through in certain several room, meet
Under the premise of structure stress, 15, directly formation large space can be supported with dismantling concrete.
On the basis of above-described embodiment, in another embodiment of the utility model, such as Figure 17, first built-in fitting 12 and
Two built-in fittings 13 include at least connecting plate, and the connecting plate is equipped with threaded connection hole, first built-in fitting 12 and second
Built-in fitting 13 is connected by bolt 21.In this way, assembly and disassembly is easy, and connect reliable.
It is as follows through finite element analysis computation verification result under a kind of embodiment, as shown in figure 19, as seen from the figure, building
Height is 16 layers (total 48m high), and under 8 degree of area's geological processes (seismic force is larger), the cumulative horizontal displacement of building is
18.8mm, every layer of horizontal displacement are about 1.2mm (18.8/16=1.2), story drift be 1/2500 (1.2/3000, wherein
3000mm is that layer is high), less than the limit value of 1/1200 angle of displacement most stringent of in assembled high-level structure, meet shockproof requirements.
In addition, being 32 layers (total 96m high) in depth of building, in 6 degree of area's geological processes as seen from the figure as shown in figure 20
Under (seismic force is smaller) building accumulative horizontal displacement be 50mm, every layer of horizontal displacement is about 1.6mm (50/32=1.6), layer
Between angle of displacement be 1/1875 (1.6/3000, wherein 3000mm is that layer is high), be less than most stringent of 1/ in assembled high-level structure
The limit value of 1200 angle of displacements, meets shockproof requirements.
As shown in figure 21, as seen from the figure, vertical displacement of the overhanging part under vertical load and earthquake load is up to
23.5mm, overhanging total distance are 16m, and the deflection limit value of cantilever member is 2*16000/400=80mm, and vertical maximum displacement is less than
Deflection limit value, therefore the cantilevered structure can satisfy structure safety and requirement.
The above is only the preferred embodiment of the utility model, it is noted that for the common skill of the art
For art personnel, without departing from the principle of this utility model, several improvements and modifications can also be made, these improve and
Retouching also should be regarded as the protection scope of the utility model.