CN209412976U - A kind of shear wall-concrete truss overhanging construction - Google Patents

A kind of shear wall-concrete truss overhanging construction Download PDF

Info

Publication number
CN209412976U
CN209412976U CN201821342042.3U CN201821342042U CN209412976U CN 209412976 U CN209412976 U CN 209412976U CN 201821342042 U CN201821342042 U CN 201821342042U CN 209412976 U CN209412976 U CN 209412976U
Authority
CN
China
Prior art keywords
concrete
concrete truss
truss
shear wall
overhanging
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn - After Issue
Application number
CN201821342042.3U
Other languages
Chinese (zh)
Inventor
李昌州
尹犟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhuyou Zhizao Technology Investment Co ltd
Original Assignee
China Mingsheng Drawin Technology Investment Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Mingsheng Drawin Technology Investment Co Ltd filed Critical China Mingsheng Drawin Technology Investment Co Ltd
Priority to CN201821342042.3U priority Critical patent/CN209412976U/en
Application granted granted Critical
Publication of CN209412976U publication Critical patent/CN209412976U/en
Withdrawn - After Issue legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

The utility model relates to a kind of shear wall-concrete truss overhanging constructions, including at least two overhanging units setting up and down, the one end for overhanging the upper layer of unit laterally overhangs preset distance with respect to its adjacent lower, the other end laterally takes in preset distance, the overhanging for the overhanging unit being disposed adjacent is contrary, the concrete truss is longitudinally equipped with multiple rows of, the shear wall is integrally continuously arranged from bottom to top along fabricated shear wall-concrete truss overhanging construction and is surrounded by least one Core Walls Structure, it is connected between multiple rows of concrete truss of same layer by precast beam, precast floor slab is fixedly connected with the concrete truss and/or shear wall, the shear wall is at least fixedly connected with the concrete truss of row's same layer, the concrete truss on the upper layer of same row is fixedly connected integral with the concrete truss of lower layer.This building cantilever part formed one on have day, under have ground balcony space, reach the function of villa.

Description

A kind of shear wall-concrete truss overhanging construction
Technical field
The utility model belongs to building engineering field more particularly to a kind of shear wall-concrete truss overhanging construction.
Background technique
In the major premise that land resource that China can be used in urban construction is limited, population constantly increases, urbanization accelerates Under, the soil that downtown area can be sent out is fewer and fewer, and the rare degree in the especially superior location in big city is particularly evident, on the contrary , city is but rising steadily to housing demand, therefore low-density residential buildings form has been not suitable for surviving in China city, and high Layer agglomerated residence has obtained broad development with the advantage of its higher plot ratio.It is low at home in most of more developed city The villa house of density often build Outskirts of City or outer suburbs location in, and people gradually have found Suburban Life mode during house Facing the Space Quality of inhabitation and travel to and fro between residence time cost and lack improve life it is mating between contradiction.Cause This, in order to solve the contradiction of comfort and convenience, the agglomerated residence of villadom has been increasingly becoming as real estate market high-end product New lover.This kind of house is located at downtown prime location mostly, and the function distribution of villa house is imitated on Size Dwelling Design, and has " hanging garden ", occupant, which stays indoors, can get close to nature;Plane figure design can also be optimized, possessed as villa a The inhabitation atmosphere of property secret;Along with the full landscape balcony etc. towards Urban Parks or waters, therefore praised by real estate developers For " the aerial villa " in city.To a certain extent, it is equivalent to villa house ensemble, extends to aerial, " guide look crowd Mountain is small " imposing manner to be sometimes villa incomparable.
Villa embodies a kind of natural life style as a kind of high-quality house, more representative of inhabitation culture and Spirit becomes the best inhabitation selection of people's good life needs, and price is high, remote, mating uneven congruence of living all is general The logical people are difficult to the major reason received to it.And the soil and construction cost of aerial villa and common high residential building are suitable, enjoy By villa quality and occupy downtown prime location, be the house of new generation that people go after like a flock of ducks, demand crowd will not It is only limitted to the elite crowd of booming income again, but ruck and middle class, the scale of construction of the market demand is than present high level House is bigger, not only contains the demand crowd of existing high residential building, will also include a part of existing villa demand crowd.Therefore As the high-end house in down town, demand is very wide in central U.S. villa.
Utility model content
The purpose of the utility model is to provide a kind of structure novel, assembly efficiency height, villa house ensemble is simultaneously extended to Aerial shear wall-concrete truss overhanging construction.
Above-mentioned purpose is to be achieved through the following technical solutions: a kind of shear wall-concrete truss overhanging construction at least wraps Two overhanging units setting up and down are included, the overhanging unit is multilayered structure, and the one end on the upper layer of the overhanging unit is homogeneous To its adjacent lower, laterally overhanging preset distance, the other end laterally take in preset distance, and the overhanging unit being disposed adjacent hangs Choose contrary, the shear wall-concrete truss overhanging construction includes vertical load-bearing main body and overhanging described vertical Cantilever part outside load-bearing main body, every layer of the shear wall-concrete truss overhanging construction are equipped with shear wall and mix Solidifying soil truss, the concrete truss are longitudinally equipped with multiple rows of, and the shear wall is along fabricated shear wall-concrete truss overhanging type Building is whole continuously to arrange from bottom to top and is surrounded by least one Core Walls Structure, and the Core Walls Structure is arranged in the vertical load-bearing master Within the scope of body, be connected between multiple rows of concrete truss of same layer by precast beam, precast floor slab and the concrete truss and/ Or shear wall is fixedly connected, the shear wall is at least fixedly connected with the concrete truss of row's same layer, the upper layer of same row Concrete truss be fixedly connected with the concrete truss of lower layer it is integral.
Cantilever part described herein refers to the part overhang outside vertical load-bearing main body, and vertical load-bearing main body is specifically Refer to and bears building structure self weight and vertical additional load, mobile load and the structure position that it is successively transferred to basis.
Adjacent two overhanging units constitute a firm cellular construction in this building structure, and consolidating cellular construction is triangle Shape rock-steady structure, this building structure can be made of multiple firm cellular constructions, and whole building is in broken line type, and concrete truss is every Overhanging unit increments overhanging, the number of plies of each overhanging unit can be set according to specific actual conditions, if every layer overhangs 2.1 meters, that 4 layers overhang 8.4m altogether, and cantilever part, which is formed on one, day, under have the balcony space on ground, reach the function of villa, above may be used Trees etc. are planted, the function distribution of villa house is imitated on Size Dwelling Design, by villa house ensemble, extend to aerial, inhabitation Person stays indoors to get close to naturally, can also optimize plane figure and design, and the inhabitation atmosphere of individual character secret is possessed as villa It encloses, forms aerial villa;Experiment proves that this cantilevered structure can satisfy structure safety and requirement.
Specifically, this building is in the floor direction taken in upwards, every layer of upper space be it is open, have day in formation, to The upper direction for being incremented by overhanging, every layer of lower space be it is unobstructed, be down ground, one side house type of every floor has a direction There is day on being, can be planted, garden is formed, and the aerial villa of the general top grade is 2 layer of one family, then the trees of first layer Plant can be more than that layer is high, reach the second layer, make 2 layers of function of enjoying garden villa.
This structure is made of assembling truss+assembly or cast-in-place Core Walls Structure, and vertical load is common by truss and Core Walls Structure It undertakes, due to the addition of Core Walls Structure, the ability for resisting horizontal earthquake load can be greatly improved.It is larger in number of plies height, seismic force When, it can satisfy shockproof requirements.Main load-carrying member of the concrete truss as constructure body structure, can replace prefabricated post and Wallboard uses, the pure solid concrete of truss weight ratio of use it is light, it is advantageous to the economy and antidetonation of structure entirety, and can be with A large amount of concrete and bar material are saved, truss can be conducive to the connection between room, can be changed large space in forming chamber, reach The large space function of villa.
Further technical solution is that the Core Walls Structure is perpendicular as the shear wall-concrete truss overhanging construction To traffic core, the shear wall-concrete truss overhanging construction stair or elevator setting are in the Core Walls Structure.Due to cutting Stability after power wall formation Core Walls Structure is stronger, and the stress of Core Walls Structure is better than the perpend wall being separately provided, and Core Walls Structure is as vertical The escape route of traffic nuclear protection building, makes building when an earthquake occurs, guarantees the safety of staircase.
Further technical solution is that the concrete truss includes the concrete truss unit of multiple horizontal splicings, institute It is integral to state the connection of concrete truss unit.In this way, concrete truss unit member is smaller relatively light, it is readily transported and lifts, fills With by being assembled into monolithic concrete truss, globality is relatively preferable in the process, installation effectiveness is high.
Further technical solution is that the concrete truss unit includes concrete frame and is arranged in the concrete Concrete support in frame, the concrete frame include vertical web member, and concrete frame is separated by the vertical web member Multiple polygon frames, the both ends of the concrete support are connected to the angle steel joint of the polygon frame.
It should be noted that concrete frame is separated by vertical web member when the frame of concrete frame is non-bevelled The both ends of multiple quadrilateral frames, the concrete branch are connected to the angle steel joint of the quadrilateral frame, when concrete frame When a certain frame is bevel edge, then one of them polygon frame being separated to form is triangle frame, triangle frame is interior, and no setting is required Concrete support.
Further technical solution is that the vacancy position in the concrete truss is filled with foamed concrete or sound insulation Plate.In this way, then forming internal partition wall by filling-foam concrete or sound insulation plate girder, foamed concrete can in specific assembling process After prefabricated by the way of installation, the mode poured can also be used and fill, self threading pin or nailing then can be used in triangle sound insulationg board It is connect with concrete truss unit.
Further technical solution is that the upper and lower part of the inner wall of the concrete frame is equipped with the first built-in fitting, institute Stating concrete support includes diagonal brace, and the both ends of the diagonal brace are equipped with the second built-in fitting, first built-in fitting and second pre-buried Part is detachably connected.In this way, can then remove in the place that building does not need setting, mode changes relatively flexibly, and later period family If desired type is changed, want to get through in certain several room, under the premise of meeting structure stress, can be supported with dismantling concrete, directly It connects to form large space.
Further technical solution is that first built-in fitting and the second built-in fitting include at least connecting plate, the company Fishplate bar is equipped with threaded connection hole, and first built-in fitting and the second built-in fitting are bolted.In this way, assembly and disassembly is simple Just, and connection is reliable.
Further technical solution is that concrete truss unit spliced side is equipped with notch and vertical jack hole, mutually The concrete truss unit spliced side of splicing forms accommodation groove, is equipped with link block in the accommodation groove, the link block also is provided with Vertical jack hole, the vertical jack hole of the link block are connected with the vertical jack hole of the concrete truss unit, wear and connect Muscle wear connect the vertical jack hole link block is connected with concrete truss unit it is integral.
Further technical solution is that the concrete truss unit is triangular structure, two concrete truss units Bevel edge be spliced to form truss module, multiple horizontally-spliced composition concrete truss of truss module.In this way, the triangular member can It to form standard module, can largely be produced without make-to-order, directly assembly when having demand has welding, bolt to connect It connects two ways and forms entirety, this concrete truss cellular manufacture mould standard, modularization are high-efficient.
Further technical solution is that concrete truss unit is equipped with built-in connection, and the built-in connection is exposed extremely The splicing side of the concrete truss unit, the built-in connection welding mutually spliced are integral.
Further technical solution is that the concrete truss on the upper layer of same row is fixedly connected with the concrete truss of lower layer It is integral, it is respectively equipped with stretching muscle at the top and bottom of the concrete truss and injected hole, the concrete truss of lower part are stretched Muscle stretches in the injected hole of the concrete truss on top out, is perfused with mortar in the injected hole.In this way, the concrete of lower layer Truss and the connection of the concrete truss on upper layer are integral, form multi-layer concrete truss structure, can be applied to multi-story structure, on It is reliable to state connection, levels concrete truss forms effective dry type connection, can reduce wet construction, be conducive to levels concrete The conduction of power between truss, while field erected efficiency is greatly improved, improve construction speed.
Further technical solution is that the concrete truss on the upper layer and the coagulation of lower layer is arranged in the precast floor slab Between native truss, the precast floor slab and concrete truss are equipped with jack hole, the concrete truss of neighbouring setting and prefabricated Floor is bolted, and the concrete truss is equipped with jack hole, and the bolt wears the concrete truss for connecting floor, prefabricated building The jack hole of plate and the concrete truss on upper layer is simultaneously fastened by nut.
Further technical solution is, the precast floor slab be overlapped on the concrete truss and with the concrete purlin Frame is fixedly connected, and the splicing side of the precast floor slab is equipped with notch and convex block, and the convex block is overlapped on the concrete frame. In this way, making full use of the design feature of concrete truss, and notch and convex block, assembling process are equipped in the splicing side of precast floor slab It is middle to be fixedly connected with the two while precast floor slab is overlapped on concrete truss, the bottom of vertical web member, concrete support The part being connected with concrete frame can be then accommodated in the notch, and precast floor slab delivers load to concrete truss.And The utility model use the pure solid concrete of truss weight ratio it is light, be conducive to antidetonation, and can save a large amount of concrete and Bar material, the standardization of the utility model production mould, modularization, high-efficient, truss can be conducive to the connection between room, shape At different functions.
Further technical solution is that the concrete frame is provided with stretching muscle, and the convex block of the precast floor slab, which is equipped with, to be worn Hole is connect, the stretching muscle, which is worn, connects the jack hole, is perfused with grouting material in the jack hole.In this way, above structure be conducive to it is pre- The conduction of power between floor and concrete truss processed, while field erected efficiency is greatly improved, construction speed is improved, is passed through Precast floor slab can be connect globality that is integral, and then increasing structure by grouting material with concrete truss, and connection is more reliable, can The end of operative constraint precast floor slab, it is ensured that this connecting node is destroyed smaller under geological process or even do not destroyed.The grouting Material is preferably mortar.
Further technical solution is that the shear wall and concrete truss splice, the shear wall and concrete truss Splicing side be equipped with stretching muscle, the stretching muscle of the two mutually overlaps, by casting concrete sleeper by shear wall and concrete Truss connection, the stretching muscle are anchored in the concrete sleeper.
Further technical solution is notch to be equipped at the top of the concrete truss, the both ends of the precast beam are taken respectively It connects in the notch at the top of the two rows of concrete truss being disposed adjacent, the concrete truss is equipped with connector, described pre- Beam processed is equipped with jack hole, and the top of the precast beam is equipped with recess, and the jack hole is connected to the recess, and the connector is worn It crosses the jack hole to protrude into the recess, fastener is equipped in the recess, the fastener is connected with the connector.
Connector and fastener in jack hole of the utility model by being inserted into precast beam is by concrete truss and in advance Beam processed forms effective dry type connection, in assembling process, after concrete truss is vertical good, it is only necessary in the hoisting process of precast beam The middle lapping ends by precast beam are inserted into connector in the precast beam in the notch that concrete truss is arranged in Jack hole and recess in, then fastened by fastener, above structure be conducive to concrete truss and precast beam it Between power conduction, while greatly improving field erected efficiency, improve construction speed.
Further technical solution is that the connector is screw rod, and the fastener is nut, one end anchor of the screw rod Gu the other end, which is worn, connects the nut in the concrete truss.
Further technical solution is to be perfused with grouting material in the jack hole and recess.
Detailed description of the invention
The attached drawing for constituting a part of the utility model is used to provide a further understanding of the present invention, this is practical new The illustrative embodiments and their description of type are not constituteed improper limits to the present invention for explaining the utility model.
The structural schematic diagram of the building of assembly concrete truss involved in a kind of embodiment of Fig. 1 the utility model;
Fig. 2 is to build first layer concrete truss with formula concrete truss involved in a kind of embodiment of the utility model Arragement construction schematic diagram;
Fig. 3 be a kind of embodiment of the utility model involved in formula concrete truss building concrete truss with it is prefabricated The arragement construction schematic diagram of beam;
Fig. 4 is the arragement construction schematic diagram of precast floor slab involved in a kind of embodiment of the utility model;
Fig. 5 is the structural representation after the assembly is completed of an overhanging unit involved in a kind of embodiment of the utility model Figure;
Fig. 6 is the structural representation of a firm unit after the assembly is completed involved in a kind of embodiment of the utility model Figure;
It is intended to;
Fig. 7 and Fig. 8 is respectively that the structure of firm unit assembling process involved in a kind of embodiment of the utility model is shown It is intended to;
Fig. 9 and Figure 10 is respectively that the structure of concrete truss unit involved in a kind of embodiment of the utility model is shown;
Figure 11~Figure 14 is respectively the structural schematic diagram of concrete truss involved in a kind of embodiment of the utility model;
Figure 15 and Figure 16 is the connecting node of concrete truss and floor involved in a kind of embodiment of the utility model Structural schematic diagram;
Figure 17 is the cross-sectional view in the face connecting node A-A of concrete truss involved in Figure 16 and precast floor slab;
Figure 18 is the cross-sectional view in the face connecting node B-B of concrete truss involved in Figure 17 and precast floor slab;
Figure 19 is the connection structure signal of concrete truss involved in a kind of embodiment of the utility model and shear wall Figure;
Figure 20 and Figure 21 is respectively the Finite element analysis results figure under a kind of embodiment.
In figure:
1 concrete truss, 2 precast beam, 3 precast floor slab, 4 concrete truss unit
5 built-in connection, 6 shear wall 7 overhangs 8 link block of unit
9 wear and connect 10 Core Walls Structure of muscle, 11 concrete frame, 12 first built-in fitting
Vertical 15 concrete support of web member, 16 notch of 13 second built-in fitting 14
17 convex block, 18 injected hole, 20 foamed concrete
21 bolts 22 stretch out the vertical load-bearing main body of 23 concrete sleeper of muscle 25
26 cantilever part, 27 basis
Specific embodiment
The utility model is described in detail with reference to the accompanying drawing, the description of this part be only it is exemplary and explanatory, There should not be any restriction effect to the protection scope of the utility model.In addition, those skilled in the art's retouching according to this document It states, the corresponding combination can be carried out to the feature in embodiment in this document and in different embodiments.
The utility model embodiment is as follows, referring to Fig.1~8, a kind of shear wall-concrete truss overhanging construction, and at least Including two overhanging units 7 setting up and down, the overhanging unit 7 is multilayered structure, the one end on the upper layer of the overhanging unit 7 With respect to its adjacent lower, laterally overhanging preset distance, the other end laterally take in preset distance, the overhanging unit 7 being disposed adjacent Overhanging it is contrary, the shear wall-concrete truss overhanging construction include vertical load-bearing main body 25 and overhanging in institute The cantilever part 26 outside vertical load-bearing main body 25 is stated, every layer of the shear wall-concrete truss overhanging construction is equipped with Shear wall 6 and concrete truss 1, the concrete truss 1 is longitudinal to be equipped with multiple rows of, and the shear wall 6 is along fabricated shear wall- Concrete truss overhanging construction is integrally continuously arranged from bottom to top and is surrounded by least one Core Walls Structure 10, the Core Walls Structure 10 are arranged in vertical 25 range of load-bearing main body, are connected between multiple rows of concrete truss 1 of same layer by precast beam 2, Precast floor slab 3 is fixedly connected with the concrete truss 1 and/or shear wall 6, the shear wall 6 at least with row's same layer Concrete truss 1 is fixedly connected, and the concrete truss 1 on the upper layer of same row and the concrete truss 1 of lower layer are fixedly connected into whole Body.
Cantilever part 26 described herein, which refers to, overhangs part outside vertical load-bearing main body 25, and vertical load-bearing main body 25 It specifically refers to bear building structure self weight and vertical additional load, mobile load and the structure position that it is successively transferred to basis 27.
Adjacent two overhanging units 7 constitute a firm cellular construction in this building structure, and consolidating cellular construction is three Angular rock-steady structure, this building structure can be made of multiple firm cellular constructions, and whole building is in broken line type, concrete truss 1 every overhanging unit 7 is incremented by overhanging, and the number of plies of each overhanging unit 7 can be set according to specific actual conditions, if every layer of overhanging 2.1 Rice, then 4 layers overhang 8.4m altogether, cantilever part 26, which is formed on one, day, under have the balcony space on ground, reach the function of villa Can, trees etc. can be planted above, and the function distribution that villa house is imitated on Size Dwelling Design extends to villa house ensemble In the air, occupant stays indoors to get close to naturally, can also optimize plane figure and design, and individual character secret is possessed as villa Inhabitation atmosphere, form aerial villa;Experiment proves that this cantilevered structure can satisfy structure safety and requirement.
Specifically, this building is in the floor direction taken in upwards, every layer of upper space be it is open, have day in formation, to The upper direction for being incremented by overhanging, every layer of lower space be it is unobstructed, be down ground, one side house type of every floor has a direction There is day on being, can be planted, garden is formed, and the aerial villa of the general top grade is 2 layer of one family, then the trees of first layer Plant can be more than that layer is high, reach the second layer, make 2 layers of function of enjoying garden villa.
This structure is made of assembling truss+assembly or cast-in-place Core Walls Structure 10, and vertical load is by truss and Core Walls Structure 10 Shared can greatly improve the ability for resisting horizontal earthquake load due to the addition of Core Walls Structure 10.In number of plies height, earthquake When power is larger, it can satisfy shockproof requirements.Main load-carrying member of the concrete truss 1 as constructure body structure, can replace Prefabricated post and wallboard use, the pure solid concrete of truss weight ratio of use it is light, have to the economy and antidetonation of structure entirety Benefit, and a large amount of concrete and bar material can be saved, truss can be conducive to the connection between room, can become larger in forming chamber Space reaches the large space function of villa.
On the basis of above-described embodiment, in another embodiment of the utility model, such as Fig. 1~8,10 conduct of Core Walls Structure The shear wall-concrete truss overhanging construction vertical traffic core, the shear wall-concrete truss overhanging construction Stair or elevator setting are in the Core Walls Structure 10.Stability after forming Core Walls Structure 10 due to shear wall 6 is stronger, Core Walls Structure 10 Stress be better than the perpend wall that is separately provided, the escape route that Core Walls Structure 10 build as vertical traffic nuclear protection makes to build hair When Radix Rehmanniae shakes, guarantee the safety of staircase.
On the basis of above-described embodiment, in another embodiment of the utility model, such as Figure 11~13, the concrete truss 1 Concrete truss unit 4 including multiple horizontal splicings, the concrete truss unit 4 connects integral.In this way, concrete purlin 4 component of frame unit is smaller relatively light, is readily transported and lifts, whole by being assembled into monolithic concrete truss 1 in assembling process Body is relatively preferable, and installation effectiveness is high.
On the basis of above-described embodiment, in another embodiment of the utility model, such as Fig. 9, the concrete truss unit 4 is wrapped The concrete support 15 for including concrete frame 11 and being arranged in the concrete frame 11, the concrete frame 11 include perpendicular To web member 14, concrete frame 11 is separated into multiple polygon frames by the vertical web member 14, and the two of the concrete support 15 End is connected to the angle steel joint of the polygon frame.
It should be noted that vertical web member 14 is by concrete frame 11 when the frame of concrete frame 11 is non-bevelled Multiple quadrilateral frames are separated into, the both ends of the concrete branch are connected to the angle steel joint of the quadrilateral frame, work as concrete When a certain frame of frame 11 is bevel edge, then one of them polygon frame for being separated to form is triangle frame, in triangle frame No setting is required concrete support 15.
On the basis of above-described embodiment, in another embodiment of the utility model, such as Figure 10, in the concrete truss 1 Vacancy position is filled with foamed concrete 20 or sound insulationg board.In this way, passing through filling-foam concrete 20 or the plate girder then shape that insulates against sound At internal partition wall, the prefabricated rear mode installed is can be used in foamed concrete 20 in specific assembling process, and the mode poured can also be used Filling, triangle sound insulationg board then can be used self threading pin or nailing and connect with concrete truss unit 4.
On the basis of above-described embodiment, in another embodiment of the utility model, such as Fig. 9, the inner wall of the concrete frame Upper and lower part is equipped with the first built-in fitting 12, and the concrete support 15 includes diagonal brace, and the both ends of the diagonal brace are equipped with the Two built-in fittings 13, first built-in fitting 12 and the second built-in fitting 13 are detachably connected.In this way, not needing setting in building Local then can remove, mode changes relatively flexibly, and if desired later period house type is changed, want to get through in certain several room, meet Under the premise of structure stress, 15, directly formation large space can be supported with dismantling concrete.
On the basis of above-described embodiment, in another embodiment of the utility model, such as Fig. 9, first built-in fitting 12 and Two built-in fittings 13 include at least connecting plate, and the connecting plate is equipped with threaded connection hole, first built-in fitting 12 and second Built-in fitting 13 is connected by bolt 21.In this way, assembly and disassembly is easy, and connect reliable.
On the basis of above-described embodiment, in another embodiment of the utility model, such as Figure 11, the concrete truss unit 4 Splice side and be equipped with notch 16 and vertical jack hole, the concrete truss unit 4 mutually spliced splices side and forms accommodation groove, the appearance It sets and is equipped with link block 8 in slot, the link block 8 also is provided with vertical jack hole, and the vertical jack hole of the link block 8 is mixed with described The vertical jack hole of solidifying soil truss element 4 is connected, and wears to connect muscle 9 and wear and connects the vertical jack hole for the link block 8 and coagulation Native truss element 4 connects integral.
On the basis of above-described embodiment, in another embodiment of the utility model, such as Figure 12, the concrete truss unit 4 For triangular structure, the bevel edge of two concrete truss units 4 is spliced to form truss module, multiple horizontally-spliced structures of truss module At concrete truss 1.In this way, the triangular member can form standard module, it can largely be produced without make-to-order, there is demand When it is directly assembled, there is welding, bolt 21 to connect two ways and form entirety, this concrete truss unit 4 produces mould Tool standardization, modularization, it is high-efficient.
On the basis of above-described embodiment, in another embodiment of the utility model, such as Figure 13, concrete truss unit 4 is equipped with Built-in connection 5, the splicing side of the built-in connection 5 concrete truss unit 4, the pre-buried company mutually spliced Fitting 5 welds integral.
On the basis of above-described embodiment, in another embodiment of the utility model, such as Figure 14, the concrete on the upper layer of same row Truss 1 is fixedly connected integral with the concrete truss 1 of lower layer, and the top and bottom of the concrete truss 1, which are respectively equipped with, stretches Muscle 22 and injected hole 18 out, the stretching muscle 22 of the concrete truss 1 of lower part stretch to the injected hole of the concrete truss 1 on top In 18, mortar is perfused in the injected hole 18.In this way, the concrete truss 1 of lower layer and the concrete truss 1 on upper layer connect into It is whole, 1 structure of multi-layer concrete truss is formed, can be applied to multi-story structure, above-mentioned connection is reliable, levels concrete truss 1 forms effective dry type connection, can reduce wet construction, be conducive to the conduction of power between levels concrete truss 1, while significantly Field erected efficiency is improved, construction speed is improved.
On the basis of above-described embodiment, in another embodiment of the utility model, such as Figure 15, the setting of precast floor slab 3 exists Between the concrete truss 1 on the upper layer and the concrete truss 1 of lower layer, the precast floor slab 3 and concrete truss 1 are equipped with Jack hole, the concrete truss 1 and precast floor slab 3 of neighbouring setting are connected by bolt 21, and the concrete truss 1 is equipped with Jack hole, the bolt 21 wear the jack hole of the concrete truss 1 for connecting layer, precast floor slab 3 and the concrete truss 1 on upper layer And it is fastened by nut.
On the basis of above-described embodiment, in another embodiment of the utility model, such as Figure 16~18, the precast floor slab 3 is taken It connects on the concrete truss 1 and is fixedly connected with the concrete truss 1, the splicing side of the precast floor slab 3 is equipped with slot Mouth 16 and convex block 17, the convex block 17 are overlapped on the concrete frame 11.In this way, making full use of the knot of concrete truss 1 Structure feature, and it is equipped with notch 16 and convex block 17 in the splicing side of precast floor slab 3, precast floor slab 3 is overlapped in assembling process mixed The two is fixedly connected while on solidifying soil truss 1, bottom and 11 phase of concrete frame of vertical web member 14, concrete support 15 Part even can be then accommodated in the notch 16, and precast floor slab 3 delivers load to concrete truss 1.And the utility model The pure solid concrete of truss weight ratio of use it is light, be conducive to antidetonation, and a large amount of concrete and bar material can be saved, this The standardization of utility model production mould, modularization, high-efficient, truss can be conducive to the connection between room, form different function Energy.
On the basis of above-described embodiment, in another embodiment of the utility model, such as Figure 17 and Figure 18, the concrete frame 11 are equipped with stretching muscle 22, and the convex block 17 of the precast floor slab 3 is equipped with jack hole, and the stretching muscle 22, which is worn, connects the jack hole, institute It states and is perfused with grouting material in jack hole.In this way, above structure is conducive to the conduction of power between precast floor slab 3 and concrete truss 1, Field erected efficiency is greatly improved simultaneously, improves construction speed, it can be by precast floor slab 3 and concrete truss by grouting material 1 connection it is integral, and then increase structure globality, connect it is more reliable, can operative constraint precast floor slab 3 end, it is ensured that This connecting node is destroyed smaller under geological process or even is not destroyed.The grouting material is preferably mortar.
On the basis of above-described embodiment, in another embodiment of the utility model, such as Figure 19, the shear wall 6 and concrete Truss 1 splices, and the splicing side of the shear wall 6 and concrete truss 1, which is equipped with, stretches out muscle 22, the 22 phase interconnection of stretching muscle of the two It connects, is connect shear wall 6 with concrete truss 1 by casting concrete sleeper 23, the stretching muscle 22 is anchored at the coagulation In native sleeper 23.
On the basis of above-described embodiment, in another embodiment of the utility model, states and is equipped with notch at the top of concrete truss 1, The both ends of the precast beam 2 are overlapped on respectively in the notch at 1 top of two rows of concrete truss being disposed adjacent, the coagulation Native truss 1 is equipped with connector, and the precast beam 2 is equipped with jack hole, and the top of the precast beam 2 is equipped with recess, the jack hole It is connected to the recess, the connector passes through the jack hole and protrudes into the recess, and fastener, institute are equipped in the recess Fastener is stated to be connected with the connector.
The utility model by insertion precast beam 2 jack hole in connector and fastener by concrete truss 1 with Precast beam 2 forms effective dry type connection, in assembling process, after concrete truss 1 is vertical good, it is only necessary in hanging for precast beam 2 During dress by the lapping ends of precast beam 2 in the notch that concrete truss 1 is set, while making described in connector insertion It in jack hole and recess in precast beam 2, is then fastened by fastener, above structure is conducive to concrete truss 1 The conduction of power between precast beam 2, while field erected efficiency is greatly improved, improve construction speed.
On the basis of above-described embodiment, in another embodiment of the utility model, the connector is screw rod, the fastener For nut, one end of the screw rod is anchored in the concrete truss 1, and the other end, which is worn, connects the nut.
On the basis of above-described embodiment, in another embodiment of the utility model, it is perfused in the jack hole and recess Slurry.
A kind of calculating verification result under embodiment is as follows, as follows through finite element analysis computation verification result, such as Figure 20 institute Show, as seen from the figure, depth of building is 32 layers (total 96m high), the accumulative level of (seismic force is larger) under 8 degree of area's geological processes Displacement is 74.6mm, and every layer of horizontal displacement is about 2.33mm (74.6/32=2.33), story drift 1/1288 (2.33/3000, wherein 3000mm is that layer is high), less than the limit value of 1/1200 angle of displacement most stringent of in assembled high-level structure, Meet shockproof requirements.Therefore the structure is suitable for the situation that the number of plies is high, seismic force is larger.
As shown in figure 21, depth of building is 32 layers (total 96m high), and under 8 degree of area's geological processes, overhanging part is vertical Vertical displacement under load and earthquake load is up to 62mm, and overhanging total distance is 16m, and the deflection limit value of cantilever member is 2* 16000/400=80mm, vertical maximum displacement is less than deflection limit value, therefore the cantilevered structure can satisfy structure safety and use It is required that.
The above is only the preferred embodiment of the utility model, it is noted that for the common skill of the art For art personnel, without departing from the principle of this utility model, several improvements and modifications can also be made, these improve and Retouching also should be regarded as the protection scope of the utility model.

Claims (10)

1. a kind of shear wall-concrete truss overhanging construction, which is characterized in that single including at least two overhangings setting up and down Member, the overhanging unit are multilayered structure, and with respect to its adjacent lower, laterally overhanging is pre- for the one end on the upper layer of the overhanging unit Set a distance, the other end laterally take in preset distance, and the overhanging for the overhanging unit being disposed adjacent is contrary, the shear wall- Concrete truss overhanging construction includes the cantilever part of vertical load-bearing main body and overhanging outside the vertical load-bearing main body, Every layer of the shear wall-concrete truss overhanging construction is equipped with shear wall and concrete truss, the concrete truss Longitudinal to be equipped with multiple rows of, the shear wall is along the whole cloth continuous from bottom to top of fabricated shear wall-concrete truss overhanging construction Set and be surrounded by least one Core Walls Structure, the Core Walls Structure is arranged within the scope of the vertical load-bearing main body, same layer it is multiple rows of It is connected between concrete truss by precast beam, precast floor slab is fixedly connected with the concrete truss and/or shear wall, described Shear wall is at least fixedly connected with the concrete truss of row's same layer, the concrete truss on the upper layer of same row and mixing for lower layer Solidifying soil truss is fixedly connected integral.
2. shear wall according to claim 1-concrete truss overhanging construction, which is characterized in that the Core Walls Structure is made For the shear wall-concrete truss overhanging construction vertical traffic core, the shear wall-concrete truss overhanging construction Stair or elevator setting in the Core Walls Structure.
3. shear wall according to claim 1-concrete truss overhanging construction, which is characterized in that the concrete purlin Frame includes the concrete truss unit of multiple horizontal splicings, and the concrete truss unit connection is integral.
4. shear wall according to claim 3-concrete truss overhanging construction, which is characterized in that the concrete purlin Frame unit includes concrete frame and the concrete support that is arranged in the concrete frame, and the concrete frame includes perpendicular To web member, concrete frame is separated into multiple polygon frames by the vertical web member, and the both ends of the concrete support are connected to The angle steel joint of the polygon frame.
5. shear wall according to claim 4-concrete truss overhanging construction, which is characterized in that the concrete purlin Vacancy position in frame is filled with foamed concrete or sound insulationg board.
6. shear wall according to claim 4-concrete truss overhanging construction, which is characterized in that the concrete frame The upper and lower part of inner wall be equipped with the first built-in fitting, the concrete support includes diagonal brace, and the both ends of the diagonal brace are all provided with There is the second built-in fitting, first built-in fitting and the second built-in fitting are detachably connected.
7. the shear wall according to claim 3~6 any one-concrete truss overhanging construction, which is characterized in that institute Concrete truss unit spliced side is stated equipped with notch and vertical jack hole, the concrete truss unit spliced side mutually spliced is formed Accommodation groove, the accommodation groove is interior to be equipped with link block, and the link block also is provided with vertical jack hole, and vertically wearing for the link block connects Hole is connected with the vertical jack hole of the concrete truss unit, wears to connect muscle and wear and connects the vertical jack hole for the link block It is connected with concrete truss unit integral.
8. shear wall according to claim 7-concrete truss overhanging construction, which is characterized in that the upper layer of same row Concrete truss be fixedly connected with the concrete truss of lower layer integral, the top and bottom of the concrete truss are set respectively Have and stretches out muscle and injected hole, in the injected hole for the concrete truss that the stretching muscle of the concrete truss of lower part stretches to top, institute It states and is perfused with mortar in injected hole.
9. shear wall according to claim 8-concrete truss overhanging construction, which is characterized in that the precast floor slab It is arranged between the concrete truss on the upper layer and the concrete truss of lower layer, the precast floor slab and concrete truss are equipped with Jack hole, the concrete truss and precast floor slab of neighbouring setting are bolted, and the concrete truss is equipped with to wear and connect Hole, the bolt wear the concrete truss for connecting layer, the jack hole of precast floor slab and the concrete truss on upper layer and pass through spiral shell Mother's fastening.
10. shear wall according to claim 9-concrete truss overhanging construction, which is characterized in that the shear wall with The splicing side of concrete truss splicing, the shear wall and concrete truss is equipped with stretching muscle, the stretching muscle phase interconnection of the two It connects, is connect shear wall with concrete truss by casting concrete sleeper, the stretching muscle is anchored at the concrete sleeper It is interior.
CN201821342042.3U 2018-08-20 2018-08-20 A kind of shear wall-concrete truss overhanging construction Withdrawn - After Issue CN209412976U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201821342042.3U CN209412976U (en) 2018-08-20 2018-08-20 A kind of shear wall-concrete truss overhanging construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201821342042.3U CN209412976U (en) 2018-08-20 2018-08-20 A kind of shear wall-concrete truss overhanging construction

Publications (1)

Publication Number Publication Date
CN209412976U true CN209412976U (en) 2019-09-20

Family

ID=67930142

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201821342042.3U Withdrawn - After Issue CN209412976U (en) 2018-08-20 2018-08-20 A kind of shear wall-concrete truss overhanging construction

Country Status (1)

Country Link
CN (1) CN209412976U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109281394A (en) * 2018-08-20 2019-01-29 中民筑友科技投资有限公司 A kind of shear wall-concrete truss overhanging construction

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109281394A (en) * 2018-08-20 2019-01-29 中民筑友科技投资有限公司 A kind of shear wall-concrete truss overhanging construction
CN109281394B (en) * 2018-08-20 2023-08-29 中民筑友科技投资有限公司 Shear wall-concrete truss overhanging type building

Similar Documents

Publication Publication Date Title
CN109072604A (en) Use the method for constructing multi-story structure of stacked structure steel wall truss
CN105297893B (en) Mortise and tenon type concrete composite beam cross connecting structure and its construction method
CN205875394U (en) Antidetonation concrete beam column that dry process is connected
CN209412984U (en) A kind of building
CN209412976U (en) A kind of shear wall-concrete truss overhanging construction
CN109281390A (en) A kind of assembly concrete truss shear wall building structure
CN209412968U (en) A kind of assembly concrete truss shear wall building structure
CN209412983U (en) A kind of assembled interlayer arrangement concrete truss overhanging construction
CN209412967U (en) A kind of assembly concrete truss building structure
CN106088328A (en) A kind of group frame
CN209412982U (en) A kind of interlayer cantilevered concrete truss formula building
Charnish et al. The bow: Unique diagrid structural system for a sustainable tall building
CN109281478A (en) A kind of assembly method of shear wall-concrete truss overhanging construction
CN109372123A (en) A kind of interlayer cantilevered concrete truss formula building
CN109281394A (en) A kind of shear wall-concrete truss overhanging construction
CN215977672U (en) Assembled beam column connected node
CN109372097A (en) A kind of assembly concrete truss building structure
CN109281405A (en) A kind of assembled interlayer arrangement concrete truss overhanging construction
CN109372101A (en) A kind of assembly method of assembled interlayer arrangement concrete truss overhanging construction
CN109281404A (en) A kind of building
CN109281395A (en) A kind of assembly method of assembly concrete truss building
CN209412977U (en) A kind of precast concrete truss element and precast concrete truss
CN109372100A (en) A kind of assembly method of assembly concrete truss shear wall building
CN109372266A (en) A kind of assembly method of interlayer cantilevered concrete truss formula building
CN2584693Y (en) Building wall

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CP03 Change of name, title or address
CP03 Change of name, title or address

Address after: 5 / F, office building 2, Zhongmin zhuyou Co., Ltd., No. 10, Zhongshi Road, shaping street, Kaifu District, Changsha City, Hunan Province, 410000

Patentee after: Zhuyou Zhizao Technology Investment Co.,Ltd.

Address before: No. 10, Zhongshi Road, Kaifu District, Changsha City, Hunan Province, 410205

Patentee before: Zhongmin Zhuyou Technology Investment Co.,Ltd.

EE01 Entry into force of recordation of patent licensing contract
EE01 Entry into force of recordation of patent licensing contract

Assignee: Linzhou Hantai Construction Labor Service Co.,Ltd.

Assignor: Zhuyou Zhizao Technology Investment Co.,Ltd.

Contract record no.: X2021980009995

Denomination of utility model: A shear wall concrete truss cantilever building

Granted publication date: 20190920

License type: Common License

Record date: 20210929

EE01 Entry into force of recordation of patent licensing contract
EE01 Entry into force of recordation of patent licensing contract

Assignee: Hunan Shangyi Engineering Labor Service Co.,Ltd.

Assignor: Zhuyou Zhizao Technology Investment Co.,Ltd.

Contract record no.: X2021980010464

Denomination of utility model: A shear wall concrete truss cantilever building

Granted publication date: 20190920

License type: Common License

Record date: 20211011

AV01 Patent right actively abandoned
AV01 Patent right actively abandoned
AV01 Patent right actively abandoned

Granted publication date: 20190920

Effective date of abandoning: 20230829

AV01 Patent right actively abandoned

Granted publication date: 20190920

Effective date of abandoning: 20230829