CN103741712A - 挡土墙施工方法 - Google Patents

挡土墙施工方法 Download PDF

Info

Publication number
CN103741712A
CN103741712A CN201410021144.5A CN201410021144A CN103741712A CN 103741712 A CN103741712 A CN 103741712A CN 201410021144 A CN201410021144 A CN 201410021144A CN 103741712 A CN103741712 A CN 103741712A
Authority
CN
China
Prior art keywords
wall body
wall
concrete
retaining wall
steel bars
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201410021144.5A
Other languages
English (en)
Other versions
CN103741712B (zh
Inventor
郑舟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China 19th Metallurgical Group Co ltd
Original Assignee
China 19th Metallurgical Group Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China 19th Metallurgical Group Co ltd filed Critical China 19th Metallurgical Group Co ltd
Priority to CN201410021144.5A priority Critical patent/CN103741712B/zh
Publication of CN103741712A publication Critical patent/CN103741712A/zh
Application granted granted Critical
Publication of CN103741712B publication Critical patent/CN103741712B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Retaining Walls (AREA)

Abstract

本发明涉及一种挡土墙施工方法:开挖土方;铺设钢筋;用混凝土浇注形成挡土墙的墙踵、墙趾和墙身下部;并保证埋设在混凝土部内的竖向钢筋从墙身下部的上面露出;在墙身下部上表面砌筑水泥空心砖,所述竖向钢筋穿过水泥空心砖的孔洞;砌筑到预设高度后,在该层水泥空心砖上面设置横向钢筋,横向钢筋与竖向钢筋绑扎在一起;向所有水泥空心砖内部注满混凝土,混凝土包裹住竖向钢筋和横向钢筋;重复上述步骤,直到砌筑至墙身设计高度。本发明的施工方法修筑完成的挡土墙相对于一般毛石砌筑的挡土墙,减少了土方开挖量,且挡土墙强度更高。并且由于不需要采用大块毛石砌筑,使得施工过程简单快速,尤其适用于场地狭小的施工环境。

Description

挡土墙施工方法
技术领域
本发明涉及一种挡土墙的施工方法。
背景技术
挡土墙是用于维持路基或山坡土体稳定的一种常用建筑结构,其基本原理在于,在路基或山坡侧面修筑墙体,利用墙体阻挡土体滑落,并承受土体压力。现在技术中为了提高挡土墙对土体的支撑力,通常采用增加挡土墙厚度的方法,但这样会导致土方开挖量的增加,提高工程费用,如果在有开挖限制的施工场地,想要增加挡土墙厚度则更加困难。
发明内容
本发明所要解决的技术问题是:提供一种挡土墙施工方法,只需相对较少的土方开挖量即可修筑成强度足够的挡土墙。
本发明解决其技术问题所采用的技术方案是:
挡土墙施工方法,包括修筑基础和墙身的步骤,修筑基础和墙身的步骤为:
A、根据基础的设计开挖土方;在挖好的空间铺设钢筋;用混凝土浇注形成混凝土部,所述混凝土部包括挡土墙的墙踵、墙趾和墙身下部;并保证埋设在混凝土部内的竖向钢筋从墙身下部的上面露出;所述墙踵和墙趾即为基础;
B、在墙身下部上表面用砂浆砌筑水泥空心砖,所述竖向钢筋穿过水泥空心砖的孔洞;
C、在水泥空心砖砌筑到预设高度后,在该层水泥空心砖上面设置横向钢筋,横向钢筋与竖向钢筋绑扎在一起;向所有水泥空心砖内部注满混凝土,混凝土包裹住竖向钢筋和横向钢筋;
D、然后在该层水泥空心砖上继续用砂浆砌筑水泥空心砖,并重复上述C步骤,直到砌筑至墙身设计高度,当竖向钢筋长度不够时,对钢筋进行搭接延长;所述砌筑的所有水泥空心砖部分即为墙身上部,所述墙身下部和墙身上部构成挡土墙的墙身。
进一步的,还包括修筑墙身排水系统的步骤:修筑过程中,在所述墙身下部或墙身上部预设排水管;所述墙身上部修筑完成后,在墙身下部或墙身上部后方的排水管管口处,设置碎石滤水层;所述排水管与碎石滤水层连通。
进一步的,还包括修筑墙顶排水沟的步骤:基础、墙身、墙身排水系统修筑好后,在挡土墙后用泥土回填,在所述墙身上部后侧修筑墙顶排水沟。
本发明的有益效果是:由于采用水泥空心砖砌筑墙身,在空心砖内部空间贯穿竖向钢筋,每层砖缝之间设置横向钢筋,再灌注混凝土形成一体,本发明的施工方法修筑完成的挡土墙相对于一般毛石砌筑的挡土墙,减少了土方开挖量,且强度更高;并且由于不需要采用大块毛石砌筑,使得施工过程简单快速,尤其适用于场地狭小的施工环境。
附图说明
图1是本发明方法修筑的挡土墙一种实施例的示意图;
图中附图标记为:1-混凝土部、11-墙踵、12-墙趾、21-墙身下部、22-墙身上部、31-竖向钢筋、32-横向钢筋、4-碎石滤水层、41-排水管、5-排水沟。
具体实施方式
下面结合附图和实施例对本发明进一步说明:如图1所示:
挡土墙施工方法,包括修筑基础和墙身的步骤,修筑基础和墙身的步骤为:
A、根据基础的设计开挖土方;在挖好的空间铺设钢筋;用混凝土浇注形成混凝土部1,所述混凝土部1包括挡土墙的墙踵11、墙趾12和墙身下部21;并保证埋设在混凝土部1内的竖向钢筋31从墙身下部21的上面露出;所述墙踵11和墙趾12即为基础;
B、在墙身下部21上表面用砂浆砌筑水泥空心砖,所述竖向钢筋31穿过水泥空心砖的孔洞;
C、在水泥空心砖砌筑到预设高度后,在该层水泥空心砖上面设置横向钢筋32,横向钢筋32与竖向钢筋31绑扎在一起;向所有水泥空心砖内部注满混凝土,混凝土包裹住竖向钢筋31和横向钢筋32;
D、然后在该层水泥空心砖上继续用砂浆砌筑水泥空心砖,并重复上述C步骤,直到砌筑至墙身设计高度,当竖向钢筋31长度不够时,对钢筋进行搭接延长;所述砌筑的所有水泥空心砖部分即为墙身上部22,所述墙身下部21和墙身上部22构成挡土墙的墙身。
本发明的挡土墙施工方法,是先按照设计,用混凝土浇筑形成混凝土部1,所述混凝土部1包括挡土墙的墙踵11、墙趾12和墙身下部21。
然后,在墙身下部21上用水泥空心砖继续砌筑墙身上部22,砌筑用的水泥空心砖的孔洞尺寸要满足钢筋能够顺利穿过,并且在孔洞内注入的混凝土能够充分包裹钢筋。例如190mm×190mm×400mm的两孔水泥空心砖。将空心砖用砂浆砌筑在墙身下部21上,并且让墙身下部21露出的竖向钢筋31穿过空心砖的孔。各条竖向钢筋31之间的间距和钢筋的规格,可以根据实际情况选择,为了达到更高的强度,可以选择较粗的钢筋和较小的竖向钢筋31间隔。
当水泥空心砖砌筑到预设高度后,在该层水泥空心砖上面设置横向钢筋32,横向钢筋32与竖向钢筋31绑扎在一起,这里的预设高度根据实际情况选择,为达到墙体更高强度可以选择较小的高度设置横向钢筋32,最后修筑完成的挡土墙的内部横向钢筋排布会更加紧密,通常该预设高度选择400mm~800mm。
上述步骤完成后,向所有水泥空心砖内部注满混凝土,混凝土包裹住竖向钢筋31和横向钢筋32。优选的,为了满足强度要求和更好的填充水泥空心砖内的空隙,灌注水泥空心砖的混凝土可以采用细石混凝土,例如C30细石混凝土。
然后,在水泥空心砖上继续用砂浆砌筑水泥空心砖,并且重复上述步骤,直到砌筑至墙身设计的高度,如果竖向钢筋31长度不够,则钢筋进行搭接延长。混凝土部1上方用水泥空心砖砌筑的部分即为墙身上部22。
所述的墙踵11和墙趾12即为挡土墙的基础,所述墙身下部21和墙身上部22构成挡土墙的墙身。
根据实际情况,如果墙身设计比较高,还可以在墙身下部21上面,用水泥空心砖砌筑一层护脚,护脚的砌筑方法可以采用上述的砌筑墙身上部22的相同方法。
本发明的挡土墙施工方法,由于采用了水泥空心砖砌筑形成墙身,相对于用毛石砌筑挡土墙土方开挖量也大大减少,而且施工过程也更加简便快速,由于在水泥空心砖砌体内穿插横向和竖向钢筋,使得修筑好的挡土墙强度也高于一般的毛石挡土墙。
本发明的挡土墙施工方法,可以还包括修筑墙身排水系统的步骤:修筑过程中,在所述墙身下部21或墙身上部22预设排水管41;所述墙身上部22修筑完成后,在墙身下部21或墙身上部22后方的排水管41管口处,设置碎石滤水层4;所述排水管41与碎石滤水层4连通。
该墙身排水系统的修筑方法是在修筑墙身的过程中,事先预设好排水管41,根据情况排水管41也可以替换为排水沟。待整个基础和墙身修筑完成后,在墙身下部21后方填土夯实,填土到达滤水层的设计位置时铺设碎石滤水层4,碎石滤水层4与排水管41连通。所述墙身排水系统用于快速排出浸入墙后土体的水份。
本发明的挡土墙施工方法,可以还包括修筑墙顶排水沟的步骤:基础、墙身、墙身排水系统修筑好后,在挡土墙后用泥土回填,在所述墙身上部22后侧修筑墙顶排水沟5。所述排水沟5用于山坡土体表面的排水。

Claims (3)

1.挡土墙施工方法,包括修筑基础和墙身的步骤,其特征在于,修筑基础和墙身的步骤为:
A、根据基础的设计开挖土方;在挖好的空间铺设钢筋;用混凝土浇注形成混凝土部(1),所述混凝土部(1)包括挡土墙的墙踵(11)、墙趾(12)和墙身下部(21);并保证埋设在混凝土部(1)内的竖向钢筋(31)从墙身下部(21)的上面露出;所述墙踵(11)和墙趾(12)即为基础;
B、在墙身下部(21)上表面用砂浆砌筑水泥空心砖,所述竖向钢筋(31)穿过水泥空心砖的孔洞;
C、在水泥空心砖砌筑到预设高度后,在该层水泥空心砖上面设置横向钢筋(32),横向钢筋(32)与竖向钢筋(31)绑扎在一起;向所有水泥空心砖内部注满混凝土,混凝土包裹住竖向钢筋(31)和横向钢筋(32);
D、然后在该层水泥空心砖上继续用砂浆砌筑水泥空心砖,并重复上述C步骤,直到砌筑至墙身设计高度,当竖向钢筋(31)长度不够时,对钢筋进行搭接延长;所述砌筑的所有水泥空心砖部分即为墙身上部(22),所述墙身下部(21)和墙身上部(22)构成挡土墙的墙身。
2.如权利要求1所述的挡土墙施工方法,其特征在于,还包括修筑墙身排水系统的步骤:修筑过程中,在所述墙身下部(21)或墙身上部(22)预设排水管(41);所述墙身上部(22)修筑完成后,在墙身下部(21)或墙身上部(22)后方的排水管(41)管口处,设置碎石滤水层(4);所述排水管(41)与碎石滤水层(4)连通。
3.如权利要求2所述的挡土墙施工方法,其特征在于,还包括修筑墙顶排水沟的步骤:基础、墙身、墙身排水系统修筑好后,在挡土墙后用泥土回填,在所述墙身上部(22)后侧修筑墙顶排水沟(5)。
CN201410021144.5A 2014-01-16 2014-01-16 挡土墙施工方法 Active CN103741712B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410021144.5A CN103741712B (zh) 2014-01-16 2014-01-16 挡土墙施工方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410021144.5A CN103741712B (zh) 2014-01-16 2014-01-16 挡土墙施工方法

Publications (2)

Publication Number Publication Date
CN103741712A true CN103741712A (zh) 2014-04-23
CN103741712B CN103741712B (zh) 2015-06-03

Family

ID=50498771

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410021144.5A Active CN103741712B (zh) 2014-01-16 2014-01-16 挡土墙施工方法

Country Status (1)

Country Link
CN (1) CN103741712B (zh)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105649106A (zh) * 2016-03-04 2016-06-08 中国建筑第八工程局有限公司 钢管骨肋的挡土墙结构及其施工方法
CN110093900A (zh) * 2019-05-28 2019-08-06 中国电建集团贵阳勘测设计研究院有限公司 一种嵌入式混凝土防滑凸榫浆砌石挡土墙
CN110258621A (zh) * 2019-04-30 2019-09-20 上海二十冶建设有限公司 便于快速施工的装配式挡土墙

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS61165424A (ja) * 1983-08-02 1986-07-26 Toyo Jitsugyo Kk 耐震性増大の新型擁壁工法
JPH04106221A (ja) * 1990-08-27 1992-04-08 Ozawa Concrete Kogyo Kk 壁体の施工法および壁体背面土の排水方法
JPH05230845A (ja) * 1992-02-25 1993-09-07 Toyo Giken Kk L型ブロック擁壁の構造およびその施工方法
JPH08253944A (ja) * 1995-03-16 1996-10-01 Takaaki Endo 大型擁壁の構築方法
JPH10176338A (ja) * 1996-12-17 1998-06-30 Haneda Concrete Kogyo Kk L形擁壁の構築方法
KR20020076530A (ko) * 2001-03-29 2002-10-11 김상수 블록식 녹화 옹벽
CN101787708A (zh) * 2010-02-10 2010-07-28 黄靓 一种装配整体式悬臂式挡土墙及其施工方法
CN102852160A (zh) * 2012-10-06 2013-01-02 朱维伟 用于艺术墙绘的复合结构挡墙及其施工方法

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS61165424A (ja) * 1983-08-02 1986-07-26 Toyo Jitsugyo Kk 耐震性増大の新型擁壁工法
JPH04106221A (ja) * 1990-08-27 1992-04-08 Ozawa Concrete Kogyo Kk 壁体の施工法および壁体背面土の排水方法
JPH05230845A (ja) * 1992-02-25 1993-09-07 Toyo Giken Kk L型ブロック擁壁の構造およびその施工方法
JPH08253944A (ja) * 1995-03-16 1996-10-01 Takaaki Endo 大型擁壁の構築方法
JPH10176338A (ja) * 1996-12-17 1998-06-30 Haneda Concrete Kogyo Kk L形擁壁の構築方法
KR20020076530A (ko) * 2001-03-29 2002-10-11 김상수 블록식 녹화 옹벽
CN101787708A (zh) * 2010-02-10 2010-07-28 黄靓 一种装配整体式悬臂式挡土墙及其施工方法
CN102852160A (zh) * 2012-10-06 2013-01-02 朱维伟 用于艺术墙绘的复合结构挡墙及其施工方法

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105649106A (zh) * 2016-03-04 2016-06-08 中国建筑第八工程局有限公司 钢管骨肋的挡土墙结构及其施工方法
CN110258621A (zh) * 2019-04-30 2019-09-20 上海二十冶建设有限公司 便于快速施工的装配式挡土墙
CN110093900A (zh) * 2019-05-28 2019-08-06 中国电建集团贵阳勘测设计研究院有限公司 一种嵌入式混凝土防滑凸榫浆砌石挡土墙
CN110093900B (zh) * 2019-05-28 2024-03-01 中国电建集团贵阳勘测设计研究院有限公司 一种嵌入式混凝土防滑凸榫浆砌石挡土墙

Also Published As

Publication number Publication date
CN103741712B (zh) 2015-06-03

Similar Documents

Publication Publication Date Title
CN106499413B (zh) 一种浅埋偏压段隧道地层加固施工方法
CN107201908B (zh) 一种酷寒地区隧道深埋中心水沟的施工方法
CN108035335A (zh) 一种冻结法施工井筒式地下停车库方法
CN105672348A (zh) 一种深水区砂卵石地层截除桥梁桩基的施工方法
CN106930321B (zh) 一种大直径顶管结合洞桩修建地下结构的施工方法
CN104100280B (zh) 一种双翼挑梁初期支护结构及其隧道施工方法
CN107119712A (zh) 一种连拱式挡土墙及其施工方法
CN206070508U (zh) 一种加固地基基础的装置
CN108843341A (zh) 一种桩墙一体式的隧道明洞结构及其施工方法
CN107905798A (zh) 采用中导洞法进行平顶直墙暗挖施工的方法
CN103422510A (zh) 钢管框架式围堰结构及施工方法
CN105464074A (zh) 一种人工挖孔桩高聚物注浆防护结构及其施工方法
CN205399474U (zh) 一种快速拼装现浇式加筋土挡墙
CN110284885A (zh) 盾构检修井施工方法
CN103741712B (zh) 挡土墙施工方法
CN110847929B (zh) 基于分区爆破的隧道洞口段预加固及开挖施工方法
CN101793027B (zh) 一种桩心注浆静压锚杆桩
CN205617390U (zh) 一种用于黄土地区的柔性面层基坑支护体系
CN103334450B (zh) 一种带排水沟的桩柱预制板挡土墙的施工方法
CN204000848U (zh) 一种用于水下施工的嵌岩桩
CN104060616B (zh) 一种支挡工程的施工模板及施工方法
KR20110019674A (ko) 지 더블유 기초보강공법
CN110821500B (zh) 穿越土石分界地层的大断面隧道开挖及支护施工方法
CN204919566U (zh) 一种软土地区塔吊基础施工支护结构
CN104594367B (zh) 一种组合式围堰结构及施工方法

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant