CN103738478B - Deepwater column exportation buoy - Google Patents

Deepwater column exportation buoy Download PDF

Info

Publication number
CN103738478B
CN103738478B CN201410036825.9A CN201410036825A CN103738478B CN 103738478 B CN103738478 B CN 103738478B CN 201410036825 A CN201410036825 A CN 201410036825A CN 103738478 B CN103738478 B CN 103738478B
Authority
CN
China
Prior art keywords
column
float body
turntable
defeated
floating drum
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201410036825.9A
Other languages
Chinese (zh)
Other versions
CN103738478A (en
Inventor
王晋
谢毅
李志刚
罗勇
张益公
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Cotec Inc
China National Offshore Oil Corp CNOOC
Offshore Oil Engineering Co Ltd
Original Assignee
BEIJING GAOTAI DEEP-SEA TECHNOLOGY Co Ltd
China National Offshore Oil Corp CNOOC
Offshore Oil Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by BEIJING GAOTAI DEEP-SEA TECHNOLOGY Co Ltd, China National Offshore Oil Corp CNOOC, Offshore Oil Engineering Co Ltd filed Critical BEIJING GAOTAI DEEP-SEA TECHNOLOGY Co Ltd
Priority to CN201410036825.9A priority Critical patent/CN103738478B/en
Publication of CN103738478A publication Critical patent/CN103738478A/en
Application granted granted Critical
Publication of CN103738478B publication Critical patent/CN103738478B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

A kind of Deepwater column exportation buoy, including:One float body, the turntable being located on float body, the turntable is connected by swivel bearing with float body, the float body is deep draft column formula structure, the bottom of column float body is provided with a permanent ballast tank, top is provided with ballast tank at Water Plane;Meanwhile, the free period of the rolling of the column float body, pitching and heave movement is more than 20 seconds, with away from the main energy range of wave.The present invention is applied widely, can not only be served in the marine site of harsh environmental conditions, can also be served in the excellent marine site of condition;Moreover, greatly improving the exercise performance of outer defeated floating drum, the long-range outer defeated operation under deep water sea area severe sea condition is realized;Meanwhile, it is greatly lowered the design difficulty of outer petroleum pipeline and mooring system, it is possible to save outer defeated and mooring system cost.

Description

Deepwater column exportation buoy
Technical field
The present invention relates to crude oil exporting device, more particularly to a kind of floating platform crude oil being applied under deep water adverse circumstances Outer defeated Deepwater column exportation buoy.Belong to ocean engineering field.
Background technology
Crude oil exporting is an important component of offshore oil field development, directly influences the economy of whole oil field development Benefit.So far, the outer defeated pattern for Crude Oil at Sea has two kinds of forms, and one is:It is defeated outside submarine pipeline;Two are:Wear at sea It is defeated outside shuttle oil tanker.
Although it will not be influenceed to make oil field stop production by environmental weather conditions using output oil outside submerged pipeline, and pipeline Operation management expense is relatively low, but the investment cost that submerged pipeline is built is at a relatively high, with larger investment risk, once spread If, it is necessary to there is sufficiently high crude output to reclaim the huge investment of submerged pipeline.Such as:U.S. Mexico gulf, Submarine Pipeline Road system is highly developed and intensive, therefore, and crude oil exporting relies primarily on submarine pipeline system.
And for other deep water sea areas in the world, such as:Marginal basins, West Africa marine site, Brazil, Southeast Asia etc., due to seabed Pipe-line system is less-developed, defeated system outside marine shuttle tanker, is still the major way of current offshore oilfield crude oil exporting.
Defeated system is generally comprised outside marine shuttle tanker:Floating type oil storage platform, mooring facilities and shuttle tanker.Utilize shuttle The most distinguishing feature that oil tanker carries out crude oil exporting is small investment, and facility is reusable, can be used in multiple offshore oilfields and opens The crude oil exporting task of hair, it is easy to use, investment risk will not be produced because of the small limitation of oilfield reserve.Typically can be according to oil field Yield, the ability of oil storage facility and oil field offshore distance, selection one or several shuttle tankers transport oil.
It is different according to berthing mode, it is divided into using defeated outside shuttle tanker progress:String reclining;Other reclining;Long-range outer defeated formula. Wherein, defeated outside string reclining and other reclining, it is offshore oilfield Floating Production oil storage system (FPS0) typically to require floating type oil storage platform, And the general ship form design or single point mooring system having as shuttle tanker.
As shown in Fig. 2 at present, the existing outer defeated floating drum of tradition is shallow draft list barrel shape structure, generally by barrel shape structure master Body 201 and the turntable 202 being located on barrel shape main structure body 201 are constituted, wherein, turntable 202 passes through rotation with barrel shape main structure body 101 Connection is held in rotating shaft, to realize the relative rotation between turntable 202 and barrel shape main structure body 101;Barrel shape diameter of movement is general 20 Rice or so, drinking water is general at 10 meters or so.
The existing outer defeated floating drum of tradition has simple in construction, and materials compare province, transport and install relatively inexpensive advantage.But It is very good that it is only applicable to the environmental conditions such as West Africa, the less region of wave;Therefore, such a outer defeated floating drum is in West Africa marine site It is widely used.It has the disadvantage, due to outer defeated floating drum motion free period (in design, be mainly in view of rolling, Pitching and heave) it is general at 10 seconds or so, close to the main energy range of wave, so, its exercise performance is excessively poor, externally defeated The design requirement of oil pipe and anchor system is very high, it is impossible to applied to environmental condition rather harsh, the larger marine site of wave, such as:Nan Zhong State sea, the North Sea, the other marine sites of Brazil and the world.
The content of the invention
It is a primary object of the present invention to overcome the disadvantages mentioned above that prior art is present, and provide outside a kind of deep water column Defeated floating drum, its is applied widely, can not only be served in the marine site of harsh environmental conditions, can also be served in the excellent sea of condition Domain;Moreover, greatly improving the exercise performance of outer defeated floating drum, the long-range outer defeated behaviour under deep water sea area severe sea condition is realized Make;Meanwhile, be greatly lowered the design difficulty of outer petroleum pipeline and mooring system, it is possible to save it is outer it is defeated and mooring system into This.
The purpose of the present invention is realized by following technical scheme:
A kind of Deepwater column exportation buoy, including:One float body, it is characterised in that:Also include:It is located at float body On turntable, the turntable is connected by swivel bearing with float body, and the float body is deep draft column formula structure, in column The bottom of formula float body is provided with a permanent ballast tank, and top is provided with ballast tank at Water Plane;Meanwhile, the column The free period of the rolling of formula float body, pitching and heave movement is more than 20 seconds, with away from the main energy range of wave.
The calculation formula of the free period of column float body motion is:In formula, M is:It is floating The quality and additional mass sum of body;K is:The stiffness coefficient of the freedom of motion.
The middle part of the column float body, outer petroleum pipeline junction have been disposed about outer oil transportation tube connector basis knot Structure, outer defeated ground cable foundation structure;Meanwhile, the near middle of column float body there also is provided anchor chain.
The turntable is connected as a single entity with cable arm, and cable arm is connected by turntable with outer defeated floating drum, and outer defeated floating drum is by being Cable is connected with shuttle tanker.
The cable arm is in extension structure, i.e.,:Cable arm extends outward and down a setpoint distance, forms cable arm One inverted "L" shaped, to reduce the shuttle tanker tilting moment that externally defeated floating drum is produced.
At deck at the top of the turntable, top attachment structure is provided with, top attachment structure is slab and girder.
The column float body is connected and composed by several deep elongated legs that absorb water, the cylinder of column float body Centre, middle part anchor chain and outer petroleum pipeline junction, be provided with middle portion connecting structure, portion connecting structure is in this:Truss structure Or slab and girder, cylinder and support anchor chain and outer petroleum pipeline to connect column float body.
The permanent ballast tank is connected between the cylinder of column float body, and permanent ballast tank is tied for closed in space Structure.
Beneficial effects of the present invention:The present invention is due to using above-mentioned technical proposal, and its is applied widely, can not only be on active service In the marine site of harsh environmental conditions, the excellent marine site of condition can be also served in;Moreover, greatly improving the fortune of outer defeated floating drum Dynamic performance, realizes the long-range outer defeated operation under deep water sea area severe sea condition;Meanwhile, make setting for the sharp mooring system of outer petroleum pipeline Meter difficulty is greatly lowered, it is possible to save outer defeated and mooring system cost.
Brief description of the drawings:
Fig. 1 is defeated layout drawing outside offshore oilfield distance type of the present invention.
Fig. 2 is defeated floating drum dimensional structure diagram outside existing traditional deep water.
Fig. 3 A are defeated floating drum perspective view outside column deep water of the present invention.
Fig. 3 B are defeated floating drum side view outside column deep water of the present invention.
Major Symbol explanation in figure:
101. Floating Storage ship, 102. anchoring systems, 103. outer petroleum pipelines, defeated floating drum outside 104., 105. anchoring systems, 106. flotation hose, 107. heaving piles, 108. shuttle tankers, 201. barrel shape main structure bodies, 202. turntables, 300. Water Planes, 301. Column float body, 302. turntables, 303. ballast tanks, 304. buoyancy compartments, 305. permanent ballast tanks, 306. cable arms, Defeated ground cable basis is tied outside for 307. outer petroleum pipeline pipe arrangements, 308. outer oil transportation tube connector foundation structures, 309. anchor chains, 310. Portion connecting structure, 313. floor structures in structure, 311. top attachment structures, 312..
Embodiment
As shown in figure 1, the typical long-range outer defeated system of deepwater includes:It is separately fixed at the anchoring system in seabed (102,105), the outer petroleum pipeline 103 being suspended in water, the outer defeated floating drum 104 for being fixed on seabed and by heaving pile 107 with it is outer defeated The connected flotation hose 106 of floating drum 104, wherein, anchoring system 102 is connected with Floating Storage ship 101, makes Floating Storage ship 101 Stabilization is at sea;Another anchoring system 105 for being fixed on seabed is connected with outer defeated floating drum 104, makes outer defeated floating drum 104 stable in sea On;The one end for the outer petroleum pipeline 103 being suspended in water is connected with Floating Storage ship 101, and the other end is connected with outer defeated floating drum 104; Shuttle tanker 108 is connected on defeated floating drum 104 outside by heaving pile, and shuttle tanker 108 shares a set of mooring system with outer defeated floating drum 104 System 105.The crude oil handled well is delivered to outer defeated floating drum 104 from Floating Storage wheel 101 by outer petroleum pipeline 103, then from outer defeated floating Cylinder 104 is delivered to shuttle tanker 108 by flotation hose 106, finally, is transported by shuttle tanker 108 to land terminal, completes one Secondary crude oil exporting operation.
It can be found that outer defeated floating drum 104 is most important among whole outer defeated system, it is necessary to ensure outer from outer defeated flow The design safety of petroleum pipeline 103 and anchoring system (102,105), while being relied on, it is necessary to provide mooring to shuttle tanker 108. Because the outer defeated size of floating drum 104 itself is smaller, its wave effect highly significant being subject to, the motion of outer defeated floating drum 104 is externally defeated The ultimate strength and fatigue life requirements of oil pipe 103 and anchoring system (102,105) are very high.For the very good ripple of environmental condition The less marine site of wave, though existing traditional outer defeated floating drum 104 can meet design use requirement, and for harsh environmental conditions wave Larger marine site, then can not use existing traditional outer defeated floating drum 104.
As shown in Fig. 3 A, Fig. 3 B, the present invention includes:One column float body 301, it is located at column float body 301 On turntable 302, wherein, turntable 302 is connected by swivel bearing with column float body 301, with realize turntable 302 with it is vertical Relative rotation between pillar float body 301;According to the long-time statistical feature of wave, Wave energy is typically only distributed in wave Cycle is within the scope of 3-20 seconds, to only have small energy to exist for the interval that the cycle is more than 20 seconds.Therefore, it is of the invention vertical Pillar float body 301 increases the free period of its motion, with away from the main energy range of wave.It is heaved, roll and pitch fortune Dynamic free period is:More than 20 seconds.
According to the motion equation, the free period of some freedom of motion of floating body is:In formula, M For:The quality and additional mass sum of floating body;K is:The stiffness coefficient of the freedom of motion.From formula, it can be seen that to increase The period of motion of big floating body, only two selections, i.e.,:Increase floating body quality or reduce motion stiffness coefficient.For the present invention Floating drum, it is main to consider heave, the motion of roll and pitch three degree of freedom.
For heave movement, M is:The quality and additional mass sum of floating drum, K is:Heave movement water elastic stiffness, specifically Show as:Water plane area size.Increase mass M means increase steel weight, and cost increase, this way is refused to recommend.
Column float body 301 of the present invention is:Two (or many) drinking water elongated legs deeply connect and compose column body formula Structure, can effectively reduce deep motion rigidity, and free period is moved in increase.Meanwhile, elongated rod structure is also effectively reduced Wave action area near Water Plane, has got the effect for reducing wave force.
For rolling, pitching, M is:The rotary inertia of floating drum and additional mass sum.K is:Rolling, pitching recover Torque, shows as the displacement product high with Transverse Metacenter height, Longitudinal Metacentre.
The present invention is deep drinking water formula structure, and buoyancy compartment 304 provides enough buoyancy for whole outer defeated floating drum, in float body 301 bottom is provided with a permanent ballast tank 305, is provided with the top of column float body 301 at Water Plane 300 At the position of centre of gravity of ballast tank 303, permanent ballast tank 305 and ballast tank 303 all away from column float body, so, The rotary inertia of floating drum can farthest be increased.Meanwhile, on the premise of stability requirement is met, by adjusting permanent ballast tank 305 and the proportioning of ballast tank 303 to minimize, Transverse Metacenter is high, Longitudinal Metacentre is high.Finally so that column float body 301 Rolling, the free period of pitching are more than 20 seconds, reach the purpose away from the main energy range of wave.
The present invention absorbs water formula pole structure deeply due to using, also, in cylinder bottom setting permanent ballast tank 305, reduction The position of centre of gravity of total.So that the center of gravity of total is less than centre of buoyancy, unconditional stability is reached.
Queen post structure is only a kind of way of realization therein, and other can also be used on the premise of retention property is consistent Structure type, such as open side type or three pillar type.
Turntable 302 is integrated with cable arm 306, and cable arm 306 is connected by turntable 302 with outer defeated floating drum, outer defeated floating drum It is connected by heaving pile with shuttle tanker.
Shuttle tanker in defeated operation process, is connected on the cable arm 306 of defeated floating drum outside, cable arm by heaving pile outside 306 be integral type structure with turntable 302, and shuttle tanker, will be as turntable 302 be around outer defeated when being acted on by environmental forces Floating drum rotates to the minimum direction of suffered environmental forces, and forms vane effect.At the same time, shuttle tanker will external defeated floating drum Produce a larger tilting moment.Cable arm 306 is designed to extension, i.e.,:Outward and down extension one is set cable arm 306 Set a distance, makes the formation of cable arm 306 one inverted "L" shaped, can effectively reduce the shuttle tanker power of toppling that externally defeated floating drum is produced Square.
According to the motion feature of floating body, the influence that is caused to institute's attached article of roll and pitch motion, will with rotation The distance at center increases and increased.Outer oil transportation tube connector foundation structure 308, outer defeated ground cable foundation structure 310 are arranged Near pivot, i.e.,:Near the middle part of column float body, outer petroleum pipeline junction;It can effectively reduce outer The caused active force of defeated floating drum motion.Meanwhile, the connection of anchor chain 309 is arranged near pivot, i.e.,:Column float body Near middle;Reduce the horizontal anchor chain power tilting moment that externally defeated floating drum is produced.
According to the design function feature of outer defeated floating drum, at the deck at the top of turntable, and middle part anchor chain and outer petroleum pipeline connect Place is met, main connection external applied load is assume responsibility for, in addition, by the larger gravity of generation and inertial load at the fixed ballast of bottom. The design is provided with reinforcement attachment structure at three above-mentioned key positions.Wherein, it is provided with top at the deck at the top of turntable Portion connecting structure 311, top attachment structure 311 is typical slab and girder, plays and is responsible for connection column float body 301 The effect of the cylinder of left and right two and support turntable 302, middle portion connecting structure 312 can be truss structure or slab and girder, play negative The effect of two cylinders and support anchor chain and outer petroleum pipeline of duty connection column float body 301, outer petroleum pipeline pipe arrangement 307 is used for Realize the connection between outer petroleum pipeline and flotation hose;Floor structure 313 is closed in space's structure, while also serving as fixing A part for ballast tank 305 is connected between the cylinder of column float body 301.
The above described is only a preferred embodiment of the present invention, any formal limitation not is made to the present invention, it is all It is any simple modification, equivalent variations and the modification made according to the technical spirit of the present invention to above example, still falls within In the range of technical solution of the present invention.

Claims (5)

1. a kind of Deepwater column exportation buoy, including:One float body, it is characterised in that:Also include:It is located on float body Turntable, the turntable is connected by swivel bearing with float body, and the float body is deep draft column formula structure, in column The bottom of float body is provided with a permanent ballast tank, and top is provided with ballast tank at Water Plane;Meanwhile, the column The free period of the rolling of float body, pitching and heave movement is more than 20 seconds, with away from the main energy range of wave;The column The middle part of float body, outer petroleum pipeline junction have been disposed about outer oil transportation tube connector foundation structure, outer defeated ground cable base Plinth structure;Meanwhile, the near middle of column float body there also is provided anchor chain;The column float body is by several depths Drinking water elongated legs are connected and composed, and centre, middle part anchor chain and the outer petroleum pipeline junction of the cylinder of column float body are set There is middle portion connecting structure;The turntable is connected as a single entity with cable arm, and cable arm is connected by turntable with outer defeated floating drum, outer defeated floating drum It is connected by heaving pile with shuttle tanker;The cable arm is in extension structure, i.e.,:Cable arm outward and down the setting of extension one away from From making cable arm formation one inverted "L" shaped, to reduce the shuttle tanker tilting moment that externally defeated floating drum is produced.
2. Deepwater column exportation buoy according to claim 1, it is characterised in that:The column float body motion The calculation formula of free period be:In formula, M is:The quality and additional mass sum of floating body;K is:Should The stiffness coefficient of freedom of motion.
3. Deepwater column exportation buoy according to claim 1, it is characterised in that:At deck at the top of the turntable, Top attachment structure is provided with, top attachment structure is slab and girder.
4. Deepwater column exportation buoy according to claim 1, it is characterised in that:The middle portion connecting structure is:Purlin Frame structure or slab and girder, cylinder and support anchor chain and outer petroleum pipeline to connect column float body.
5. Deepwater column exportation buoy according to claim 1, it is characterised in that:The permanent ballast tank is connected to vertical Between the cylinder of pillar float body, permanent ballast tank is closed in space's structure.
CN201410036825.9A 2014-01-26 2014-01-26 Deepwater column exportation buoy Expired - Fee Related CN103738478B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410036825.9A CN103738478B (en) 2014-01-26 2014-01-26 Deepwater column exportation buoy

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410036825.9A CN103738478B (en) 2014-01-26 2014-01-26 Deepwater column exportation buoy

Publications (2)

Publication Number Publication Date
CN103738478A CN103738478A (en) 2014-04-23
CN103738478B true CN103738478B (en) 2017-07-28

Family

ID=50495576

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410036825.9A Expired - Fee Related CN103738478B (en) 2014-01-26 2014-01-26 Deepwater column exportation buoy

Country Status (1)

Country Link
CN (1) CN103738478B (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104833500B (en) * 2015-05-07 2017-07-14 中国海洋石油总公司 A kind of outer defeated floating drum damping characteristic development test device
CN109501968A (en) * 2018-12-07 2019-03-22 大连船舶重工集团有限公司 A kind of sea multipoint mooring emptying is transferred system

Family Cites Families (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
NO176011C (en) * 1992-04-30 1998-01-21 Norske Stats Oljeselskap Load / losseböye
NO951977L (en) * 1995-05-18 1996-11-19 Statoil As Method of loading and processing of hydrocarbons
NO20011524L (en) * 2001-03-23 2002-09-24 Leif Hoeegh & Co Asa Vessels and unloading system
US6763862B2 (en) * 2001-11-06 2004-07-20 Fmc Technologies, Inc. Submerged flowline termination at a single point mooring buoy
FR2928898B1 (en) * 2008-03-21 2010-04-16 Saipem Sa FLOATING SUPPORT COMPRISING A TURRET EQUIPPED WITH A MOORING BUOY FOR DOWNLINK / DECKABLE SURFACE LINK PIPES
CN102137788A (en) * 2008-08-29 2011-07-27 霍顿维森深水公司 Floating oil storage system and method
CN103129715B (en) * 2012-03-16 2017-02-01 中国海洋石油总公司 Conduit-rack semi-submersible type oil-extraction platform

Also Published As

Publication number Publication date
CN103738478A (en) 2014-04-23

Similar Documents

Publication Publication Date Title
WO2018095304A1 (en) Movable ballast leveling control device for use in floating wind turbine
CN102758446B (en) Semi-submersible type offshore floating wind turbine foundation
CA2900477C (en) Apparatus for mooring floater using submerged pontoon
CN112009634A (en) Submersible active support structure in offshore installations
NO20101494A1 (en) A storage, loading & unloading system for storing liquid hydrocarbons with application for offshore installations used for drilling and production
CN203021962U (en) Floating dock
CN102433890B (en) Floating type offshore wind turbine base and positioning system thereof
CN105000137B (en) Covering of the fan revolution single point mooring transfusion system
CN104925231A (en) Floating fan foundation and floating wind generator set
WO2017215054A1 (en) Single point mooring device
CN107002638A (en) For the floating platform using wind energy
WO2017215053A1 (en) Single point mooring out-transportation terminal
CN103895828A (en) Double-curved-surface floating type production oil storage platform
CN203819467U (en) Ocean platform positioning system
CN110671280A (en) Floating type fan foundation
CN114013584B (en) Deep sea wind power foundation based on buoyancy tower concept and single-point tension mooring
CN203902799U (en) Double-curved-surface-shaped floating oil production and storage platform
CN103738478B (en) Deepwater column exportation buoy
CN108454799B (en) A kind of offshore wind farm buoyant foundation transportation by driving construction method
CN109159853B (en) Self-adaptive mooring device for offshore shallow water area
CN104760670B (en) It is capable of the low cost fixed artificial floating island of fast construction
CN103552659A (en) Light channel buoy capable of being quickly distributed
EP0122273A1 (en) Floating, semi-submersible structure
CN105857525A (en) Tower mooring device with hinged stand columns
CN203486110U (en) Buoyant-tower-type ocean platform

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CP01 Change in the name or title of a patent holder
CP01 Change in the name or title of a patent holder

Address after: 100010 Chaoyangmen North Street, Dongcheng District, Dongcheng District, Beijing

Co-patentee after: OFFSHORE OIL ENGINEERING Co.,Ltd.

Patentee after: CHINA NATIONAL OFFSHORE OIL Corp.

Co-patentee after: COTEC, Inc.

Address before: 100010 Chaoyangmen North Street, Dongcheng District, Dongcheng District, Beijing

Co-patentee before: OFFSHORE OIL ENGINEERING Co.,Ltd.

Patentee before: CHINA NATIONAL OFFSHORE OIL Corp.

Co-patentee before: COTEC, Inc.

CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20170728

Termination date: 20220126