CN103727311A - 预制直埋保温管简易牵引车 - Google Patents
预制直埋保温管简易牵引车 Download PDFInfo
- Publication number
- CN103727311A CN103727311A CN201310657758.8A CN201310657758A CN103727311A CN 103727311 A CN103727311 A CN 103727311A CN 201310657758 A CN201310657758 A CN 201310657758A CN 103727311 A CN103727311 A CN 103727311A
- Authority
- CN
- China
- Prior art keywords
- thermal insulation
- insulation pipe
- prefabricated direct
- buried thermal
- pipe
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Images
Classifications
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F16—ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
- F16L—PIPES; JOINTS OR FITTINGS FOR PIPES; SUPPORTS FOR PIPES, CABLES OR PROTECTIVE TUBING; MEANS FOR THERMAL INSULATION IN GENERAL
- F16L1/00—Laying or reclaiming pipes; Repairing or joining pipes on or under water
- F16L1/024—Laying or reclaiming pipes on land, e.g. above the ground
- F16L1/028—Laying or reclaiming pipes on land, e.g. above the ground in the ground
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F16—ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
- F16L—PIPES; JOINTS OR FITTINGS FOR PIPES; SUPPORTS FOR PIPES, CABLES OR PROTECTIVE TUBING; MEANS FOR THERMAL INSULATION IN GENERAL
- F16L1/00—Laying or reclaiming pipes; Repairing or joining pipes on or under water
- F16L1/12—Laying or reclaiming pipes on or under water
- F16L1/20—Accessories therefor, e.g. floats, weights
- F16L1/235—Apparatus for controlling the pipe during laying
Landscapes
- Engineering & Computer Science (AREA)
- General Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- Thermal Insulation (AREA)
Abstract
本发明涉及一种预制直埋保温管简易牵引车。目前采取破坏外护管人工焊接支架等措施,在沟槽底部移动保温管,其余大部分是在沟槽底部拖拽推送,导致聚乙烯外护管严重划伤,钢管端头受损,保温管保温效果被降低,从而缩短其使用寿命。一种预制直埋保温管简易牵引车,其组成包括:安装吊钩(2)的半圆形吊具(3),所述的半圆形吊具通过紧固件(4)连接凹槽托架(5),所述的凹槽托架下方连接雪橇架(7);预制直埋保温管(1)的上半部和下半部分别内衬于所述的吊具和所述的凹槽托架内,所述的预制直埋保温管的内壁衬有一层保温层(8),所述的保温层内壁衬有钢管(6)。本发明应用于预制直埋保温管牵引车。
Description
技术领域:
本发明涉及一种预制直埋保温管简易牵引车。具体涉及预制直埋保温管在沟槽廊道施工现场搬运使用的简易运输工具。
背景技术:
目前,预制直埋保温管施工过程中,由于道路交通和城市管理因素不能完全开挖道路,只能从一处开挖沟槽下管,再向预定施工现场转移,目前采取破坏外护管人工焊接支架等措施,在沟槽底部移动保温管,其余大部分是在沟槽底部拖拽推送,导致聚乙烯外护管严重划伤,钢管端头受损,保温管保温效果被降低,从而缩短其使用寿命。
发明内容:
本发明的目的是提供一种预制直埋保温管简易牵引车。
上述的目的通过以下的技术方案实现:
一种预制直埋保温管简易牵引车,其组成包括:安装吊钩的半圆形吊具,所述的半圆形吊具通过紧固件连接凹槽托架,所述的凹槽托架下方连接雪橇架;预制直埋保温管的上半部和下半部分别内衬于所述的吊具和所述的凹槽托架内,所述的预制直埋保温管的内壁衬有一层保温层,所述的保温层内壁衬有钢管。
所述的预制直埋保温管简易牵引车,所述的雪橇架前部设置牵引钩环,所述的牵引钩环连接绳索。
所述的预制直埋保温管简易牵引车,所述的雪橇架的竖直方向截面呈等腰梯形,所述的雪橇架上底宽为200mm,所述的雪橇架下底宽为400mm。
所述的预制直埋保温管简易牵引车,所述的半圆形吊具与所述的凹槽托架相扣成圆形。
所述的预制直埋保温管简易牵引车,所述的紧固件为螺丝紧固装置,所述的紧固件的宽度为200mm。
所述的预制直埋保温管简易牵引车,所述的保温层为高分子材料。
本发明的有益效果:
1.本发明设计了带有吊钩的半圆形吊具,并将半圆形吊具与凹槽托架对扣形成圆筒后通过紧固件连接,圆筒内放置需要搬运的预制直埋保温管和钢管进行整体移动。整体性移动能够加快预制直埋保温管在沟槽边向沟槽底部移动的速度,由于整个装置设计小巧,在复杂的现场也能搬运、拖拽自如,一人即可提起移动,轻巧灵便。同人工拖拽式的运输相比,能够提高搬运效率30%,加快了施工安装进度,完全杜绝了管道的损伤,降低了人工费用30%。
2.本发明设置的半圆形吊具与凹槽托架对扣形成圆筒。能够解决沟槽底部现场转运对聚乙烯外护管破坏、划伤的问题,保证预制直埋保温管设计生产时的使用寿命,降低日后的维护成本,延长管道的使用年限。
附图说明:
附图1是本发明的结构示意图。
附图2是附图1的左视图。
图中:1. 预制直埋保温管;2. 吊钩;3. 半圆形吊具;4. 紧固件;5. 凹槽托架;6. 钢管;7. 雪橇架;8. 保温层。
具体实施方式:
实施例1:
一种预制直埋保温管简易牵引车,其组成包括:安装吊钩2的半圆形吊具3,所述的半圆形吊具通过紧固件4连接凹槽托架5,所述的凹槽托架下方连接雪橇架7;预制直埋保温管1的上半部和下半部分别内衬于所述的吊具和所述的凹槽托架内,所述的预制直埋保温管的内壁衬有一层保温层8,所述的保温层内壁衬有钢管6。
实施例2:
根据实施例1所述的预制直埋保温管简易牵引车,所述的雪橇架前部设置牵引钩环,所述的牵引钩环连接绳索,方便拖拽以加快拖拽速度。
实施例3:
根据实施例1或2所述的预制直埋保温管简易牵引车,所述的雪橇架的竖直方向截面呈等腰梯形,所述的雪橇架上底宽为200mm,所述的雪橇架下底宽为400mm。
实施例4:
根据实施例1或2所述的预制直埋保温管简易牵引车,所述的半圆形吊具与所述的凹槽托架相扣成圆形。
实施例5:
根据实施例1或2所述的预制直埋保温管简易牵引车,所述的紧固件为螺丝紧固装置,所述的紧固件的宽度为200mm。
实施例6:
根据实施例1或2所述的预制直埋保温管简易牵引车,所述的保温层为高分子材料,如泡沫、苯板等。
Claims (6)
1.一种预制直埋保温管简易牵引车,其组成包括:安装吊钩的半圆形吊具,其特征是:所述的半圆形吊具通过紧固件连接凹槽托架,所述的凹槽托架下方连接雪橇架;预制直埋保温管的上半部和下半部分别内衬于所述的吊具和所述的凹槽托架内,所述的预制直埋保温管的内壁衬有一层保温层,所述的保温层内壁衬有钢管。
2.根据权利要求1所述的预制直埋保温管简易牵引车,其特征是:所述的雪橇架前部设置牵引钩环,所述的牵引钩环连接绳索。
3.根据权利要求1或2所述的预制直埋保温管简易牵引车,其特征是:所述的雪橇架的竖直方向截面呈等腰梯形,所述的雪橇架上底宽为200mm,所述的雪橇架下底宽为400mm。
4.根据权利要求1或2所述的预制直埋保温管简易牵引车,其特征是:所述的半圆形吊具与所述的凹槽托架相扣成圆形。
5.根据权利要求1或2所述的预制直埋保温管简易牵引车,其特征是:所述的紧固件为螺丝紧固装置,所述的紧固件的宽度为200mm。
6.根据权利要求1或2所述的预制直埋保温管简易牵引车,其特征是:所述的保温层为高分子材料。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201310657758.8A CN103727311B (zh) | 2013-12-09 | 2013-12-09 | 预制直埋保温管简易牵引车 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201310657758.8A CN103727311B (zh) | 2013-12-09 | 2013-12-09 | 预制直埋保温管简易牵引车 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN103727311A true CN103727311A (zh) | 2014-04-16 |
CN103727311B CN103727311B (zh) | 2016-01-20 |
Family
ID=50451524
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201310657758.8A Expired - Fee Related CN103727311B (zh) | 2013-12-09 | 2013-12-09 | 预制直埋保温管简易牵引车 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN103727311B (zh) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104249749A (zh) * | 2014-09-25 | 2014-12-31 | 哈尔滨朗格斯特节能科技有限公司 | 预制直埋保温管管件运输车及制作方法 |
Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE20001331U1 (de) * | 2000-01-21 | 2000-03-30 | Roco Rohrbedarf Gmbh | Vorrichtung zur Befestigung von sich in Wärme ausdehnenden Rohren |
DE20015533U1 (de) * | 1999-09-13 | 2000-12-21 | Zahn Harald Gmbh | Abhängelement |
CN201202887Y (zh) * | 2008-05-15 | 2009-03-04 | 上海新奇五金有限公司 | 组装式滑动机构 |
CN202510929U (zh) * | 2012-04-01 | 2012-10-31 | 唐山兴邦管道工程设备有限公司 | 一种新型的直埋保温管 |
CN202868203U (zh) * | 2012-09-14 | 2013-04-10 | 天津豪威特管道设备有限公司 | 一种保温管支撑装置 |
CN202927257U (zh) * | 2012-10-17 | 2013-05-08 | 陕西陕煤澄合矿业有限公司 | 悬空电缆拖移装置 |
CN203571213U (zh) * | 2013-12-09 | 2014-04-30 | 哈尔滨朗格斯特节能科技有限公司 | 预制直埋保温管简易牵引车 |
-
2013
- 2013-12-09 CN CN201310657758.8A patent/CN103727311B/zh not_active Expired - Fee Related
Patent Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE20015533U1 (de) * | 1999-09-13 | 2000-12-21 | Zahn Harald Gmbh | Abhängelement |
DE20001331U1 (de) * | 2000-01-21 | 2000-03-30 | Roco Rohrbedarf Gmbh | Vorrichtung zur Befestigung von sich in Wärme ausdehnenden Rohren |
CN201202887Y (zh) * | 2008-05-15 | 2009-03-04 | 上海新奇五金有限公司 | 组装式滑动机构 |
CN202510929U (zh) * | 2012-04-01 | 2012-10-31 | 唐山兴邦管道工程设备有限公司 | 一种新型的直埋保温管 |
CN202868203U (zh) * | 2012-09-14 | 2013-04-10 | 天津豪威特管道设备有限公司 | 一种保温管支撑装置 |
CN202927257U (zh) * | 2012-10-17 | 2013-05-08 | 陕西陕煤澄合矿业有限公司 | 悬空电缆拖移装置 |
CN203571213U (zh) * | 2013-12-09 | 2014-04-30 | 哈尔滨朗格斯特节能科技有限公司 | 预制直埋保温管简易牵引车 |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104249749A (zh) * | 2014-09-25 | 2014-12-31 | 哈尔滨朗格斯特节能科技有限公司 | 预制直埋保温管管件运输车及制作方法 |
CN104249749B (zh) * | 2014-09-25 | 2017-09-29 | 哈尔滨朗格斯特节能科技有限公司 | 预制直埋保温管管件运输车及制作方法 |
Also Published As
Publication number | Publication date |
---|---|
CN103727311B (zh) | 2016-01-20 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106351670B (zh) | 一种封闭的预支护隧道结构 | |
CN204917742U (zh) | 一种管道安装用便携式龙门吊 | |
CN205024717U (zh) | 一种城市综合管廊沉管段的施工装置 | |
CN105626088B (zh) | 丁字形暗挖隧道盾构机下井平移方法 | |
CN105736829A (zh) | 管沟内管道机械化安装方法 | |
CN209040835U (zh) | 一种盾构空推通过暗挖隧道并二次始发的施工结构 | |
CN104775825A (zh) | 盾构机单井整体始发施工方法 | |
CN105545313A (zh) | 丁字形暗挖隧道盾构机后配套台车下井平移系统及其方法 | |
CN107255188A (zh) | 一种适用于综合管廊交叉口节点处的管道吊装方法 | |
CN204436416U (zh) | 铺设台车 | |
CN205417623U (zh) | 长台阶物料转运机 | |
CN206015442U (zh) | 一种可拆式复合型盾构施工轨枕 | |
CN105569671A (zh) | 丁字形暗挖隧道盾构施工运送碴土系统及运送方法 | |
CN203571213U (zh) | 预制直埋保温管简易牵引车 | |
CN104863601A (zh) | 盾构机分体始发加长管线悬吊系统 | |
CN202560321U (zh) | 盾构分体始发管线同步移动装置 | |
CN103727311A (zh) | 预制直埋保温管简易牵引车 | |
JP4778476B2 (ja) | 推進管移動装置 | |
CN202012045U (zh) | 一种顶进地道桥的组合式框架钢构 | |
CN205387937U (zh) | 丁字形暗挖隧道盾构机后配套台车下井平移系统 | |
CN104534168B (zh) | 一种深埋管机 | |
KR20110035318A (ko) | 비 개착식 터널 압입공법에서의 선단 구조체 | |
CN102108679A (zh) | 一种顶进地道桥的组合式框架钢构及顶进地道桥的方法 | |
CN206049705U (zh) | 独立的双重抱紧自锁式盾构机电瓶车限位装置 | |
CN104372746A (zh) | 铁路桥梁预制后张法简支t梁注砼模板支架及其安装工艺 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20160120 Termination date: 20211209 |
|
CF01 | Termination of patent right due to non-payment of annual fee |