CN103669665A - 钢筋桁架楼承板施工的标高差节点施工工艺 - Google Patents

钢筋桁架楼承板施工的标高差节点施工工艺 Download PDF

Info

Publication number
CN103669665A
CN103669665A CN201310708177.2A CN201310708177A CN103669665A CN 103669665 A CN103669665 A CN 103669665A CN 201310708177 A CN201310708177 A CN 201310708177A CN 103669665 A CN103669665 A CN 103669665A
Authority
CN
China
Prior art keywords
floor
support plate
floor support
steel bar
construction
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201310708177.2A
Other languages
English (en)
Other versions
CN103669665B (zh
Inventor
吐尔洪太
潘海尔丁
罗耀海
邓志凯
王佛来
邱黎
刘柳炼
朱臣
陈桅
罗祥玮
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangdong Fourth Construction Engineering Corp
Original Assignee
Guangdong Fourth Construction Engineering Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangdong Fourth Construction Engineering Corp filed Critical Guangdong Fourth Construction Engineering Corp
Priority to CN201310708177.2A priority Critical patent/CN103669665B/zh
Publication of CN103669665A publication Critical patent/CN103669665A/zh
Application granted granted Critical
Publication of CN103669665B publication Critical patent/CN103669665B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Joining Of Building Structures In Genera (AREA)
  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

本发明涉及建筑施工技术领域,提出一种钢筋桁架楼承板施工的标高差节点施工工艺,其包括步骤1)制备Z型衬托板、节点附加钢筋;2)Z型衬托板、边模安装,Z型衬托板的上翼搭在钢梁的部分至少50mm;3)楼承板安装;4)节点附加钢筋设置,节点附加钢筋的两端分别与楼板标高变化处的高、低标高楼承板的钢筋桁架焊接,节点附加钢筋的中段位于节点处;5)栓钉焊接;6)模板安装工程验收;7)混凝土浇筑。本发明的突出的实质性特点和显著进步在于:通过在楼板标高变化处设置Z型衬托板和附加钢筋,解决了楼承板施工过程中的高差节点衔接问题,具有提高楼承板高低差节点施工质量、简化施工工序和缩短工期的特点。

Description

钢筋桁架楼承板施工的标高差节点施工工艺
技术领域
本发明涉及建筑施工技术领域,尤其是钢筋桁架楼承板施工技术。 
背景技术
钢筋桁架楼承板是当今建筑施工行业推崇的新兴建筑组合材料,具有轻质、高强、工厂化生产、安装便捷、美观耐用等优点,是集建筑与装潢于一体的高级建筑装饰材料。 
在钢结构楼承板的设计与施工领域,于2012年2月09日国家标准委员会颁布了《钢筋桁架楼承板》国家标准,并于2012年8月1日起执行。该标准规定了钢筋桁架楼承板的术语和定义、标记与示例、材料、要求、试验方法、检验规则、订货内容、标志、包装、运输和贮存。并说明了该标准适用于钢筋桁架楼承板的生产、检验和验收。 
但是楼承板工艺在施工应用过程中的质量控制要点,检验标准等细节还没纳入到标准中。另一方面,在楼承板施工过程遇到的问题、解决办法及标准化施工等诸多实际困难仍然存在。 
发明内容
本发明的目的提出钢筋桁架楼承板施工的标高差节点施工工艺,其可解决楼承板施工过程中的高差节点衔接问题,具有提高楼承板高低差节点施工质量、简化施工工序和缩短工期的特点。 
本发明的目的可通过有下技术方案来实现。 
钢筋桁架楼承板施工的标高差节点施工工艺,所采用的钢筋桁架楼承板包括钢筋桁架和连接于其底部的镀锌板,包括如施工下骤。 
1)制备Z型衬托板、节点附加钢筋, 
根据设计楼板的高度差,预先用厚度为3~5 mm的钢板制作Z型衬托板,Z型衬托板包括有竖板,竖板的两侧分别垂直连接上翼和下翼,上翼的宽度至少50mm、下翼的宽度至少50mm,竖板的宽度等于节点处设计楼板的高度差;节点附加钢筋成Z形和/或L形;
2)Z型衬托板、边模安装,
在楼板标高变化处设置Z型衬托板和钢梁,楼板周边和洞口设置边模板;Z型衬托板的上翼搭在钢梁的部分至少50mm,Z型衬托板与钢梁表面每隔200~300mm间距点焊至少20mm长的焊缝,焊缝冷却后敲除焊渣。
3)楼承板安装, 
根据布置图按现有施工规范依次安装楼承板,板与板之间连接采用扣合方式并用拉钩紧密连接,用支座竖筋将楼承板的钢筋桁架与钢梁焊接固定;高标高楼承板的镀锌板边缘与Z型衬托板的上翼边缘焊接,低标高楼承板的镀锌板与Z型衬托板的下翼边缘焊接。
4)节点附加钢筋设置, 
楼板标高变化处的楼承板的高标高楼承板与低标高楼承板之间设置节点附加钢筋,节点附加钢筋的两端分别与楼板标高变化处的高、低标高楼承板的钢筋桁架焊接,节点附加钢筋中段位于节点处,楼板标高变化处的其它部位按现有规范设置附加负筋,洞口边设置附加钢筋。
5)栓钉焊接, 
按现有规范,用栓钉将楼承板的底模板与钢梁焊接固定。
6)模板安装工程验收, 
按现有规范进行模板安装工程验收。
7)混凝土浇筑, 
按现有规范进行混凝土浇筑,钢筋桁架楼承板的钢筋桁架、节点附加钢筋全部由楼面混凝土密实包裹,钢筋桁架楼承板的镀锌板和Z型衬托板的一侧面与楼面混凝土5相连接。
本发明的突出的实质性特点和显著进步在于: 
通过在楼板标高变化处设置Z型衬托板和附加钢筋,增加了节点刚度,以免浇注混凝土时,楼承板节点出现脱节事故,解决了楼承板施工过程中的高差节点衔接问题,具有提高楼承板高低差节点施工质量、简化施工工序和缩短工期的特点。
附图说明
图1为Z型衬托板截面图。 
图2为楼承板安装示意图。 
图3 为Z型衬托板安装示意图。 
图4为附加钢筋设置示意图。 
图5为实施本发明后的楼层板结构示意图。 
具体实施方式
下面用具体实施例对发明作进一步说明: 
参考图1至图5,钢筋桁架楼承板施工的标高差节点施工工艺,所采用的钢筋桁架楼承板包括钢筋桁架31和连接于其底部的镀锌板30,包括有下施工步骤。
1)制备Z型衬托板、节点附加钢筋, 
根据设计楼板的高度差H,预先用厚度为5 mm的钢板制作Z型衬托板2,Z型衬托板2包括有竖板20,竖板20的两侧分别垂直连接上翼21和下翼22,上翼宽为50mm、下翼宽为60mm,竖板20的宽度等于节点处设计楼板的高度差H;节点附加钢筋4做成Z形和L形。
2)Z型衬托板、边模安装, 
在楼板标高变化处设置Z型衬托板2和钢梁1,楼板周边和洞口设置边模板;Z型衬托板2的上翼21搭在钢梁1的部分为50mm,Z型衬托板2与钢梁1表面每隔300mm间距点焊长25mm、高2mm的焊缝,焊缝冷却后敲除焊渣。
3)楼承板安装, 
根据布置图按现有施工规范依次安装楼承板3,板与板之间连接采用扣合方式并用拉钩紧密连接,用支座竖筋32将楼承板3的钢筋桁架31与钢梁1焊接固定;高标高楼承板3的镀锌板30边缘与Z型衬托板2的上翼21边缘焊接,低标高楼承板3的镀锌板30与Z型衬托板2的下翼22边缘焊接。
4)节点附加钢筋设置, 
楼板标高变化处的高标高楼承板3与低标高楼承板3之间设置节点附加钢筋4,节点附加钢筋4的上端部与高标高楼承板3的钢筋桁架31焊接,节点附加钢筋4的下端部与低标高楼承板3的钢筋桁架31焊接,节点附加钢筋4中段位于节点处,楼板标高变化处的其它部位按现有规范设置附加负筋,洞口边设置附加钢筋。
5)栓钉焊接, 
按现有规范,用栓钉将楼承板3的底模板30与梁1焊接固定。
6)模板安装工程验收, 
按现有规范进行模板安装工程验收。
7)混凝土浇筑, 
按现有规范进行混凝土浇筑,钢筋桁架楼承板3的钢筋桁架31、节点附加钢筋4全部由楼面混凝土5密实包裹,钢筋桁架楼承板3的镀锌板30和Z型衬托板2的一侧面与楼面混凝土5相连接,完成后的楼层板结构如图5所示。

Claims (1)

1.钢筋桁架楼承板施工的标高差节点施工工艺,所采用的钢筋桁架楼承板包括钢筋桁架(31)和连接于其底部的镀锌板(30),其特征在于包括如下步骤:
1)制备Z型衬托板、节点附加钢筋
根据设计楼板的高度差(H),预先用厚度为3~5 mm的钢板制作Z型衬托板(2),Z型衬托板(2)包括有竖板(20),竖板(20)的两侧分别垂直连接上翼(21)和下翼(22),上翼(21)的宽度至少50mm、下翼(22)的宽度至少50mm,竖板(20)的宽度等于节点处设计楼板的高度差(H);节点附加钢筋(4)成Z形和/或L形;
2)Z型衬托板、边模安装
在楼板标高变化处设置Z型衬托板(2)和钢梁,楼板周边和洞口设置边模板;Z型衬托板(2)的上翼(21)搭在钢梁(1)的部分至少50mm,Z型衬托板(2)与钢梁(1)表面每隔200~300mm间距点焊至少20mm长的焊缝,焊缝冷却后敲除焊渣; 
3)楼承板安装
根据布置图按现有施工规范依次安装楼承板(3),板与板之间连接采用扣合方式并用拉钩紧密连接,用支座竖筋(32)将楼承板(3)的钢筋桁架(31)与钢梁(1)焊接固定;高标高楼承板(3)的镀锌板(30)边缘与Z型衬托板(2)的上翼(21)边缘焊接,低标高楼承板(3)的镀锌板(30)与Z型衬托板(2)的下翼(22)边缘焊接;
4)节点附加钢筋设置
楼板标高变化处的高标高楼承板(3)与低标高楼承板(3)之间设置节点附加钢筋(4),节点附加钢筋(4)的两端分别与楼板标高变化处的高、低标高楼承板(3)的钢筋桁架(31)焊接,节点附加钢筋(4)中段位于节点处,楼板标高变化处的其它部位按现有规范设置附加负筋,洞口边设置附加钢筋;
5)栓钉焊接
按现有规范,用栓钉将楼承板(3)的底模板(30)与钢梁(1)焊接固定;
6)模板安装工程验收
按现有规范进行模板安装工程验收;
7)混凝土浇筑
按现有规范进行混凝土浇筑,钢筋桁架楼承板(3)的钢筋桁架(31)、节点附加钢筋(4)全部由楼面混凝土(5)密实包裹,钢筋桁架楼承板(3)的镀锌板(30)和Z型衬托板(2)的一侧面与楼面混凝土(5)相连接。
CN201310708177.2A 2013-12-20 2013-12-20 钢筋桁架楼承板施工的标高差节点施工工艺 Active CN103669665B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310708177.2A CN103669665B (zh) 2013-12-20 2013-12-20 钢筋桁架楼承板施工的标高差节点施工工艺

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310708177.2A CN103669665B (zh) 2013-12-20 2013-12-20 钢筋桁架楼承板施工的标高差节点施工工艺

Publications (2)

Publication Number Publication Date
CN103669665A true CN103669665A (zh) 2014-03-26
CN103669665B CN103669665B (zh) 2016-06-15

Family

ID=50308374

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310708177.2A Active CN103669665B (zh) 2013-12-20 2013-12-20 钢筋桁架楼承板施工的标高差节点施工工艺

Country Status (1)

Country Link
CN (1) CN103669665B (zh)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108625485A (zh) * 2018-06-04 2018-10-09 浙江中益建材科技有限公司 一种钢筋桁架板端部连接节点结构及施工方法
CN109518860A (zh) * 2018-12-13 2019-03-26 江阴普顿塑胶有限公司 可拆卸自承式桁架复合材料楼承板
CN110042962A (zh) * 2019-05-20 2019-07-23 中建钢构有限公司 降板连接结构及其施工方法
CN110284716A (zh) * 2019-07-18 2019-09-27 成都建工第四建筑工程有限公司 钢筋桁架楼承板的升降板节点结构的施工方法
CN111485654A (zh) * 2019-01-25 2020-08-04 河南天久装配式建筑有限公司 一种装配式建筑中降板与钢梁连接结构及施工方法
CN113279529A (zh) * 2021-06-28 2021-08-20 北京城建集团有限责任公司 基于钢筋桁架楼承板的大跨度免拆阶梯结构及其施工方法

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2249781Y (zh) * 1996-06-06 1997-03-19 资贸(厦门)建材工业有限公司 压型钢质楼承板
CN101949191A (zh) * 2010-09-06 2011-01-19 中国建筑第八工程局有限公司 无支撑超长异型悬挑楼板施工方法
CN102134907A (zh) * 2010-12-31 2011-07-27 中铁二局股份有限公司 钢筋桁架楼承板施工方法
CN102425306A (zh) * 2011-03-17 2012-04-25 建研科技股份有限公司 钢筋桁架楼承板的施工方法及钢筋桁架楼承板

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2249781Y (zh) * 1996-06-06 1997-03-19 资贸(厦门)建材工业有限公司 压型钢质楼承板
CN101949191A (zh) * 2010-09-06 2011-01-19 中国建筑第八工程局有限公司 无支撑超长异型悬挑楼板施工方法
CN102134907A (zh) * 2010-12-31 2011-07-27 中铁二局股份有限公司 钢筋桁架楼承板施工方法
CN102425306A (zh) * 2011-03-17 2012-04-25 建研科技股份有限公司 钢筋桁架楼承板的施工方法及钢筋桁架楼承板

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108625485A (zh) * 2018-06-04 2018-10-09 浙江中益建材科技有限公司 一种钢筋桁架板端部连接节点结构及施工方法
CN109518860A (zh) * 2018-12-13 2019-03-26 江阴普顿塑胶有限公司 可拆卸自承式桁架复合材料楼承板
CN109518860B (zh) * 2018-12-13 2024-05-03 无锡佳尔旺环保科技有限公司 可拆卸自承式桁架复合材料楼承板
CN111485654A (zh) * 2019-01-25 2020-08-04 河南天久装配式建筑有限公司 一种装配式建筑中降板与钢梁连接结构及施工方法
CN110042962A (zh) * 2019-05-20 2019-07-23 中建钢构有限公司 降板连接结构及其施工方法
CN110284716A (zh) * 2019-07-18 2019-09-27 成都建工第四建筑工程有限公司 钢筋桁架楼承板的升降板节点结构的施工方法
CN110284716B (zh) * 2019-07-18 2021-06-29 成都建工第四建筑工程有限公司 钢筋桁架楼承板的升降板节点结构的施工方法
CN113279529A (zh) * 2021-06-28 2021-08-20 北京城建集团有限责任公司 基于钢筋桁架楼承板的大跨度免拆阶梯结构及其施工方法
CN113279529B (zh) * 2021-06-28 2023-09-29 北京城建集团有限责任公司 基于钢筋桁架楼承板的大跨度免拆阶梯结构及其施工方法

Also Published As

Publication number Publication date
CN103669665B (zh) 2016-06-15

Similar Documents

Publication Publication Date Title
CN103669665A (zh) 钢筋桁架楼承板施工的标高差节点施工工艺
CN105256713B (zh) 半装配式钢混凝土组合梁及其建造方法
CN105839846A (zh) 预制装配式钢筋混凝土叠合梁
CN202658532U (zh) 桥梁湿接缝施工模板
CN103806593B (zh) 一种预制混凝土构件
CN208486364U (zh) 框架结构体系
CN102926504B (zh) 一种钢混叠合梁结合部施工方法
CN104695337A (zh) 自提升滑翻施工系统及施工方法
CN104895197A (zh) 一种型钢混凝土柱-钢筋混凝土梁节点连接方法
CN110924537A (zh) 一种h型钢混凝土转换梁-钢筋混凝土柱节点的施工工艺
CN109403200A (zh) 一种隔板后浇的小箱梁桥的施工方法及其小箱梁桥
CN105317052A (zh) 一种塔吊基础螺栓固定方法
CN103669720A (zh) 一种预制梁及具有榫锚体系的钢筋混凝土结构
CN103206075A (zh) 型钢混凝土悬挑结构施工用悬吊平台
CN210316185U (zh) 一种预制剪力墙、连接节点
CN206109960U (zh) 一种能够快速施工的钢‑混凝土组合结构桥梁
CN102493553A (zh) 钢筋混凝土梁与钢梁连接节点的构件及其施工方法
CN104563525B (zh) 一种箱式钢拱梁整体卧式组对方法
CN106592821B (zh) 剪力钢板与一侧钢筋网的侧立式整体成型结构及方法
CN203640122U (zh) 钢筋桁架楼承板标高差节点结构
CN102587649B (zh) 高大悬挑结构模板型钢支撑系统
CN104047223A (zh) 轻型组合结构桥梁及其施工方法
CN104153386B (zh) 桩基承台周边立面垫层工具式钢模及其施工方法
CN107700531B (zh) 一种倒角定型钢模板的支设方法
CN104947804A (zh) 一种钢托架及利用其构建梁柱节点结构的施工方法

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C53 Correction of patent of invention or patent application
CB03 Change of inventor or designer information

Inventor after: Tuerhongtai.Panhaierding

Inventor after: Zhang Jianfeng

Inventor after: Wang Folai

Inventor after: Liu Liulian

Inventor after: Zhu Chen

Inventor after: Chen Wei

Inventor after: Luo Xiangwei

Inventor after: Luo Yaohai

Inventor after: He Hanlin

Inventor after: Zhong Ziqiang

Inventor after: Deng Zhikai

Inventor after: Zhou Yu

Inventor after: Wen Zhiping

Inventor after: Lin Peidong

Inventor after: Yang Qubo

Inventor before: Tuerhongtai

Inventor before: Luo Xiangwei

Inventor before: PANHAIERDING

Inventor before: Luo Yaohai

Inventor before: Deng Zhikai

Inventor before: Wang Folai

Inventor before: Qiu Li

Inventor before: Liu Liulian

Inventor before: Zhu Chen

Inventor before: Chen Wei

COR Change of bibliographic data

Free format text: CORRECT: INVENTOR; FROM: TUERHONGTAI PANHAIERDING LUO YAOHAI DENG ZHIKAI WANG FOLAI QIU LI LIU LIULIAN ZHU CHEN CHEN WEI LUO XIANGWEI TO: TUERHONGTAI PANHAIERDING LUO YAOHAI HE HANLIN ZHONG ZIQIANG DENG ZHIKAI ZHOU YU WEN ZHIPING LIN PEIDONG YANG QUBO ZHANG JIANFENG WANG FOLAI LIU LIULIAN ZHU CHEN CHEN WEI LUO XIANGWEI

CB02 Change of applicant information

Address after: 510100 No. 99, Baiyun District, Guangzhou, Guangdong, Yuexiu District

Applicant after: GUANGDONG FOURTH CONSTRUCTION ENGINEERING CO., LTD.

Address before: 510100 No. 99, Baiyun District, Guangzhou, Guangdong, Yuexiu District

Applicant before: Guangdong Fourth Construction Company

COR Change of bibliographic data
C14 Grant of patent or utility model
GR01 Patent grant