CN103628498B CN201210311835.XA CN201210311835A CN103628498B CN 103628498 B CN103628498 B CN 103628498B CN 201210311835 A CN201210311835 A CN 201210311835A CN 103628498 B CN103628498 B CN 103628498B
Authority
CN
China
Prior art keywords
bolt
hole
steel plate
foundation bolt
anchor
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201210311835.XA
Other languages
Chinese (zh)
Other versions
CN103628498A (en
Inventor
魏尚起
毕鹤飞
刘光明
李宁
徐冰
谭芳娜
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China MCC20 Group Corp Ltd
Original Assignee
China MCC20 Group Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China MCC20 Group Corp Ltd filed Critical China MCC20 Group Corp Ltd
Priority to CN201210311835.XA priority Critical patent/CN103628498B/en
Publication of CN103628498A publication Critical patent/CN103628498A/en
Application granted granted Critical
Publication of CN103628498B publication Critical patent/CN103628498B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Foundations (AREA)
  • Piles And Underground Anchors (AREA)

Abstract

The present invention relates to the installation method of a kind of foundation bolt.A kind of T-shaped foundation bolt hole method for blocking, including: one, bury foundation bolt sleeve underground, sleeve top surface is higher than equipment Foundations surface;Two, the repetition measurement of basis when, the upper surface of foundation bolt sleeve need to be cut into level, and carry out grinding process;Three, make closure steel plate: be fabricated to square steel plate, the big 100mm of diameter of the side ratio anchor (bolt) hole of closure steel plate with sheet metal, a circular hole is opened in center, and the diameter of circular hole should 1mm bigger than the diameter of anchor (bolt) hole;Four, the closure steel plate made is enclosed within foundation bolt before installing by equipment, and seals with the gap between anchor (bolt) hole is blocked between steel plate and foundation bolt by silica gel;Five, installation equipment after adjusting examination, anchor (bolt) hole is blocked steel plate and is welded and fixed with foundation bolt sleeve, thus complete the closure of anchor (bolt) hole.The present invention is simple to operate, and efficiency of construction is high, manpower and materials are little, environmental pollution is little for input.

Description

T-shaped foundation bolt hole method for blocking
Technical field
The present invention relates to main equipment install, particularly relate to the installation method of a kind of foundation bolt.
Background technology
Due to metallurgical machinery large-scale visual plant such as such as milling train, coiling machine etc., its foundation bolt is usually T-shaped foundation bolt.T-shaped foundation bolt typically can not be in the milk, and is intended to use the form sealed to protect.T-shaped anchor (bolt) hole was blocked in the past and generally use dry sand bitumen process to carry out the closure of anchor (bolt) hole.During dry sand bitumen process closure anchor (bolt) hole, the sleeve top surface of anchor (bolt) hole need to be the most equal with milling train surface of base, so beneficially the pouring into of dry sand and Colophonium.The method is after equipment adjusts and checked and accepted, and implements before back-grouting.The method is first to be poured in foundation bolt sleeve by dry sand, and closely knit.When being filled by dry sand to during from sleeve top surface 6~10mm, stop filling sand.Then, Colophonium is poured in sleeve, until filling anchor (bolt) hole.Dry sand bitumen process closure anchor (bolt) hole has engineering time length, puts into the problems such as manpower and materials are many, environmental pollution is big.
Summary of the invention
Present invention seek to address that drawbacks described above, it is provided that a kind of T-shaped foundation bolt hole method for blocking.The present invention is simple to operate, and efficiency of construction is high, put into that manpower and materials are little, environmental pollution is little, good in economic efficiency.
For solving the problems referred to above, a kind of T-shaped foundation bolt hole method for blocking of the present invention, it comprises the following steps:
Step one, buries foundation bolt sleeve underground, and sleeve top surface is higher than equipment Foundations surface;
Step 2, need to cut into the upper surface of foundation bolt sleeve level the repetition measurement of basis when, and carry out grinding process;
Step 3, makes closure steel plate: be fabricated to square steel plate, the big 100mm of diameter of the side ratio anchor (bolt) hole of closure steel plate with sheet metal, and a circular hole is opened in center, and the diameter of circular hole should 1mm bigger than the diameter of anchor (bolt) hole;
Step 4, the closure steel plate made is enclosed within foundation bolt before installing by equipment, and seals with the gap between anchor (bolt) hole is blocked between steel plate and foundation bolt by silica gel;
Step 5, installation equipment after adjusting examination, anchor (bolt) hole is blocked steel plate and is welded and fixed with foundation bolt sleeve, thus complete the closure of anchor (bolt) hole.
The present invention utilizes the anchor (bolt) hole closure steel plate through processing to be enclosed within foundation bolt, it is positioned on the sleeve of anchor (bolt) hole, utilize the gap between silica gel sealing anchor (bolt) hole closure steel plate and foundation bolt, anchor (bolt) hole then blocks steel plate be welded and fixed with foundation bolt sleeve, thus solve the closure of anchor (bolt) hole.The method has simple to operate, and efficiency of construction is high, put into the distinguishing features such as manpower and materials are little, environmental pollution is little, good in economic efficiency.
Accompanying drawing explanation
The present invention is further illustrated below in conjunction with the accompanying drawings:
Fig. 1 is the schematic diagram of the present invention.
Detailed description of the invention
Referring to Fig. 1, a kind of T-shaped foundation bolt hole method for blocking of the present invention, it comprises the following steps:
Step one, buries foundation bolt sleeve 1 underground, and sleeve top surface is higher than equipment Foundations 2 surface;
Step 2, need to cut into the upper surface of foundation bolt sleeve level the repetition measurement of basis when, and carry out grinding process;
Step 3, makes closure steel plate 3: be fabricated to square steel plate, the big 100mm of diameter of the side ratio anchor (bolt) hole of closure steel plate with sheet metal, and a circular hole is opened in center, and the diameter of circular hole should 1mm bigger than the diameter of anchor (bolt) hole;
Step 4, equipment 4 install in place before the closure steel plate made is enclosed within foundation bolt, and seal with the gap between anchor (bolt) hole is blocked between steel plate and foundation bolt by silica gel 5;
Step 5, hanging device installation in place, and be adjusted checking and accepting;
Step 6, after equipment adjusts acceptance(check), blocks anchor (bolt) hole steel plate and is welded and fixed with foundation bolt sleeve, thus complete the closure of T-shaped anchor (bolt) hole.

Claims (1)

1. a T-shaped foundation bolt hole method for blocking, it is characterised in that it comprises the following steps:
Step one, buries foundation bolt sleeve underground, and sleeve top surface is higher than equipment Foundations surface;
Step 2, need to cut into the upper surface of foundation bolt sleeve level the repetition measurement of basis when, and carry out grinding process;
Step 3, makes closure steel plate: be fabricated to square steel plate, the big 100mm of diameter of the side ratio anchor (bolt) hole of closure steel plate with sheet metal, and a circular hole is opened in center, and the diameter of circular hole should 1mm bigger than the diameter of foundation bolt;
Step 4, the closure steel plate made is enclosed within foundation bolt before installing by equipment, and seals with the gap between anchor (bolt) hole is blocked between steel plate and foundation bolt by silica gel;
Step 5, installation equipment after adjusting examination, anchor (bolt) hole is blocked steel plate and is welded and fixed with foundation bolt sleeve, thus complete the closure of anchor (bolt) hole.
CN201210311835.XA 2012-08-29 2012-08-29 T-shaped foundation bolt hole method for blocking Active CN103628498B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201210311835.XA CN103628498B (en) 2012-08-29 2012-08-29 T-shaped foundation bolt hole method for blocking

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201210311835.XA CN103628498B (en) 2012-08-29 2012-08-29 T-shaped foundation bolt hole method for blocking

Publications (2)

Publication Number Publication Date
CN103628498A CN103628498A (en) 2014-03-12
CN103628498B true CN103628498B (en) 2016-08-10

Family

ID=50209925

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201210311835.XA Active CN103628498B (en) 2012-08-29 2012-08-29 T-shaped foundation bolt hole method for blocking

Country Status (1)

Country Link
CN (1) CN103628498B (en)

Families Citing this family (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103953065B (en) * 2014-05-22 2015-11-18 赵东京 A kind of power-equipment pedestal fastener and fixing means
CN107339556A (en) * 2017-08-11 2017-11-10 中冶华天工程技术有限公司 A kind of dismountable foundation bolt box device
CN109945019B (en) * 2017-12-21 2021-12-07 中国二十冶集团有限公司 Temporary fixing device for foundation bolt with reserved hole and using method of temporary fixing device
CN114046306A (en) * 2021-11-30 2022-02-15 中国三冶集团有限公司 Rear-implanted bolt device

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201344190Y (en) * 2008-11-28 2009-11-11 中冶东方工程技术有限公司上海分公司 Sleeve end-plate type anchor bolt
CN201934860U (en) * 2011-02-25 2011-08-17 杨立新 Foundation bolt of turning device bearing alternating overload
CN202176663U (en) * 2011-07-31 2012-03-28 徐工集团工程机械股份有限公司江苏徐州工程机械研究院 Damping device for engine support of mining dump truck
JP2012072648A (en) * 2010-09-01 2012-04-12 Marutaka Kogyo Inc Installed foundation construction method

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201344190Y (en) * 2008-11-28 2009-11-11 中冶东方工程技术有限公司上海分公司 Sleeve end-plate type anchor bolt
JP2012072648A (en) * 2010-09-01 2012-04-12 Marutaka Kogyo Inc Installed foundation construction method
CN201934860U (en) * 2011-02-25 2011-08-17 杨立新 Foundation bolt of turning device bearing alternating overload
CN202176663U (en) * 2011-07-31 2012-03-28 徐工集团工程机械股份有限公司江苏徐州工程机械研究院 Damping device for engine support of mining dump truck

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
国外几种地脚螺栓锚固方法;李懋星;《施工技术》;20020531;第31卷(第5期);第50页 *

Also Published As

Publication number Publication date
CN103628498A (en) 2014-03-12

Similar Documents

Publication Publication Date Title
CN103628498B (en) T-shaped foundation bolt hole method for blocking
CN203705266U (en) Static load testing device for testing engineering pile
CN105220654B (en) Earth and rockfill dam reinforcing structure and construction method thereof
CN104863108B (en) A kind of ground-connecting-wall soil lateral pressure box embedded device
CN105064371A (en) Deformation alarming method for deep foundation pit
CN103290836A (en) Vacuum decompression compacting and consolidating construction method for soft foundation treatment
CN103981909B (en) Fast repairing method after crack on anchor bolt and structure
CN102828533B (en) Vertical pressure resistance static load test pile head advanced processing node of cast-in-place pile and construction method
CN107964978A (en) Wind driven generator base crab-bolt ruggedized construction and foundation anchor bolt fracture reinforcement means
CN104074209B (en) Deep plate load testing device
CN107989639B (en) Concrete sealing plug of underground water-sealed cavern and its parameter determination method and construction method
CN103953075B (en) Self Balance Test Method of Foundation Pile load box squeezing unit and mud-jacking technology
CN207333947U (en) A kind of oil-gas pipeline protective device
CN102400564A (en) Temporary underpinning system for masonry structure bearing wall rear opening and construction method thereof
CN204023791U (en) Embedding anchor bolts device
CN203583514U (en) Pre-buried structure of ultra-deep foundation bolt
CN202247924U (en) Assembled steel structure open caisson in pipe jacking construction
CN106368236B (en) Device and method for self-adaptive adjustment of foundation in goaf
CN204940374U (en) For the anti-breaking device of pile-end post-grouting Grouting Pipe of self-balancing approach peg
CN205857792U (en) Shear wall concrete replacement bottom provisions for grouting
CN205047225U (en) A facility that is used for pipeline below to press coal exploitation
CN206706771U (en) A kind of combined support structure of sealing basis interpolation pile tube and rectangular pile
CN106120644A (en) A kind of monitoring instrument buries protection device underground
CN206457791U (en) A kind of dam monitoring instrument embedding protection device
CN105804087A (en) Installation method for steel structure below large deep foundation pit supporting beam

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant