CN206457791U - A kind of dam monitoring instrument embedding protection device - Google Patents

A kind of dam monitoring instrument embedding protection device Download PDF

Info

Publication number
CN206457791U
CN206457791U CN201720037052.5U CN201720037052U CN206457791U CN 206457791 U CN206457791 U CN 206457791U CN 201720037052 U CN201720037052 U CN 201720037052U CN 206457791 U CN206457791 U CN 206457791U
Authority
CN
China
Prior art keywords
panel
annulus
monitoring instrument
frame
protection device
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201720037052.5U
Other languages
Chinese (zh)
Inventor
陆伟刚
孙膑
袁程
高琛
毕超
吴月
姚天雯
刘鹏程
许伟健
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Yangzhou University
Original Assignee
Yangzhou University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Yangzhou University filed Critical Yangzhou University
Priority to CN201720037052.5U priority Critical patent/CN206457791U/en
Application granted granted Critical
Publication of CN206457791U publication Critical patent/CN206457791U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model discloses a kind of dam monitoring instrument embedding protection device; including four pieces of panels and four U-shaped pins; the panel is being respectively provided with two annulus up and down at a certain distance from both sides of the edge; therefore have 4 annulus on each panel; the height all same that annulus or so is compareed and set, the annulus of the same side of panel is vertically aligned two-by-two.The panel of four pieces of same specifications is assembled two-by-two, then constitutes rectangular protecting frame frame in the annulus with the edge of the adjacent two pieces of panels of U-shaped pin insertion.Monitoring instrument is placed in the center of rectangular protecting frame frame, by the way that by the native grinding compacting in dam inside and outside rectangular protecting frame frame, rectangular frame can effectively prevent the external shock power during dam construction, and assembling is quick and easy, reaches the protective effect to monitoring instrument.The utility model dexterously utilizes the panel with annulus and U-shaped pin one rectangular frame of formation nested against one another, simple in construction, easy construction; when protect-ing frame structure is lifted, frictional resistance is small, and lifting is simple; without using large-scale lifting appliance, reduction expense, the purpose of accelerating construction progress have been reached.

Description

A kind of dam monitoring instrument embedding protection device
Technical field
The utility model is related to a kind of monitoring instrument, and in particular to a kind of dam monitoring instrument embedding protection device.
Background technology
In hydraulic engineering during dam construction, often bury around it and dispose substantial amounts of monitoring instrument, for supervising Control construction and the running status of dykes and dams.Due to there is the presence of big machinery in work progress, its enormous impact conducted oneself with dignity and brought Power influences whether monitoring instrument, thus needs to set corresponding protector on embedded instrument periphery.Existing protection device master Have following several:The first is the periphery that arrangement cylindrical steel cylinder one large-scale is placed on monitoring instrument, when side dam outside steel drum Body is rolled after end, is put into monitoring instrument, then dam soil in cylinder is closely knit and then extract steel cylinder with cal rolling, and one point instrument is complete Completed into embedded process;It is for second, including two piece first Qian shape plate and two piece second Qian shape assembled with several blocks of Qian shape plates Plate, two right angles of each first Qian shape plate are respectively embedded into the L-shaped neck composition rectangular protecting frame frame of two the second Qian shape plates, will Monitoring instrument is placed in the center of rectangular protecting frame frame;The third includes two pieces of first panels, two pieces of second panels and four U-shaped pins 4 annulus are had on bolt, each panel, the annulus of two kinds of panels is vertically aligned two-by-two, then four are disposed vertically with the insertion of U-shaped pin Rectangular protecting frame frame is constituted in the annulus of block panel, monitoring instrument is placed in the center of rectangular protecting frame frame.
Three of the above device mainly has some following deficiency:The first device be disadvantageous in that steel cylinder deadweight and volume compared with Greatly, transhipment, installation will use large-scale machinery, construct cumbersome, costly;Second of device is although simple in construction and constructs just Victory, but because the device is spliced by several blocks of Qian shape plates, centre has neck, hangs when pulling out frictional resistance than larger, gap compared with Greatly;The third device largely avoids the deficiency of first two, but device be completed after due on two pieces of adjacent panels Annulus be up and down fasten, therefore device up lift when can not extract respectively.
Utility model content
The purpose of this utility model is that there is provided monitor a kind of simple in construction and practical in view of the shortcomings of the prior art Device buries protection device.
The purpose of this utility model there is provided a kind of monitoring instrument protection device, including four pieces of panels, four U-shaped pins Bolt, the medial surface both upper ends thereof of every piece of panel is arranged with annulus, and the medial surface bottom two ends of every piece of panel are arranged with down Annulus, every piece of panel is coaxially set with the upper annulus on one end top and the lower annulus of its underpart;Upper and lower annulus is horizontally disposed with, Upper and lower annulus is vertically arranged with panel;Four pieces of panel head and the tail connections form rectangular protecting frame frame, the corresponding end of adjacent two pieces of panels Upper and lower annulus in set U-shaped pin to realize both connections.
It is preferred that, the panel cross section is isosceles trapezoid.
It is preferred that, the external diameter of the internal diameter and the U-shaped pin of the upper and lower annulus of panel matches.
It is preferred that, the height of the U-shaped pin is more than the height of rectangular protecting frame frame.
It is preferred that, the panel top edge is provided with Heave Here, and Heave Here is vertically arranged.
It is preferred that, the surfaces externally and internally of the panel is marked with scale.
It is preferred that, the Heave Here is prominent ring-type, and the quantity of Heave Here is 1-3.
Compared with prior art, the utility model has the advantages that:
The utility model includes four pieces of panels and four U-shaped pins, and the panel is in the certain distance apart from both sides of the edge Two annulus are respectively provided with above and below place, therefore 4 annulus are had on each panel, annulus or so control and the height all same set, The annulus of the same side of panel is vertically aligned two-by-two.The panel of four pieces of same specifications is assembled two-by-two, then inserts adjacent two with U-shaped pin Rectangular protecting frame frame is constituted in the annulus at the edge of block panel, monitoring instrument is placed in the center of rectangular protecting frame frame, by inciting somebody to action The native grinding compacting in dam inside and outside rectangular protecting frame frame, rectangular frame can effectively prevent the external shock power during dam construction, And assembling is quick and easy, reaches the protective effect to monitoring instrument.
The internal diameter of annulus on panel is adapted with the diameter of U-shaped pin, to make panel knot after U-shaped pin insertion annulus Close even closer, the rectangular protecting frame frame of formation is more firm, impact resistance is more stablized.
For the ease of rectangular frame assembling is more facilitated, the height of U-shaped pin should be higher than rectangular frame, when need When dismantling assembling, directly extracting U-shaped pin just can directly be carried out.
Required elevation is hung for the ease of the rectangular protecting frame frame is pulled out:Four pieces of panels should be provided with ceiling edge The Heave Here of prominent ring-type, can catch on Heave Here with machinery or manpower boom hoisting, and the dismounting of this rectangle protection device is simple, can 4 pieces of panels are lifted respectively.Therefore the deadweight of rectangular protecting frame frame is small and middle un-grooved, therefore rectangular protecting frame frame and inside and outside native Frictional force is small, it is not necessary to which large lifting equipment can be sling, and work progress is convenient, and dam construction progress is not influenceed.Preferably, institute State Heave Here and be uniformly arranged 1 ~ 3 at the top of four pieces of panels, this panel is all symmetrical, so lifting is convenient and strength-saving.
In order that rectangular protecting frame frame, which hangs to pull out to dam soil, rolls elevation, scale is put in the panel surface and outer surface, Scale is compareed during up pulling up to compare, and stops lifting when elevation needed for arrival, now position is new Roll elevation.
The utility model dexterously interfixes to form a rectangle using four pieces of panels with annulus and four U-shaped pins Protect-ing frame structure, simple in construction, cost is low, and joining method is convenient;Four pieces of panels of the utility model are fixed with U-shaped pin, Assembling it is more convenient, protect-ing frame structure lifted during, detachably into single panel, thus hang pull out when panel be mutually it is right Claim, only protect-ing frame structure just need to can be promoted to using easy boom hoisting by new elevation in lifting process, and without using Large-scale lifting appliance, has reached reduction expense, has reduced construction interference, the purpose of accelerating construction progress;U-shaped of the present utility model Pin and panel can be removed mutually, hang pull out when frictional resistance it is small, dam soil will not be had a huge impact.
Brief description of the drawings
Fig. 1 is overlooking the structure diagram of the present utility model;
Fig. 2 is the structural side view of panel described in the utility model;
Fig. 3 is the structure top view of panel described in the utility model;
Fig. 4 is the structural representation of U-shaped pin described in the utility model.
In figure:1 panel, 2 annulus, 3 U-shaped pins, 4 Heave Heres, 5 scales.
Embodiment
Technical solutions of the utility model are described in detail below, but protection domain of the present utility model do not limit to The embodiment.
Embodiment:As shown in figure 1, a kind of monitoring instrument protection device, including four pieces of panels 1 with annulus 2 and four U-shapeds Pin 3, as shown in Figure 2,3, the panel 1 at a certain distance from both sides of the edge up and down be respectively provided with two annulus 2, i.e., on Annulus, lower annulus, therefore 4 annulus 2, the control of annulus 2 or so and the height all same set are had on each panel 1, panel 1 The annulus 2 of the same side is vertically aligned two-by-two.The panel 1 of four pieces of same specifications is assembled two-by-two, then inserts adjacent two pieces with U-shaped pin 3 Rectangular protecting frame frame is constituted in the annulus 2 at the edge of panel 1, as shown in figure 4, the internal diameter that the diameter of U-shaped pin 3 should be with annulus 2 It is adapted, lifting as shown in figure 1, first by all extractions of 4 U-shaped pins 3, then lift by crane four pieces of panels 1, by monitoring instrument respectively The center of rectangular protecting frame frame is placed in, by the way that by the native grinding compacting in dam inside and outside rectangular protecting frame frame, rectangular protecting frame frame can have Effect prevents external shock power during dam construction, and assembling process is quick and easy, has reached the protective effect to monitoring instrument.
The panel 1 is being respectively provided with circle on two annulus 2, the panel 1 up and down at a certain distance from both sides of the edge The internal diameter of ring 2 is adapted with the diameter of U-shaped pin 3, to make panel combine even closer, shape after the insertion annulus 2 of U-shaped pin 3 Into rectangular protecting frame frame it is more firm, impact resistance more stablize.It is more square for the ease of the rectangular frame is assembled Just, the height of U-shaped pin 3 should be higher than rectangular frame, and when needing to dismantle assembling, directly extracting U-shaped pin 3 just can be direct Carry out.
The panel 1 is evenly provided with the Heave Here 4 of two prominent ring-types in top edge respectively, completes whole square In the assembly working of shape protect-ing frame structure, the dam soil outside protect-ing frame structure is rolled, to covering monitoring instrument in protect-ing frame structure Dam soil is closely knit with small vibrating apparatus layered rolling, until reaching same elevation with outer box dam soil, uses manpower or simple lifting Device hooks Heave Here, and panel 1 is lifted respectively, it is not necessary to which large lifting equipment can be sling, and work progress is convenient, not influenceed Dam construction progress.
As shown in Fig. 2 putting on scale 5 on the surface of panel 1 and outer surface, scale is compareed during up pulling up Compare, stop lifting when elevation needed for arrival, now elevation is rolled in position for new.
As described above, although the utility model has been represented and described with reference to specific preferred embodiment, it must not Explain to limitation of the present utility model, do not departing from the premise for the spirit and scope of the present utility model that appended claims are defined Under, can various changes can be made in the form and details to it.

Claims (7)

1. a kind of monitoring instrument buries protection device, it is characterized in that, the protection device includes four pieces of panels(1), four U-shaped pins Bolt(3), every piece of panel(1)Medial surface both upper ends thereof be arranged with annulus(2), every piece of panel(1)Medial surface bottom two End is arranged with lower annulus(2), every piece of panel(1)With the upper annulus on one end top(2)With the lower annulus of its underpart(2)Coaxial line Set;Upper and lower annulus(2)It is horizontally disposed, upper and lower annulus(2)With panel(1)It is vertically arranged;Four pieces of panels(1)Head and the tail connection shape Rectangular protect-ing frame structure, adjacent two pieces of panels(1)Corresponding end upper and lower annulus(2)It is middle that U-shaped pin is set(3)Realize both Connection.
2. monitoring instrument according to claim 1 buries protection device, it is characterised in that:The panel(1)Cross section is Isosceles trapezoid.
3. monitoring instrument according to claim 1 buries protection device, it is characterised in that:The panel(1)Upper and lower annulus (2)Internal diameter and the U-shaped pin(3)External diameter match.
4. monitoring instrument according to claim 1 buries protection device, it is characterised in that:The U-shaped pin(3)Height More than the height of rectangular protecting frame frame.
5. monitoring instrument according to claim 1 buries protection device, it is characterised in that:The panel(1)Top edge Provided with Heave Here(4), Heave Here(4)It is vertically arranged.
6. monitoring instrument according to claim 1 buries protection device, it is characterised in that:The panel(1)Interior appearance Face is marked with scale(5).
7. monitoring instrument according to claim 5 buries protection device, it is characterised in that:The Heave Here(4)For protrusion Ring-type, Heave Here(4)Quantity be 1-3.
CN201720037052.5U 2017-01-13 2017-01-13 A kind of dam monitoring instrument embedding protection device Expired - Fee Related CN206457791U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720037052.5U CN206457791U (en) 2017-01-13 2017-01-13 A kind of dam monitoring instrument embedding protection device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720037052.5U CN206457791U (en) 2017-01-13 2017-01-13 A kind of dam monitoring instrument embedding protection device

Publications (1)

Publication Number Publication Date
CN206457791U true CN206457791U (en) 2017-09-01

Family

ID=59699054

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720037052.5U Expired - Fee Related CN206457791U (en) 2017-01-13 2017-01-13 A kind of dam monitoring instrument embedding protection device

Country Status (1)

Country Link
CN (1) CN206457791U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107907379A (en) * 2017-12-30 2018-04-13 扬州大学 A kind of Portable underground water sampler

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107907379A (en) * 2017-12-30 2018-04-13 扬州大学 A kind of Portable underground water sampler
CN107907379B (en) * 2017-12-30 2023-12-22 扬州大学 Portable groundwater sampling device

Similar Documents

Publication Publication Date Title
CN203247012U (en) Composite insulator hoisting fixture
CN206502579U (en) Power pole hoisting device
CN203372984U (en) Beam body pulley turnover device
CN206457791U (en) A kind of dam monitoring instrument embedding protection device
CN207877121U (en) A kind of equipment for supporting patient with burn of steel box-girder
CN205975489U (en) Monitoring instrument embedding protective device
CN106120644A (en) A kind of monitoring instrument buries protection device underground
CN202156868U (en) Lifting device for overweight and oversized thin-wall tower devices
CN205954572U (en) Novel protection is buried underground to dam safety monitoring instrument device
CN207211918U (en) Internally lifting pole
CN202988556U (en) Special lifting appliance for angle-steel type frame body
CN206220461U (en) A kind of packaged type I-steel hoistway operation platform
CN205772956U (en) Novel tower crane counterweight is from dismantling device
CN205527632U (en) Vertical well lid door opening device
CN201961952U (en) Electronic translation of novel bridge crane clamp
CN204873463U (en) Crane hook protector of voiced light suggestion
CN207986495U (en) A kind of Bridge High-pier main reinforcement hanging apparatus
CN203754232U (en) Simple steel rail lifting tool
CN206969990U (en) The special auxiliary hoisting device of steel grating structure workshop construction
CN103061315B (en) Monitoring instrument embedding protective device
CN203760929U (en) Tension tower line-tightening steering pulley used during construction of power transmission line tower
CN207713240U (en) A kind of magnetic force boom hoisting suitable for different size steel plates
CN203096700U (en) Protecting device used for embedding of monitoring instrument
CN202988576U (en) Simple and easy chain hoist lifting support
CN202825155U (en) Medium and small sleeve drawing device for blast furnace iron making

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20170901

CF01 Termination of patent right due to non-payment of annual fee