CN205975489U - Monitoring instrument embedding protective device - Google Patents
Monitoring instrument embedding protective device Download PDFInfo
- Publication number
- CN205975489U CN205975489U CN201620892497.7U CN201620892497U CN205975489U CN 205975489 U CN205975489 U CN 205975489U CN 201620892497 U CN201620892497 U CN 201620892497U CN 205975489 U CN205975489 U CN 205975489U
- Authority
- CN
- China
- Prior art keywords
- panel
- annulus
- panels
- monitoring instrument
- protection device
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Revetment (AREA)
Abstract
The utility model discloses a monitoring instrument embedding protective device, including two first panels, two second panels and four pins, two kinds of panels all are equipped with two rings on the minor face edge, 4 total rings on every panel of event, ring on the first panel set up highly all with the high difference of the ring of second panel, two liang of vertical alignment of ring of two kinds of panels, reuse pin inserts and constitutes rectangle protective frame in the ring of placing four panels perpendicularly, arrange the monitoring instrument in at rectangle protective frame's center, it is real to grind compacting through the soil of the dam with inside and outside the rectangle protective frame, rectangular frame can effectively prevent the external impact force in the dykes and dams work progress, and the equipment is quick simple, reach the guard action to the monitoring instrument, the utility model discloses utilize panel and pin rectangular frame of formation of each other nested of taking the ring ingeniously, simple structure, construction convenience, when protective frame promoted, the frictional resistance was little, lifted by crane simply, need not use the large -scale equipment that lifts by crane, had reached the reduction expense for the mesh of construction progress.
Description
Technical field
This utility model is related to a kind of monitoring instrument and in particular to a kind of monitoring instrument buries protection device.
Background technology
In hydraulic engineering during dam construction, often burying about and disposing substantial amounts of monitoring instrument, for supervising
The construction of control dykes and dams and running status.Due to there being the presence of big machinery in work progress, its enormous impact conducted oneself with dignity and bring
Power influences whether monitoring instrument, so that arranging corresponding preventer in embedded instrument periphery.Existing protection device master
Have several as follows:The first is the periphery that one large-scale cylindrical steel cylinder of arrangement is placed on monitoring instrument, when the outer side dam of steel drum
After body rolls end, put into monitoring instrument, then extract by closely knit for dam soil cal rolling in cylinder and then by steel cylinder, one point instrument is complete
Embedded process is become to complete;Second is assembled with several blocks of Qian shape plates, including two piece of first Qian shape plate and two piece of second Qian shape
Plate, two right angles of each the first Qian shape plate are respectively embedded into the L-shaped draw-in groove composition rectangular protecting frame frame of two the second Qian shape plates, will
Monitoring instrument is placed in the center of rectangular protecting frame frame.
Both the above device mainly has some deficiency following:The first device is disadvantageous in that steel cylinder deadweight and volume relatively
Greatly, transhipment, installation will use large-scale machinery, and construction is loaded down with trivial details, costly;Although second device structure is simple and constructs just
Victory, but because this device is to be spliced by several blocks of Qian shape plates, centre has draw-in groove, hangs that frictional resistance ratio when pulling out is larger, and gap is relatively
Greatly.
Utility model content
The purpose of this utility model is for the deficiencies in the prior art, provides a kind of structure simple and practical monitor
Protection device buried by device.
The purpose of this utility model is achieved through the following technical solutions, a kind of monitoring instrument protection device, including two pieces
First panel, two pieces of second panels and four pins, two pieces of first panels, two pieces of second panels surround rectangular protecting frame frame, and two
Block first panel is oppositely arranged, and two pieces of second panels are oppositely arranged;First panel both sides arrange the first annulus along short transverse, the
Two panel both sides arrange the second annulus along in short transverse, pin pass through first panel the first annulus, the second of second panel
Annulus realizes the connection of first and second panel.
Preferably, the inside radius of the first annulus of described first panel and the second annulus of second panel and pin external diameter phase
Adaptation.
Preferably, the first annulus of described first panel and the second annulus of second panel are crisscross arranged.
Preferably, the height of described pin is more than first and second panel height.
Preferably, the surfaces externally and internally of described first panel and second panel will put on scale.
Preferably, the quantity of the first annulus in described first panel is 2, the quantity of the first annulus in second panel
For 2, the first annulus is coaxially set with the first annulus.
Preferably, described first and second panel top is provided with the Heave Here of prominent ring-type
Compared with prior art, this utility model has the advantages that:This utility model monitoring instrument protection device
Including two pieces of first panels, two pieces of second panels and four pins, described two panels are equipped with two circles on short side edge
Ring, therefore have 4 annulus on each panel, the height of the annulus setting in first panel is all with the annulus of second panel highly not
With the annulus of two kinds of panels is vertically aligned two-by-two, then is disposed vertically composition rectangle guarantor in the annulus of four pieces of panels with pin insertion
Shield framework, monitoring instrument is placed in the center of rectangular protecting frame frame, by by inside and outside rectangular protecting frame frame dam soil grinding compacting,
Rectangular frame can effectively prevent the external shock power during dam construction, and assembles quickly and easily, reaches to monitoring instrument
Protective effect.
The inside radius of two kinds of panel annulus is adapted with the thickness of pin, to make panel combine more after pin insertion annulus
Step up close, the rectangular protecting frame frame of formation is more firm, and impact resistance is more stable.
In order to further enhance the fixed effect of pin, the height of two kinds of panel annulus should mutually stagger, so that pin is solid
Fixed rectangular frame is firmer.
Convenient for the ease of assembling described rectangular frame, the height of pin should be higher than rectangular frame, works as needs
During dismounting assembling, directly extract pin and just can directly carry out.
Hang required elevation for the ease of pulling out described rectangular protecting frame frame, described four pieces of panels should be provided with ceiling edge
The Heave Here of prominent ring-type, available machinery or manpower boom hoisting catch on Heave Here, and the dismounting of this rectangle protection device is simple, can
4 pieces of panels are lifted respectively;Therefore the deadweight of rectangular protecting frame frame is little and middle un-grooved, therefore rectangular protecting frame frame and inside and outside soil
Frictional force is little it is not necessary to large lifting equipment can be sling, and work progress is convenient, does not affect dam construction progress.Preferably, institute
State Heave Here and be uniformly arranged 1 ~ 3 at described four pieces of panel tops, this panel is all symmetrical, so lifting is convenient and strength-saving.
In order that rectangular protecting frame frame hangs to pull out rolls elevation to dam soil, put on scale in described panel surface and outer surface,
During up pulling up, comparison scale compares, and stops lifting, now position is new when reaching required elevation
Roll elevation.
This utility model is dexterously interfixed using four pieces of panels with annulus and pin and forms a rectangular protecting frame
Frame, structure is simple, low cost, and joining method is convenient;
Four blocks of panel pins of this utility model are fixed, and assembling is more convenient, during protect-ing frame structure lifting,
Detachably become single panel, thus hang pull out when panel be symmetrical, only need to play lifting using easy in lifting process
Put and just protect-ing frame structure can be promoted to new elevation, and without using large-scale lifting appliance, reached reduction expense, reduce apply
Work interference, the purpose of accelerating construction progress;This utility model pin and panel can mutually be removed, hang pull out when frictional resistance little, right
Dam soil will not have a huge impact.
Brief description
Fig. 1 is the overlooking the structure diagram of this utility model monitoring instrument protection device;
Fig. 2 is the structural representation of the first panel of this utility model monitoring instrument protection device;
Fig. 3 is the structural representation of the second panel of this utility model monitoring instrument protection device;
Fig. 4 is the structural representation of the pin of this utility model monitoring instrument protection device.
Fig. 5 is the profile in Fig. 1 along A-A.
In figure:1 first panel, 2 second panels, 3 first annulus, 4 second annulus, 5 pins.
Specific embodiment
Below technical solutions of the utility model are described in detail, but protection domain of the present utility model do not limit to
Described embodiment.
Embodiment:As shown in figure 1, a kind of monitoring instrument protection device, including 1, two pieces of two pieces of first panels with annulus
Band annulus second panel 2 and four pins 5, as shown in Figure 2,3, first panel 1 is provided with the first annulus 3 at the edge of side, the
Two panels are provided with the second annulus 4, the annulus vertical alignment two-by-two of two kinds of panels in lateral edges, then are inserted with pin 5 and vertically put
Put composition rectangular protecting frame frame in the annulus of four pieces of panels, as shown in figure 4, the thickness of pin should be relative with the inside radius of annulus
Should, lifting, as shown in figure 1, first all extracting 4 pins, is then lifted by crane four pieces of panels respectively, monitoring instrument is placed in rectangle
The center of protect-ing frame structure, by by the dam soil grinding compacting inside and outside rectangular protecting frame frame, rectangular protecting frame frame can effectively prevent dike
External impulsive force in dam work progress, assembling process quickly and easily, has reached the protective effect to monitoring instrument.
The inside radius of described panel 1 and panel 2 annulus is adapted with the thickness of pin 5, so that pin 5 inserts the first annulus
3rd, panel is made to combine after the second annulus 4 even closer, the rectangular protecting frame frame of formation is more firm, and impact resistance is more steady
Fixed.First panel 1 and second panel 2 are equipped with annulus, the inside radius of described two panel annulus and the thickness of pin 5 in side
It is adapted, so that pin 5 inserts the first annulus 3, even closer, the rectangular protecting frame of formation that makes panel combine after the second annulus 4
Frame is more firm, and impact resistance is more stable.In order to further enhance the fixed effect of pin 5, the height of two kinds of panel annulus
Degree should mutually stagger, so that the rectangular frame that pin 5 is fixed into is firmer.For the ease of described rectangular frame is assembled more
Convenient, the height of pin 5 should be higher than rectangular frame, when needing dismounting assembling, directly extracts pin 5 and just can directly enter
OK.
Described first panel 1 and second panel 2 are evenly provided with the lifting of two prominent ring-types respectively in top
Point, in the assembly working completing whole rectangular protecting frame frame, the dam soil outside protect-ing frame structure is rolled, in protect-ing frame structure
The dam soil small vibrating apparatus layered rolling covering monitoring instrument is closely knit, until reaching same elevation with outer box dam soil, uses
Manpower or simple lifting appliance hook Heave Here, two pieces of first panels 1 and two pieces of second panels 2 are lifted respectively it is not necessary to big
Heavy-duty hoisting equipment can be sling, and work progress is convenient, does not affect dam construction progress.
As shown in figure 5, putting on scale in described panel surface and outer surface, compare scale ratio during up pulling up
Relatively, stop lifting when reaching required elevation, now position is new to roll elevation.
Monitoring instrument is placed in the center of rectangular protecting frame frame, close by rolling the dam soil inside and outside rectangular protecting frame frame
Real, rectangular frame can effectively prevent the external shock power during dam construction, and assembles quickly and easily, reaches to monitoring instrument
Protective effect;This utility model dexterously forms a rectangular frame, knot using the panel with annulus and pin are nested against one another
Structure is simple, easy construction, and when protect-ing frame structure is lifted, frictional resistance is little, and lifting is simple, without using large-scale lifting appliance, reaches
Reduction expense, the purpose of accelerating construction progress are arrived.
Although as described above, having represented with reference to specific preferred embodiment and having described this utility model, it must not
Explain to restriction of the present utility model, in the premise of the spirit and scope of the present utility model defining without departing from claims
Under, can various changes can be made in the form and details to it.
Claims (7)
1. a kind of monitoring instrument buries protection device it is characterised in that described protection device includes two pieces of first panels(1), two
Block second panel(2)With four pins(5), two pieces of first panels(1), two pieces of second panels(2)Surround rectangular protecting frame frame, two
Block first panel(1)It is oppositely arranged, two pieces of second panels(2)It is oppositely arranged;First panel(1)Both sides are along short transverse setting the
One annulus(3), second panel(2)Both sides arrange the second annulus along in short transverse(4), pin(5)Through first panel(1)'s
First annulus(3), second panel(2)The second annulus(4)Realize first and second panel(1、2)Connection.
2. monitoring instrument according to claim 1 buries protection device it is characterised in that described first panel(1)?
One annulus(3)With second panel(2)The second annulus(4)Inside radius and pin(5)External diameter is adapted.
3. monitoring instrument according to claim 1 and 2 buries protection device it is characterised in that described first panel(1)'s
First annulus(3)With second panel(2)The second annulus(4)It is crisscross arranged.
4. monitoring instrument according to claim 3 buries protection device it is characterised in that described pin(5)Height big
In first and second panel(1、2)Highly.
5. monitoring instrument according to claim 4 buries protection device it is characterised in that described first panel(1)With
Two panels(2)Surfaces externally and internally to put on scale.
6. monitoring instrument according to claim 5 buries protection device it is characterised in that described first panel(1)On
First annulus(3)Quantity be 2, second panel(2)On the first annulus(4)Quantity be 2, the first annulus(3)With
One annulus(4)It is coaxially set.
7. monitoring instrument according to claim 6 buries protection device it is characterised in that described first and second panel(1)Top
Portion is provided with the Heave Here of prominent ring-type.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620892497.7U CN205975489U (en) | 2016-08-17 | 2016-08-17 | Monitoring instrument embedding protective device |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620892497.7U CN205975489U (en) | 2016-08-17 | 2016-08-17 | Monitoring instrument embedding protective device |
Publications (1)
Publication Number | Publication Date |
---|---|
CN205975489U true CN205975489U (en) | 2017-02-22 |
Family
ID=58030783
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201620892497.7U Expired - Fee Related CN205975489U (en) | 2016-08-17 | 2016-08-17 | Monitoring instrument embedding protective device |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN205975489U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106120644A (en) * | 2016-08-17 | 2016-11-16 | 扬州大学 | A kind of monitoring instrument buries protection device underground |
-
2016
- 2016-08-17 CN CN201620892497.7U patent/CN205975489U/en not_active Expired - Fee Related
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106120644A (en) * | 2016-08-17 | 2016-11-16 | 扬州大学 | A kind of monitoring instrument buries protection device underground |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102877680B (en) | Construction method for prefabricated column to be lifted in position for one time | |
CN103711078A (en) | Temporary girder-type support for bridge construction and dismantling method thereof | |
CN203372984U (en) | Beam body pulley turnover device | |
CN205975489U (en) | Monitoring instrument embedding protective device | |
CN206767425U (en) | A kind of integral hoisting device for rapid for ground-connecting-wall steel reinforcement cage | |
CN106120644A (en) | A kind of monitoring instrument buries protection device underground | |
CN207877121U (en) | A kind of equipment for supporting patient with burn of steel box-girder | |
CN206457791U (en) | A kind of dam monitoring instrument embedding protection device | |
CN205954572U (en) | Novel protection is buried underground to dam safety monitoring instrument device | |
CN206016412U (en) | Deflecting plate | |
CN207211918U (en) | Internally lifting pole | |
CN205527632U (en) | Vertical well lid door opening device | |
CN203096700U (en) | Protecting device used for embedding of monitoring instrument | |
CN206969990U (en) | The special auxiliary hoisting device of steel grating structure workshop construction | |
CN208187422U (en) | A kind of embedded protective device of monitoring instrument | |
CN207713240U (en) | A kind of magnetic force boom hoisting suitable for different size steel plates | |
CN207030731U (en) | A kind of more cabin piping lane adjustable horizontal boom hoistings | |
CN203760929U (en) | Tension tower line-tightening steering pulley used during construction of power transmission line tower | |
CN103061315B (en) | Monitoring instrument embedding protective device | |
CN206278833U (en) | It is a kind of can assembled list hanger of the Rapid Rooting on steel construction H profile steel flange plate | |
CN206088904U (en) | Guide tracked lift of guide rail detachable | |
CN206208527U (en) | A kind of large rocket engine and frame entirety turnover fixture | |
CN206384744U (en) | A kind of simple and easy hoisting device | |
CN205187625U (en) | Normal close formula hoist and mount flange device | |
CN203583476U (en) | Ground anchor plate for concrete ground |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20170222 Termination date: 20170817 |