CN206278833U - It is a kind of can assembled list hanger of the Rapid Rooting on steel construction H profile steel flange plate - Google Patents
It is a kind of can assembled list hanger of the Rapid Rooting on steel construction H profile steel flange plate Download PDFInfo
- Publication number
- CN206278833U CN206278833U CN201620899813.3U CN201620899813U CN206278833U CN 206278833 U CN206278833 U CN 206278833U CN 201620899813 U CN201620899813 U CN 201620899813U CN 206278833 U CN206278833 U CN 206278833U
- Authority
- CN
- China
- Prior art keywords
- hanging board
- iron wedge
- hanging
- steel construction
- flange plate
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Load-Engaging Elements For Cranes (AREA)
Abstract
The utility model be it is a kind of can assembled list hanger of the Rapid Rooting on steel construction H profile steel flange plate,Including hanging board,Rigid iron wedge and shackle,The hanging board side cuts off a part for L-shaped,The hanging board bottom is provided with hole for hoist,The hanging board has two,Two hanging boards are oppositely arranged,Hole for hoist aligns,Two hanging board connections,Two L-shaped breach of hanging board constitute convex breach,The hanging board middle part is provided with rigid iron wedge groove,The rigid iron wedge groove is connected with the L-shaped breach of hanging board,The shackle is connected through hole for hoist with hanging board,The hanging board is hung in steel construction H profile steel by convex breach,The rigid rigid iron wedge groove of iron wedge insertion,Specific position equipment is had bad luck using the utility model,Lifting,When centering works,Equipment stress is more reasonable,Reduce the security risk that difficulty of construction and equipment are installed,Increased efficiency of construction,Finished product protection is more perfect.
Description
Technical field
The utility model is related to equipment hoisting technical field, more particularly to one kind can Rapid Rooting in the steel construction H profile steel wing
Assembled list hanger on listrium.
Background technology
The infrastructure in-site installation device category such as electric power, industrial premises is more, and workload is larger, and general hall space
Relatively narrow, equipment installs more compact, and many distinct device installation sites are closer to the distance, there is crossover phenomenon or equipment peace
Holding position space is smaller.In installation process, the need of work such as the having bad luck, lift of many equipment, centering is in installation
The arrangement that related operation is taken root a little is carried out on steel construction temporarily, reserving hole is installed or in some positions using miscellaneous equipment
The wall of completion, the concrete roof perforate arrangement of constructing take root a little for meeting construction demand.
When wall to completion of having constructed, openings in the ceiling arrangement are taken root, the destruction to wall and top board it is more serious and
Follow-up repair process is complex, additionally causes construction cost to increase.Reserving hole is installed and is arranged using other equipment and take root a little
When, a position of taking root more is fixed, and how much there is deviation with an ideal position of taking root, cause to have bad luck, the operational difficulties such as centering compared with
Greatly, if especially lifting is taken root, some deviations are larger, and hanging device has imbalance, causes equipment difficult and security risk in place
It is corresponding to increase.
Being taken root on the steel construction of installation at present has two methods:One kind is in steel construction by wirerope-winding
On, one kind is that interim hanger is welded on steel construction.By wirerope-winding on steel structure beam or column, need to be in corner angle position
Cushioning semi-circular tube etc. is protected to steel wire rope, if weight of equipment is larger, easily cause steel wire rope produce it is expendable hard curved,
Cause steel wire rope mechanical properties decrease;Hanger is welded on steel construction, above-mentioned problem can be solved substantially, but with into
Product protective awareness strengthens and the requirement of related compulsive clause, and increasing owner and producer on steel construction not in being faced
When hanger welding, and interim hanger make, welding, and follow-up cutting, polishing etc. also have certain workload, for same
It is not strong that hanger access times few equipment in position installs practicality.
The content of the invention
The utility model aims to solve the problem that the deficiencies in the prior art, overcomes above-mentioned existing specific position equipment to install selection and takes root
The difficult problem of point, and provide it is a kind of can assembled list hanger of the Rapid Rooting on steel construction H profile steel flange plate.
The utility model to achieve the above object, using following technical scheme:One kind can Rapid Rooting in steel construction H profile steel
Assembled list hanger on flange plate, including hanging board, rigid iron wedge and shackle, one of the hanging board side excision L-shaped
Point, the hanging board bottom is provided with hole for hoist, and the hanging board has two, and two hanging boards are oppositely arranged, hole for hoist alignment, two
Individual hanging board connection, two L-shaped breach of hanging board constitute convex breach, and the hanging board middle part is provided with rigid iron wedge groove, institute
State rigid iron wedge groove to be connected with the L-shaped breach of hanging board, the shackle is connected through hole for hoist with hanging board, the hanging board leads to
Excess convexity v notch v is hung in steel construction H profile steel, the rigid rigid iron wedge groove of iron wedge insertion.
Described hanging board can be formed using the cutting of Q235 steel plates.
Described rigid iron wedge is used and is made with hanging board identical material.
Described rigid iron wedge gradient is 1:15.
Two described hanging boards are connected by screw bolts.
Described shackle uses GB 559-87 standard shackles.
Described shackle inner side spacing is more than 2 times of hanging plate thickness 10-30mm.
The beneficial effects of the utility model are:Taken root a little as what specific position equipment was installed using the utility model, kept away
Exempt to be destroyed to having built the wall of completion, top board by laying bricks or stones, the scene of reducing is done over again reparation phenomenon, reduces construction cost;Make
Specific position equipment is had bad luck with the utility model, is lifted, centering work when, equipment stress is more reasonable, reduces and applies
The security risk that work difficulty and equipment are installed, increased efficiency of construction, and finished product protection is more perfect;The utility model making side
Just, simple to operate and reusing is high, wide using scope, with practicality very high.
Brief description of the drawings
Fig. 1 is structural representation of the present utility model;
Fig. 2 is hanging plate structure schematic diagram of the present utility model;
Fig. 3 is rigid iron wedge structural representation of the present utility model;
In figure:1- shackles;2- hanging boards;3- rigidity iron wedges;4- steel construction H profile steels;5- rigidity iron wedge grooves;6- holes for hoist;
It is described in detail referring to the drawings below with reference to embodiment of the present utility model.
Specific embodiment
The utility model is described in further detail with reference to the accompanying drawings and examples:
As depicted in figs. 1 and 2, it is a kind of can assembled list hanger of the Rapid Rooting on steel construction H profile steel flange plate, including
Hanging board 2, rigid iron wedge 3 and shackle 1, the side of the hanging board 2 cut off a part for L-shaped, and the bottom of the hanging board 2 is provided with hangs
Dress hole 6, the hanging board 2 has two, and two hanging boards 2 are oppositely arranged, and hole for hoist 6 aligns, and two hanging boards 2 are connected, two
The L-shaped breach of hanging board 2 constitutes convex breach, and the middle part of the hanging board 2 is provided with rigid iron wedge groove 5, the rigid iron wedge groove 5 with
The L-shaped breach connection of hanging board 2, the shackle 1 is connected through hole for hoist 6 with hanging board 2, and the hanging board 2 is lacked by convex
Mouth is hung in steel construction H profile steel 4, and the rigid iron wedge 3 inserts rigid iron wedge groove 5.
Described hanging board 2 can be formed using the cutting of Q235 steel plates.
Described rigid iron wedge 3 is used and is made with the identical material of hanging board 2.
As shown in figure 3, the described rigid gradient of iron wedge 3 is 1:15.
Two described hanging boards 2 are connected by screw bolts.
Described shackle 1 uses GB 559-87 standard shackles.
The described inner side spacing of shackle 1 is more than 2 times of thickness 10-30mm of hanging board 2.
The utility model is exemplarily described above in conjunction with accompanying drawing, it is clear that the utility model is implemented not to be received
The limitation of aforesaid way, if the various improvement that method design of the present utility model and technical scheme are carried out are employed, or without
Improvement directly applies to other occasions, within protection domain of the present utility model.
Claims (7)
1. a kind of can assembled list hanger of the Rapid Rooting on steel construction H profile steel flange plate, it is characterised in that including hanging board
(2), rigid iron wedge (3) and shackle (1), hanging board (2) side cut off a part for L-shaped, and hanging board (2) bottom sets
There is hole for hoist (6), the hanging board (2) there are two, and two hanging boards (2) are oppositely arranged, hole for hoist (6) alignment, two hangings
Plate (2) is connected, and two L-shaped breach of hanging board (2) constitute convex breach, and hanging board (2) middle part is provided with rigid iron wedge groove
(5), the rigid iron wedge groove (5) connects with the L-shaped breach of hanging board (2), and the shackle (1) is through hole for hoist (6) and hangs
Plate (2) is connected, and the hanging board (2) is hung in steel construction H profile steel (4) by convex breach, and rigid iron wedge (3) insertion is firm
Property iron wedge groove (5).
2. according to claim 1 can assembled list hanger of the Rapid Rooting on steel construction H profile steel flange plate, its feature
It is that described hanging board (2) can be formed using the cutting of Q235 steel plates.
3. according to claim 1 can assembled list hanger of the Rapid Rooting on steel construction H profile steel flange plate, its feature
It is that described rigid iron wedge (3) uses and is made with hanging board (2) identical material.
4. according to claim 1 can assembled list hanger of the Rapid Rooting on steel construction H profile steel flange plate, its feature
It is that described rigid iron wedge (3) gradient is 1:15.
5. according to claim 1 can assembled list hanger of the Rapid Rooting on steel construction H profile steel flange plate, its feature
It is that two described hanging boards (2) are connected by screw bolts.
6. according to claim 1 can assembled list hanger of the Rapid Rooting on steel construction H profile steel flange plate, its feature
It is that described shackle (1) uses GB 559-87 standard shackles.
7. according to claim 1 can assembled list hanger of the Rapid Rooting on steel construction H profile steel flange plate, its feature
It is that described shackle (1) inner side spacing is more than 2 times of hanging board (2) thickness 10-30mm.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620899813.3U CN206278833U (en) | 2016-08-17 | 2016-08-17 | It is a kind of can assembled list hanger of the Rapid Rooting on steel construction H profile steel flange plate |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620899813.3U CN206278833U (en) | 2016-08-17 | 2016-08-17 | It is a kind of can assembled list hanger of the Rapid Rooting on steel construction H profile steel flange plate |
Publications (1)
Publication Number | Publication Date |
---|---|
CN206278833U true CN206278833U (en) | 2017-06-27 |
Family
ID=59084106
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201620899813.3U Active CN206278833U (en) | 2016-08-17 | 2016-08-17 | It is a kind of can assembled list hanger of the Rapid Rooting on steel construction H profile steel flange plate |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN206278833U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111874825A (en) * | 2020-06-12 | 2020-11-03 | 中国二冶集团有限公司 | Construction method for hoisting component by using unconventional hoisting equipment |
-
2016
- 2016-08-17 CN CN201620899813.3U patent/CN206278833U/en active Active
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111874825A (en) * | 2020-06-12 | 2020-11-03 | 中国二冶集团有限公司 | Construction method for hoisting component by using unconventional hoisting equipment |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103835527B (en) | A kind of dismountable supporting device | |
CN206278833U (en) | It is a kind of can assembled list hanger of the Rapid Rooting on steel construction H profile steel flange plate | |
CN206308702U (en) | A kind of portable basis of derrick crane | |
CN203271096U (en) | Operating platform | |
CN202546011U (en) | Double-layer cable bridge | |
CN103628498B (en) | T-shaped foundation bolt hole method for blocking | |
CN203808541U (en) | Tool guardrail for use on H-beams | |
CN209065274U (en) | A kind of simple lifting tool for I-beam hanging point | |
CN203938396U (en) | A kind of engineering hanging device | |
KR101192265B1 (en) | Phc long pile construction machine and method thereof | |
CN207798583U (en) | Based on the more dimensional structure face shear boxs of limited block combined type | |
CN204205520U (en) | The cable trough safeguard structure of distribution box device | |
CN206480999U (en) | A kind of crane span structure for cable | |
CN105502146A (en) | Lifting device for European style transformer station | |
CN219315718U (en) | Pile foundation pile casing that can splice | |
CN204691399U (en) | The safe enclosing of a kind of sectional construction | |
CN206607893U (en) | A kind of posting component and posting | |
CN204689553U (en) | A kind of steady type equipment jacking apparatus | |
CN104018677B (en) | Reinforcing bar binding mould and using method | |
CN204643699U (en) | A kind of Simple And Practical lifting device | |
CN218595861U (en) | Sandwich plate hoisting clamp | |
CN204080619U (en) | A kind of fixed pedestal of bridge pier upper limb and bridge | |
CN214995801U (en) | Hanging scaffold capable of being quickly installed and detached | |
CN204751889U (en) | Jockey is used in concrete form hoist and mount | |
CN204342322U (en) | The counterbalanced weight structure of arm tower crane |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |