CN111874825A - Construction method for hoisting component by using unconventional hoisting equipment - Google Patents

Construction method for hoisting component by using unconventional hoisting equipment Download PDF

Info

Publication number
CN111874825A
CN111874825A CN202010556647.8A CN202010556647A CN111874825A CN 111874825 A CN111874825 A CN 111874825A CN 202010556647 A CN202010556647 A CN 202010556647A CN 111874825 A CN111874825 A CN 111874825A
Authority
CN
China
Prior art keywords
hoisting
lifting
bolt
shaped connecting
unconventional
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202010556647.8A
Other languages
Chinese (zh)
Inventor
贾成一
杜泽鹏
叶民强
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Second Metallurgy Group Co Ltd
Original Assignee
China Second Metallurgy Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Second Metallurgy Group Co Ltd filed Critical China Second Metallurgy Group Co Ltd
Priority to CN202010556647.8A priority Critical patent/CN111874825A/en
Publication of CN111874825A publication Critical patent/CN111874825A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66DCAPSTANS; WINCHES; TACKLES, e.g. PULLEY BLOCKS; HOISTS
    • B66D3/00Portable or mobile lifting or hauling appliances
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66DCAPSTANS; WINCHES; TACKLES, e.g. PULLEY BLOCKS; HOISTS
    • B66D2700/00Capstans, winches or hoists
    • B66D2700/01Winches, capstans or pivots
    • B66D2700/0183Details, e.g. winch drums, cooling, bearings, mounting, base structures, cable guiding or attachment of the cable to the drum

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The invention relates to a construction method for hoisting a component by using unconventional hoisting equipment, which comprises the following steps of firstly manufacturing an auxiliary device for hoisting the component by using the unconventional hoisting equipment, wherein the device comprises 2U-shaped connecting parts, lifting lugs, bolts and wedges which are symmetrically arranged on a lower flange plate of an H-shaped steel beam, and is characterized in that: a lifting lug is connected to the lower cover plate of the 2U-shaped connecting parts, and a lifting hole is formed in the middle of a bolt hole formed in the upper end of the lifting lug; the two lifting lugs are connected into a whole by the bolt; the wedge iron is formed by processing a steel plate; during construction, firstly, the 2U-shaped connecting parts are symmetrically placed on the lower flange plate of the H-shaped steel beam, then the U-shaped connecting parts are firmly fixed by wedges, the two lifting lugs are connected into a whole by bolts, and finally the inverted chain is hung in the lifting hole to carry out lifting operation.

Description

Construction method for hoisting component by using unconventional hoisting equipment
The technical field is as follows:
the invention relates to a construction method for hoisting a component by using unconventional hoisting equipment, belonging to the field of construction of constructional engineering.
Secondly, background art:
when the maintenance engineering construction of the steel structure factory building is carried out, the condition that the hoisting operation of the component can not be carried out by a crane due to the limitation of site conditions and needs to be completed by an unconventional means is usually met, in the prior art, when a certain component needs to be hoisted, a method is generally adopted, wherein a temporary lifting lug is welded on a lower flange plate of a beam above the component to be hoisted, then a chain block is hung on the temporary lifting lug, the component hoisting work is completed through the chain block, when the component is just positioned below the crane beam in the factory building, the temporary lifting lug is not allowed to be welded on the lower flange plate of the crane beam according to the design and specification requirements, or when inflammable goods are arranged below the H-shaped steel beam and the temporary lifting lug is not convenient to weld on the lower flange plate of the H-shaped steel beam, the hoisting work of the components below the crane beam or the H-beam in the plant cannot be completed.
Thirdly, the invention content:
aiming at the defects of the prior art, the invention provides the construction method for hoisting the component by using the unconventional hoisting equipment, which is simple to operate and convenient to use.
The technical problem to be solved by the invention is to provide a construction method for hoisting a component by using unconventional hoisting equipment, which comprises the following steps of firstly manufacturing an auxiliary device for hoisting the component by using the unconventional hoisting equipment, wherein the device comprises 2U-shaped connecting parts, lifting lugs, bolts and wedges which are symmetrically arranged on a lower flange plate of an H-shaped steel beam, and is characterized in that: the 2U-shaped connecting parts are processed by steel plates, and lifting lugs are welded at the end parts, close to the opening, of the lower cover plate; the upper end of the lifting lug is provided with at least two bolt holes, and the middle part of the lifting lug is provided with a hoisting hole; the bolt penetrates into the bolt hole, and the two lifting lugs are connected into a whole by screwing the bolt; the wedge iron is formed by processing a steel plate; during construction, firstly, the 2U-shaped connecting parts are symmetrically placed on the lower flange plate of the H-shaped steel beam, then the wedge iron penetrates into a gap between the upper cover plate of the U-shaped connecting part and the lower flange plate of the H-shaped steel beam, the wedge iron is knocked to fix the U-shaped connecting part firmly, the bolt penetrates into the bolt hole in the lifting lug, the two lifting lugs are connected into a whole by screwing the bolt, and finally, the inverted chain is hung in the lifting hole in the lifting lug to carry out lifting operation.
The invention has the following beneficial and positive effects: the construction method is simple to operate, convenient and quick to construct, convenient to dismantle and reusable, can be quickly installed and fixed on the lower flange plates of the H-shaped steel beams with different specifications without damaging the H-shaped steel beams, effectively solves the problem that temporary lifting lugs cannot be welded on the lower flange plates of the H-shaped steel beams when the crane beam works below the crane beam, or cannot be hoisted due to the fact that the temporary lifting lugs cannot be welded on the lower flange plates of the H-shaped steel beams or flammable objects are arranged below the H-shaped steel beams.
Description of the drawings
FIG. 1: first assembly diagram of the embodiment of the invention
FIG. 2: the invention is a schematic structural diagram
FIG. 3: second assembly diagram of the embodiment of the invention
Fifth, detailed description of the invention
The first embodiment is as follows: referring to fig. 1 and 2, the invention relates to a construction method for hoisting a component by using unconventional hoisting equipment, which comprises the following steps of firstly manufacturing an auxiliary device for hoisting the component by using the unconventional hoisting equipment, wherein the device comprises 2U-shaped connecting parts 6 symmetrically arranged on a lower flange plate of an H-shaped steel beam, a lifting lug 2, a bolt 5 and a wedge 7, and is characterized in that: the 2U-shaped connecting parts 6 are processed by steel plates, and lifting lugs 2 are welded at the end parts, close to the opening, of the lower cover plates; the upper end of the lifting lug 2 is provided with at least two bolt holes 3, and the middle part of the lifting lug 2 is provided with a hoisting hole 4; the bolt 5 penetrates into the bolt hole 3, and the two lifting lugs 2 are connected into a whole by screwing the bolt 5; the wedge iron 7 is formed by processing a steel plate; during construction, firstly, 2U-shaped connecting parts 6 are symmetrically placed on a lower flange plate of an H-shaped steel beam 1, then a wedge 7 is penetrated into a gap between an upper cover plate of the U-shaped connecting part 6 and the lower flange plate of the H-shaped steel beam 1, the wedge 7 is knocked to fix the U-shaped connecting part 6 firmly, a bolt 5 is penetrated into a bolt hole 3 on a lifting lug 2, the bolt 5 is screwed to connect two lifting lugs 2 into a whole, and finally, a chain block is hung in a lifting hole 4 on the lifting lug 2, so that the lifting operation can be carried out.
Example two: referring to fig. 2 and 3, when the lower flange plate of the H-shaped beam 1 is wide and the inverted chain cannot be hung in the hoisting holes 4 of the two lifting lugs 2, a short section of steel wire rope 8 can be firstly inserted into the hoisting holes 4 of the two lifting lugs 2, and then the inverted chain is hung in the rope loop of the steel wire rope 8, so that the hoisting operation can be performed.

Claims (2)

1. A construction method for hoisting a component by using unconventional hoisting equipment comprises the steps of firstly manufacturing an auxiliary device for hoisting the component by using the unconventional hoisting equipment, wherein the auxiliary device comprises 2U-shaped connecting parts (6), lifting lugs (2), bolts (5) and wedges (7) which are symmetrically arranged on a lower flange plate of an H-shaped steel beam, and is characterized in that: the 2U-shaped connecting parts (6) are processed by steel plates, and lifting lugs (2) are welded at the end parts, close to the opening, of the lower cover plate; the upper end of the lifting lug (2) is provided with at least two bolt holes (3), and the middle part of the lifting lug (2) is provided with a hoisting hole (4); the bolt (5) penetrates into the bolt hole (3), and the two lifting lugs (2) are connected into a whole by screwing the bolt (5); the wedge iron (7) is formed by processing a steel plate; during construction, firstly, 2U-shaped connecting parts (6) are symmetrically placed on a lower flange plate of an H-shaped steel beam (1), then a wedge (7) is penetrated into a gap between an upper cover plate of the U-shaped connecting part (6) and a lower flange plate of the H-shaped steel beam (1), the wedge (7) is knocked to fix the U-shaped connecting part (6) firmly, a bolt (5) is penetrated into a bolt hole (3) on a lifting lug (2), the bolt (5) is screwed down to connect the two lifting lugs (2) into a whole, and finally, a chain block is hung in a lifting hole (4) on the lifting lug (2) to carry out lifting operation work.
2. The construction method for hoisting the component by using the unconventional hoisting equipment as claimed in claim 1, wherein the construction method comprises the following steps: the chain hoist is characterized by further comprising a steel wire rope (8), wherein the steel wire rope (8) penetrates into the hoisting holes (3) in the two lifting lugs (2), and the inverted chain is hung in a rope sleeve of the steel wire rope (8).
CN202010556647.8A 2020-06-12 2020-06-12 Construction method for hoisting component by using unconventional hoisting equipment Pending CN111874825A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202010556647.8A CN111874825A (en) 2020-06-12 2020-06-12 Construction method for hoisting component by using unconventional hoisting equipment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202010556647.8A CN111874825A (en) 2020-06-12 2020-06-12 Construction method for hoisting component by using unconventional hoisting equipment

Publications (1)

Publication Number Publication Date
CN111874825A true CN111874825A (en) 2020-11-03

Family

ID=73157647

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202010556647.8A Pending CN111874825A (en) 2020-06-12 2020-06-12 Construction method for hoisting component by using unconventional hoisting equipment

Country Status (1)

Country Link
CN (1) CN111874825A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113998575A (en) * 2021-11-24 2022-02-01 中国十九冶集团有限公司 Crane beam hoisting device, hoisting structure and hoisting method

Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH08333076A (en) * 1995-06-07 1996-12-17 Nishi Nippon Syst Kensetsu Kk Hanger for take-up drum or the like
JPH1160147A (en) * 1997-08-19 1999-03-02 Hitachi Metals Ltd Suspension fitting
JP2006131371A (en) * 2004-11-08 2006-05-25 Toshiba Corp Pipe suspending tool and suspending method
CN203390474U (en) * 2013-07-15 2014-01-15 中国二冶集团有限公司 Auxiliary turn-over device for I-shaped piece with big cross section
CN203667792U (en) * 2014-01-27 2014-06-25 山东电力建设第三工程公司 H type steel beam lifting lug
CN206172803U (en) * 2016-08-17 2017-05-17 中建钢构有限公司 Anchor clamps formula otic placode
CN206278833U (en) * 2016-08-17 2017-06-27 中国能源建设集团天津电力建设有限公司 It is a kind of can assembled list hanger of the Rapid Rooting on steel construction H profile steel flange plate
CN111217274A (en) * 2020-03-19 2020-06-02 北京城建集团有限责任公司 A hang in midair hoist that is used for assembled buckling restrained steel plate wall quick, high-efficient assembly
CN210710491U (en) * 2019-09-02 2020-06-09 上海二十冶建设有限公司 Movable hanger connecting structure

Patent Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH08333076A (en) * 1995-06-07 1996-12-17 Nishi Nippon Syst Kensetsu Kk Hanger for take-up drum or the like
JPH1160147A (en) * 1997-08-19 1999-03-02 Hitachi Metals Ltd Suspension fitting
JP2006131371A (en) * 2004-11-08 2006-05-25 Toshiba Corp Pipe suspending tool and suspending method
CN203390474U (en) * 2013-07-15 2014-01-15 中国二冶集团有限公司 Auxiliary turn-over device for I-shaped piece with big cross section
CN203667792U (en) * 2014-01-27 2014-06-25 山东电力建设第三工程公司 H type steel beam lifting lug
CN206172803U (en) * 2016-08-17 2017-05-17 中建钢构有限公司 Anchor clamps formula otic placode
CN206278833U (en) * 2016-08-17 2017-06-27 中国能源建设集团天津电力建设有限公司 It is a kind of can assembled list hanger of the Rapid Rooting on steel construction H profile steel flange plate
CN210710491U (en) * 2019-09-02 2020-06-09 上海二十冶建设有限公司 Movable hanger connecting structure
CN111217274A (en) * 2020-03-19 2020-06-02 北京城建集团有限责任公司 A hang in midair hoist that is used for assembled buckling restrained steel plate wall quick, high-efficient assembly

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113998575A (en) * 2021-11-24 2022-02-01 中国十九冶集团有限公司 Crane beam hoisting device, hoisting structure and hoisting method

Similar Documents

Publication Publication Date Title
CN201419967Y (en) Sling for large-scale components
CN214167082U (en) Special lifting device for pressure vessel
CN201176364Y (en) Hoisting tools of steel structure for H-shaped section steel component
CN111874825A (en) Construction method for hoisting component by using unconventional hoisting equipment
CN204983173U (en) Steel construction beam -column connection node
CN201116261Y (en) Tool type safety shackle for hanging steel crane beam
CN104018680A (en) Lifting method for large-span solid-web arc beam
CN204850048U (en) Overlap joint structure of quick hoist and mount of supplementary high -rise girder steel
CN212868112U (en) Auxiliary device for unconventional hoisting
CN210914945U (en) Hoisting device for upper structure of aluminum electrolytic cell
CN112392245A (en) Assembly type cantilever I-shaped steel beam operation device capable of being turned over without wall penetration and operation method thereof
CN213923845U (en) Hoisting beam mounting tool
CN105019556A (en) Lap-joint structure assisting quick hoisting of high-rise steel beam, and application of lap-joint structure
CN210594914U (en) Modularization drilling platform panel hoist
CN218595861U (en) Sandwich plate hoisting clamp
CN215946521U (en) Combined clamping type lifting appliance on H-shaped steel beam at top of factory building
CN111608202A (en) Reverse construction method basement ring beam steel bar installation method and device
CN214192283U (en) Large-diameter pipe jacking lifting device
CN219860058U (en) Prefabricated PC side fascia on-spot hoist
CN219156381U (en) Underground factory building bridge machine hoist device
CN219906667U (en) Crane beam circulation hoisting sling
CN216613753U (en) Roof beam hoist and mount that convenient scene was installed and removed uses hoist
CN210122447U (en) Special lifting appliance for lifting large-scale combined template
CN215048059U (en) Flange type guide pipe auxiliary lifting appliance
CN111042538A (en) Hoisting and mounting method of buckling restrained brace

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20201103