CN219860058U - Prefabricated PC side fascia on-spot hoist - Google Patents
Prefabricated PC side fascia on-spot hoist Download PDFInfo
- Publication number
- CN219860058U CN219860058U CN202320564218.4U CN202320564218U CN219860058U CN 219860058 U CN219860058 U CN 219860058U CN 202320564218 U CN202320564218 U CN 202320564218U CN 219860058 U CN219860058 U CN 219860058U
- Authority
- CN
- China
- Prior art keywords
- prefabricated
- lifting
- sleeve
- hole
- strength bolt
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 210000003195 fascia Anatomy 0.000 title claims description 10
- 229910000831 Steel Inorganic materials 0.000 claims abstract description 13
- 239000010959 steel Substances 0.000 claims abstract description 13
- 230000035515 penetration Effects 0.000 claims description 2
- 229910001294 Reinforcing steel Inorganic materials 0.000 abstract description 2
- 239000011513 prestressed concrete Substances 0.000 description 5
- 238000000034 method Methods 0.000 description 3
- 238000010276 construction Methods 0.000 description 2
- 238000005516 engineering process Methods 0.000 description 2
- 230000009286 beneficial effect Effects 0.000 description 1
- 230000000903 blocking effect Effects 0.000 description 1
- 239000004567 concrete Substances 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 238000004134 energy conservation Methods 0.000 description 1
- 230000007613 environmental effect Effects 0.000 description 1
- 238000004519 manufacturing process Methods 0.000 description 1
- 230000003014 reinforcing effect Effects 0.000 description 1
- 238000010008 shearing Methods 0.000 description 1
- 239000002699 waste material Substances 0.000 description 1
Landscapes
- Load-Bearing And Curtain Walls (AREA)
Abstract
The utility model relates to the technical field of assembled steel structure PC external wall panels, in particular to a prefabricated PC external wall panel on-site lifting appliance. The prefabricated PC external wall panel is internally provided with reinforcing steel bars, and the lifting appliance comprises a sleeve, a connecting plate and a high-strength bolt; the inner wall of the sleeve is provided with internal threads, the lower part of the sleeve is provided with a through hole, and the steel bar penetrates through the through hole to pre-arrange the sleeve in the prefabricated PC external wall panel; the connecting plate is fixedly connected with the lifting lug, a lifting hole is formed in the lifting lug, and a connecting hole is formed in the connecting plate; the high-strength bolt passes through the connecting hole and then is screwed into the internal thread of the sleeve. The utility model can ensure that the wallboard is lifted at a constant speed, does not crack, and does not break, and because the stress capability of a single lifting appliance is enhanced, the four-point symmetrical lifting is easy to balance, the 10.9-level high-strength bolt is stressed axially, the lifting point is not broken, the bolt is prevented from breaking, and the potential safety hazard is eliminated.
Description
Technical Field
The utility model relates to the technical field of assembled steel structure PC external wall panels, in particular to a prefabricated PC external wall panel on-site lifting appliance.
Background
In order to meet the requirements of energy conservation and environmental protection, reduce labor cost and reduce construction waste emission, develop an assembled steel structure and PC building system at full power, develop prefabricated prestressed concrete external wall boards in China and perfect wallboard manufacturing and mounting processes and equipment.
The lifting appliance is mainly used for lifting the prefabricated prestressed concrete external wall panel, the technology of the whole domestic prestressed concrete prefabricated wall panel is almost blank, so that the technology and lifting tool are not mature, the current general lifting rings are used on a few construction sites, the maximum load of the lifting rings is 3 tons at present, the minimum load of the prefabricated prestressed concrete external wall panel is about 13 tons, 6-point lifting is required at least, great difficulty is brought to lifting balance and load distribution, potential safety hazards of unbalanced load lifting object inclination are left, and meanwhile, the safety accidents of object falling and vehicle inclination are caused due to overload fracture of individual lifting points.
The existing lifting appliance is directly stressed by the threads, the threads mainly bear axial force, but when the prefabricated prestressed external wallboard is lifted, the threads need to bear huge shearing force in the lifting process of the wallboard, and thread breakage is very easy to cause.
Because the prefabricated prestressed concrete external wall panel is produced by adopting high-strength prestressed steel wires, the surface tension of the wall panel is very large, so that the design length of the wall panel is longer, two cranes are required to lift and hang in the lifting process, and any lifting point fails to cause the breakage of the whole wall panel.
The international general lifting appliance is more, and a tool suitable for lifting the wallboard is not found yet.
Disclosure of Invention
In order to solve the technical problems, the utility model discloses a prefabricated PC external wall panel on-site lifting appliance.
The specific technical scheme is as follows:
the utility model provides a prefabricated PC side fascia on-spot hoist, prefabricated PC side fascia inside preset reinforcing bar, hoist includes sleeve, connecting plate and high strength bolt; the inner wall of the sleeve is provided with internal threads, the lower part of the sleeve is provided with a through hole, and the steel bar penetrates through the through hole to pre-arrange the sleeve in the prefabricated PC external wall panel; the connecting plate is fixedly connected with the lifting lug, a lifting hole is formed in the lifting lug, and a connecting hole is formed in the connecting plate; the high-strength bolt passes through the connecting hole and then is screwed into the internal thread of the sleeve.
The sleeves are symmetrically arranged at four points on the prefabricated PC external wall panel.
And a gasket is additionally arranged between the high-strength bolt and the connecting plate.
And a plug is additionally arranged between the bottom of the high-strength bolt and the steel bar.
And the connecting plate and the lifting lug are welded in a vertical penetration way.
The high-strength bolt is a 10.9-level high-strength bolt.
Compared with the prior art, the utility model has the following beneficial technical effects:
the lifting appliance provided by the utility model can ensure that wallboards are lifted at a constant speed, cracks and fracture are avoided, and the lifting appliance is easy to balance due to the fact that the stress capability of a single lifting appliance is enhanced, the lifting appliance is symmetrical in 4 points, the bolts are stressed axially, the lifting points are not broken, and the 10.9-level high-strength bolts are used, so that the breakage of the bolts is avoided, and the potential safety hazard is eliminated.
Drawings
FIG. 1 is a top view of the spreader of the present utility model;
FIG. 2 is a cross-sectional view taken along section A-A of FIG. 1;
FIG. 3 is a schematic view of the structure of the sleeve according to the present utility model;
in the figure, 1, prefabricating a PC external wall panel; 2. a sleeve; 3. a connecting plate; 4. lifting lugs; 5. a hoisting hole; 6. a high-strength bolt; 7. a gasket; 8. reinforcing steel bars; 9. plugging; 10. and a through hole.
Detailed Description
The utility model will be further described with reference to the accompanying drawings, but the scope of the utility model is not limited to the accompanying drawings.
The utility model discloses a prefabricated PC external wall panel, wherein a steel bar 8 is preset in the prefabricated PC external wall panel, and a lifting appliance comprises a sleeve 2, a connecting plate 3 and a high-strength bolt 6; the inner wall of the sleeve 2 is provided with internal threads, the lower part of the sleeve 2 is provided with a through hole 10, the steel bar 8 passes through the through hole, the sleeve 2 is arranged in the prefabricated PC external wall panel 1 in advance, and the sleeve 2 is arranged in a four-point symmetry manner on the prefabricated PC external wall panel; the connecting plate 3 and the lifting lug 4 are vertically and thoroughly welded, a lifting hole 5 is formed in the lifting lug 4, and a connecting hole is formed in the connecting plate 3; the high-strength bolt 6 passes through the connecting hole and then is screwed into the internal thread of the sleeve 2, and a gasket 7 is additionally arranged between the high-strength bolt 6 and the connecting plate 3. A plug 9 is additionally arranged between the bottom of the high-strength bolt 6 and the steel bar 8 and used for blocking concrete, and the high-strength bolt 6 is a 10.9-level high-strength bolt.
When the connecting plate is used, the four sleeves 2 are symmetrically arranged in the prefabricated PC external wall panel 1 in advance, high-strength bolts 6 at four-point symmetry positions penetrate through connecting holes of the connecting plate 3 and then are screwed into internal threads of the sleeves 2, so that the connecting plate and the prefabricated PC external wall panel are fixed, and then the hanging ropes are hung at the hanging holes for hanging.
Claims (6)
1. The utility model provides a prefabricated PC side fascia (1) scene hoist which characterized in that: the steel bars (8) are preset in the prefabricated PC external wall panel (1), and the lifting appliance comprises a sleeve (2), a connecting plate (3) and a high-strength bolt (6); the inner wall of the sleeve (2) is provided with internal threads, the lower part of the sleeve (2) is provided with a through hole (10), the steel bar (8) passes through the through hole (10), and the sleeve (2) is preset in the prefabricated PC external wall panel (1); the connecting plate (3) is fixedly connected with the lifting lug (4), a lifting hole (5) is formed in the lifting lug (4), and a connecting hole is formed in the connecting plate (3); the high-strength bolt (6) passes through the connecting hole and is screwed into the internal thread of the sleeve (2).
2. The prefabricated PC side fascia (1) field sling according to claim 1, characterized in that: the sleeves (2) are symmetrically arranged at four points on the prefabricated PC external wall panel (1).
3. The prefabricated PC side fascia (1) field sling according to claim 1, characterized in that: a gasket (7) is additionally arranged between the high-strength bolt (6) and the connecting plate (3).
4. The prefabricated PC side fascia (1) field sling according to claim 1, characterized in that: a plug (9) is additionally arranged between the bottom of the high-strength bolt (6) and the steel bar (8).
5. The prefabricated PC side fascia (1) field sling according to claim 1, characterized in that: the connecting plate (3) and the lifting lug (4) are welded in a vertical penetration way.
6. The prefabricated PC side fascia (1) field sling according to claim 1, characterized in that: the high-strength bolt (6) is a 10.9-level high-strength bolt.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202320564218.4U CN219860058U (en) | 2023-03-21 | 2023-03-21 | Prefabricated PC side fascia on-spot hoist |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202320564218.4U CN219860058U (en) | 2023-03-21 | 2023-03-21 | Prefabricated PC side fascia on-spot hoist |
Publications (1)
Publication Number | Publication Date |
---|---|
CN219860058U true CN219860058U (en) | 2023-10-20 |
Family
ID=88319131
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202320564218.4U Active CN219860058U (en) | 2023-03-21 | 2023-03-21 | Prefabricated PC side fascia on-spot hoist |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN219860058U (en) |
-
2023
- 2023-03-21 CN CN202320564218.4U patent/CN219860058U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN206580442U (en) | A kind of hanging apparatus suitable for Assembled Building gangboard prefabricated components | |
CN219860058U (en) | Prefabricated PC side fascia on-spot hoist | |
CN211769817U (en) | Lifting appliance for chemical tower sections | |
CN218619794U (en) | Prefabricated stand special lifting device based on UHPC connects | |
CN202936737U (en) | Continuous beam cradle hoisting structure for corrugated steel webs | |
CN206624552U (en) | A kind of incineration furnace grate lifts special shoulder pole | |
CN106285015A (en) | Steel structural roof beam method for rapidly mounting based on location-plate | |
CN211110630U (en) | Multifunctional lifting appliance for lifting high-speed rail concrete box girder | |
CN202322137U (en) | Telescopic hanger | |
CN216737195U (en) | Steel column hoisting device | |
CN210084724U (en) | A general hoisting accessory is hung to plane four points for precast concrete component | |
CN209797239U (en) | special lifting appliance for quickly lifting tin bath bottom bricks of float glass production line | |
CN221479293U (en) | Cable tower main cable saddle grid reaction frame bolt lifting appliance | |
CN218969768U (en) | Hoisting device for corrugated steel web section beam | |
CN206969990U (en) | The special auxiliary hoisting device of steel grating structure workshop construction | |
CN212425121U (en) | Balance beam hoisting device | |
CN210064891U (en) | Linear four-point-crane universal hoisting device for precast concrete member | |
CN214192283U (en) | Large-diameter pipe jacking lifting device | |
CN212868112U (en) | Auxiliary device for unconventional hoisting | |
CN210084718U (en) | A general frock of lifting by crane for precast concrete member | |
CN211545685U (en) | Assembled hoisting point component device of super-huge prefabricated reinforced concrete structure | |
CN220664627U (en) | Prefabricated cavity post hoist and mount component | |
CN220201135U (en) | Hoisting auxiliary device for single machine double hoisting points of hoisting equipment | |
CN213294396U (en) | Auxiliary equipment for hoisting double-group hoisting rings of large prefabricated part of assembled bridge | |
CN216764076U (en) | Steel construction secondary beam hoisting structure |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |