CN204940374U - For the anti-breaking device of pile-end post-grouting Grouting Pipe of self-balancing approach peg - Google Patents

For the anti-breaking device of pile-end post-grouting Grouting Pipe of self-balancing approach peg Download PDF

Info

Publication number
CN204940374U
CN204940374U CN201520753903.7U CN201520753903U CN204940374U CN 204940374 U CN204940374 U CN 204940374U CN 201520753903 U CN201520753903 U CN 201520753903U CN 204940374 U CN204940374 U CN 204940374U
Authority
CN
China
Prior art keywords
grouting pipe
grouting
pile body
pile
self
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201520753903.7U
Other languages
Chinese (zh)
Inventor
张永志
王公胜
王艳森
孙文
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
GANSU PROVINCIAL ACADEMY OF BUILDING RESEARCH
Original Assignee
GANSU PROVINCIAL ACADEMY OF BUILDING RESEARCH
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by GANSU PROVINCIAL ACADEMY OF BUILDING RESEARCH filed Critical GANSU PROVINCIAL ACADEMY OF BUILDING RESEARCH
Priority to CN201520753903.7U priority Critical patent/CN204940374U/en
Application granted granted Critical
Publication of CN204940374U publication Critical patent/CN204940374U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Piles And Underground Anchors (AREA)

Abstract

The utility model relates to the equipment preventing Grouting Pipe to be pulled off in self-balancing approach peg process, is specially the anti-breaking device of pile-end post-grouting Grouting Pipe for self-balancing approach peg.It comprises pile body (1), the Grouting Pipe (2) that pile body (1) is inner pre-buried; Described pile body (1) interior lower end is embedded with load box (3), and its inside is also provided with Grouting Pipe (2), and its Grouting Pipe (2) two ends pass load box (3) and pile body (1); Described Grouting Pipe (2) outside is provided with disrance sleeve (4), upper end is provided with steel plug (5), lower end is provided with grouting valve (6), and disrance sleeve (4) upper end passes the top of pile body (1); Its disrance sleeve (4) up and down two ends symmetry be provided with sealing mat (7).Its beneficial effect is: structure is simple, easy to use, utilizes disrance sleeve to be separated by the concrete that Grouting Pipe and pile body are poured into, and after carrying out self-balancing approach peg, can ensure that pre-buried Grouting Pipe is not pulled off at load cell position.

Description

For the anti-breaking device of pile-end post-grouting Grouting Pipe of self-balancing approach peg
Technical field
The utility model relates to the equipment preventing Grouting Pipe to be pulled off in self-balancing approach peg process, is specially the anti-breaking device of pile-end post-grouting Grouting Pipe for self-balancing approach peg.
Background technology
Self-balancing approach is a kind of static load test method based on seeking to load counter-force in foundation pile inside.Correspondingly, the enforcement technology of this test method, is called " reflexive force method peg technology " or " self-balancing approach peg technology ".According to existing dossier of investigating, by domestic hat with " self-balancing approach " and name stake in pre-buried loading equipemtn carry out the method for pile's bearing properties detection, have AfarVasela company of Israel propose and implement early than generation nineteen sixty.Different from traditional accumulation load method, this technology is placed in bottom pile body by the load box made by the sizing of pile capacity parameter request in work progress, connect exert pressure oil pipe and displacement measuring device in stake top, after concrete curing to valid period of standard, exerted pressure to bottom load box by top high-voltage oil pump, draw the total frictional resistance of bearing capacity of pile tip and stake side.
And foundation pile autobalanced detection method is embedded load case in the middle of pile body, utilize the Balancing relization of stake self counter-force to the loading of pile body, be a kind of test method close to vertical compression, uplift pile actual operating conditions, the utmost tip resistance of single pile vertical resistance pressure, CAPO test and pile soil horizon, the utmost lateral friction of pile-end soil can be determined.Although self-balancing test is widely used, for the test pile of post jacking process, when carrying out self-balancing approach test, pre-buried Grouting Pipe can be broken because of opening of load box, affects later stage slip casting; Time serious, even do over again, add construction period and labour intensity.Therefore, for the problems referred to above we to have developed a kind of structure simple, easy to use, disrance sleeve is utilized to be separated by the concrete that Grouting Pipe and pile body are poured into, after carrying out self-balancing approach peg, the anti-breaking device of pile-end post-grouting Grouting Pipe for self-balancing approach peg that pre-buried Grouting Pipe is not pulled off at load cell position can be ensured.
Utility model content
The purpose of this utility model is for above-described problems of the prior art, there is provided a kind of structure simple, easy to use, disrance sleeve is utilized to be separated by the concrete that Grouting Pipe and pile body are poured into, after carrying out self-balancing approach peg, the anti-breaking device of pile-end post-grouting Grouting Pipe for self-balancing approach peg that pre-buried Grouting Pipe is not pulled off at load cell position can be ensured.
In order to realize described object, the utility model specifically adopts following technical scheme:
For the anti-breaking device of pile-end post-grouting Grouting Pipe of self-balancing approach peg, it comprises pile body 1, the Grouting Pipe 2 that pile body 1 is inner pre-buried.It is characterized in that: described pile body 1 interior lower end is embedded with load box 3, and its inside is also provided with Grouting Pipe 2, its Grouting Pipe 2 two ends pass load box 3 and pile body 1; Be provided with disrance sleeve 4 outside described Grouting Pipe 2, upper end is provided with steel plug 5, and lower end is provided with grouting valve 6, and disrance sleeve 4 upper end passes the top of pile body 1; Its disrance sleeve about 4 two ends symmetry be provided with sealing mat 7.
Described Grouting Pipe 2 upper end passes the top 100cm of pile body 1, and lower end passes the bottom 30cm of pile body 1.
Described disrance sleeve 4 upper end passes the top 50cm of pile body 1, and lower end passes load box 50cm, and disrance sleeve 4 is sealed by sealing mat 7 with the gap of Grouting Pipe 2, and after its sealing, outside is provided with mackintosh.
Described disrance sleeve 4 is made up of PVC material.
The utility model is used for the anti-breaking device of pile-end post-grouting Grouting Pipe of self-balancing approach peg, be provided with disrance sleeve 4 outside described Grouting Pipe 2, upper end is provided with steel plug 5, and lower end is provided with grouting valve 6, and Grouting Pipe 2 upper end passes the top 100cm of pile body 1, lower end passes the bottom 30cm of pile body 1; Disrance sleeve 4 upper end of being made up of PVC material passes the top 50cm of pile body 1, lower end passes load box 50cm, disrance sleeve 4 is sealed by sealing mat 7 with the gap of Grouting Pipe 2, and outside is provided with mackintosh after its sealing, it utilizes disrance sleeve to be separated by the concrete that Grouting Pipe and pile body are poured into, after carrying out self-balancing approach peg, can ensure that pre-buried Grouting Pipe is not pulled off at load cell position, easy to use, any adverse effect can not be produced to later stage slip casting.
Compared with prior art, the beneficial effects of the utility model are: structure is simple, easy to use, disrance sleeve is utilized to be separated by the concrete that Grouting Pipe and pile body are poured into, after carrying out self-balancing approach peg, can ensure that pre-buried Grouting Pipe is not pulled off at load cell position, any adverse effect can not be produced to later stage slip casting.
Accompanying drawing explanation
Fig. 1 is the structural representation before the utility model load box opens.
Fig. 2 is the structural representation after the utility model load box opens.
In figure: pile body 1, Grouting Pipe 2, load box 3, disrance sleeve 4, steel plug 5, grouting valve 6, sealing mat 7.
Detailed description of the invention
Below in conjunction with accompanying drawing 1, accompanying drawing 2, structure of the present utility model and beneficial effect thereof are further illustrated.
Embodiment 1
For the anti-breaking device of pile-end post-grouting Grouting Pipe of self-balancing approach peg, as described in Figure 1, it comprises pile body 1, the Grouting Pipe 2 that pile body 1 is inner pre-buried.Described pile body 1 interior lower end is embedded with load box 3, and its inside is also provided with Grouting Pipe 2, and its Grouting Pipe 2 two ends pass load box 3 and pile body 1; Be provided with disrance sleeve 4 outside described Grouting Pipe 2, upper end is provided with steel plug 5, and lower end is provided with grouting valve 6, and disrance sleeve 4 upper end passes the top of pile body 1; Its disrance sleeve about 4 two ends symmetry be provided with sealing mat 7.
Described Grouting Pipe 2 upper end passes the top 100cm of pile body 1, and lower end passes the bottom 30cm of pile body 1.
Described disrance sleeve 4 upper end passes the top 50cm of pile body 1, and lower end passes load box 50cm, and disrance sleeve 4 is sealed by sealing mat 7 with the gap of Grouting Pipe 2, and after its sealing, outside is provided with mackintosh.
Described disrance sleeve 4 is made up of PVC material.
The concrete that Grouting Pipe 2 and pile body 1 pour into separates by described disrance sleeve 4, after carrying out self-balancing approach peg, can ensure that pre-buried Grouting Pipe 2 is not pulled off in load box 3 position, easy to use, can not produce any adverse effect to later stage slip casting.
During work, the first inner embedded load case 3 of pile body 1, then Grouting Pipe 2 is arranged on disrance sleeve 4 inside composition integral structure, and Grouting Pipe 2 upper end passes disrance sleeve 4 upper end 50cm, lower end passes disrance sleeve 4; Subsequently the Grouting Pipe 2 of integral structure, disrance sleeve 4 are arranged on pile body 1 inside, and it passes load box 3, then carries out slip casting by grouting valve 6, with the shutoff of steel plug 5 after slip casting completes, it is easy to use.
In description of the present utility model, term " on ", D score instruction orientation based on orientation shown in the drawings, be only the utility model instead of require that the utility model must operate with specific orientation for convenience of description, therefore can not be interpreted as restriction of the present utility model.
The foregoing is only preferred embodiment of the present utility model, be not limited to the utility model, for a person skilled in the art, the utility model can have various modifications and variations.All within spirit of the present utility model and principle, any amendment done, equivalent replacement, improvement etc., all should be included within protection domain of the present utility model.

Claims (4)

1. for the anti-breaking device of pile-end post-grouting Grouting Pipe of self-balancing approach peg, it comprises pile body (1), the Grouting Pipe (2) that pile body (1) is inner pre-buried; It is characterized in that: described pile body (1) interior lower end is embedded with load box (3), and its inside is also provided with Grouting Pipe (2), its Grouting Pipe (2) two ends pass load box (3) and pile body (1); Described Grouting Pipe (2) outside is provided with disrance sleeve (4), upper end is provided with steel plug (5), lower end is provided with grouting valve (6), and disrance sleeve (4) upper end passes the top of pile body (1); Its disrance sleeve (4) up and down two ends symmetry be provided with sealing mat (7).
2. according to claim 1 for the anti-breaking device of pile-end post-grouting Grouting Pipe of self-balancing approach peg, it is characterized in that: described Grouting Pipe (2) upper end passes the top 100cm of pile body (1), and lower end passes the bottom 30cm of pile body (1).
3. according to claim 1 for the anti-breaking device of pile-end post-grouting Grouting Pipe of self-balancing approach peg, it is characterized in that: described disrance sleeve (4) upper end passes the top 50cm of pile body (1), lower end passes load box 50cm, disrance sleeve (4) is sealed by sealing mat (7) with the gap of Grouting Pipe (2), and after its sealing, outside is provided with mackintosh.
4. according to claim 1 or 2 for the anti-breaking device of pile-end post-grouting Grouting Pipe of self-balancing approach peg, it is characterized in that: described disrance sleeve (4) is made up of PVC material.
CN201520753903.7U 2015-09-25 2015-09-25 For the anti-breaking device of pile-end post-grouting Grouting Pipe of self-balancing approach peg Expired - Fee Related CN204940374U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520753903.7U CN204940374U (en) 2015-09-25 2015-09-25 For the anti-breaking device of pile-end post-grouting Grouting Pipe of self-balancing approach peg

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520753903.7U CN204940374U (en) 2015-09-25 2015-09-25 For the anti-breaking device of pile-end post-grouting Grouting Pipe of self-balancing approach peg

Publications (1)

Publication Number Publication Date
CN204940374U true CN204940374U (en) 2016-01-06

Family

ID=55007816

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520753903.7U Expired - Fee Related CN204940374U (en) 2015-09-25 2015-09-25 For the anti-breaking device of pile-end post-grouting Grouting Pipe of self-balancing approach peg

Country Status (1)

Country Link
CN (1) CN204940374U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105256845A (en) * 2015-09-25 2016-01-20 甘肃省建筑科学研究院 Pile end post-grouting grouting pipe snapping-prevention device used for measuring pile through self-balancing method

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105256845A (en) * 2015-09-25 2016-01-20 甘肃省建筑科学研究院 Pile end post-grouting grouting pipe snapping-prevention device used for measuring pile through self-balancing method

Similar Documents

Publication Publication Date Title
CN104374649B (en) A kind of experimental rig and method for being used to observe shear deformation breaks down feature between pile tube and the slip casting soil body
CN105239586B (en) Method for supporting foundation pit by adopting support structure
CN205530247U (en) Prebored hole bag slip casting stock structure
CN103149091A (en) Anti-pulling vertical tension loading test device of building pile
CN104196063B (en) Device that keyhole grout pile top mark is high and using method thereof
CN204112378U (en) A kind of two casing device of pile measurement with emulation buffer action
CN202543966U (en) Pile-supported cantilever retaining wall
CN204940374U (en) For the anti-breaking device of pile-end post-grouting Grouting Pipe of self-balancing approach peg
CN104374650A (en) Testing device and method for testing static force shear property between tubular pile and grouting soil body
CN104032764A (en) Press-in type sunk well reaction system
CN105256845B (en) For the anti-breaking device of pile-end post-grouting Grouting Pipe of self-balancing approach peg
CN104032720B (en) It is applicable to test method and the device of deep supporting course bearing capacity
CN208039242U (en) The pile anchoring of novel building engineering ground
CN103628498B (en) T-shaped foundation bolt hole method for blocking
CN203411974U (en) Slope protection pile steel pipe allowing grouting condition to be seen
CN205691438U (en) A kind of anchoring type Rock And Soil in-situ direct shear test device
CN207007401U (en) A kind of soil pressure cell fixing device for Tunnel Surrounding Rock Pressure test
CN208733668U (en) A kind of suspension cable anchor foundation
CN208653452U (en) Roadbed subsidence monitoring device
CN203891045U (en) Leakage blocking and grouting device between deep foundation pit fender posts
CN203977418U (en) Prevent cast-in-place pile concrete loss device
CN207760900U (en) Building pile foundation experimental rig
CN205857792U (en) Shear wall concrete replacement bottom provisions for grouting
CN205444262U (en) A pile head for dead load compression test
CN205591213U (en) Simple and easy device of construction branch stake

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20160106

Termination date: 20170925