CN203411974U - Slope protection pile steel pipe allowing grouting condition to be seen - Google Patents
Slope protection pile steel pipe allowing grouting condition to be seen Download PDFInfo
- Publication number
- CN203411974U CN203411974U CN201320515810.1U CN201320515810U CN203411974U CN 203411974 U CN203411974 U CN 203411974U CN 201320515810 U CN201320515810 U CN 201320515810U CN 203411974 U CN203411974 U CN 203411974U
- Authority
- CN
- China
- Prior art keywords
- steel pipe
- slope protection
- pipe body
- protection pile
- pile
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Abstract
The utility model provides a slope protection pile steel pipe allowing the grouting condition to be seen. The slope protection pile steel pipe effectively solves the problems that in an existing grouting process, cement easily flows out of pile containing holes and the grouting condition inside the pile containing holes can not be observed in the secondary grouting process. According to the scheme, the slope protection pile steel pipe comprises a steel pipe body, wherein the bottom portion of the steel pipe body is closed, a plurality of grout vent holes which are communicated with an inner cavity of the steel pipe body are evenly distributed in the side edge wall of the lower portion of the steel pipe body, and a transparent plate which is perpendicular to the steel pipe body is arranged on the portion, close to the upper end of the steel pipe body, of the steel pipe body in a sleeved mode. The slope protection pile steel pipe can prevent cement paste from flowing out of the pile containing holes and allow the grouting condition inside the pile containing holes to be observed in the secondary grouting process, and is simple in structure, convenient to use, economical and practical.
Description
Technical field
The utility model relates to steel pipe, particularly a kind of slope protection pile steel pipe of visual slip casting situation.
Background technology
At present, in deep foundation pit support, use slope protection pile, and in building the process of slope protection pile, first to bore according to certain rules stake hole, and then in stake hole, insert bottom with the steel pipe in the slurry hole of overflowing, steel pipe bottom lock, then steel pipe is carried out to rubble filling, again steel pipe is carried out to injected water mud for the first time afterwards, until fill up steel pipe, till space between steel pipe sidewall and soil layer, and in the process of injected water mud, cement paste is easy to overflow from stake hole, very inconvenient, after slip casting for the first time, need envelope stake hole, because cement paste can partly infiltrate in soil layer, therefore the cement paste plane in steel pipe can decline, at this moment carry out slip casting for the second time, and now stake hole has been sealed, cannot observe the slip casting situation in a hole, to slip casting, brought trouble.
Utility model content
For above-mentioned situation, for overcoming the defect of prior art, the object of the utility model is just to provide a kind of slope protection pile steel pipe of visual slip casting situation, and while effectively having solved existing slip casting, cement easily flows out, can not observe during secondary grouting in a hole problems such as slip casting situation from dress stake hole.
The scheme of its solution is, comprises steel pipe, and steel pipe bottom lock is evenly equipped with a plurality of and excessive slurry hole steel pipe intracavity inter-connection on the skirt wall of steel pipe bottom, and steel pipe is set with the transparent panel vertical with steel pipe near its upper end.
The utility model not only can prevent that cement paste from overflowing from stake hole, and the slip casting situation in stake hole can observe secondary grouting time, simple in structure, easy to use, economical and practical.
Accompanying drawing explanation
Fig. 1 is the utility model structural representation.
Schematic diagram when Fig. 2 is stake hole insertion the utility model.
The specific embodiment
Below in conjunction with accompanying drawing, the specific embodiment of the present utility model is described in further detail.
By Fig. 1 and Fig. 2, provided, the utility model comprises steel pipe, and steel pipe 1 bottom lock is evenly equipped with a plurality of and excessive slurry hole 2 steel pipe 1 intracavity inter-connection on steel pipe 1 bottom skirt wall, and steel pipe 1 is set with the transparent panel vertical with steel pipe 14 near its upper end.
In order to reach result of use better, said steel pipe 1 upper end outer edge surface is provided with screw thread 3, has the screw corresponding with steel pipe 1 screw thread 3 on transparent panel 4, and transparent panel 4 is fixed on the screw thread 3 of steel pipe 1 through screw.
Said transparent panel 4 is Ya Geli plate.
When the utility model is used, steel pipe is inserted in stake hole 5,4 of transparent panels are erected on the ground line 6 around of a hole 5, transparent panel 4 not only can play and prevent that cement paste from overflowing the effect in a hole 5 in pouring into the process of cement paste, and can arrive by transparent panel 4 Real Time Observation the slip casting situation in stake hole 5, be convenient for people to the control to slip casting, owing to screw thread 3 screws, transparent panel 4 being positioned on steel pipe 1, therefore after slip casting completes, transparent panel 4 can be taken off, continue to use, saved material.
The utility model not only can prevent that cement paste from overflowing from stake hole, and the slip casting situation in stake hole can observe secondary grouting time, simple in structure, easy to use, economical and practical.
Claims (2)
1. the slope protection pile steel pipe of a visual slip casting situation, comprise steel pipe, it is characterized in that, steel pipe (1) bottom lock, on the skirt wall of steel pipe (1) bottom, be evenly equipped with a plurality of and excessive slurry hole (2) steel pipe (1) intracavity inter-connection, steel pipe (1) is set with the transparent panel (4) vertical with steel pipe (1) near its upper end.
2. the slope protection pile steel pipe of a kind of visual slip casting situation according to claim 1, it is characterized in that, said steel pipe (1) upper end outer edge surface is provided with screw thread (3), on transparent panel (4), have the screw corresponding with steel pipe (1) screw thread (3), transparent panel (4) is fixed on the screw thread (3) of steel pipe (1) through screw.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201320515810.1U CN203411974U (en) | 2013-08-23 | 2013-08-23 | Slope protection pile steel pipe allowing grouting condition to be seen |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201320515810.1U CN203411974U (en) | 2013-08-23 | 2013-08-23 | Slope protection pile steel pipe allowing grouting condition to be seen |
Publications (1)
Publication Number | Publication Date |
---|---|
CN203411974U true CN203411974U (en) | 2014-01-29 |
Family
ID=49974874
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201320515810.1U Expired - Fee Related CN203411974U (en) | 2013-08-23 | 2013-08-23 | Slope protection pile steel pipe allowing grouting condition to be seen |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN203411974U (en) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106869133A (en) * | 2017-04-14 | 2017-06-20 | 中建八局第建设有限公司 | A kind of soil nailing casting head device and its construction method |
CN108729562A (en) * | 2018-06-08 | 2018-11-02 | 江苏省苏中建设集团股份有限公司 | A kind of waterproof plugging device |
CN110326154A (en) * | 2017-07-10 | 2019-10-11 | 株式会社Lg化学 | Battery module housings and battery module including it |
CN108729562B (en) * | 2018-06-08 | 2024-04-26 | 江苏国峰建设有限公司 | Waterproof plugging device |
-
2013
- 2013-08-23 CN CN201320515810.1U patent/CN203411974U/en not_active Expired - Fee Related
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106869133A (en) * | 2017-04-14 | 2017-06-20 | 中建八局第建设有限公司 | A kind of soil nailing casting head device and its construction method |
CN106869133B (en) * | 2017-04-14 | 2022-07-12 | 中建八局第一建设有限公司 | Soil nail grouting head device and construction method thereof |
CN110326154A (en) * | 2017-07-10 | 2019-10-11 | 株式会社Lg化学 | Battery module housings and battery module including it |
US11264654B2 (en) | 2017-07-10 | 2022-03-01 | Lg Chem, Ltd. | Battery module case and battery module comprising the same |
CN108729562A (en) * | 2018-06-08 | 2018-11-02 | 江苏省苏中建设集团股份有限公司 | A kind of waterproof plugging device |
CN108729562B (en) * | 2018-06-08 | 2024-04-26 | 江苏国峰建设有限公司 | Waterproof plugging device |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN107905218A (en) | A kind of karst cave treatment method in the construction applied to Pile In Drill In Karst Terrain | |
CN205530247U (en) | Prebored hole bag slip casting stock structure | |
CN103266594A (en) | Slide-resistant pile | |
CN203411974U (en) | Slope protection pile steel pipe allowing grouting condition to be seen | |
CN203594055U (en) | Structure of basement guide wall waterproof concrete horizontal construction joint | |
CN205742173U (en) | A kind of prefabricated bulkhead for cast-in-place concrete pile | |
CN203583504U (en) | Water pumping structure for concrete layer pouring | |
CN204282382U (en) | A kind of equipment by decompression drainage quick blocking precipitation pipe well | |
CN208201856U (en) | A kind of concrete filling pile head laitance concrete collection device | |
CN204080750U (en) | Box-type suction foundation sluice structure | |
CN204212168U (en) | A kind of dam water-retaining structure utilizing solution cavity to combine to build a dam | |
CN103243913B (en) | The method for blocking of fabricated shear wall architectural lower floor junction grout blanket | |
CN104674780A (en) | Karst stratum stabilization structure | |
CN105041318A (en) | Method for sealed type empty field mining subsequent filling | |
CN104500108B (en) | Tunnel Base returns water spot processing method | |
CN204199277U (en) | The spiral building stake of filling concrete | |
CN104328794B (en) | A kind of narrow base tower four lower limb associating well foundation | |
CN203174586U (en) | Concrete pipe pile for reinforcing railway soft soil foundation | |
CN203924411U (en) | Prefabricated assembled fire wall | |
CN202450511U (en) | Grouting device | |
CN206800427U (en) | The interim rubber sack cofferdam of siphon water-filling | |
CN206736900U (en) | Pilework | |
CN204825918U (en) | Composite pile supporting construction in deep peat matter soil layer | |
CN109035998A (en) | A kind of apparatus for demonstrating of effective stress varying effect | |
CN203188644U (en) | Narrow slit cement grouting device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20140129 Termination date: 20150823 |
|
EXPY | Termination of patent right or utility model |