CN105041318A - Method for sealed type empty field mining subsequent filling - Google Patents
Method for sealed type empty field mining subsequent filling Download PDFInfo
- Publication number
- CN105041318A CN105041318A CN201510482436.3A CN201510482436A CN105041318A CN 105041318 A CN105041318 A CN 105041318A CN 201510482436 A CN201510482436 A CN 201510482436A CN 105041318 A CN105041318 A CN 105041318A
- Authority
- CN
- China
- Prior art keywords
- filling
- closed
- goaf
- top board
- base plate
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Abstract
The invention discloses a method for sealed type empty field mining subsequent filling. The method is characterized in that a filling patio is dug in a top plate, four exhaust holes are formed at the positions of four corners of the top plate by utilizing a drilling machine; partition walls are built around a goaf, a base plate and the top plate are treated to be flat; waterproof materials are laid on the partition walls around the goaf, the base plate and the top plate; a sealed filling space is defined by the artition walls, the base plate and the top plate; a filling material is injected into the sealed filling space through the filling patio; when the filling material overflows out of the exhaust holes, the injection is stopped; after the filling material fills the sealed filling space, the four exhaust holes and the filling patio are covered with a layer of waterproof material, and openings are sealed with cement. According to the method, the volume and shape of filling grout are maintained, a complete roof-contacted filling body is formed, and accordingly the goals of filling and roof contact are achieved.
Description
Technical field
The invention belongs to Mining Science And Technology of Underground Metal Mine field, particularly relate to a kind of closed barnyard mining afterwards filling method.
Background technology
The mode that underground mining method is safeguarded by ground pressure is divided into openstope method, filling method and caved stopes three major types.
At present, openstope method uses relatively extensive, and nugget, in exploitation process, is divided into mineral building and ore pillar by openstope method, and the first step is first dug up mine room, and second step is dug up mine post again.When rooming, stope goaf exists with spacious empty form, and safeguards with the steadiness of ore pillar and country rock itself.After mineral building has been adopted, timely stooping pillaring and process goaf.Process goaf generally adopts placement method, i.e. openstope method afterwards filling.
As can be seen from the feature of above-mentioned openstope method, the primary condition of application openstope method is that ore and country rock are firm, goaf-fixing time interiorly allows larger exposed area.The application of this kind of mining methods the earliest, the most extensive, also the most ripe technically.
Openstope method afterwards filling mainly contains dry stowing and consolidated fill, dry stowing refers to and adopts loose waste fill goaf, consolidated fill is that bottom adopts high cement-sand ratio, top adopts low cement-sand ratio to carry out consolidated fill, body to be filled reaches some strength, for roof safety and pillar recovery subsequently create conditions.Carry out the back production of adjacent back end afterwards again, back production is complete carries out non-cementing (as tailings) filling to ore pillar goaf again.
The afterwards filling in goaf, Tight filling is the key technology difficult problem needing to solve, and relevant Tight filling problem fails to be well solved all the time.
There is much research in this respect at present, research filler in the majority, and compared with traditional dry stowing or sand-lime consolidated fill, adopted high-moisture quick-setting cementitious materials to play a role improving in Tight filling effect.As: " non-ferrous metal (mine part) " 06 phase in 1996 " VCR method stope afterwards ' three-in-one ' filling and Percentage of Water Rapid Solidifying Material connects top " paper, once use " three-in-one " filling in goaf in large quantities and finally connect top with high water retaining quick-set, but in the end connect in the practice of top, the slurries that high-water material mixes with water are before rapid hardening, a large amount of free water and free water-clogged slurries are due to infiltration also directly discharge, the former liquid level of slurry being full of goaf declines, cause and connect top and do not go up, obturation solidifies upper back easy-weathering, and filling effect is unsatisfactory.
Summary of the invention
The object of this invention is to provide a kind of closed barnyard mining afterwards filling method.
The object of the invention is to be realized by following technical proposals.
A kind of closed barnyard mining afterwards filling method, after the method adopts the complete mineral building of openstope method back production, form spacious empty goaf, it is characterized in that the upper cutting fill pass (6) of top board (5), transfer casting resin by fill pass (6) and carry fortune equipment, material, personnel and ventilation, rig is utilized to get four steam vents (8) at top board (5) four edges, in goaf surrounding building partition (3), base plate (10) and top board (5) are processed smooth, in goaf surrounding partition wall (3), base plate (10) and the upper paving waterproofing materials (7) of top board (5), waterproofing materials is not pasted in steam vent (8) and filling well (6) position, partition wall (3), base plate (10) and top board (5) surround a closed filling space (4), by fill pass (6), filler is injected closed filling space (4), when filler overflows steam vent (8), stop injecting, after filler fills closed filling space (4), again four steam vents (8) and fill pass (6) are covered one deck waterproofing materials, and seal with cement.
Described filler is the mixed solution of high-moisture quick-setting cementitious materials and water; Described waterproofing materials is SBS waterproof roll.
The diameter of described fill pass (6) is 1000-2000mm, and the aperture of steam vent (8) is 60-150mm; The thickness of described partition wall (3) is 100-200mm.
The present invention compared with prior art, its significantly beneficial effect be embodied in:
Mineral building goaf surrounding and top, base plate are sticked waterproofing materials by the present invention, make it formation closed filling space, again filler is injected closed filling space, prevent the discharge of water in filling slurries, keep volume and the shape of filling slurries, after condensation of materials to be filled, form the obturation that connects top completely, thus solve Tight filling problem.Present invention process is simple, and safe and reliable, simple, cost is lower.
Accompanying drawing explanation
Fig. 1 is a kind of production face generalized section of closed barnyard mining afterwards filling method.
Fig. 2 is a kind of fore-set top view of closed barnyard mining afterwards filling method.
Number in figure: 1 is adjacent room of not digging up mine; 2 is ore pillar; 3 is partition wall; 4 is closed filling space; 5 is top board; 6 is fill pass; 7 is waterproofing materials; 8 is steam vent; 9 is adjacent room obturation of having dug up mine; 10 is base plate.
Detailed description of the invention
The present invention is further described below in conjunction with accompanying drawing.
As depicted in figs. 1 and 2, a kind of closed barnyard mining afterwards filling method, after the method adopts the complete mineral building of openstope method back production, form spacious empty goaf, it is characterized in that digging a fill pass 6 on top board 5, transfer casting resin by fill pass 6 and carry fortune equipment, material, personnel and ventilation, rig is utilized to get four steam vents 8 at top board 5 four edges, at goaf surrounding building partition 3, base plate 10 and top board 5 are processed smooth, at goaf surrounding partition wall 3, paving waterproofing materials 7 on base plate 10 and top board 5, waterproofing materials is not pasted in steam vent 8 and filling well 6 position, partition wall 3, base plate 10 and top board 5 surround a closed filling space 4, by fill pass 6, filler is injected closed filling space 4, when filler overflows steam vent 8, stop injecting, after filler fills closed filling space 4, again four steam vents 8 and fill pass 6 are covered one deck waterproofing materials, and seal with cement.Described filler is the mixed solution of ZKD high water filling material and water; Described waterproofing materials is SBS waterproof roll; Described fill pass diameter is 1000-2000mm, and the aperture of steam vent is 60-150mm; Described partition wall thickness is 100-200mm.
Claims (3)
1. a closed barnyard mining afterwards filling method, after the method adopts the complete mineral building of openstope method back production, form spacious empty goaf, it is characterized in that the upper cutting fill pass (6) of top board (5), transfer casting resin by fill pass (6) and carry fortune equipment, material, personnel and ventilation, rig is utilized to get 4 steam vents (8) at top board (5) four edges, in goaf surrounding building partition (3), base plate (10) and top board (5) are processed smooth, in goaf surrounding partition wall (3), base plate (10) and the upper paving waterproofing materials (7) of top board (5), partition wall (3), base plate (10) and top board (5) surround a closed filling space (4), by fill pass (6), filler is injected closed filling space (4), when filler overflows steam vent (8), stop injecting, after filler fills closed filling space 4, again four steam vents (8) and fill pass (6) are covered one deck waterproofing materials, and seal with cement.
2. one according to claim 1 closed barnyard mining afterwards filling method, is characterized in that described filler is the mixed solution of high-moisture quick-setting cementitious materials and water; Described waterproofing materials is SBS waterproof roll.
3. one according to claim 1 closed barnyard mining afterwards filling method, it is characterized in that the diameter of described fill pass (6) is 1000-2000mm, the aperture of steam vent (8) is 60-150mm; The thickness of described partition wall (3) is 100-200mm.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510482436.3A CN105041318B (en) | 2015-08-07 | 2015-08-07 | A kind of closed barnyard mining afterwards filling method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510482436.3A CN105041318B (en) | 2015-08-07 | 2015-08-07 | A kind of closed barnyard mining afterwards filling method |
Publications (2)
Publication Number | Publication Date |
---|---|
CN105041318A true CN105041318A (en) | 2015-11-11 |
CN105041318B CN105041318B (en) | 2017-11-28 |
Family
ID=54448240
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201510482436.3A Expired - Fee Related CN105041318B (en) | 2015-08-07 | 2015-08-07 | A kind of closed barnyard mining afterwards filling method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN105041318B (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105971669A (en) * | 2016-07-06 | 2016-09-28 | 冀中能源邯郸矿业集团有限公司 | Gob sealing method capable of protecting coal seam from spontaneous combustion |
CN108005718A (en) * | 2017-12-18 | 2018-05-08 | 固岩科技发展有限公司 | A kind of metal mine consolidated fill method |
CN113187481A (en) * | 2021-05-28 | 2021-07-30 | 辽宁科技大学 | Filling mining method for overburden rock concentrated grouting caving stoping |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101806226A (en) * | 2010-03-19 | 2010-08-18 | 中国矿业大学 | Mined out space dam-type filling method |
CN102155259A (en) * | 2011-03-08 | 2011-08-17 | 北京科技大学 | Filling retaining wall constructed by using tunneling waste stones, and construction method of retaining wall |
CN102392644A (en) * | 2010-11-30 | 2012-03-28 | 淄博市王庄煤矿 | Stripped fluid expansion filling mining method for below middle thick coal seam |
CN102562068A (en) * | 2012-02-07 | 2012-07-11 | 瓮福(集团)有限责任公司 | Mine subsequent cemented and non-cemented filling mining method |
CN102996177A (en) * | 2012-12-09 | 2013-03-27 | 陕西煎茶岭镍业有限公司 | Method for reserving filling channel in operation with cement filling method |
CN103615285A (en) * | 2013-12-04 | 2014-03-05 | 南京银茂铅锌矿业有限公司 | Stope route arrangement mode and method beneficial to roof-contacted filling |
-
2015
- 2015-08-07 CN CN201510482436.3A patent/CN105041318B/en not_active Expired - Fee Related
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101806226A (en) * | 2010-03-19 | 2010-08-18 | 中国矿业大学 | Mined out space dam-type filling method |
CN102392644A (en) * | 2010-11-30 | 2012-03-28 | 淄博市王庄煤矿 | Stripped fluid expansion filling mining method for below middle thick coal seam |
CN102155259A (en) * | 2011-03-08 | 2011-08-17 | 北京科技大学 | Filling retaining wall constructed by using tunneling waste stones, and construction method of retaining wall |
CN102562068A (en) * | 2012-02-07 | 2012-07-11 | 瓮福(集团)有限责任公司 | Mine subsequent cemented and non-cemented filling mining method |
CN102996177A (en) * | 2012-12-09 | 2013-03-27 | 陕西煎茶岭镍业有限公司 | Method for reserving filling channel in operation with cement filling method |
CN103615285A (en) * | 2013-12-04 | 2014-03-05 | 南京银茂铅锌矿业有限公司 | Stope route arrangement mode and method beneficial to roof-contacted filling |
Non-Patent Citations (2)
Title |
---|
江宁等: "草楼铁矿充填接顶新工艺", 《矿业研究与开发》 * |
陆锋等: "铜坑矿采矿方法的变更与发展", 《矿业研究与开发》 * |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105971669A (en) * | 2016-07-06 | 2016-09-28 | 冀中能源邯郸矿业集团有限公司 | Gob sealing method capable of protecting coal seam from spontaneous combustion |
CN108005718A (en) * | 2017-12-18 | 2018-05-08 | 固岩科技发展有限公司 | A kind of metal mine consolidated fill method |
CN113187481A (en) * | 2021-05-28 | 2021-07-30 | 辽宁科技大学 | Filling mining method for overburden rock concentrated grouting caving stoping |
Also Published As
Publication number | Publication date |
---|---|
CN105041318B (en) | 2017-11-28 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN110242301B (en) | Two-step grouting modification water-retention coal mining method for roof aquifer | |
CN107237651B (en) | A kind of multi-level grouting water-tight reinforcement means of coal mine underground reservoir and reservoir dam | |
CN103291325B (en) | The preventing control method of Coal-mining Above Confined-water floor strata gushing water | |
CN107035401B (en) | A kind of abandoned mine fire damp administers new technology | |
CN102705005B (en) | Technology for plugging water bursting in mine by directional diversion grouting | |
CN102337906B (en) | Construction method for pouring airtight partition wall between recovered roadway and reserved roadway | |
WO2018233149A1 (en) | Argillaceous soft rock roadway partition multi-granularity grouting reinforcement method | |
CN206667278U (en) | Lava crack Tunnel gushing treatment constructing structure | |
CN209145035U (en) | The node structure blocked when for being in the milk at assembled architecture shear wall installation seam | |
CN104500082A (en) | Mining-method tunnel inner shield receiving construction method | |
CN105155541A (en) | Double-slurry closing construction method for sump | |
CN103046932A (en) | Pre-grouting and water plugging method for permeable layer in vertical shaft | |
CN106592614B (en) | The method for blocking of leakage point in foundation pit waterproof of man | |
CN105041318A (en) | Method for sealed type empty field mining subsequent filling | |
CN109595029A (en) | Goaf partial stowage supporting structure and its construction method under the conditions of tight roof | |
CN108797621A (en) | A kind of water sealing structure and its construction method in rich water depth ovum gravel erratic boulder stratum front pre-grouting | |
CN106381405A (en) | Rare earth mine liquid collection system and method | |
CN103573280B (en) | Method for supporting porous ooze invasion compound roof roadway | |
CN207537993U (en) | A kind of diversion tunnel concrete plug | |
CN109853477A (en) | Change the concentrative seepage plugging structure and method that dynamic water is hydrostatic in gallery | |
CN207348879U (en) | Tailwater tunnel structure | |
CN106522959A (en) | Steel-structure waterproof jointing plate of well wall and construction process of steel-structure waterproof jointing plate | |
CN209603062U (en) | Change the concentrative seepage plugging structure that dynamic water is hydrostatic in gallery | |
CN109235668A (en) | Residential building curtain wall and wall crack plugging structure | |
CN105178960B (en) | To the closed method for capping of mining with stowing in one kind |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20171128 Termination date: 20190807 |
|
CF01 | Termination of patent right due to non-payment of annual fee |