CN109945019B - Temporary fixing device for foundation bolt with reserved hole and using method of temporary fixing device - Google Patents

Temporary fixing device for foundation bolt with reserved hole and using method of temporary fixing device Download PDF

Info

Publication number
CN109945019B
CN109945019B CN201711396862.0A CN201711396862A CN109945019B CN 109945019 B CN109945019 B CN 109945019B CN 201711396862 A CN201711396862 A CN 201711396862A CN 109945019 B CN109945019 B CN 109945019B
Authority
CN
China
Prior art keywords
centering
hole
bottom plate
bolt
equipment
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201711396862.0A
Other languages
Chinese (zh)
Other versions
CN109945019A (en
Inventor
李伟
陈雷
金辽东
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China MCC20 Group Corp Ltd
Original Assignee
China MCC20 Group Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China MCC20 Group Corp Ltd filed Critical China MCC20 Group Corp Ltd
Priority to CN201711396862.0A priority Critical patent/CN109945019B/en
Publication of CN109945019A publication Critical patent/CN109945019A/en
Application granted granted Critical
Publication of CN109945019B publication Critical patent/CN109945019B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The invention relates to the field of clamping parts in holes or clamping parts on the back of a wall after the parts are inserted from the front, in particular to a temporary fixing device for a foundation bolt with a reserved hole and a using method of the temporary fixing device. The utility model provides a temporary fixing device of preformed hole rag bolt, includes base (1) and equipment bottom plate (2), characterized by: the positioning device further comprises at least two centering hooks (4), the centering hooks (4) are embedded in a gap between the foundation bolt (31) and the positioning hole (21) through clamping edges (42), and the flanges (41) of the centering hooks (4) are lined between the gasket (31) and the equipment floor (2). A use method of a temporary fixing device for a foundation bolt with a reserved hole is characterized by comprising the following steps: the method is implemented in sequence as follows: presetting; centering; coarse adjustment; fourthly, fine adjustment. The invention has the beneficial effects that: simple structure, convenient use, low cost, guaranteed quality and wide application range.

Description

Temporary fixing device for foundation bolt with reserved hole and using method of temporary fixing device
Technical Field
The invention relates to the field of clamping parts in holes or clamping parts on the back of a wall after the parts are inserted from the front, in particular to a temporary fixing device for a foundation bolt with a reserved hole and a using method of the temporary fixing device.
Background
In the process of equipment installation, the installation form of the foundation bolts with the reserved holes is frequently met, and the equipment installation is completed through the steps of penetrating the foundation bolts into bolt holes of an equipment base when the equipment is in place, inserting the tail parts of the bolts into the reserved foundation bolt holes, and performing temporary centering (coarse adjustment) → foundation bolt grouting → final centering (fine adjustment) → equipment bottom plate grouting. Because during coarse adjustment, the foundation bolt is movably hung on the equipment bottom plate, a certain gap is reserved between the bolt hole on the bottom plate and the bolt, the gap is ensured to be uniform during operation, so that the foundation bolt is prevented from being out of plumb and tightly against the hole wall on one side when the equipment is in grouting, the equipment is difficult to move towards a certain direction, and fine adjustment is difficult. At present, a method of winding a plurality of layers of plastic films or other similar materials on the neck of a bolt rod is often adopted in construction, and the method has the advantages of inaccurate positioning, easy falling and no due effect.
Disclosure of Invention
The invention discloses a temporary fixing device for foundation bolts with reserved holes and a using method thereof, aiming at overcoming the defects of the prior art and providing a positioning piece which is simple in structure, convenient to use, low in cost and capable of ensuring quality.
The invention achieves the purpose by the following technical scheme:
the utility model provides a temporary fixing device of preformed hole rag bolt, includes base and equipment bottom plate, is equipped with the base hole on the base, is equipped with the locating hole on the equipment bottom plate, and the nut cover is established in the locating hole in to rag bolt's one end, and is lined with the gasket between nut and the equipment bottom plate, and the equipment bottom plate is located on the base through the stabilizer blade, and the locating hole is located directly over the base hole, and rag bolt's the other end is the nut end promptly and stretches in the base hole, characterized by: the centering hook is composed of a flange and clamping edges, the flange is an Contraband-shaped groove, two ends of a notch of the flange are respectively and vertically connected with the two clamping edges, the two clamping edges are parallel to each other and are arranged on the same side of a plane of the notch of the flange, and the plane of the notch of the flange is vertical to the plane of the clamping edges;
well colluding inlays in the clearance between rag bolt and locating hole through the card limit, and well flange lining of colluding is between gasket and equipment floor, and well each card limit of colluding is around rag bolt evenly distributed.
The temporary fixing device for the foundation bolt with the reserved hole is characterized in that:
the bottom of the groove of the centering hook flange and the notch part form an obtuse included angle of 135-175 degrees, and the bottom of the groove of the flange is inclined upwards;
if the pitch diameter of the anchor bolt screw is a, the aperture of the positioning hole is b, and the outer diameter of the clamping edge is c, c =1/2 (b-a).
The using method of the temporary fixing device for the foundation bolt with the reserved hole is characterized by comprising the following steps: the method is implemented in sequence as follows:
presetting: arranging an equipment bottom plate on a base through a support leg, enabling a positioning hole to be arranged right above a base hole, sleeving one end of an anchor bolt in the positioning hole through a nut, lining a gasket between the nut and the equipment bottom plate, and extending the other end of the anchor bolt, namely a nut end, into the base hole;
centering: embedding at least two centering hooks in a gap between the foundation bolt and the positioning hole through clamping edges, and lining the flanges of the centering hooks between the gasket and the equipment floor to enable the clamping edges of the centering hooks to be evenly distributed around the foundation bolt;
third, coarse adjustment: coarse adjusting equipment, checking and adjusting the position of the centering hook again after the completion of the coarse adjusting equipment, enabling the centering hook to keep the uniform distribution of all clamping edges around the foundation bolt, and then pouring concrete grout;
fourthly, fine adjustment: and after the poured concrete slurry reaches the designed strength, loosening the nut, taking out the centering hook and finely adjusting the equipment.
According to the invention, the centering hook is inserted into the gap between the foundation bolt and the positioning hole, so that the verticality and the surrounding gap uniformity of the foundation bolt are ensured, a margin is left for fine adjustment of equipment, and the problems that the foundation bolt is close to the positioning hole wall of the equipment to influence the fine adjustment of the equipment and the like are solved. The centering hook can be made of iron wires bent by using sharp nose pliers according to the difference value between the diameter of the foundation bolt and the aperture of the positioning hole, the materials are easy to obtain, the processing is simple, the centering hook can be repeatedly used for multiple times, time, labor and force are saved, the construction quality is guaranteed, the construction efficiency is greatly improved, and the centering hook is also suitable for other occasions needing bolt centering and has a wide application range.
The invention has the beneficial effects that: simple structure, convenient use, low cost, guaranteed quality and wide application range.
Drawings
FIG. 1 is a schematic structural view of a centering hook according to the present invention;
FIG. 2 is a schematic cross-sectional view of the invention after centering has been completed;
FIG. 3 is a schematic cross-sectional view of the present invention after coarse tuning has been completed and the anchor bolt holes have been filled;
FIG. 4 is a schematic cross-sectional view of the invention after finishing and grouting the foundation bolt holes.
Detailed Description
The invention is further illustrated by the following specific examples.
Example 1
A temporary fixing device for an anchor bolt with a reserved hole comprises a base 1, an equipment bottom plate 2 and two centering hooks 4, and is specifically structured as shown in figures 1 and 2:
a base hole 11 is formed in the base 1, a positioning hole 21 is formed in the equipment bottom plate 2, one end of the foundation bolt 31 is sleeved in the positioning hole 21 through a nut 32, a gasket 33 is lined between the nut 32 and the equipment bottom plate 2, the equipment bottom plate 2 is arranged on the base 1 through a support leg 22, the positioning hole 21 is arranged right above the base hole 11, and the other end of the foundation bolt 31, namely a nut end, extends into the base hole 11;
centering hook 4 is shown in fig. 1: the centering hook 4 is composed of a rib 41 and a clamping edge 42, the rib 41 is an Contraband-shaped groove, two ends of the notch of the rib 41 are respectively and vertically connected with the two clamping edges 42, the two clamping edges 42 are parallel to each other and are arranged on the same side of the plane of the notch of the rib 41, and the plane of the notch of the rib 41 is vertical to the plane of the clamping edge 42;
the centering hook 4 is embedded in the gap between the anchor bolt 31 and the positioning hole 21 through clamping edges 42, the flanges 41 of the centering hook 4 line the gap between the spacer 31 and the equipment floor 2, and the clamping edges 42 of the centering hook 4 are evenly distributed around the anchor bolt 31.
In this embodiment:
the bottom of the groove of the retaining edge 41 of the centering hook 4 and the notch part form an obtuse included angle of 135-175 degrees, and the bottom of the groove of the retaining edge 41 is inclined upwards;
if the pitch diameter of the screw of the anchor bolt 31 is a, the diameter of the positioning hole 21 is b, and the outer diameter of the clamping edge is c, c =1/2 (b-a).
When the embodiment is used, the following steps are sequentially carried out:
presetting: arranging the equipment bottom plate 2 on the base 1 through the support legs 22, enabling the positioning hole 21 to be arranged right above the base hole 11, sleeving one end of the foundation bolt 31 in the positioning hole 21 through the nut 32, lining a gasket 33 between the nut 32 and the equipment bottom plate 2, and extending the other end, namely the nut end, of the foundation bolt 31 into the base hole 11;
centering: as shown in fig. 2: embedding two centering hooks 4 in a gap between the foundation bolt 31 and the positioning hole 21 through clamping edges 42, wherein the flanges 41 of the centering hooks 4 are lined between the gasket 31 and the equipment floor 2, so that the clamping edges 42 of the centering hooks 4 are evenly distributed around the foundation bolt 31;
third, coarse adjustment: rough adjustment equipment, which checks and adjusts the position of the centering hook 4 again after the completion so that the centering hook 4 keeps the uniform distribution of the clamping edges 42 around the foundation bolt 31, and then pours concrete grout 5 as shown in fig. 3;
fourthly, fine adjustment: after the poured concrete grout 5 reaches the designed strength, the nut 32 is loosened, the centering hook 4 is taken out, the equipment is finely adjusted, and the concrete grout 5 is poured between the equipment bottom plate 2 and the base 1 again after the fine adjustment is qualified, as shown in fig. 4.

Claims (2)

1. The utility model provides a preformed hole rag bolt's interim fixing device, including base (1) and equipment bottom plate (2), be equipped with basic hole (11) on base (1), be equipped with locating hole (21) on equipment bottom plate (2), the one end of rag bolt (31) is passed through nut (32) cover and is established in locating hole (21), be lined with gasket (33) between nut (32) and equipment bottom plate (2), equipment bottom plate (2) are located base (1) through stabilizer blade (22), and locating hole (21) are located directly over basic hole (11), the other end of rag bolt (31) is the nut end promptly and stretches in basic hole (11), characterized by: the centering hook (4) is composed of a flange (41) and clamping edges (42), the flange (41) is an Contraband-shaped groove, two ends of a notch of the flange (41) are respectively and vertically connected with the two clamping edges (42), the two clamping edges (42) are parallel to each other and are arranged on the same side of a plane at the notch of the flange (41), and the plane at the notch of the flange (41) is vertical to the plane of the clamping edges (42);
the centering hook (4) is embedded in a gap between the foundation bolt (31) and the positioning hole (21) through clamping edges (42), a flange (41) of the centering hook (4) is lined between the gasket (33) and the equipment bottom plate (2), and the clamping edges (42) of the centering hook (4) are evenly distributed around the foundation bolt (31);
the bottom of the groove of the retaining edge (41) of the centering hook (4) and the notch part form an obtuse angle of 135-175 degrees, and the bottom of the groove of the retaining edge (41) is obliquely upward;
c =1/2(b-a) when the pitch diameter of the screw of the anchor bolt (31) is a, the aperture of the positioning hole (21) is b, and the outer diameter of the clamping edge is c.
2. The method for using a temporary fixing apparatus for a pre-bored anchor bolt according to claim 1, wherein: the method is implemented in sequence as follows:
presetting: the method comprises the following steps that an equipment bottom plate (2) is arranged on a base (1) through a supporting leg (22), a positioning hole (21) is arranged right above a base hole (11), one end of an anchor bolt (31) is sleeved in the positioning hole (21) through a nut (32), a gasket (33) is lined between the nut (32) and the equipment bottom plate (2), and the other end of the anchor bolt (31), namely a nut end, extends into the base hole (11);
centering: embedding at least two centering hooks (4) in a gap between the foundation bolt (31) and the positioning hole (21) through clamping edges (42), wherein the flanges (41) of the centering hooks (4) are lined between the gasket (33) and the equipment bottom plate (2), and the clamping edges (42) of the centering hooks (4) are evenly distributed around the foundation bolt (31);
third, coarse adjustment: coarse adjusting equipment, checking and adjusting the position of the centering hook (4) again after the equipment is adjusted, enabling the centering hook (4) to keep the clamping edges (42) evenly distributed around the foundation bolt (31), and then pouring concrete grout (5);
fourthly, fine adjustment: after the poured concrete grout (5) reaches the designed strength, the nut (32) is loosened, the centering hook (4) is taken out, and the equipment is finely adjusted.
CN201711396862.0A 2017-12-21 2017-12-21 Temporary fixing device for foundation bolt with reserved hole and using method of temporary fixing device Active CN109945019B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201711396862.0A CN109945019B (en) 2017-12-21 2017-12-21 Temporary fixing device for foundation bolt with reserved hole and using method of temporary fixing device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201711396862.0A CN109945019B (en) 2017-12-21 2017-12-21 Temporary fixing device for foundation bolt with reserved hole and using method of temporary fixing device

Publications (2)

Publication Number Publication Date
CN109945019A CN109945019A (en) 2019-06-28
CN109945019B true CN109945019B (en) 2021-12-07

Family

ID=67006152

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201711396862.0A Active CN109945019B (en) 2017-12-21 2017-12-21 Temporary fixing device for foundation bolt with reserved hole and using method of temporary fixing device

Country Status (1)

Country Link
CN (1) CN109945019B (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113700317B (en) * 2021-08-27 2022-09-27 中国二十二冶集团有限公司 Bolt positioning method for avoiding fitting of bolt and bolt hole wall

Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN202073113U (en) * 2011-04-07 2011-12-14 华锐风电科技(集团)股份有限公司 Foundation bolt base post-grouting supporting device
JP2012067514A (en) * 2010-09-24 2012-04-05 Sekisui Chem Co Ltd Post-for-handrail support structure and construction method therefor
CN203639934U (en) * 2013-10-28 2014-06-11 中国十七冶集团有限公司 Pre-buried positioning device for equipment foundation bolt
CN104032768A (en) * 2014-06-06 2014-09-10 江苏中核华纬工程设计研究有限公司 Foundation bolt structure and construction method thereof
CN204003902U (en) * 2014-08-22 2014-12-10 贵州航天精工制造有限公司 A kind of ears floating self-locking nut assembly
CN104565707A (en) * 2013-10-14 2015-04-29 纬创资通股份有限公司 Stand assembly and electronic device
JP5909019B1 (en) * 2015-09-07 2016-04-26 株式会社フロム Anchor bolt mounting bracket and anchor bolt mounting method using the bracket
JP2017020288A (en) * 2015-07-14 2017-01-26 栗原 新治 Anchor bolt positioning tool
CN206233261U (en) * 2016-12-07 2017-06-09 西京学院 It is a kind of to can be used to pour the fixing device for reclaiming ground packing material

Family Cites Families (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2000144759A (en) * 1998-11-12 2000-05-26 Hitoshi Mori Insulation material linking means in insulating pc foundation beam and insulation material linking construction using it
KR200421529Y1 (en) * 2006-04-29 2006-07-14 스타코 주식회사 Prefabricated of Unit Cabin the Whole Construction
JP2012161225A (en) * 2011-02-03 2012-08-23 Chugoku Electric Power Co Inc:The Vernier fitting having temporary connecting function and connection method of the same
CN103628498B (en) * 2012-08-29 2016-08-10 中国二十冶集团有限公司 T-shaped foundation bolt hole method for blocking
CN105848839B (en) * 2016-03-31 2018-05-04 中交第二航务工程局有限公司 Short-term for Wavelike steel webplate combining structure beam bridge matches prefab-form system
CN106894514B (en) * 2017-01-24 2019-03-26 中国建筑第八工程局有限公司 A kind of exterior wall cladding attachment device and its construction method

Patent Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2012067514A (en) * 2010-09-24 2012-04-05 Sekisui Chem Co Ltd Post-for-handrail support structure and construction method therefor
CN202073113U (en) * 2011-04-07 2011-12-14 华锐风电科技(集团)股份有限公司 Foundation bolt base post-grouting supporting device
CN104565707A (en) * 2013-10-14 2015-04-29 纬创资通股份有限公司 Stand assembly and electronic device
CN203639934U (en) * 2013-10-28 2014-06-11 中国十七冶集团有限公司 Pre-buried positioning device for equipment foundation bolt
CN104032768A (en) * 2014-06-06 2014-09-10 江苏中核华纬工程设计研究有限公司 Foundation bolt structure and construction method thereof
CN204003902U (en) * 2014-08-22 2014-12-10 贵州航天精工制造有限公司 A kind of ears floating self-locking nut assembly
JP2017020288A (en) * 2015-07-14 2017-01-26 栗原 新治 Anchor bolt positioning tool
JP5909019B1 (en) * 2015-09-07 2016-04-26 株式会社フロム Anchor bolt mounting bracket and anchor bolt mounting method using the bracket
CN206233261U (en) * 2016-12-07 2017-06-09 西京学院 It is a kind of to can be used to pour the fixing device for reclaiming ground packing material

Also Published As

Publication number Publication date
CN109945019A (en) 2019-06-28

Similar Documents

Publication Publication Date Title
US9359756B2 (en) Steel beam support embed and methods of use thereof
CN103061504B (en) Concrete slab Pipe installing hole to be provided construction mould and construction method
CN109945019B (en) Temporary fixing device for foundation bolt with reserved hole and using method of temporary fixing device
CN205330189U (en) Steel column locating rack
CN205421321U (en) Precast reinforced concrete base
CN204201296U (en) Vertical pump line fixing frame
CN204199318U (en) Multipurpose iron tower base foundation bolt positioning template device
CN105696796A (en) Cantilever scaffold steel girder anchoring method
CN211647540U (en) Adjustable concrete pole positioning seat
CN210049616U (en) Vertical pre-buried device of reservation entrance to a cave
CN204023791U (en) Embedding anchor bolts device
CN105442868A (en) Adjustable steel-structure reticulated shell spliced scaffold
CN102155097B (en) Locating device for installing large embedded member of concrete wall and installing method thereof
CN210421935U (en) Supporting formwork component and supporting formwork structure for landscape pool irregular inclined plane pool wall
CN204174910U (en) A kind of wall-connecting device of scaffold
CN209194876U (en) A kind of novel lifting, anchoring integration PC component suspender
CN209620634U (en) A kind of fixed device of embedded iron parts
CN206626274U (en) The sleeve structure installed between two parties for control pipeline
CN203880641U (en) Lawn lamp installation frame
CN105221836A (en) Location of pipeline erecting device
KR101057167B1 (en) Apparatus for reinforcing pile head and construction method of foundation using therof
CN205296201U (en) Positioner suitable for post installation of rim of a cup basis
CN204326495U (en) A kind of structure of tool-type anchored end of Overhanging Outside Scaffold section steel beam
CN215518849U (en) Fan blade embedded part
CN204040495U (en) A kind of suspension fixing support rack of high-order cast-in fixing bolt

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant