CN103556649A - 海上风力发电机组的导管架调平机构 - Google Patents

海上风力发电机组的导管架调平机构 Download PDF

Info

Publication number
CN103556649A
CN103556649A CN201310554037.4A CN201310554037A CN103556649A CN 103556649 A CN103556649 A CN 103556649A CN 201310554037 A CN201310554037 A CN 201310554037A CN 103556649 A CN103556649 A CN 103556649A
Authority
CN
China
Prior art keywords
jacket
wind turbine
offshore wind
levelling gear
spud leg
Prior art date
Application number
CN201310554037.4A
Other languages
English (en)
Other versions
CN103556649B (zh
Inventor
朱荣华
牛福维
李凤
张美阳
龙正如
孙香
Original Assignee
广东明阳风电产业集团有限公司
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 广东明阳风电产业集团有限公司 filed Critical 广东明阳风电产业集团有限公司
Priority to CN201310554037.4A priority Critical patent/CN103556649B/zh
Publication of CN103556649A publication Critical patent/CN103556649A/zh
Application granted granted Critical
Publication of CN103556649B publication Critical patent/CN103556649B/zh

Links

Abstract

本发明公开了一种海上风力发电机组的导管架调平机构,所述的导管架设置在钢管桩上,导管架的下端设有多根桩腿,桩腿套于钢管桩之内,所述的钢管桩的顶部固定有顶升支座平台,所述的导管架的桩腿下部固定有油缸支座平台,顶升支座平台与油缸支座平台之间设有可推动桩腿上、下移动的推顶装置。本发明采用液压缸调节,具有结构简单、工作可靠、传动力大、运动平稳、操作简便,调平精准等优点。其操作系统放置在导管架上,液压缸与导管架桩腿采用螺栓连接,可在导管架出厂前完成安装工作,减少水下作业时间,安全性能高同时有效降低了导管架安装调平时施工成本。

Description

海上风力发电机组的导管架调平机构

【技术领域】

[0001] 本发明涉及海上风力发电机组的导管架调平机构。

【背景技术】

[0002] 导管架基础是近海上风电机组基础的一种重要基础形式,海上风机安装前首先将钢管桩打入海底,然后将导管架基础套于钢管桩内,并用高强度灌浆材料连接,风机塔筒底法兰与导管架基础法兰用螺栓连接。为保证风机整体垂直度,导管架基础法兰面水平度应控制在要求的精度范围内,因此导管架基础安装过程中需采用调平装置对其进行调平。

[0003] 本发明就是在上述基础上作出的。

【发明内容】

[0004] 本发明的目的在于克服现有技术的不足之处,提供一种结构简单、工作可靠、传动力大、运动平稳,操作简便,调平精准,安全可靠,调平成本低的海上风电机组的导管架调平机构。

[0005] 本发明的目的是这样实现的:

[0006] 海上风力发电机组的导管架调平机构,所述的导管架设置在钢管桩上,导管架的下端设有多根桩腿,桩腿套于钢管桩之内,所述的钢管桩的顶部固定有顶升支座平台,所述的导管架的桩腿下部固定有油缸支座 平台,顶升支座平台与油缸支座平台之间设有可推动桩腿上、下移动的推顶装置。

[0007] 如上所述的海上风力发电机组的导管架调平机构,其特征在于所述的推顶装置包括固定在油缸支座平台上的液压缸,液压缸的活塞杆与顶升支座平台相抵,所述的导管架上还设有液压站,液压站通过油管与液压缸连通。

[0008] 如上所述的海上风力发电机组的导管架调平机构,其特征在于所述的液压缸底端设有控制阀及截止阀,油管通过控制阀及截止阀与液压缸连通。

[0009] 如上所述的海上风力发电机组的导管架调平机构,其特征在于所述的油缸支座平台上开小孔,油管穿过小孔顺延导管架桩腿与液压站连接。

[0010] 如上所述的海上风力发电机组的导管架调平机构,其特征在于所述的导管架桩腿上开小孔,油管穿过油缸支座平台及桩腿上的小孔由桩腿内部直接与液压站连接。

[0011] 如上所述的海上风力发电机组的导管架调平机构,其特征在于所述的活塞杆的前端为球形结构。

[0012] 如上所述的海上风力发电机组的导管架调平机构,其特征在于所述的活塞杆的前端为柱形结构。

[0013] 如上所述的海上风力发电机组的导管架调平机构,其特征在于所述的活塞杆的前端为柱形结构,并开有螺栓孔。

[0014] 如上求所述的海上风力发电机组的导管架调平机构,其特征在于所述的导管架的上端还设有水平传感器和操作控制箱。[0015] 本发明采用液压缸调节,具有结构简单、工作可靠、传动力大、运动平稳、操作简便,调平精准等优点。其操作系统放置在导管架上,液压缸与导管架桩腿采用螺栓连接,可在导管架出厂前完成安装工作,减少水下作业时间,安全性能高同时有效降低了导管架安装调平时施工成本。

【附图说明】

[0016] 图1是本发明的导管架调平机构的结构示意图;

[0017] 图2是图1的A部放大图;

[0018] 图3是图1的B部放大图;

[0019] 图4是本发明的活塞杆结构图之一;

[0020] 图5是本发明的活塞杆结构图之二 ;

[0021] 图6是本发明的活塞杆结构图之三;

[0022] 图7是本发明的顶升支座平台与钢管桩连接的结构示意图之一;

[0023] 图8是图7的俯视图;

[0024] 图9是本发明的顶升支座平台与钢管桩连接的结构示意图之二 ;

[0025] 图10是图9的俯视图;

【具体实施方式】

[0026] 海上风力发电机组的导管架调平机构,所述的导管架I设置在钢管桩2上,钢管桩2为空心管,导管架I的上端设有顶座10,导管架I的下端设有多根桩腿11,多根桩腿11之间连接有连接杆12,桩腿11套于钢管桩2之内,导管架桩腿与钢管桩之间用高强浆料连接。所述的钢管桩2的顶部固定有顶升支座平台3,所述的导管架I的桩腿11下部固定有油缸支座平台4,顶升支座平台3与油缸支座平台4之间设有可推动桩腿11上、下移动的推顶装置5。

[0027] 上述的推顶装置5可以是电动推杆。

[0028] 上述的推顶装置5还可以是包括固定在油缸支座平台4上的液压缸51,液压缸51的活塞杆52与顶升支座平台3相抵,所述的导管架I上还设有液压站6,液压站6包括驱动电机、液压泵、阀组及附件等,液压站6通过油管7与液压缸51连通。其中液压油缸与油缸支座平台4可以通过螺栓连接。

[0029] 液压缸51底端设有控制阀511及截止阀512,油管7通过控制阀511及截止阀512与液压缸51连通。

[0030] 液压缸51与液压站6的连通方式可以是:油缸支座平台4上开小孔,油管7穿过小孔顺延导管架桩腿11与液压站6连接。

[0031] 液压缸51与液压站6的连通方式还可以是:在导管架桩腿11上开小孔,油管7穿过油缸支座平台及桩腿上的小孔由桩腿11内部直接与液压站6连接。

[0032] 如图4所示,上述的活塞杆52的前端可以是球形结构,便于力的传递,如图5所示,活塞杆52的前端还可以是柱形结构;如图6所示,活塞杆52的前端还可以是柱形结构,并开有螺栓孔521,在顶升支座平台3相应位置焊接有铰接支座,与活塞杆采用铰接连接。液压缸51工作时推动活塞杆52,活塞杆52顶住顶升支座平台3,由于液压缸51固定在导管架桩腿11上的油缸支座平台4上,从而可以带动导管架桩腿11向上移动,从而实现调平目的。

[0033] 导管架I的顶座10上还设有水平传感器8和操作控制箱9。操作控制箱9根据水平传感器8检测结果分别对安装在各个桩腿上的液压缸实行自动控制,或者手动控制。

[0034] 本发明的工作原理是:根据导管架上的水平传感器检测结果,通过控制系统发出调平指令自动调节或通过操作控制箱上的控制按钮手动调节导管架相应桩腿上的液压缸伸缩量,实现导管架调平的目的。

[0035] 本发明的调平机构,每一对导管架桩腿和钢管桩之间可以安装I个,2个,3个或多个。

[0036] 如图7、图8所示,本发明的油缸支座平台可根据液压缸个数设计成整体结构焊接于钢管桩;如图9、图10所示,或设计为单个结构焊接于钢管桩。

Claims (9)

1.海上风力发电机组的导管架调平机构,所述的导管架(I)设置在钢管桩(2)上,导管架(I)的下端设有多根桩腿(11),桩腿(11)套于钢管桩(2 )之内,所述的钢管桩(2 )的顶部固定有顶升支座平台(3),所述的导管架(I)的桩腿(11)下部固定有油缸支座平台(4),顶升支座平台(3 )与油缸支座平台(4 )之间设有可推动桩腿(11)上、下移动的推顶装置(5 )。
2.根据权利要求1所述的海上风力发电机组的导管架调平机构,其特征在于所述的推顶装置(5)包括固定在油缸支座平台(4)上的液压缸(51),液压缸(51)的活塞杆(52)与顶升支座平台(3)相抵,所述的导管架(I)上还设有液压站(6),液压站(6)通过油管(7)与液压缸(51)连通。
3.根据权利要求2所述的海上风力发电机组的导管架调平机构,其特征在于所述的液压缸(51)底端设有控制阀(511)及截止阀(512),油管(7)通过控制阀(511)及截止阀(512)与液压缸(51)连通。
4.根据权利要求3所述的海上风力发电机组的导管架调平机构,其特征在于所述的油缸支座平台(4)上开小孔,油管(7)穿过小孔顺延导管架桩腿(11)与液压站(6)连接。
5.根据权利要求3所述的海上风力发电机组的导管架调平机构,其特征在于所述的导管架桩腿(11)上开小孔,油管(7)穿过油缸支座平台及桩腿上的小孔由桩腿(11)内部直接与液压站(6 )连接。
6.根据权利要求3所述的海上风力发电机组的导管架调平机构,其特征在于所述的活塞杆(52)的前端为球形结构。
7.根据权利要求3所述的海上风力发电机组的导管架调平机构,其特征在于所述的活塞杆(52)的前端为柱形结构。
8.根据权利要求3所述的海上风力发电机组的导管架调平机构,其特征在于所述的活塞杆(52)的前端为柱形结构,并开有螺栓孔(521)。
9.根据权利要求2所述的海上风力发电机组的导管架调平机构,其特征在于所述的导管架上端还设有水平传感器(8)和操作箱(9)。
CN201310554037.4A 2013-11-08 2013-11-08 海上风力发电机组的导管架调平机构 CN103556649B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310554037.4A CN103556649B (zh) 2013-11-08 2013-11-08 海上风力发电机组的导管架调平机构

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310554037.4A CN103556649B (zh) 2013-11-08 2013-11-08 海上风力发电机组的导管架调平机构

Publications (2)

Publication Number Publication Date
CN103556649A true CN103556649A (zh) 2014-02-05
CN103556649B CN103556649B (zh) 2015-08-12

Family

ID=50010986

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310554037.4A CN103556649B (zh) 2013-11-08 2013-11-08 海上风力发电机组的导管架调平机构

Country Status (1)

Country Link
CN (1) CN103556649B (zh)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104266631A (zh) * 2014-10-17 2015-01-07 国家电网公司 电力塔倾斜监测装置
CN106988293A (zh) * 2017-04-27 2017-07-28 中国葛洲坝集团机电建设有限公司 一种升船机主机房钢格构柱施工方法及安装精度控制方法
CN107470860A (zh) * 2017-07-17 2017-12-15 南通蓝岛海洋工程有限公司 一种海上升压站下部组件的建造工艺
CN110241823A (zh) * 2019-05-10 2019-09-17 江苏华西村海洋工程服务有限公司 一种海上桩基施工的调平工艺
US10837151B2 (en) 2014-11-27 2020-11-17 Ihc Holland Ie B.V. Temporarily coupling between jacket and pile

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101463595A (zh) * 2007-12-18 2009-06-24 中国海洋石油总公司 内外夹持式导管架调平装置
KR20110021216A (ko) * 2009-08-25 2011-03-04 홍경엽 친 환경형 강관 전주 시공방법
CN102535534A (zh) * 2012-01-05 2012-07-04 江苏海上龙源风力发电有限公司 一种潮间带多角架风机基础调平灌浆施工工艺
CN102628277A (zh) * 2012-04-18 2012-08-08 中国水电顾问集团华东勘测设计研究院 无过渡段单桩式海上风机基础结构
CN102777333A (zh) * 2012-07-21 2012-11-14 广东明阳风电产业集团有限公司 桁架式风力发电机组结构
CN203569584U (zh) * 2013-11-08 2014-04-30 广东明阳风电产业集团有限公司 海上风力发电机组的导管架调平机构

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101463595A (zh) * 2007-12-18 2009-06-24 中国海洋石油总公司 内外夹持式导管架调平装置
KR20110021216A (ko) * 2009-08-25 2011-03-04 홍경엽 친 환경형 강관 전주 시공방법
CN102535534A (zh) * 2012-01-05 2012-07-04 江苏海上龙源风力发电有限公司 一种潮间带多角架风机基础调平灌浆施工工艺
CN102628277A (zh) * 2012-04-18 2012-08-08 中国水电顾问集团华东勘测设计研究院 无过渡段单桩式海上风机基础结构
CN102777333A (zh) * 2012-07-21 2012-11-14 广东明阳风电产业集团有限公司 桁架式风力发电机组结构
CN203569584U (zh) * 2013-11-08 2014-04-30 广东明阳风电产业集团有限公司 海上风力发电机组的导管架调平机构

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104266631A (zh) * 2014-10-17 2015-01-07 国家电网公司 电力塔倾斜监测装置
US10837151B2 (en) 2014-11-27 2020-11-17 Ihc Holland Ie B.V. Temporarily coupling between jacket and pile
CN106988293B (zh) * 2017-04-27 2018-12-21 中国葛洲坝集团机电建设有限公司 一种升船机主机房钢格构柱施工方法及安装精度控制方法
CN106988293A (zh) * 2017-04-27 2017-07-28 中国葛洲坝集团机电建设有限公司 一种升船机主机房钢格构柱施工方法及安装精度控制方法
CN107470860A (zh) * 2017-07-17 2017-12-15 南通蓝岛海洋工程有限公司 一种海上升压站下部组件的建造工艺
WO2019015260A1 (zh) * 2017-07-17 2019-01-24 南通蓝岛海洋工程有限公司 一种海上升压站下部组件的建造工艺
CN107470860B (zh) * 2017-07-17 2019-05-21 南通蓝岛海洋工程有限公司 一种海上升压站下部组件的建造工艺
CN110241823A (zh) * 2019-05-10 2019-09-17 江苏华西村海洋工程服务有限公司 一种海上桩基施工的调平工艺

Also Published As

Publication number Publication date
CN103556649B (zh) 2015-08-12

Similar Documents

Publication Publication Date Title
EP2628854B1 (en) Jacking system for a leg of a jack-up platform
CA2743656C (en) Tower segments and method for off-shore wind turbines
ES2399603T3 (es) Procesamiento y dispositivo para la creación de un cimiento subacuático de una obra de construcción
US10100482B2 (en) Method of installing an offshore foundation and template for use in installing an offshore foundation
US10322913B2 (en) Device and method for placing a rotor blade of a wind turbine
US10577819B2 (en) Method and apparatus for erecting tower with hydraulic cylinders
CN205346674U (zh) 升降式立柱悬臂吊
CN102556284B (zh) 吸力贯入式弧形板锚及其安装工具和施工方法
EP2585712A1 (en) Lifting device and method for positioning of an unwieldy object
CN102162233B (zh) 一种连续步进式液压升降装置及升降方法
US10161095B2 (en) Device and method for assembling a structure
US20120001431A1 (en) Method and apparatus for energy generation
CN204569220U (zh) 风塔附件装载机
EP2325398A1 (en) A system and method of extending piles into a seabed
CN204799839U (zh) 一种建筑工地钢筋折弯装置
CN102320291B (zh) 电动调平支撑系统
CN202194142U (zh) 抱桩器
CN1696417A (zh) 城市地下工程模拟试验系统
WO2006107649A2 (en) Mobile wind-driven electric generating system and method and apparatus
CN101774511B (zh) 爬升式吊装及其使用方法
CN202249735U (zh) 全套管全回转钻机
CN204435376U (zh) 一种智能桩机设备
CN204205376U (zh) 一种新型纤维增强型检修平台
CN103981847A (zh) 自升式风电安装平台的升降机构
CN201785765U (zh) 用于海上风电机组多桩基础的二次调平结构

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
GR01 Patent grant
C14 Grant of patent or utility model
CP03 Change of name, title or address
CP03 Change of name, title or address

Address after: 528437 Torch Road, Torch Development Zone, Guangdong, Zhongshan, No. 22

Patentee after: Ming Yang wisdom Energy Group AG

Address before: 22 Ming Yang Industrial Zone, Torch Road, torch hi tech Industrial Development Zone, Guangdong, Zhongshan 528400, China

Patentee before: Guangdong Mingyang Wind Power Group Co., Ltd.